Você está na página 1de 6

CURRICULUM VITAE

From,
SHAIKH . ANWAR HUSSAIN.
Mobile : + 966-5-60348436 / +91-9845280904
E-mail : anwar_eng@rediffmail.com
: annu.anwar@gmail.com

Professional Qualifications :
B.E. (Mechanical Engineering) : Obtained from B.L.D.E.A’s Engg College, Bijapur
Affiliated to Karnataka University, Dharwad.

Specialization : Successfully completed the course in


“ Piping Engineering “ at I.I.T.
(Indian Institute of Technology) Powai, Mumbai.

Computer literacy : Familiar with MS-Office, AutoCAD, Microstation, CAE Pipe

Professional Skills :

 Preparing Piping Plans, Piping Layout, Equipment Layout, ISO Drawings. Reviewing P & ID,
Equipment Drawings and Structural Drawings.
 Carried out Detail design of Plant piping and Pipe lines (LSTK Projects).
 Prepared MTO, LDT, Valve Data Sheet, Scope of work, Pipe line routing, Population density
calculation, various piping calculations used for process piping and pipe lines.
 Preparing piping safety instruction sheets with the required calculations for pipe wall thickness,
Maximum allowable operating pressure (MAOP), and test pressure.
 Supervise all mechanical/piping construction activities to ensure all the works are carried out as per
project specification and schedule.
 Installation of piping systems, tanks and steel structures by using Plan, Isometric drawings
and P & ID’s.
 Checking of ISO drawings, release for Pre-fabrication of A/G spools (C.S./SS,LTCS) based on
the priority and material availability.
 Involved in loops preparation, Mechanical clearance, Pneumatic testing and final box up
of Equipments & Piping system.
 Prepared Various Pre-Commissioning Procedures of Piping systems.
 Carried out Installation of Fire fighting equipments like fire hydrants, Sprinkler system, deluge
system & fire water pump and related piping systems.
 Supervised the installation of under ground Fire water / Cooling water lines.
 Carried out loading of various types of Catalyst used in Ammonia / Fertilizer Plants.
 Closely follow the Test-Packs & Preparing punch list of piping systems and ensuring clearing
those points in consultation with client engineers.
 Conversant with various international Codes and Standards like, ASME, API, ASTM, & ARAMCO.
 Familiar working with personnel from diverse nationalities and quality management systems
of ISO 9001 certified organizations.
 Planning and day wise progress monitoring of work as per schedule.
Page 1 of 6
 Liaise and build rapport with clients and consultant engineers on engineering issues.
Experience Summary :
I) Orgnization : ZUHAIR FAYEZ PARTNERSHIP CONSULTANTS. 
AL­KHOBAR. (K.S.A)

Client : SAUDI ARAMCO

Designation : Piping Engineer.

Period : Feb 2007 to till date.

Project Brief : A) Sulfur Recovery Unit. (BI-10-00057/59)


LSTK Detail Design, Uthmaniyah/ Shedgum Gas Plant.

Sulfur Recovery Unit expansion and updating of


Claus to Superclaus process at Uthmaniyah and Shedgum
Gas Plant. Detailed design of SRU expansion as per
dProcess licensor Jacobs Engineering’s requirement
which involves replacement of sulfur Condenser and its
associated piping, placing of new Coalescer and Air
Blower and its associated piping, Steam tracing and
jacketed lines.

Responsibilities :
 Preparing piping safety instruction sheets with the
required calculations for pipe wall thickness, Maximum
allowable operating pressure (MAOP), and test pressure.
 Preparing and reviewing Hot Tap calculations in
accordance to ASME B31.3, ASME section VIII div. 1
 To understand Project specific requirements & to ensure
its implementation.
 Review P & ID, Piping Plans, Isometric, and Equipment
Drawings.
 Routing lines, Constructing Piping Plans, Equipment
location plan, and Isometric drawings.
 Prepare MTO, SOW, LDT, Valve data sheet, Hot tap
calculations, Re-in pad calculations and Tie-in details.
 Co-ordinate with stress group for finalizing pipe-routing
and placing of Supports.
 Co-ordination with other disciplines to expedite the job.

Project Brief : B ) Ras Az-Zawr AH Crude oil Pipeline.


(BI-10-00709) Project Proposal.

This Project Proposal is to Provide a new 22/20”


Safaniyah Khursaniyah to Raz Az-zawr a 19 km long
crude oil line with a total capacity of 168 MBCD and

Page 2 of 6
Scraping facilities (Scraper Launcher and Receiver) at
both ends. This crude oil line will be used as a fuel supply
line to Saudi Arabian Mining Company Ma’aden and to
WEC/IWPP located at Ras Az-zawr.
Responsibilities :
 To understand Project requirements & to ensure
its implementation.
 Review P & ID, Plan and profile, Piping Plan, Structural
and civil foundation drawings.
 Constructing Piping Plans, Isometric and Plot Plan.
 Prepare SIS, MTO, SOW, Project Proposal Document,
LDT, Valve data sheet, Population Density calculations,
 Co-ordination with other disciplines to expedite the job.

Project Brief : C) Master Gas System Expansion Project (MGS)


1) BI-10-00432 Gas Pipeline EWYFG-1 20” pipeline
for ARAMCO including valve stations, pigging
facilities and filtration stations.

