Você está na página 1de 2

Freeway Corridor Study

Project Brief
January 30 & 31, 2013

North-South

PUBLIC INFORMATION MEETING 2

Pioneer Road / County C


This project brief discusses the issues associated with the Pioneer Road/County C interchange, including its ramps and ramp intersections. It also briefly describes a range of alternatives developed and how they address these issues, as well as comparing the impacts and costs associated with these improvements.

LEGEND
Major Roadways Existing Interchange Potential New Interchange

60 CTH W

CEDARBURG

GRAFTON

Lakefield Rd

County C / Pioneer Rd

MEQUON

Issues in the Area:

(not to scale)

Substandard ramp length

Highland Rd Port Washington Rd

THIENSVILLE

Lake Michigan

Mequon Rd

167

Donges Bay Rd

County Line Rd
Milwaukee Co

Ozaukee Co BAYSIDE

Brown Deer Rd

100
RIVER HILLS FOX POINT

Alternatives Presented
Alternatives to be evaluated in the environmental impact statement include various No-Build and Build alternatives. The No-Build alternative leaves the system as it currently exists and serves as a base alternative for comparison. The Build alternatives presented tonight are shown below.

BROWN DEER

Port Washington Rd

W Good Hope Rd
MILWAUKEE GLENDALE

SPOT IMPROVEMENTS

Silver Spring Dr

Parallel Ramps - Extends ramp length to meet todays standards.


Project Location Map

N
Substandard ramp length

RECONSTRUCTION*

Diamond Interchange - Diamond interchange designed to todays standards.

N
Substandard ramp length

Comparison of Impacts
Alternative Relative Costs* Wetland Impacts
Impacts to Potentially Historic Properties Impacts to Public Recreation Properties

R/W Acquisition **

Potential Residential Relocations

Potential Commercial Relocations

Spot Improvement Parallel Ramps Diamond Interchange

yes

na

na

Low

$$

yes

na

na

Moderate

na = none anticipated *compares relative total project costs at this location **compares relative right of way aquisitions at this location

Whats Next
Alternatives will be refined based on comments received from this public meeting and ongoing traffic analysis and engineering. Each alternative will then be evaluated based on comments received, impacts, and on how well it meets the purpose and need for this study. The alternatives will be compared to determine which provide the most benefit while minimizing impacts. Intersections will be evaluated for signals or roundabouts. The retained alternatives will be presented at the third public information meeting in late summer 2013. A recommended alternative will then be presented in the Draft Environmental Impact Statement followed by a Public Hearing in early 2014 for your additional input.

*Interchange alternatives are compatible with four-lane and six-lane I-43 mainline alternatives.

How to Get Involved


Attend public meetings to share your thoughts with the project team. For the latest project information, go to: http://www.dot.wisconsin.gov/projects/seregion/43 or email comments directly to: doti43northsouth@dot.wi.gov

Contact Information
Steve Hoff, P.E. Project Manager (262) 548-6718 PO Box 798 141 NW Barstow Street Waukesha, WI 53187 Manojoy Nag, P.E. Supervisor (262) 548-6423 PO Box 798 141 NW Barstow Street Waukesha, WI 53187