Você está na página 1de 2

33984 Federal Register / Vol. 72, No.

118 / Wednesday, June 20, 2007 / Notices

Carson: BRAC 2005; Integrated Global necessary to allow the PCMS to certify nepa_eis_docs.htm. Copies can be
Presence and Basing Strategy (also soldiers for operational deployments. requested from the PCMS NEPA
known as Global Defense Posture The Final EIS also evaluated the No Coordinator or viewed at local libraries.
Realignment); and the Army Modular Action alternative in accordance with Dated: June 13, 2007.
Force initiative. These programs are part the Council on Environmental Quality
Addison D. Davis, IV,
of the overall Army restructuring and and Army NEPA implementing
regulations to provide a benchmark Deputy Assistant Secretary of the Army
are needed to prepare the Army’s
(Environment, Safety and Occupational
combat forces for deployment around against which to compare the magnitude Health).
the world. of environmental effects of the Proposed
[FR Doc. 07–3026 Filed 6–19–07; 8:45 am]
The Proposed Action evaluated in the Action. Under the No Action
BILLING CODE 3710–08–M
Final PCMS Transformation EIS is the alternative, no additional soldiers
Army’s preferred alternative to would train at the PCMS despite the
implement the three transformation stationing of significant numbers of
programs. The Proposed Action additional soldiers at Fort Carson. The DEPARTMENT OF EDUCATION
includes: (1) Increased use of the PCMS Proposed Action’s construction would
training areas to provide training for not occur. Existing land and Notice of Proposed Information
approximately 8,500 realigned Active environmental management programs Collection Requests
Component (AC) soldiers and additional would continue. This alternative is not AGENCY: Department of Education.
Reserve Component (RC) soldiers feasible because restationing at Fort SUMMARY: The Acting Leader,
assigned to, or otherwise under the Carson has been directed by BRAC Information Management Case Services
control of, Fort Carson, and (2) 2005, and soldiers assigned to Fort Team, Regulatory Information
construction of facilities in the Carson need to be trained. Management Services, Office of
cantonment and training areas. The Alternatives for the BRAC Management, invites comments on the
Final EIS also evaluates the realignment at Fort Carson were not proposed information collection
environmental effects of the current considered in the Final EIS in requests as required by the Paperwork
withdrawal and reservation of 2,517.12 accordance with the BRAC Law, which Reduction Act of 1995.
acres of public land and 130,139 acres exempts such alternatives from
DATES: Interested persons are invited to
of federally owned minerals within the consideration. Other alternatives
considered by the Army, but determined submit comments on or before August
PCMS borders (as required by Section
not to be feasible, included training 20, 2007.
2908 of Pub. L. 140–201.
The Proposed Action will provide for troops at other locales, acquiring SUPPLEMENTARY INFORMATION: Section
increased frequency of training for additional land for training, or varying 3506 of the Paperwork Reduction Act of
existing and new units stationed at, or training schedules to account for 1995 (44 U.S.C. Chapter 35) requires
otherwise assigned to Fort Carson. operational deployments. These that the Office of Management and
Training and maneuver activities would alternatives were determined not to be Budget (OMB) provide interested
be similar to the types of activities that reasonable because they did not meet Federal agencies and the public an early
presently occur on the PCMS. The the purpose and need of the action or opportunity to comment on information
increased training requirements of unreasonably restricted the Army’s collection requests. OMB may amend or
additional AC and RC units, however, ability to react to changing conditions. waive the requirement for public
will result in increased frequency of use Acquisition of additional land was also consultation to the extent that public
of the training areas. The Army will not considered reasonable, in part, participation in the approval process
continue to implement land and because not enough information about it would defeat the purpose of the
environmental management programs is currently known. information collection, violate State or
and practices to sustain its training The Proposed Action has the potential Federal law, or substantially interfere
lands for continued use. to result in adverse effects to land use, with any agency’s ability to perform its
Support facilities will be constructed air quality, noise, geology and soils, statutory obligations. The Acting
in the PCMS cantonment area, including water resources, biological resources, Leader, Information Management Case
a brigade support complex, medical cultural resources, transportation, Services Team, Regulatory Information
facilities, storage facilities, minimum utilities, and hazardous and toxic Management Services, Office of
soldier support functions, a vehicle substances. With implementation of Management, publishes that notice
maintenance facility, motor pools and mitigation measures and best containing proposed information
upgrade of roads and utilities. Similar to management practices, none of the collection requests prior to submission
existing facilities at the PCMS, the impacts would be significant. Minor of these requests to OMB. Each
cantonment facilities constructed under temporary beneficial effects will occur proposed information collection,
the Proposed Action alternative would for socioeconomic resources. grouped by office, contains the
be austere. No units will be permanently The Proposed Action does not include following: (1) Type of review requested,
stationed at the PCMS; therefore, the expansion of the PCMS or land e.g. new, revision, extension, existing or
PCMS will not support long-term acquisition. The Proposed Action reinstatement; (2) Title; (3) Summary of
soldier care and will have no role in incorporates modifications to training the collection; (4) Description of the
providing permanent support for requirements to best meet current need for, and proposed use of, the
dependents, civilian contractors, or training needs. The Army plans to information; (5) Respondents and
personnel other than minimal custodial prepare a separate EIS for PCMS land frequency of collection; and (6)
staff. Outside the cantonment, the Army expansion once a proposed action and Reporting and/or Recordkeeping
will construct and operate a live hand initial set of alternatives have been burden. OMB invites public comment.
rwilkins on PROD1PC63 with NOTICES

