Sheet 1 of 4

Activity ID Activity Description Orig Rem % Dur Dur Comp Actual/ Forecast Start Actual/ Forecast Finish Total Float Planned Start Planned Finish
2010 2011 2012 2013

N D J F M AM J J A S O N D J F MAM J J A S ON D J F M AM J J A S O N D J F MA

Milestone
Milestone
Milestone
General Milestone MM010171 MM010178 MM010179 MM010181 MM012200 MM010164 MM010174 MM012401 MM015180 MECHANICAL COMPLETION FIRST COMMERCIAL PRODUCTION PROVISIONAL ACCEPTANCE ACHIEVED Taking Over of Whole Plant COMPLETE ERECTION OF REFORMER STEAM PRODUCTION BY BOILER First Feed to Reformer PROVISIONAL ACCEPTANCE CERTIFICATE COMPLETION OF PERFORMANCE TEST 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25-JAN-13 26-MAR-13 26-MAR-13 30-SEP-12 15-SEP-12 27-NOV-12 26-MAR-13 26-MAR-13 26-NOV-12 0 0 0 0 0 0 0 27-NOV-12 0 0 26-MAR-13 26-MAR-13 26-NOV-12 25-JAN-13 26-MAR-13 26-MAR-13 28-APR-12 30-JUL-12 CM
MECHANICAL COMPLETION FIRST COMMERCIAL PRODUCTIO PROVISIONAL ACCEPTANCE ACHIEVE Taking Over of Whole Plan

Construction Milestone
COMPLETE ERECTION OF REFORME

Precom. / Commissioning
STEAM PRODUCTION BY BOILE First Feed to Reforme PROVISIONAL ACCEPTANCE CERTIFICAT COMPLETION OF PERFORMANCE TES

Construction & Precommissioning


Ammonia
Piping Installation
Rack Piping Erection C1N52022 C1N52542 Hydro Test C1N53001 Hydro Test 172 37 55 15-MAY-11A 13-OCT-12 0 01-OCT-11 30-OCT-12
Hydro Test

Ammonia Main Pipe Rack Steam Reforming & Desulphurization Area

250 245

4 15

94 89

12-JUL-11A 16-NOV-11A

03-SEP-12 14-SEP-12

0 0

Around Equipment Piping Erection

Insulation
Piping C1N91529 10 Unit - Piping Insulation ( Ammonia Recovery ) 49 49 0 04-SEP-12 30-OCT-12 0 02-JUN-12 15-NOV-12
10 Unit - Piping Insulation ( Ammonia Recovery

Pre-commissioning
Unit 01: NG Desulphurization & Compression Unit C1NP0102A S-01-1: Natural Gas Compressor System Unit 10 : Ammonia Recovery Unit C1NP2302A S-10-1: Ammonia Recovery System 84 12 25 15-JUN-12A 15-SEP-12 0 92 22 26 11-JUN-12A 21-SEP-12 0

Start Date Finish Date Data Date

27-NOV-09 26-MAR-13 31-AUG-12

Actual/Forecast Bar Planned Bar Progress Bar Critical Activity

REVISION BOX Date Revision 31-AUG-12 Issue for Approval 13-APR-11 Issue for Approval_Rev.07 10-NOV-10 Issue for Approval_Rev.06

F08D
Checked H.C. Kim H.C.Kim H.R.DO Approved Y. Kim Y. Kim Y. Kim

FERTIL-2 Ammonia Urea Project Critical Path Schedule

Primavera Systems, Inc.

Sheet 2 of 4
Activity ID Activity Description Orig Rem % Dur Dur Comp Actual/ Forecast Start Actual/ Forecast Finish Total Float Planned Start Planned Finish
2010 2011 2012 2013

N D J F M AM J J A S O N D J F MAM J J A S ON D J F M AM J J A S O N D J F MA

Urea
Steel Structure
S201 Structure C2N31504 C2N31505 C2N31506 Alignment Grating Roof Panel 42 33 15 3 5 15 99 99 0 04-SEP-11A 21-JAN-12A 02-SEP-12 02-SEP-12 04-SEP-12 16-SEP-12 0 0 0

Piping Installation
A/G Piping Shop Fabrication C2N51501 C2N51503 C2N52001 Shop Fabrication - C.S. line Shop Fabrication - S.S. Line Urea Main Pipe Rack 260 165 201 10 10 4 99 99 98 21-MAY-11A 25-JUN-11A 27-AUG-11A 11-SEP-12 11-SEP-12 04-SEP-12 0 02-APR-11 0 02-AUG-11 0 28-AUG-11 30-OCT-11 31-DEC-11 14-JAN-12
Shop Fabrication - C.S. line Shop Fabrication - S.S. Line

Rack Piping Erection


Urea Main Pipe Rack

Pre-commissioning
Unit 21 : Ammonia Pumping Unit C2NP0302B S-21-1: Ammonia Pumping System Unit 22 : Urea Synthesis and Flare Unit C2NP0402B S-22-1: Urea Synthesis System Unit 27 : Granulation Unit C2NP1202 C2NP1602 S-27-2: Urea Granulation Auxiliary System S-28-1: Desorption and Hydrolysis System 102 110 50 29 1 3 22-MAY-12A 22-MAY-12A 24-OCT-12 15-OCT-12 0 17-SEP-12 0 15-SEP-12 01-NOV-12 15-NOV-12
S-27-2: Urea Granulation Auxiliary System

