Escolar Documentos
Profissional Documentos
Cultura Documentos
Why a new initiative for the deployment of R d l t f Renewables i the bl in th Mediterranean and how to join it
Francesco STARACE President RES4MED
November 2012
Agenda
Introduction RES4MED Association Cooperation activities Next steps
Slide 2
Slide 4
2010
2007
2012
Slide 5
RE deployment Priorities
An open dialogue among all stakeholders to share options and experience, in order to support decision makers; Additional tools for technology transfer and capacity building, both institutional and for manager of agencies, utilities, industries; Develop new green local solutions such as distributed generation, smart grids, solar heating and cooling, desalination; Strong support from international financial institutions; Identification of concrete investment opportunities, developing an industrial clustering to attract investments.
Slide 6
From 1991 o 99
2009 009
2010
2012
Slide 7
Ultimate goal: supply 15% of electric energy needs of EU by 2050 (100 GW) GW).
Medgrid concept
Slide 10
Technology T h l focus All energy, RE and efficiency Electricity and Gas Renewable deployment of 20 GW at 2020 Transmission and interconnection grids
N. f N of members 33
OME
Industrial
MedReg
Institutional
2007
24
Institutional
2008
43
Industrial consortium ti
2009
57
MedGrid
2010
20
PWMSP
2010
MedTSO M dTSO
Why a new initiative RES4MED
Industrial I d ti l
2012
16
Slide 12
The possibility of making business through export of RES generation to Europe has to be seen as a mid-longer term perspective for a series of reasons (lack of infrastructures, different regulatory frameworks, timing of EU off takers, different trading g y , g , g rules, need for enhanced transparency, etc).
Slide 13
Slide 14
Slide 16
Involving key stakeholders from North Africa, Middle East, g y , , Turkey and the Balkans
Offering the expertise, knowledge and experience of its members to the whole of the various initiatives
Slide 17
Members
Slide 21
Slide 22
RES4MED Knowledge Management System is aimed at: Creating synergies within a privileged network Avoiding duplication of already existing analyses Sharing skills and k h kill d know-how h Identifying potential partnerships Creating efficiencies in management of development funds
Why a new initiative RES4MED Slide 23
Main F t M i Features
1. Strategic information of ongoing studies 2. Specific reference projects 2 S ifi f j 3. Additional documents on specific issues
Slide 24
E Easy access f from RES4MED i t internet site www.res4med.org t it 4 d Restricted and protected access for privileged users Fle ible inte acti e tool Flexible, interactive Dedicated News and Information
Slide 25
Optimal market design for a sustainable RES integration in the electricity markets
Slide 26
INFRASTRUCTURES KEY PROJECT Trans-Mediterranean central corridor: focus on RES generation deployment into the Mghrebian power system Analysis of the Tlc sector in the Med Basin and Ict integration in RE Power Plants
Why a new initiative RES4MED
Slide 27
Slide 29
Slide 30
Slide 31
Slide 32
Slide 33
Slide 34
Slide 35
Slide 36
Similar approach for collaboration in preparing and running conferences, workshops, conferences workshops seminars where Turkish stakeholders will be invited to join.
Slide 37
Terms of collaboration
Institutional, R&D agencies and academia can apply to become member or associated with no fee but just with in kind resources Energy companies, manufacturers, investors will be asked to pay a fee for full members of 30.000 /year or a fee of 5.000 /year for associated member Of course no fee required for the Advisory Board, application to join working groups on projects and knowledge management system / communication / events
Slide 38
Slide 40
This publication has been prepared for general guidance on matters of interest only, and does not constitute professional advice. You should not act upon the information contained in this publication without obtaining specific professional advice. No representation or warranty (express or implied) is given as to the accuracy or completeness of the information contained in this publication, and, to the extent permitted by law, RES4MED, its members, employees and agents do not accept or assume any liability, responsibility or duty of care for any consequences of you or anyone else acting, or refraining to act in reliance on the information acting act, contained in this publication or for any decision based on it. 2012 RES4MED. All rights reserved. In this document, RES4MED refers to Renewable Energy Solutions for the Mediterranean.