Check Parameter
Acceptance Standard
Frequency
Acceptance Criteria
Earth Work in Embankment & Subgrade Liquid Limit MORT&H Specifications for Roads & bridges Section-305/ClauseIS: 2720 (Part 305.2 5)1985 Section-900/Clause903.2 70 % Maximum
Plasticity index
1) At the beginning for approval of each source and change of source 2) 2 Tests per 3000 m3
45 % Maximum
OMC and Maximum Dry Density for Emb. up to 3m MORT&H Specifications for Roads & bridges OMC and Maximum Section-305/ClauseIS: 2720 (Part Dry Density for Emb. 305.2 8)1983 more than 3m Section-900/ClauseOMC and Maximum 903.2 Dry Density for Subgrade & Earthen Shoulders
1.52 g/cc Minimum 1) At the beginning for approval of each source and change of source 2) 2 Tests per 3000 m3
Check Parameter California Bearing Ratio for Embankment (Soil obtained from the excavated portion of the roadway) California Bearing Ratio for Embankment (Soil obtained from the borrow area) California Bearing Ratio for Subgrade (Soil obtained from the excavated portion of the roadway)
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
1) At the beginning for approval of each source and change of source 2) 1 Tests per 3000 m3
MORT&H Specifications IS: 2720 (Part 16)1979 for Roads & bridges Section-305/Clause305.2 Section-900/Clause903.2 & Contract IS: 2720 (Part Specifications 16)1979
1) At the beginning for approval of each source and change of source 2) 1 Tests per 3000 m3
1) At the beginning for approval of each source and change of source 2) 1 Tests per 3000 m3
for Roads & bridges Section-305/Clause305.2 Section-900/Clause903.2 & Contract Specifications Check Parameter California Bearing Ratio for Subgrade (Soil obtained from the borrow area) Acceptance Standard Performance Standard Frequency Acceptance Criteria
IS: 2720 (Part 16)1979 MORT&H Specifications for Roads & bridges IS: 2720 (Part Section-305/Clause4)1985 305.2 Section-900/Clause903.2 MORT&H Specifications for Roads & bridges IS: 2720 (Part Section-305/Clause27)1977 305.2
1) At the beginning for approval of each source and change of source 2) 1 Tests per 3000 m3
1) At the beginning for approval of each source and change of source 2) 2 Tests per 3000 m3
The size of coarse material should not exceed 75mm in embankment and 50mm in subgrade
No of samples0.5
Deleterious Constituents
1. Material should be free from swamps marshes and bogs 2. Any soil that comes under classification of OL,OI and OH is treated as unsuitable
Field Tests Moisture Content Prior to Compaction Field Dry Density of Embankment Layers up to 6m height IS: 2720 (Part 2)1973 MORT&H Specifications for Roads & bridges Section-900/Clause903.2 & Contract IS: 2720 (Part Specifications 28)1974
-2, +1 of OMC
95 % Minimum
Check Parameter Field Dry Density of Embankment Layers more than 6m height Field Dry Density of Sub grade layers
MORT&H Specifications Performance for Roads & bridges Acceptance Standard Standard Section-900/Clause903.2 & Contract IS: 2720 (Part Specifications 28)1974
Frequency
Acceptance Criteria
97 % Minimum
1) 1 Test per 500 m2 MORT&H Specifications for Roads & bridges Section-900/Clause903.2
97 % Minimum
0.5
Acceptance Criteria
Acceptance Standard
Performance Standard
Frequency
No of samples0.5
Acceptance Criteria
Sieve Analysis
MORT&H Specifications for Roads & bridges Section-400/Clause-401 & IS: 2386 (Part Section-900/Clause1a)1963 903.3/ Table 900-3 & Contract Specifications MORT&H Specifications for Roads & bridges Section-400/Clause-401 IS: 2720 (Part & 5)1985 Section-900/Clause903.3/ Table 900-3 MORT&H Specifications for Roads & bridges IS: 2720 (Part Section-400/Clause-401 16)1979 &
Table 400-2 (Grading 1) IS Sieve (mm) 1) At the beginning for approval of each source and change of source 2) 1 Test per 200 m3 75 26.50 4.75 0.075 25 % Maximum % Passing by weight 100 55-75 10.-30 0-10
Liquid Limit
1) At the beginning for approval of each source and change of source 2) 1 Test per 200 m3
Plasticity index
6 % Maximum
30 % Minimum
Field Tests
