Our Products
Earthwork Drainage Work Retaining Wall: Rubble Wall Construction and RC Concreting Wall Foundation Works: Raft Foundation and Piling Works: RC Piles Injection, Piles Hammering Method, Micro Piling, Bore Piling, RC Concreting Works: Sub Structure & Super Structure Roof Trusses: Timber and Steel System Road Works: Sub-grade & Road Base Pavement Works: Binder Course & Wearing Course Road Kerbs: Precast Kerb, Extruder Kerb Road Furniture Installation and Road Marking Water Reticulation Sewerage Steel Structure: Fabrication and Erection.

Civil & Structural Architecture Product Brochure CWM Kit Product Summary
Scope of Works
Earthwork (Road or Highway Construction) Outline Construction methodology for Earthwork for Road works or Highway Construction involved traffic diversion, M&E services relocation and Temporary works

Product Code

Trades
Civil & Structure

Descriptions / Details
Earthworks (Road or Highway Construction) consist of the following items; Survey and Setting Out Preparation To Start Work Protection and Preventive Actions Dewatering System and Silt Traps Method of working in Cutting Section Method of working in Filling Section Work

CWM
EW-01

Scope of Works
Earthwork (General Building Construction) Earthwork in open land where no M&E underground services and no public traffic in the working area and no traffic diversion required.

Trades
Civil & Structure

Descriptions / Details
Earthworks (General Building Construction) consist of the following items; Survey and Setting Out Preparation To Start Work Protection and Preventive Actions Dewatering System and Silt Traps Method of working in Cutting Section Method of working in Filling Section Work

CWM
EW-02

Civil & Structural Product Brochure


Scope of Works
Sub Structure Works (Pile Cap) Outline building foundation works start from pile cutting until complete the RC works for pile cap casting.

Product Code

Trades
Civil & Structure

Descriptions / Details
Sub Structure Works (Pile Cap) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation Prior to Start Concreting Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Pile Cap Excavation Pile Cutting to the Required Level Fix and Install Formwork and Accessories Fixing Formwork Supports Installation M&E Underground Services Pile Cap: Fixing Reinforcement Bar Pile Cap: Placement of Concrete Striking Formwork Setting Out (Horizontal & Vertical)

CWM
SB-01

Civil & Structural Product Brochure


Scope of Works
Sub Structure Works (Raft Foundation) Outline foundation works (Raft Foundation) construction methodology from base excavation until completion RC concreting work. Suitable for Low Residential Project.

Product Code

Trades
Civil & Structure

Descriptions / Details
Sub Structure Woks (Raft Foundation) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation Prior to Start Concreting Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Base Excavation & Compaction Fixing and Installation of M&E Underground Services Fixing and Installation Formwork and Formwork Supports Raft Foundation: Fixing Reinforcement Bar Raft Foundation: Placement of Concrete Striking Formwork

CWM
SB-02

Civil & Structural Product Brochure


Scope of Works
Super Structure Works ( RC Works) Outline building structural construction works start from getting approval concrete ready mix plant supplier, rebar cutting, formwork fixing until completion of the concreting work.

Product Code

Trades
Civil & Structure

Descriptions / Details
Sub Structure Works (Pile Cap) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation Prior to Start Concreting Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Pile Cap Excavation Pile Cutting to the Required Level Fix and Install Formwork and Accessories Fixing Formwork Supports Installation M&E Underground Services Pile Cap: Fixing Reinforcement Bar Pile Cap: Placement of Concrete Striking Formwork Setting Out (Horizontal & Vertical)

CWM
ST-01

Civil & Structural Product Summary


Scope of Works
RC Retaining Wall Construction Outline common type of RC Retaining Wall construction methodology start from rebar bending and cutting, formwork fixing, concreting process until RC wall backfilling completed.

Product Code

Trades
Civil & Structure

Descriptions / Details
Sub Structure Works (Pile Cap) consist of the following items; Design Mix submission & Plant Trial Mix requirements. Preparation to Start Works (Bar Bending Works and Carpentry Works) Survey Setting Out (Position, Level, Alignment) Preparation and Casting (Base and Wall) include fixing reinforcement bar, formwork, support and all accessories Casting Retaining Wall Base and Wall Application of Curing Compound and Striking Formwork Retaining Wall: Backfilling & Compaction Design Mix submission & Plant Trial Mix requirements.

CWM
ST-02

Civil & Structural Product Brochure


Scope of Works
Steel Structure (Fabrication & Erection) Outline steel structure works from material receiving, marking and cutting, fit up and welding until completion steel structure erection.