65 71

65 71

0 0

17-SEP-12 17-SEP-12

20-NOV-12 26-NOV-12

0 0

Unit 28: Desorption and Hydrolysis Unit


S-28-1: Desorption and Hydrolysis System

Utility
Instrument
Loop Test C3N76002 Loop Test 105 51 60 02-MAY-12A 29-OCT-12 0 01-JUL-12 17-NOV-12
Loop Test

Pre-commissioning
Unit 83: Auxiliary Boiler and Steam System C3NP0604 C3NP1002 S-83-3: Auxiliary Boiler System S-86-1: Nitrogen Import and Distribution 48 43 16 15 53 46 30-APR-12A 02-MAY-12A 09-OCT-12 17-SEP-12 0 0 18-MAR-12 29-APR-12 Unit 86: Inert Gas Unit
S-86-1: Nitrogen Import and Distributio

Offsite
Steel Structure
Transfer Tower CON32515 CON32516 T/T8 (Transfer Tower Str ) T/T9 (Transfer Tower Str ) 17 30 9 22 88 84 14-APR-12A 14-APR-12A 10-SEP-12 25-SEP-12 0 01-NOV-11 0 31-DEC-11
T/T8 (Transfer Tower Str

Pre-commissioning
Urea Product from TT-7 to TT-9 CONP2100 Urea Product from TT-7 to TT-9 8 8 0 30-OCT-12 07-NOV-12 0

Sheet 3 of 4
Activity ID Activity Description Orig Rem % Dur Dur Comp Actual/ Forecast Start 17-NOV-12 Actual/ Forecast Finish 26-NOV-12 Total Float Planned Start Planned Finish
2010 2011 2012 2013

N D J F M AM J J A S O N D J F MAM J J A S ON D J F M AM J J A S O N D J F MA

New Jetty Conveyor and Ship loader System CONP2102 New Jetty Conveyor and Ship loader System 9 9 0 0 01-SEP-12 31-OCT-12
New Jetty Conveyor and Ship loader System

Commissioning & Start-Up


Ammonia
Commissioning - Ammonia
Unit 02 : Process Air Compression Unit CX1P01034 CX1P01042 CX1P01044 CX1P01056 CX1P01064 CX1P01066 CX1P01072 S-02-1: Process Air Compression Unit S-03-3: Combustion Air and Flue Gas Fan System S-04-1: Conversion Gas System S-07-2: Synthesis Gas Compressor System S-09-2: Ammonia Refrigeration System S-10-1: Ammonia Recovery System S-82-2: Ammonia Plant Boiler Feed Water System 36 50 120 74 49 158 25 36 49 120 49 49 158 25 0 0 0 12 0 0 0 28-NOV-12 07-DEC-12 27-SEP-12 09-AUG-12A 07-DEC-12 16-SEP-12 07-DEC-12 02-JAN-13 24-JAN-13 24-JAN-13 24-JAN-13 24-JAN-13 20-FEB-13 31-DEC-12 0 0 0 0 0 0 0 Unit 03 Steam Reforming &Waste Heat Recov'y Unit Unit 04 : CO Conversion Unit Unit 07 : Ammonia Synthesis Gas Compression Unit Unit 09 : Ammonia Refrigeration Unit Unit 10 : Ammonia Recovery Unit Utility Systems of Ammonia Plant

Urea
Commissioning - Urea
Unit 20 : CO2 Compression Unit CXP3424 CXP3426 CXP3440 CXP3444 S-20-2: CO2 Compressor System S-21-1: Ammonia Pumping System S-27-2: Urea Granulation Auxiliary System S-28-1: Desorption and Hydrolysis System 42 56 79 87 42 56 79 87 0 0 0 0 08-DEC-12 21-NOV-12 25-OCT-12 16-OCT-12 24-JAN-13 24-JAN-13 24-JAN-13 24-JAN-13 0 0 0 0 Unit 21 : Ammonia Pumping Unit Unit 27 : Granulation Unit Unit 28: Desorption and Hydrolysis Unit

Utility
Commissioning _Utility/ Off Site
Unit 83: Auxiliary Boiler and Steam System CXP4014 CXP4020 CXP4026 S-83-3: Auxiliary Boiler System S-83-6: MP Steam Distribution System S-86-1: Nitrogen Import and Distribution 19 31 30 19 31 7 0 0 29 10-OCT-12 01-NOV-12 19-JUN-12A 31-OCT-12 06-DEC-12 26-SEP-12 0 0 0

Unit 86: Inert Gas Unit

Sheet 4 of 4
Activity ID Activity Description Orig Rem % Dur Dur Comp Actual/ Forecast Start Actual/ Forecast Finish Total Float Planned Start Planned Finish
2010 2011 2012 2013

N D J F M AM J J A S O N D J F MAM J J A S ON D J F M AM J J A S O N D J F MA

Performance Test
Performance Test
Performance Test CX4P0801 Performance Test of Ammonia & Urea plants 28 28 0 21-FEB-13 20-MAR-13 0 14-MAR-13 26-MAR-13
Performance Test of Ammonia & Urea plant