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications IS: 2720 (Part for Roads & bridges 2)1973 Section-900/Clause903.3/ IS: 2720 (Part Table 900-3 28)1974 MORT&H Specifications for Roads & bridges Section-900/Clause903.3
-2, +1 of OMC
98 % Minimum
Mean Density should not less than the Acceptance Criteria ........1.65 Specified density + [ 1.65 - ----------------------] X SD
No of samples0.5
Acceptance Standard
Performance Standard
Frequency
No of samples0.5
Acceptance Criteria
IS Sieve (mm) MORT&H Specifications for Roads & bridges Section-400/Clause-401 & Table 400-11 IS: 2386 (Part Section-900/Clause1a)1963 903.3/ Table 900-3 & Contract Specifications 53 45 1) At the beginning for approval of each source and change of source 2) 1 Test per 100 m3 22.4 11.2 4.75 2.36 0.600 0.075 MORT&H Specifications for Roads & bridges Section-400/Clause-401 Los Angeles abrasion IS: 2386 (Part & value 4)1963 Section-900/Clause903.3/ Table 900-3 MORT&H Specifications for Roads & bridges Section-400/Clause-401 IS: 2386 (Part & 4)1963 Section-900/Clause903.3/ Table 900-3
% Passing by weight 100 95-100 60-80 40-60 25-40 15-30 8.-22 0-8
Sieve Analysis
40 % Maximum
1) At the beginning for approval of each source and change of source 2) 1 Test per 200 m3
30 % Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications for Roads & bridges Section-400/Clause-401 IS: 2386 (Part & 1)1963 Section-900/Clause903.3/ Table 900-3
1) At the beginning for approval of each source and change of source 2) 1 Test per 200 m3
30 % Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications for Roads & bridges Section-400/Clause-401 IS: 2386 (Part & 1)1963 Section-900/Clause903.3/ Table 900-3
Plasticity Index
MORT&H Specifications for Roads & bridges IS: 2720 (Part Section-400/Clause-401 5)1985 &
1) At the beginning for approval of each source and change of source 2) 1 Test per 100 m3
6 % Maximum
Field Tests
MORT&H Specifications IS: 2720 (Part for Roads & bridges 28)1974 Section-900/Clause-
98 % Minimum
Mean Density should not less than the MORT&H Specifications for Roads & bridges Section-900/Clause903.3 ........1.65
Acceptance Criteria
Performance Standard
Frequency
Acceptance Criteria
.. No of samples0.5 Asphalt Works Prime Coat IS: 8887 MORT&H Specifications for Roads & bridges Section-500/Clause-502 IS: 1206 -1978 & Section-900/ Table900-4 & Contract Specifications
1) At the beginning for approval of each source and change of source 2) 2 Tests per Lot
Field Tests
1) 1 Test per 500m2 and not less than 2 Tests per day
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Tack Coat
Check Parameter
Acceptance Standard
Performance Standard
Frequency 1) At the beginning for approval of each source and change of source 2) 2 Tests per Lot
Acceptance Criteria
IS: 8887 MORT&H Specifications for Roads & bridges IS: 1206 -1978 Section-500/Clause-503 & Section-900/Table-900-
Field Tests 3to3.50kg/10m2 over concrete surface Rate of Spread of Binder MORT&H Specifications for Roads & bridges Section-900/Table-900-4 1) 1 Test per 500m2 and not less than 2 Tests per day 2.50to3kg/10m2 over granular surface treated with primer 2to2.50kg/10m2 over bituminous surface Aggregates MORT&H Specifications for Roads & bridges Section-500/Clause-507/ IS: 2386 (Part Table-500.8 & Table1a)1963 500.17 Section 900/Table 900-4
Cleanliness (Dust)
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications for Roads & bridges Los Angeles abrasion Section-500/Clause-507/ IS: 2386 value Table-500.8 & Table(Part4)1963 500.17 Section 900/Table 900-4 MORT&H Specifications for Roads & bridges Section-500/Clause-507/ IS: 2386 Table-500.8 & Table(Part4)1963 500.17 Section 900/Table 900-4 MORT&H Specifications for Roads & bridges Section-500/Clause-507/ IS: 2386 (Part Table-500.8 & Table1)1963 500.17 Section 900/Table 900-4
1) At the beginning for approval of each source and change of source 2) 1 Test per 50 m3
1) At the beginning for approval of each source and change of source 2) 1 Test per 50 m3
1) At the beginning for approval of each source and change of source 2) 1 Test per 50 m3
