Escolar Documentos
Profissional Documentos
Cultura Documentos
Overview
Ship-to Shore Planning Ship-to-Shore Execution (Waterborne)
Organization C2
Ship-to-Shore Movement
that portion of the assault phase of an amphibious operation which includes the deployment of the landing force from the assault shipping to designated landing areas. JP 3-02
Ship-to-Shore Objective
Land troops, equipment, and supplies At prescribed times & places In formation that supports scheme of maneuver ashore
Assault forces clear the beach, advance inland and close with the enemy rapidly after landing. V MEF IWO JIMA OPORDER
Planning Considerations
Scheme of maneuver ashore LF tactical integrity Availability of amphibious shipping, AAVs, landing craft, and helicopters Threat to the LF Defense of the ATF OTH or near shore launch Flexibility Fire support Logistics/culminating point Speed and positive control
Timing
Starts when ordered by CATF "Land the landing force Ends when unload of assault shipping completed
Unloading Phases
Landing Categories
Scheduled Waves On-call Waves Nonscheduled Units Prepositioned Emergency Supplies Remaining Supplies
Scheduled Waves
Time Place Formation Serialized First use AAVs/landing craft First and subsequent use of helos Precise time schedule
On-Call Waves
Early need ashore Time/place? Request by serial number Follow scheduled waves
Non-Scheduled Units
Remaining units Prior to general unloading Not pre-boated Landing sequence table Serialized
Serialized
(water/ammo/rations/medical)
"W.A.R.M"
Remaining Supplies
All other supplies in assault shipping Loaded selectively until: Dump levels are up General unloading Not serialized
Serial Numbers
Building Blocks
Concept of operations Landing sites Formation For landing Serial numbers H-hour/D-day Assault waves Landing craft/helo availability
Ship-to-Shore Documents
1 Landing Diagram
2 Serial Assignment Table 3 Landing Craft & Vehicle Assignment Table (LCAVAT) 4 Landing Sequence Table 5 AAV /ACV Availability Table 6 AAV /ACV Employment Plan 7 Helicopter Availability Table 8 Helicopter & Serial Assignment Landing Table (HEALT) 9 Heliteam Wave & Serial Assignment Landing Table 10 Helicopter Landing Diagram
Sequence of Preparation
Concept of Operations AAV & Landing Craft Availability Tables Landing Plan Tab (w/o exhibits) Landing Diagram Landing Craft & Vehicle Assignment Table (LCAVAT) Serial Assignment Table Assault Schedule AAV Employment Plan Landing Sequence Table
PROS
(+) ship defense (+) dispersion of large force (+) OTH surprise (+) less area to clear of mines
CONS
(-) momentum of LF attack (-) command and control
- Defense of ATF - Standoff from enemy shore weapons and mines near shore
Negatives
- Reduced responsiveness of nonscheduled waves - Reduced effectiveness of C2 ashore - Increased screen requirements over a greater area
Transport Area
(an area used solely for the purpose of debarking personnel & equipment)
- used to expedite landing - used when launching AAVs - used by shallower draft vessels
Outer Transport Area (OTA)
Swept Lanes Beach Designations PCO Station Line of Departure (LOD) Launching Areas Big Deck Area Inbound/Outbound Lanes Fire Support Areas LCAC Control Features
CLF TACLOG
GREEN BEACH
RED BEACH
ORANGE BEACH
TACLOG
Tactical Logistics Group Who is in it? Who is in charge?
CATFs representative Plans and supervises waterborne ship-to- shore movement Assigns the PCO/PCS units Liaison with TACLOG & TAO Assistant CCO
SCO
CCO
PCO
PCO
RED BEACH
SCO
Under tactical control of PCO Numbered colored beach Leads first displacement craft wave to line of breakers Traffic control officer Directs returning waves to ships
LOD
GREEN 1
AAVs
LCPL
Embarked in LCPL Organizes assembly area Follows last boated wave to beach Assists boat group commander Salvage officer
RENDEZVOUS AREA
ASSEMBLY AREA
LOD
LOD
Responsible for one boated wave Forms and guides wave to and from beach Maintain boat and wave intervals Touchdown on time
BWC
GREEN 1
BGC
LOD WGO
RED BEACH
ABGC
WGO
LCAC Control
Independent Advisory Positive
LCAC CONTROL
CLZ
CLA
Conduct of Ship-to-Shore
PCO brief Pre-H-hour activities
- Prescribed load/ammo - Ships first Lt, CCO, and landing force
Pre-H-hour transfers Land the landing force Set condition 1A/flight quarters
Conduct of Ship-to-Shore
Assault troops muster in debark stations. Well decks ballast down:
Launch craft Move to rendezvous area & form waves
Conduct of Ship-to-Shore
AAVs launch and flank PCS: positive control - Touchdown at H-hour
Displacement
COA #1
A Command: Helo Airborne prior to H-hour In LFOC, O/O displace B Command: Afloat
COA #2
A Command: Surface Scheduled waves (AAVC-7/landing craft) On-call/Free Boat B Command: Afloat
EMCON
Summary
STS Planning STS Execution (Waterborne)
Organization C2