Product Code

Trades
Civil & Structure

Descriptions / Details
Steel Structure Works consist of the following items; A Fabrication Material Delivery Inspection Marking and Cutting Inspection Fit Up/ Fit Up Inspection Welding Process / Welding Inspection Final Dimension Check B Steel Surface Preparation & Finishing this part not mentioned in this work methodology. Finishing subject to structure specification painting or galvanize finishes. C On-site Erection Preparation Prior Erection Final Inspection (Post Erection Inspection)

CWM
ST-01

Civil & Structure Product Brochure


Scope of Works
Roof Truss Installation
(Prefabricated Timber Roof Truss) Timber Trusses commonly used for standard typical housing construction.

Product Code

Trades
Civil & Structure

Descriptions / Details
Roof Truss Installation (Pre Fabricated Timber Roof Trusses) consist of the following items; Design Calculation and Shop Drawing Submission. Preparation for Timber Truss Installation Timber Truss Installation Installation of Sisallation Foil/ Insulation Foil Fixing and Installation Timber Batten

CWM
RFT-01

Scope of Works
Rubble Wall Construction start from base excavation, solid stone material selection, stone laying, backfilling and compaction.
** Rubble wall face with normal joint finished

Product Code

Trades
Civil & Structure

Descriptions / Details
Rubble wall construction consist of the following items Survey and Setting Out Base: Trenches Excavation Base: Pre and Post Concreting (Base) Laying Solid Rock/ Stone Backfilling & Compaction Floor Screed Application

CWM
RW-01

Civil & Structural Product Brochure


Scope of Works
Drainage Works Outline the drainage works start from material receiving, survey setting out, trenches excavation, drainage installation until backfilling and compacting the filling earth.

Product Code

Trades
Civil & Structure

Descriptions / Details
The drainage work consist of the following items; Survey and Setting Out Trenches Excavation and Base Compaction Drainage: Installation, Laying and Construction Backfilling & Compaction Drain Type Available: Brick wall drain with or without HRGW Laying Pre-cast U drain Cast In-situ drain or drain sump Laying RCP Pipe

CWM
DR-01

Civil & Structural Product Brochure


Scope of Works
Water Reticulation Works (MSCL Pipes) Outline for common residential and medium size commercial buildings. Methodology start from trench excavation, pipe laying (Mild Steel), pipe jointing (welding) until completion final testing and commissioning.

Product Code

Trades
Civil & Structure

Descriptions / Details
The drainage work consist of the following items; General Requirements: Underground Pipe Works Dewatering Trenches Excavation & Base Preparation before Pipe Laying MSCL Pipe Laying and Jointing Trenches Backfilling and Compaction Construction of the Concrete Trust Block Testing and Commissioning

CWM
WT-01

Civil & Structural Product Brochure


Scope of Works
Sewerage Works (VCP Pipes) Outline for common residential and medium size commercial buildings. Methodology start from trench excavation, pipe laying (VCP), pipe jointing (Socket) until completion of the final testing and commissioning.

Product Code

Trades
Civil & Structure

Descriptions / Details
The sewerage work consist of the following items; General Requirements: Underground Pipe Works Sewerage Manhole Installations Dewatering Trenches Excavation & Base Preparation before Pipe Laying. Vitrified Clay Pipe Laying and Jointing Trenches Backfilling and Compaction Testing and Commissioning

CWM
WT-01

Civil & Structural Product Brochure


Scope of Works
Piling Works (Hydraulic Hammer Method) Outline for common residential and medium size commercial buildings. Methodology start from setting out until excess pile cutting and as-built drawing submission for consultant review.

Product Code

Trades
Civil & Structure

Descriptions / Details
The piling works (Hydraulic Hammer Method) consist of the following items; Survey Setting Out Pile Driving and Pile Jointing Piling Records Pile Cutting As-built (Actual Piles Position) Prepared by Surveyor

CWM
PL-01

Civil & Structural Product Brochure


Scope of Works
Piling Works (Injection Method) Outline for common residential and medium size commercial buildings. Methodology start from setting out until excess pile cutting and as-built drawing submission for consultant review.

Product Code

Trades
Civil & Structure

Descriptions / Details
The Piling works (Injection Method) consist of the following items; Survey Setting Out Pile Driving and Pile Jointing Piling Records Pile Cutting As-built (Actual Piles Position) Prepared by Surveyor

CWM
PL-02

Civil & Structure Product Brochure

Piling Works: Bore Piling, Micro Pile Road Works:


Sub-grade & Road Base Binder & Wearing Course

Pavement Works:

Road Kerbs: Extruder Kerb or Precast Road Furniture Installation Road Marking

Você também pode gostar