30 % Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Soundness
MORT&H Specifications for Roads & bridges Section-500/Clause-507/ IS: 2386 (Part Table-500.8 & Table5)1963 500.17 Section 900/Table 900-4 MORT&H Specifications for Roads & bridges Section-500/Clause-507/ IS: 2386 (Part Table-500.8 & Table3)1963 500.17 Section 900/Table 900-4
For DBM - 2 % Maximum for water absorption For BC - 2 % Maximum for water absorption
MORT&H Specifications for Roads & bridges Section-500/Clause-507/ BIS: 812 (Part Stone Polishing Value Table-500.8 & Table114) 500.17 Section 900/Table 900-4 MORT&H Specifications for Roads & bridges IS: 2720 (Part Section-500/Clause37)1976 507.2.3
For BC - 55 % Minimum
50 Minimum
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Penetration
MORT&H Specifications for Roads & bridges Section-500/ IS: 1203-1978 Clause-507.2.1 & IS: 73 MORT&H Specifications for Roads & bridges Section-500/ IS: 1208-1978 Clause-507.2.1 & IS: 73 MORT&H Specifications for Roads & bridges Section-500/ IS: 1205-1978 Clause-507.2.1 & IS: 73 MORT&H Specifications for Roads & bridges Section-500/ IS: 1202-1978 Clause-507.2.1 & IS: 73 MORT&H Specifications for Roads & bridges Section-500/ IS: 1209-1978 Clause-507.2.1 & IS: 73
1) At the beginning for approval of each source and change of source 2) Two tests per lot
60-70
Ductility
1) At the beginning for approval of each source and change of source 2) Two tests per lot
75 Cms Minimum
Softening Point
1) At the beginning for approval of each source and change of source 2) Two tests per lot
40-550C Minimum
Specific Gravity
1) At the beginning for approval of each source and change of source 2) Two tests per lot
0.99 Minimum
Flash point
1) At the beginning for approval of each source and change of source 2) Two tests per lot
1750C Minimum
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Polymer Modified Bitumen (PMB-70) 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot
Penetration
IRC SP: 53
IS: 1203-1978
50-90
Ductility
IRC SP: 53
IS: 1208-1978
60 Minimum
IRC SP: 53
IS: 1205-1978
55 Minimum
IRC SP: 53
IS: 1206-1978
2-6
IRC SP: 53
220 Minimum
Seperation Test
IRC SP: 53
3 Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Crumb Rubber Modified Bitumen (CRMB-55) Penetration Elastic recovery Softening Point Seperation Test Flash point IRC SP: 53 IRC SP: 53 IRC SP: 53 IRC SP: 53 IRC SP: 53 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 1) At the beginning for approval of each source and change of source 2) Two tests per lot 60 Maximum 50 Minimum 55 Minimum 4 Maximum 220 Minimum
IS: 1203-1978 IRC SP: 53 Appendix-1 IS: 1205-1978 IRC SP: 53 Appendix-2 IS: 1209-1978
Dense Bituminous Macadam Nominal Aggregate Size 40mm Grading-1 Layer thickness 80-100mm IS Sieve (mm)
No of samples0.5
45.00 37.50
Sieve Analysis
MORT&H Specifications for Roads & bridges Section-500/Clause-507 & Table 500-10
1) At the beginning for approval 2) One set for each 400 tons of mix subject to a minimum of 2 tests per plant per day
Acceptance Standard MORT&H Specifications for Roads & bridges Section-500/Clause-507 & Table 500-10
Frequency 1) At the beginning for approval 2) One set for each 400 tons of mix subject to a minimum of 2 tests per plant per day
Acceptance Criteria 26.50 13.20 4.75 2.36 0.300 0.075 63-93 55-75 38-54 28-42 7.-21 2.-8
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Modified Marshall Method Marshall Stability 20.25KN Minimum Flow Air Voids Voids in mineral aggregate Voids filled with Bitumen Extraction and Sieve Analysis MORT&H Specifications ASTM D for Roads & bridges 2726/1188 Section-500/Clause-507 & Table 500-11 3 -6mm 1) At the beginning for approval 2) One set for each 400 tons of mix 3%-6% subject to a minimum of 2 tests per plant per day 11% Minimum 65 % - 75 % IRC: SP 111988(APP-5) MORT&H Specifications for Roads & bridges Section-500/Clause-507/ IS: 6241-1971 Table-500.8 & Table500.17 Section 900/Table 900-4 + 0.30% of OBC
Stripping Value
% Passing by weight
Sieve Analysis
MORT&H Specifications for Roads & bridges Section-500/Clause-507 & Table 500-10
