Earthwork Drainage Work Retaining Wall: Rubble Wall Construction and RC Concreting Wall Foundation Works: Raft Foundation and Piling Works: RC Piles Injection, Piles Hammering Method, Micro Piling, Bore Piling, RC Concreting Works: Sub Structure & Super Structure Roof Trusses: Timber and Steel System Road Works: Sub-grade & Road Base Pavement Works: Binder Course & Wearing Course Road Kerbs: Precast Kerb, Extruder Kerb Road Furniture Installation and Road Marking Water Reticulation Sewerage Steel Structure: Fabrication and Erection.
Civil & Structural Architecture Product Brochure CWM Kit Product Summary
Scope of Works
Earthwork (Road or Highway Construction) Outline Construction methodology for Earthwork for Road works or Highway Construction involved traffic diversion, M&E services relocation and Temporary works
Product Code
Trades
Civil & Structure
Descriptions / Details
Earthworks (Road or Highway Construction) consist of the following items; Survey and Setting Out Preparation To Start Work Protection and Preventive Actions Dewatering System and Silt Traps Method of working in Cutting Section Method of working in Filling Section Work
CWM
EW-01
Scope of Works
Earthwork (General Building Construction) Earthwork in open land where no M&E underground services and no public traffic in the working area and no traffic diversion required.
Trades
Civil & Structure
Descriptions / Details
Earthworks (General Building Construction) consist of the following items; Survey and Setting Out Preparation To Start Work Protection and Preventive Actions Dewatering System and Silt Traps Method of working in Cutting Section Method of working in Filling Section Work
CWM
EW-02
Product Code
Trades
Civil & Structure
Descriptions / Details
Sub Structure Works (Pile Cap) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation Prior to Start Concreting Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Pile Cap Excavation Pile Cutting to the Required Level Fix and Install Formwork and Accessories Fixing Formwork Supports Installation M&E Underground Services Pile Cap: Fixing Reinforcement Bar Pile Cap: Placement of Concrete Striking Formwork Setting Out (Horizontal & Vertical)
CWM
SB-01
Product Code
Trades
Civil & Structure
Descriptions / Details
Sub Structure Woks (Raft Foundation) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation Prior to Start Concreting Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Base Excavation & Compaction Fixing and Installation of M&E Underground Services Fixing and Installation Formwork and Formwork Supports Raft Foundation: Fixing Reinforcement Bar Raft Foundation: Placement of Concrete Striking Formwork
CWM
SB-02
Product Code
Trades
Civil & Structure
Descriptions / Details
Sub Structure Works (Pile Cap) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation Prior to Start Concreting Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Pile Cap Excavation Pile Cutting to the Required Level Fix and Install Formwork and Accessories Fixing Formwork Supports Installation M&E Underground Services Pile Cap: Fixing Reinforcement Bar Pile Cap: Placement of Concrete Striking Formwork Setting Out (Horizontal & Vertical)
CWM
ST-01
Product Code
Trades
Civil & Structure
Descriptions / Details
Sub Structure Works (Pile Cap) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation to Start Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Preparation and Casting (Base and Wall) include fixing reinforcement bar, formwork, support and all accessories Casting Retaining Wall Base and Wall Application of Curing Compound and Striking Formwork Retaining Wall: Backfilling & Compaction Design Mix submission & Plant Trial Mix requirements.
CWM
ST-02
Product Code
Trades
Civil & Structure
Descriptions / Details
Steel Structure Works consist of the following items; A Fabrication Material Delivery Inspection Marking and Cutting Inspection Fit Up/ Fit Up Inspection Welding Process / Welding Inspection Final Dimension Check B Steel Surface Preparation & Finishing this part not mentioned in this work methodology. Finishing subject to structure specification painting or galvanize finishes. C On-site Erection Preparation Prior Erection Final Inspection (Post Erection Inspection)
CWM
ST-01
Product Code
Trades
Civil & Structure
Descriptions / Details
Roof Truss Installation (Pre Fabricated Timber Roof Trusses) consist of the following items; Design Calculation and Shop Drawing Submission. Preparation for Timber Truss Installation Timber Truss Installation Installation of Sisallation Foil/ Insulation Foil Fixing and Installation Timber Batten
CWM
RFT-01
Scope of Works
Rubble Wall Construction start from base excavation, solid stone material selection, stone laying, backfilling and compaction.
** Rubble wall face with normal joint finished
Product Code
Trades
Civil & Structure
Descriptions / Details
Rubble wall construction consist of the following items Survey and Setting Out Base: Trenches Excavation Base: Pre and Post Concreting (Base) Laying Solid Rock/ Stone Backfilling & Compaction Floor Screed Application
CWM
RW-01
Product Code
Trades
Civil & Structure
Descriptions / Details
The drainage work consist of the following items; Survey and Setting Out Trenches Excavation and Base Compaction Drainage: Installation, Laying and Construction Backfilling & Compaction Drain Type Available: Brick wall drain with or without HRGW Laying Pre-cast U drain Cast In-situ drain or drain sump Laying RCP Pipe
CWM
DR-01
Product Code
Trades
Civil & Structure
Descriptions / Details
The drainage work consist of the following items; General Requirements: Underground Pipe Works Dewatering Trenches Excavation & Base Preparation before Pipe Laying MSCL Pipe Laying and Jointing Trenches Backfilling and Compaction Construction of the Concrete Trust Block Testing and Commissioning
CWM
WT-01
Product Code
Trades
Civil & Structure
Descriptions / Details
The sewerage work consist of the following items; General Requirements: Underground Pipe Works Sewerage Manhole Installations Dewatering Trenches Excavation & Base Preparation before Pipe Laying. Vitrified Clay Pipe Laying and Jointing Trenches Backfilling and Compaction Testing and Commissioning
CWM
WT-01
Product Code
Trades
Civil & Structure
Descriptions / Details
The piling works (Hydraulic Hammer Method) consist of the following items; Survey Setting Out Pile Driving and Pile Jointing Piling Records Pile Cutting As-built (Actual Piles Position) Prepared by Surveyor
CWM
PL-01
Product Code
Trades
Civil & Structure
Descriptions / Details
The Piling works (Injection Method) consist of the following items; Survey Setting Out Pile Driving and Pile Jointing Piling Records Pile Cutting As-built (Actual Piles Position) Prepared by Surveyor
CWM
PL-02
Pavement Works:
Road Kerbs: Extruder Kerb or Precast Road Furniture Installation Road Marking