2) BI-10-00433 Gas Pipeline UBTG-4 56” 192 KM ,


BJBFG-3 42” 7KM , SRG-2 56” 56KM pipeline for
ARAMCO including valve stations, pigging
facilities and filtration stations.
Responsibilities :
 Preparation of SIS, Valves Data sheet & Scope of Work.
 Preparation of Plot Plan, Piping Layout & Bill of
Materials.
 Pipe Wall thickness Calculations, Pipeline Sizing.
 Preparation of Document Control line list and system
index
 Checking of GADs and Piping Plan prepared by
Draftsmen/ Designers.

II) Organization : SNAMPROGETTI. SA


BUHASA  FACILITIES DEVELOPMENT & UP GRADATION PROJECT.
ABU DHABI . (UAE)

Client : ADCO(Abu-Dhabi Company for Off-shore Oil Operations)

Designation : Piping Supervisor.

Period : Feb 2006 to Dec 2006.

Responsibilities : To carry out stage wise Quality Control activities for


mechanical/piping construction activities. Supervising
installation of Piping and Equipments by interpreting all
stages of drawing (GA, P & ID & ISO) as per relevant,
Codes & Standards and Project Specifications.
Page 3 of 6
Inspection of Piping Installation of above ground and
underground GRE Lines, Reviewing method statements,
procedures, piping support drawing, Isometrics, and
layout drawings and also preparation the method
statement for the Tie-in and Shutdown jobs and
preparing As-build drawings. Issuance of Punch list,
Giving Mechanical and NDE clearance for Hydrostatic
Test, Witnessing Hydrostatic / Pneumatic test. Also
signing off completion certificates, collecting all final
documentation from contractors and representing the
Company as the day-to-day interface with contractors
during all phases of the construction.

III) Organization : CONSOLIDATED CONTRACTORS INTERNATIONAL 


COMPANY. SAL
SUR, ( SULTANATE OF OMAN )

Client : SPF TKP Omifpro SNC.

Designation : Assistant Engineer Mechanical (Pre-commissioning).

Period : March 2004 to May 2005.

Responsibilities : To carryout all Pre-commissioning activities which include


Flushing, Blowing, Reinstatement, of piping and other
systems, which includes Oil flushing of lube oil Console,
Compressor lines, lines to the Gas / Steam Turbines.
Ensuring safe implementation of all pre-commissioning
activities across all assets, with minimal disruption to other
disciplines. Preparing the Pre-commissioning procedures
and handover of certification pack contents. Supervised the
loading of various types of Catalyst and Chemicals in
columns, vessels and tanks.
Involved in installation and commissioning of fire fighting
systems like Fire hydrants, Distributers, Sprinklers &
Deluge systems.

IV) Organization : IVRCL INFRASTRUCTURES & PROJECTS LTD,


HYDERABAD. INDIA
(An ISO 9001-2000 Company)

Client : Indian Oil Corporation Ltd. (IOCL)

Inspection Agency : FACT Engineering & Design Organisation.

Designation : Site Engineer (Mechanical / Piping)

Period : May 2002 to February 2004.


Page 4 of 6
Responsibilities : To manage all site activities which includes, Piping
Installations, Trenching, Lowering, Backfilling,
Fabrication, Erection, Testing, Coating & Wrapping,
Pigging and pre-commissioning of piping and related

systems. Checking of erected lines & making punch


points & expediting to clear those punch points to avoid
work hazards during testing period. Also verifying
WPS, Welder qualification / performance records.
Consult, liaise and build rapport with clients and
consultant engineers on engineering issues. Maintaining
proper co-ordination with Design group & sub-
contractor for modification and design related queries.

V) Organization : ACAMA ENGINEERING, PUNE,


(An IBR Approved Fabricators)

Client : Various Clients.

Inspection Agency : Client engineers, IBR Inspectors & Third party agencies.

Designation : Production Engineer (Mechanical / Piping)

Period : November 1999 to April 2002.

Responsibilities : Supervising the Fabrication and related tasks of Boilers,


Boiler parts, Exchangers, Tanks & Steel structures, Co-
ordinate with IBR inspector for approval of IBR
drawings, and IBR materials, consultant for Material
Status, Technical Queries and Modifications. Planning
the job by considering the available manpower and
resources to get best results and higher productivity.
Also look after the quality aspects, indent the materials
required as per the drawings. Guiding the workforce for
the special tasks to achieve the quality standards as per
client’s requirements and to complete the job as per time
bound Schedule. Inspection of welding defects visually,
reading of Non distractive test reports and Quality
control of structures, tankages, piping etc. Preparation of
Bill of Materials, preparing documentation for various
inspection agencies.

Personal Profile :
Name : Shaikh. Anwar Hussain
Date of Birth : 3rd May 1974.
Marital Status : Married.
Permanent Address : Near, Badi-Kaman
Kamal Khan Bazaar road,

Page 5 of 6
BIJAPUR – 586-101
(Karnataka State),
INDIA
Phone : + 91-8352-256658

Nationality : INDIAN.

Passport details :
Passport No : B – 3040599.
Date of Issue : 5th February 2001.
Date of Expiry : 4th February 2011.

Page 6 of 6

Você também pode gostar