1) At the beginning for approval 2) One set for each 400 tons of mix subject to a minimum of 2 tests per plant per day
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria 37.50 100 90-100 71-95 56-80 38-54 28-42 7.-21 2.-8
Sieve Analysis
MORT&H Specifications for Roads & bridges Section-500/Clause-507 & Table 500-10
1) At the beginning for approval 2) One set for each 400 tons of mix subject to a minimum of 2 tests per plant per day
Grading -2 Marshall Method Marshall Stability 9KN Minimum Flow Air Voids Voids in mineral aggregate Voids filled with Bitumen Extraction and Sieve Analysis MORT&H Specifications ASTM D for Roads & bridges 2726/1188 Section-500/Clause-507 & Table 500-11 2-4mm 1) At the beginning for approval 2) One set for each 400 tons of mix 3%-6% subject to a minimum of 2 tests per plant per day 12% Minimum 65 % - 75 % IRC: SP 111988(APP-5) + 0.30% of OBC
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Stripping Value
MORT&H Specifications for Roads & bridges Section-500/Clause-507/ IS: 6241-1971 Table-500.8 & Table500.17 Section 900/Table 900-4
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications Control of mix temp. for Roads & bridges at the time of Laying Section-500/Clause-507 Section-900/Clause-903 Field Density of Asphalt layers MORT&H Specifications for Roads & bridges AASHTO: DT Section-500/Clause-507 230-68 (1974) Section-900/Clause-903 MORT&H Specifications for Roads & bridges Section-900/Clause903.4
125-1450C
98 % Minimum
Acceptance Criteria
Mean Density should not less than the ........1.65 Specified density + [ 1.65 - --------------------------------] X SD
No Nosamples0.5 0.5 .. of of samples
Bituminous Concrete Nominal Aggregate Size 19mm Grading-1 IS Sieve (mm) % Passing by weight 26.50 100 19.00 79-100 13.20 59-79 9.50 52-72 4.75 35-55 2.36 28-44 1.18 20-34
Sieve analysis
MORT&H Specifications for Roads & bridges IS: 2386 (Part Section-500/Clause1a)1963 509/Table 500-18
1) At the beginning for approval 2) One set for each 400 tons of mix subject to a minimum of 2 tests per plant per day
MORT&H Specifications for Roads & bridges IS: 2386 (Part Section-500/Clause1a)1963 509/Table 500-18 Performance Acceptance Standard Standard
1) At the beginning for approval 2) One set for each 400 tons of mix subject to a minimum of 2 tests per plant per day Frequency
Acceptance Criteria 0.600 0.300 0.150 0.075 15-27 10-20 5-13 2-8
Marshall Stability Flow Air Voids Marshall Quotient (Stability / Flow) Retained Stability after 24 hours in water at 600C Extraction and Sieve Analysis Coating with aggregates IRC SP: 53 ASTM D 2726/1188
1200 Kgs Minimum 2.5 mm - 4 mm 3%-5% 1) At the beginning for approval 2) One set for each 400 tons of mix subject to a minimum of 2 tests per 250-500 Kg/mm plant per day 90% Minimum
IRC SP: 53
ASTM D 1075 IRC: SP 111988(APP-5) AASHTO T 182 1) At the beginning for approval of each source and change of source
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications for Roads & bridges Control of mix temp. Section-500/Clause-509 at the time of Laying Section 900/Clause 903.4/ Table 900-4 MORT&H Specifications for Roads & bridges Section-500/Clause-509 AASHTO: DT Section 900/Clause 230-68 903.4/ Table 900-4
125-1450C
98 % Minimum
Mean Density should not less than the MORT&H Specifications for Roads & bridges Section-900/Clause903.4 ........1.65 Specified density + [ 1.65 - --------------------------------] X SD
No of samples0.5
Acceptance Criteria
.. No of samples0.5 Cement
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Chlorides(as cl)
MORT&H Specifications for Roads & bridges IS: 8112-1989 Section-1000/Clause1006 MORT&H Specifications for Roads & bridges IS: 8112-1989 Section-1000/Clause1006 MORT&H Specifications for Roads & bridges IS: 8112-1989 Section-1000/Clause1006
0.05 % Maximum
0.66 Minimum
Magnesium (MgO)
6.0 % Maximum
MORT&H Specifications Sulphuric Anhydrade for Roads & bridges IS: 8112-1989 (% by mass) Section-1000/Clause1006 MORT&H Specifications for Roads & bridges IS: 8112-1989 Section-1000/Clause1006
