Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

REPORT OF ACTIVITY
General scope of activity: After construction Surveys-Offshore Installation Dates of all related activity: April 14, 2011

Client: Company name: PTT Exploration & Production Public Company Limited. Address: 555 Vibhavadi Rangsit Rd., Chatuchak, Bangkok 10900 Contact(s): Khun Wutipong W. PO/shop/contract or job no: PR # RB119108 Component description(s): 1. ARTHIT WELLHEAD PLATFORM (AWP 10) Results: Meets requirements Subject to condition(s) noted Does not meet requirements

This is to certify that the undersigned did at the request of PTT Exploration & Production Public Company Limited. attend at Wellhead platform, Arthit field in the gulf of Thailand. On 14th April, 2011 and subsequent date(s) in order to carryout the scope of services described below.

This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 2 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

1.0 SCOPE OF SERVICE ACTIVITY: The scope of activity included the following: 1.1. Document review. 1.2. A visual inspection carried out on all structures above water and the splash zone areas. (Riser pipe, Conductor pipe, Piping and Equipment support are not within the scope of inspection) 1.3. Issuer Report of activity. 2.0 DETAILS:

2.1
2.1.1 DECK LEGS/COLUMNS.

THE PRIMARY STRUCTURE

a). No buckling, fracture observe during inspection. b). Location: Splash zone, leg assign A2 found localized paint damage (rust staining) see Fig.1. c). Platform leveling were establish on lower deck at column A1 to A2 and B1. Fig.2. d). Platform subsidence were establish on columns assign A2, with X mass tree assign A,N and R, see
Fig.3 to Fig.5.

e). Columns vertical deviation monitoring is not practicable. 2.1.2 LOWER DECK TRUSS CHORD (MAIN BEAM). a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. b). the straightness for vertical deflection monitoring on boat landing is not practicable. 2.1.3 UPPER DECK TRUSS CHORD (MAIN BEAM). a). No damage, buckling, fracture and breakdown of protective coating observe during inspection.

This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 3 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

Fig.1-Deck leg A2 at splash zone was corrosion attack (blistering/rust staining) looking west view .

This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 4 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

Column A1

Column A2

Column B1

Fig.2- Platform leveling establish viewed.


This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 5 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

FIG.3- Platform subsidence establish on lower deck columns A1 to X mass tree assign A, (Cold surface)view.

FIG.4- Platform subsidence establish on lower deck columns A1 to X mass tree assign N, (Cold surface)view.

This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 6 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

FIG.4- Platform subsidence establish on lower deck columns A1 to X mass tree assign R, (Cold surface)view.

2.2
2.2.1 MAIN TRUSS BRACING.

THE SECODARY STRUCTURE

a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.2.2 WIND TRUSSES MEMBER. a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.2.3 STIFFENING ELEMENTS. a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.2.4 LOWER DECK FLOORING a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.2.5 UPPER DECK FLOORING a). No fracture observe during inspection. b). Randomly localized paint damage (scratch).See Fig.5. 2.2.6 LOWER DECK FRAME AND STIFFENING ELEMENTS. a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.2.7 UPPER DECK FRAME AND STIFFENING ELEMENTS. a). No damage, buckling, fracture and breakdown of protective coating observe during inspection.
This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 7 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

FIG.5- Upper deck flooring, looking east viewed.

2.3
2.3.1 HAND RAIL.

THE TERTIARY STRUCTURE

a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.3.2 STAIRS. a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.3.3 LADDER. a). No damage, buckling, fracture and breakdown of protective coating observe during inspection. 2.3.4 GRATING. a No damage, buckling, fracture and breakdown of protective coating observe during inspection.

2.4
2.4.1 BOAT LANDINGS.

THE APPURTENACES

a). Location: Fender Columns, during a visual inspection, found that fender columns were damages by services boat and localized corrosion attack (buckling/rust), see Fig.6. b). Location: Upper clamp (north/south side), found severe corroded and rust staining of bolts and nuts, see Fig.7.

This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 8 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

FIG.6- Boat landing layout, looking east viewed.

FIG.7- Upper clamp support (north/south side) bolts & nuts corroded view.

This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.

PAGE 9 OF 9
Report no. 11-0893-THL Project no. 2304734 Report date: April 14, 2011 Office: THAILAND

2.4.2

BARGE BUMPERS. None. BRIDGES CONNECTING PLATFORM. None

2.4.3

2.4.4

JACKET ACCESS WALK WAY. None

3.0 CONCLUSION:

3.1
3.1.1 3.1.2

RECOMMENDATION

Platform leveling monitoring on lower deck were establish. Keep monitoring for the next campaign. Platform subsidence monitoring on columns assign A1, A2 and B1 with X mass tree assign A, N and R, Were establish, keep monitoring for the next campaign.

4.0 Attachments: N/A

Report prepared and submitted without prejudice.

Digitally signed by chutchai DN: cn=chutchai, o=ABSG Consulting inc, ou, email=cphromngam@eagle.org, c=TH Date: 2011.04.17 11:01:55 +07'00'
Chutchai Phromngam Authorized Inspector

This Report is granted subject to the condition that it is understood and agreed that nothing herein contained shall be deemed to relieve any designer, manufacturer, seller, supplier, repairer or operator of any warranty, express or implied and the liability of ABSG Consulting Inc. (hereinafter referred to as ABS Consulting) shall be limited to the acts or omissions of its employees, agents or subcontractors. Under no circumstances whatsoever shall ABS Consulting be liable for any injury or damage to any person or property occurring by reason of negligent operation or any defect in materials, machinery, equipment or other items other than such defects ascertainable by normally accepted testing standards and only upon those items actually inspected by ABS Consulting and which are covered by this Report.