Code No: 07A6HS02

R07

Set No. 2

III B.Tech II Semester Examinations,December-January, 2011-2012 INDUSTRIAL MANAGEMENT Common to Mechanical Engineering, Production Engineering, Automobile Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks

1. What is job description? Explain various parts of it. 2. Dene Management. Explain its nature and signicance. 3. (a) Dene attribute. Explain it with example. (b) Explain p chart for attributes. 4. A network consists of following activities with indicated duration in weeks: Activity A B C terminal D E F terminal G H terminal Preceeding Duration 3 A 2 D 4 E 2 A 5 B 1 B 2 E, G 3

[16] [16]

[8+8]

(a) Draw the network diagram. (b) Calculate project duration and identify critical path. 5. Write the dierences between classical theory and neo-classical theory. 6. (a) What is meant by Micromotion study & Memomotion study? (b) Draw Two-handed process chart by taking an example. Explain how is it useful in motion study. [8+8] 7. Explain various stages of purchasing procedure in detail giving the proformas of various forms used in this procedure. [16] 8. Explain various factors to be considered for location of the following industries (a) Process industries (b) Software industry (c) Garment industry. [16] [16] [16]

Code No: 07A6HS02

R07

Set No. 4

III B.Tech II Semester Examinations,December-January, 2011-2012 INDUSTRIAL MANAGEMENT Common to Mechanical Engineering, Production Engineering, Automobile Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks

1. What is meant by direction? Explain the principles of direction and control. [16] 2. List out various techniques for work measurement. What are the purposes of work measurement? [16] 3. Explain various rules for drawing network diagram using a example. 4. (a) Explain the procedure for establishing control limits of x and R charts. (b) The following are the mean lengths and ranges of lengths of a nished product from 10 samples each of size 5. The specication limits for length are 2005cm. Construct and R charts and examine whether the process is under control and state your recommendations. [16] Sample no 1 2 3 4 5 6 7 8 9 10 Mean X Range R 201 198 202 200 5 0 7 3 203 204 199 196 199 201 4 7 2 8 5 6 [16]

5. The following information is about a group of items. Classify the items as A, B and C: [16] Item No. Annual use Price 501 502 503 504 505 506 507 508 509 510 30000 280000 3000 110000 4000 220000 15000 80000 60000 8000 10 15 10 5 5 10 5 5 15 10

6. Explain Emerson and Bedeaux plans of wage incentive schemes and write advantages and limitations of them. [16] 7. Describe the positive and negative location factors for the following: (a) a pizza delivery service (b) a sporting goods store (c) a plan making aluminum cans. [16]

8. (a) What is boundaryless organization? Give its chart, advantages and disadvantages. (b) Explain salient features of inverted pyramid structure. [8+8]

Code No: 07A6HS02

R07

Set No. 1

III B.Tech II Semester Examinations,December-January, 2011-2012 INDUSTRIAL MANAGEMENT Common to Mechanical Engineering, Production Engineering, Automobile Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks

1. Explain Fulkersons rule for numbering the events by taking a example. 2. (a) What is meant by departmentation? Explain its concept. (b) Explain the aims of departmentation. 3. (a) EEnlist the prerequisites of a successful method study.

[16]

[8+8]

(b) Explain one of the steps of method study Critical Examination of the Existing method, in detail with a suitable example. [8+8] 4. Distinguish between: (a) Management and administration (b) Science and art. [8+8]

5. Alpha electronic company manufactures cathode ray tubes on mass production basis. At some intermediate point of production line, 15 samples of size 50 each have been taken. Tubes within each sample were classied into good or bad. The related data are given in the following table. Construct a P-chart with 3sigma limit and comment on the process. [16] Sample No 1 2 3 4 5 6 7 8 Number of defectives 10 10 09 10 4 6 2 3 Sample No 9 10 11 12 13 14 15 Number of defectives 9 4 8 11 8 10 9

6. Compare Andhra Pradesh, Karnataka, Delhi and MP for locating software industry. [16] 7. Explain various steps involved in job evaluation. [16]

8. Inventories are maintained in a typical concern as an inevitable evil -You accept or reject the statement- Justify your answer [16]

Code No: 07A6HS02

R07

Set No. 3

III B.Tech II Semester Examinations,December-January, 2011-2012 INDUSTRIAL MANAGEMENT Common to Mechanical Engineering, Production Engineering, Automobile Engineering Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks

1. Surface roughness measurement are taken for ve samples of turned pieces. On each piece 5 measurements have been taken along the length. These pieces have been selected randomly from a lot of 60. The observations have been shown in the following table. Compute the control limits for X and R charts and draw the observation from these trial control limits: [16] Sample No 1 2 3 4 5 Five 1 10.14 10.16 10.16 10.19 10.14 measurements of samples(x) 2 3 4 5 10.17 10.16 10.18 10.15 10.18 10.15 10.13 10.18 10.15 10.16 10.04 10.18 10.16 10.15 10.13 10.14 10.18 10.10 10.15 10.03

2. (a) Explain the procedure involved in carrying ABC analysis. (b) What are short comings of ABC classication? 3. What are advantages and limitations of merit rating system? 4. Explain various aspects of modern organization theory briey. [8+8] [16] [16]

5. Explain features of various types of Flow process charts with suitable examples. [16] 6. Management is an art of getting things done through and with people. Do you support or not? Justify. [16] 7. A small maintenance project consists of the jobs in the following table. With each job is listed its normal time and a crash time in days. The cost in rupees per day of crashing each job is also given. Activity Normal duration Activity (days) 1-2 9 1-3 8 1-4 15 2-4 5 3-4 10 4-5 2 Crash duration (days) 6 5 10 3 6 1 4 Cost of crashing Rs/ day 20 25 30 10 15 40

Code No: 07A6HS02

R07

Set No. 3
[16]

(a) What is the normal project length? (b) What is the optimum length if the overhead cost is Rs 60/day?

8. What is cellular layout ? How is it dierent from a process layout? What are its advantages & disadvantages. [16]