3.0 % Maximum
Loss on Ignition
5.0 % Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Insoluble Residue
3.0 % Maximum
MORT&H Specifications for Roads & bridges Lime saturation factor IS: 8112-1989 Section-1000/Clause1006 Physical Tests MORT&H Specifications for Roads & bridges Standard Consistency Section-1000/Clause1006 MORT&H Specifications for Roads & bridges Initial Setting Time Section-1000/Clause1006 MORT&H Specifications for Roads & bridges Final Setting Time Section-1000/Clause1006
0.66 - 1.02
1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes
Not Specified
30 minutes Minimum
Check Parameter
Acceptance Standard
Frequency 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes 1) At the beginning for approval of each source and change of source 2) One test per lot subject to a maximum of 500Tonnes
Acceptance Criteria
MORT&H Specifications Compressive Strength for Roads & bridges i) At 3 days Section-1000/Clause1006 MORT&H Specifications for Roads & bridges ii) At 7 days Section-1000/Clause1006 MORT&H Specifications for Roads & bridges iii) At 28 days Section-1000/Clause1006 MORT&H Specifications for Roads & bridges Specific Gravity Section-1000/Clause1006
3.15 Minimum
Fineness of Cement
MORT&H Specifications for Roads & bridges IS: 4031(Part Section-1000/Clause1)1988 1006
10 % Maximum
MORT&H Specifications Soundness for Roads & bridges IS: 4031(Part (Le-Chatlier method) Section-1000/Clause3)1988 1006
10 mm Maximum
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
20mm nominal size IS Sieve (mm) 1) At the beginning for approval of each source and change of source 2) Once test for every days work of each fraction of coarse aggregate 40 20 4.75 0.600 0.150 MORT&H Specifications for Roads & bridges IS: 2386 (Part Section-1000/Clause1)1963 1007 % Passing by weight 100 95-100 30-50 10-35 0-6
IS: 383-1970
Flakiness Index
1) At the beginning for approval of each source and change of source 2) Once in a month
35 % Maximum
Deleterious Materials Coal& Ignite MORT&H Specifications for Roads & bridges IS: 2386 (Part Deleterious Materials Section-1000/Clause2)1963 1007
Check Parameter
Acceptance Standard
Performance Standard
Frequency
MORT&H Specifications for Roads & bridges IS: 2386 (Part Deleterious Materials Section-1000/Clause2)1963 1007
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications for Roads & bridges IS: 2386 (Part Section-1000/Clause3)1963 1007 MORT&H Specifications for Roads & bridges 80 Section-1000/Clause1007
1) At the beginning for approval of each source and change of source 2) Once in a month
27 % Maximum
80 IS Sieve (mm) 10 MORT&H Specifications for Roads & bridges Sieve analysis for fine IS: 2386 (Part Section-1000/Clauseaggregate Zone - I 1a)1963 1008 & Table-1000-2 & IS: 383-1970 4.75 1) At the beginning for approval of each source and change of source 2.36 1.18 0.600 0.300 0.150 IS Sieve (mm) % Passing by weight 100 90-100 60-95 30-70 15-34 5.-20 0.-10 % Passing by weight
MORT&H Specifications for Roads & bridges Sieve analysis for fine IS: 2386 (Part Section-1000/Clauseaggregate Zone - II 1a)1963 1008 & Table-1000-2 & IS: 383-1970
Check Parameter
Acceptance Standard
Performance Standard
Frequency 10
Acceptance Criteria 100 90-100 75-100 55-90 35-59 8.-30 0-10 % Passing by weight 100 90-100 85-100 75-100 60-79 12.-40 0-10 % Passing by weight (Maximum) 1
MORT&H Specifications for Roads & bridges Sieve analysis for fine IS: 2386 (Part Section-1000/Clauseaggregate Zone - II 1a)1963 1008 & Table-1000-2 & IS: 383-1970
4.75 1) At the beginning for approval of each source and change of source 2.36 1.18 0.600 0.300 0.150 IS Sieve (mm) 10
MORT&H Specifications for Roads & bridges Sieve analysis for fine IS: 2386 (Part Section-1000/Clauseaggregate Zone - III 1a)1963 1008 & Table-1000-2 & IS: 383-1970
4.75 1) At the beginning for approval of each source and change of source 2.36 1.18 0.600 0.300 0.150 Deleterious Materials Coal& Ignite
MORT&H Specifications for Roads & bridges IS: 2386 (Part Deleterious Materials Section-1000/Clause2)1963 1008
