AIM - Application Implementation Methodology

Sl.No. 1 2 3 4 5 6 Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 Function Definition Operational Analysis Solution Design Build Transition Production Document No CR010 RD10 RD20 RD 50 BR030 BR010 MD050 MD070 BR100 TE020 TE040 TE 050 Project Management Plan Identify Current Financial and Operating Structure Conduct Current Business Baseline Gather Business Requirement Business Requirement Solution Gap Analysis Gaps are to be customised and will be build Solution from Functional Design Technical Solution for Functional Design Define Application Set ups (Set Up / Build) Test - Unit level Test Scripts Integration (CRP) Activities Project Mgmt Plan (PMP) As Is To Be Set up Testing User manual Description Documents CR010 RD10, RD20, RD50 BR30, BR10 BR100 TE40, MD50, MD70 GO LIVE

13

TE130

Bugs Identified by the client will be recorded in then generate MD050