Você está na página 1de 3

Contact us For EXPERT PROJECT GUIDANCE or KITS or FULLY ASSEMBLED AND TESTED PROJECTS Download Free Abstracts from:

http://liveprojects.page4.me or email: projectkits@gmail.com or call: 9247436405

Network Synchronized Traffic Management System with Intelligence SPECIFICATIONS


Domain : Embedded Systems Design

Software

Assembler, Proload

Microcontroller

89S52 CISC Micro Controller

Power Supply

+5V, 500mA Regulated Power Supply

Display

a) LCD, HD44780 16-character, 2-line (16X2)

b) LED

5mm

Crystal

11.0592MHz

Sensors

sensors

Applications

Cities, towns, walled communities etc

MEHIDIPATNAM Branch HITECH CITY Branch KOTI Branch Updated 30/01/13

: Near Pillar no 143, Mehdipatnam, LIG-202,Huda colony, Mushkmahal, Post-Bahadurpura, Hyd 64. : Near Hitech city railway stn, LIG-582, KPHB colony,7th phase, Hyderabad. : 2nd floor, Bhagawathi complex, Gujarathi galli, bank street, Koti, Hyderabad.

Contact us For EXPERT PROJECT GUIDANCE or KITS or FULLY ASSEMBLED AND TESTED PROJECTS Download Free Abstracts from: http://liveprojects.page4.me or email: projectkits@gmail.com or call: 9247436405

ABSTRACT Now a day's every system is automated in order to face new challenges. In the present days Automated systems have less manual operations, flexibility, reliability and accurate. Due to this demand every field prefers automated control systems. Especially in the field of electronics automated systems are giving good performance. Some times the term automation means with less intervention of human. One of the severe problems faced with old traffic light systems is that it has no information about the neighboring traffic light systems. This results in traffic stopping at each junction. In this project we propose to have a network of all traffic lights under the control of an intelligent algorithm that ensures smooth traffic flow. When one traffic light gives green signal, the information is broadcast to all neibhouring traffic signals. Each traffic signal acts as a node and calculates approximately the time taken by vehicles coming towards it. It adjusts its signals such that by the time vehicles reach the traffic signal there is already a green signal this ensures that the vehicles need not stop at the traffic signal. This also reduces the emissions. It is a well known fact that pollution is at its peak when the vehicles are stooped and waiting at the traffic signals.

This project uses regulated 5v, 500mA power supply. 7805, a three terminal voltage regulator is used for voltage regulation. Bridge type full wave rectifier is used to rectify the ac output of secondary of 230/12v step down transformer.

MEHIDIPATNAM Branch HITECH CITY Branch KOTI Branch Updated 30/01/13

: Near Pillar no 143, Mehdipatnam, LIG-202,Huda colony, Mushkmahal, Post-Bahadurpura, Hyd 64. : Near Hitech city railway stn, LIG-582, KPHB colony,7th phase, Hyderabad. : 2nd floor, Bhagawathi complex, Gujarathi galli, bank street, Koti, Hyderabad.

Contact us For EXPERT PROJECT GUIDANCE or KITS or FULLY ASSEMBLED AND TESTED PROJECTS Download Free Abstracts from: http://liveprojects.page4.me or email: projectkits@gmail.com or call: 9247436405

BLOCK DIAGRAM 16 X 2 Character LCD DISPLAY

RYG LED PANEl-1

Transmitter

RYG LED PANEl-2 RYG LED PANEl-3 RYG LED PANEl-4 Reset circuit 89S52 Micro Controller

Receiver

Crystal Oscillator

RS232

Block diagram of Micro Controller and sensors

230V AC Supply

Step Down Transformer +5 V

Bridge rectifier

Filter

Regulator

Mains/battery Power Indicator

Block Diagram Power supply Bridge rectifier

MEHIDIPATNAM Branch HITECH CITY Branch KOTI Branch Updated 30/01/13

: Near Pillar no 143, Mehdipatnam, LIG-202,Huda colony, Mushkmahal, Post-Bahadurpura, Hyd 64. : Near Hitech city railway stn, LIG-582, KPHB colony,7th phase, Hyderabad. : 2nd floor, Bhagawathi complex, Gujarathi galli, bank street, Koti, Hyderabad.

+12V Gn d

Você também pode gostar