Check Parameter
Acceptance Standard
Performance Standard
Frequency
MORT&H Specifications for Roads & bridges IS: 2386 (Part Deleterious Materials Section-1000/Clause2)1963 1008
3 % Maximum
MORT&H Specifications for Roads & bridges IS: 2386 (Part Section-1000/Clause3)1963 1008
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
PH Value
Sulphates (So4)
MORT&H Specifications for Roads & bridges IS: 3025 Section-1000/Clause1010 MORT&H Specifications for Roads & bridges IS: 3025 (Part 32) Section-1000/Clause1010
6 Minimum
Chlorides (Cl)
MORT&H Specifications for Roads & bridges 1) At the beginning for approval of IS: 3025 (Part 24) Section-1000/Clauseeach source and change of source 1010
250 mg /liter for structures more than 30m Maximum of 2ml of 0.1 normal NaOH to neutralise 200ml of water
MORT&H Specifications NaOH (Neuterlisation for Roads & bridges with phenolphthlein IS: 3025 (Part 22) Section-1000/Clauseas indicator) 1010 MORT&H Specifications HCl (Neuterlisation for Roads & bridges with methyl orange as IS: 3025 (Part 23) Section-1000/Clauseindicator) 1010 Physical Tests
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Suspended matter
Organic matter
In-organic matter
MORT&H Specifications for Roads & bridges IS: 3025 (Part 17) Section-1000/Clause1010 MORT&H Specifications IS: 3025 (Part 18) for Roads & bridges Section-1000/ClauseMORT&H Specifications for Roads & bridges IS: 3025 (Part 18) Section-1000/Clause1010
1) At the beginning for approval of each source and change of source 1) At the beginning for approval of each source and change of source 1) At the beginning for approval of each source and change of source
Steel Chemical Tests MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3 MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3 MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3 1) At the beginning for approval of each source and change of source
Carbon
0.30 Maximum
Sulphur
0.06 Maximum
Phosphorous
0.06 Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications for Roads & bridges Sulphur+Phosphorous IS: 1786-1985 Section-1000/Clause1009.3
0.11
Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Physical Tests
MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3 MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3 MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3 MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3 MORT&H Specifications for Roads & bridges IS: 1786-1985 Section-1000/Clause1009.3
1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment 1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment 1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment 1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment 1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment
10 % more than the actual 0.2% proof stress but not less than 485 Mpa
Elongation
14.50 % Minimum
Bend Test
Re-Bend Test
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria 6.310 + 3% for 32mm dia 3.850+ 3% for 25mm dia 2.470 + 3% for 20mm dia 1.580 + 5% for 16mm dia 0.888 + 5% for 12mm dia 0.617 + 7% for 10mm dia 0.395 + 7% for 8mm dia
1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment
Uniformity Tests
Ash content
MORT&H Specifications for Roads & bridges Section-1000/ClauseIS: 6925 1012 & IS: 9103-1999 MORT&H Specifications for Roads & bridges Section-1000/ClauseIS: 6925 1012 & IS: 9103-1999
1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment
1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
MORT&H Specifications for Roads & bridges Relative Density Section-1000/ClauseIS: 6925 1012 & IS: 9103-1999 MORT&H Specifications for Roads & bridges Chlorides ion content Section-1000/ClauseIS: 6925 1012 & IS: 9103-1999 MORT&H Specifications for Roads & bridges PH Section-1000/ClauseIS: 6925 1012 & IS: 9103-1999 Concrete MORT&H Specifications for Roads & bridges IS: 1199 - 1959 Section-1700/Clause1716
1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment
1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment
0.20 % maximum
1) At the beginning for approval of each source and change of source 2) 1 Test per Consignment
7 to 8
MORT&H Specifications Compressive Strength for Roads & bridges IS: 516 - 1959 of Concrete Section-1700/Clause1716
one test per each transit mixer at both batching plant and site initially when work starts.Subsequently sampling may be done from alternate transit mixers (1-5cum)/One set (6-15)/Two sets (16-30)/Three sets (31-50)/Four sets 51 and above
PCC 50 + 25 mm RCC 100 + 25 mm M10 - 10 Mpa M20 - 20 Mpa M25 - 25 Mpa M30 - 30 Mpa M35 - 35 Mpa
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Hume Pipes(NP-4)
IS: 458-2003
IS: 3597-1985
1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22
Acceptance Standard
Performance Standard
Frequency 1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22
Acceptance Criteria
IS: 458-2003
IS: 3597-1985
Tolerances in dimensions for overall IS: 458-2003 length Three Edge Bearing test (Load to produce IS: 458-2003 0.25mm crack) 1) 900mm dia Three Edge Bearing test (Load to produce IS: 458-2003 0.25mm crack) 1) 1000mm dia Three Edge Bearing test (Load to produce IS: 458-2003 0.25mm crack) 1) 1200mm dia
IS: 3597-1985
.+ 1 % of standard length
IS 3597-1985
1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22 1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22 1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22 1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22
Working load
66.30 KN
IS 3597-1985
Working load
72.60 KN
IS 3597-1985
Working load
88.30 KN
Straightness
IS: 458-2003
IS 3597-1985
Straightness
3mm/1Rm Maximum
Check Parameter
Acceptance Standard
Performance Standard
Frequency 1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22
Acceptance Criteria
IS: 458-2003
IS 3597-1985
Pressure
1.50 N/mm2
Permeability
IS: 458-2003
IS 3597-1985
1) At the beginning for approval of each source and change of source 2) As per IS: 458-2003 Table-22
Initial Permiability should not exceed 2.0 cm3 and the difference in any two readings during initial readings should not be more than 0.8 cm3 , Final Permiability should not exceed 0.3 cm3
35 Mpa
Check Parameter
Acceptance Standard
Performance Standard
Frequency
Acceptance Criteria
Binder Content
MORT&H Specifications for Roads & bridges BS: 3262 Section-800/ Clause-803 MORT&H Specifications for Roads & bridges BS: 3262 Section-800/ Clause-803 MORT&H Specifications for Roads & bridges BS: 3262 Section-800/ Clause-803 MORT&H Specifications for Roads & bridges BS: 3262 Section-800/ Clause-803
1) Once at the beginning for approval of each source and change 18 % Minimum by weight of source 1) Once at the beginning for approval of each source and change 30 - 40 % of source 1) Once at the beginning for approval of each source and change 10 % Minimum of source 1) Once at the beginning for approval of each source and change 42 % Maximum of source
Glass Beads
MORT&H Specifications 1) Once at the beginning for for Roads & bridges AASHTO M 249 approval of each source and change 65 % Minimum Section-800/ Clause-803 of source
Check Parameter
Acceptance Standard MORT&H Specifications for Roads & bridges Section-800/ Clause-803
Performance Standard
Frequency
Acceptance Criteria
Drying time
1) Once at the beginning for approval of each source and change 15 Minutes Maximum of source 1) Once at the beginning for approval of each source and change 45 % Maximum of source 1) Once at the beginning for approval of each source and change 102 + 9.50C of source
Skid Resistance
MORT&H Specifications for Roads & bridges BS: 6044 Section-800/ Clause-803 MORT&H Specifications for Roads & bridges ASTM D 36 Section-800/ Clause-803
Softening Point
Flow Resistance
MORT&H Specifications 1) Once at the beginning for for Roads & bridges AASHTO M 249 approval of each source and change 25% Maximum Section-800/ Clause-803 of source MORT&H Specifications 1) Once at the beginning for for Roads & bridges AASHTO M 249 approval of each source and change 0.12 Maximum Section-800/ Clause-803 of source
Yellowness Index