grenade range, ammunition holding developed for that action. The Department of Education is
area, protective equipment training An electronic version of the Final EIS especially interested in public comment
facility, and communication facilities, can be viewed or downloaded from the addressing the following issues: (1) Is
and upgrade an existing small-arms following Web site: http:// this collection necessary to the proper
range building. These projects are www.hqda.army.mil/acsim/brac/ functions of the Department; (2) will

VerDate Aug<31>2005 18:25 Jun 19, 2007 Jkt 211001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\20JNN1.SGM 20JNN1
Federal Register / Vol. 72, No. 118 / Wednesday, June 20, 2007 / Notices 33985

this information be processed and used Written requests for information should Office of Management and Budget
in a timely manner; (3) is the estimate be addressed to U.S. Department of (OMB) may amend or waive the
of burden accurate; (4) how might the Education, 400 Maryland Avenue, SW., requirement for public consultation to
Department enhance the quality, utility, Potomac Center, 9th Floor, Washington, the extent that public participation in
and clarity of the information to be DC 20202–4700. Requests may also be the approval process would defeat the
collected; and (5) how might the electronically mailed to purpose of the information collection,
Department minimize the burden of this ICDocketMgr@ed.gov or faxed to 202– violate State or Federal law, or
collection on the respondents, including 245–6623. Please specify the complete substantially interfere with any agency’s
through the use of information title of the information collection when ability to perform its statutory
technology. making your request. obligations. The Acting Leader,
Dated: June 14, 2007. Comments regarding burden and/or Information Management Case Services
James Hyler,
the collection activity requirements Team, Regulatory Information
should be electronically mailed to Management Services, Office of
Acting Leader, Information Management Case
Services Team,Regulatory Information
ICDocketMgr@ed.gov. Individuals who Management, publishes this notice
Management Services,Office of Management. use a telecommunications device for the containing proposed information
deaf (TDD) may call the Federal collection requests at the beginning of
Office of Special Education and Information Relay Service (FIRS) at 1– the Departmental review of the
Rehabilitative Services 800–877–8339. information collection. Each proposed
Type of Review: Revision. [FR Doc. E7–11859 Filed 6–19–07; 8:45 am] information collection, grouped by
Title: Special Education—Institutional office, contains the following: (1) Type
BILLING CODE 4000–01–P
Reporting on Regulatory Compliance of review requested, e.g., new, revision,
Related to the Personnel Preparation extension, existing or reinstatement; (2)
Program Service Obligation. DEPARTMENT OF EDUCATION Title; (3) Summary of the collection; (4)
Frequency: On occasion; annually; Description of the need for, and
end of semester. Notice of Proposed Information proposed use of, the information; (5)
Affected Public: Collection Requests Respondents and frequency of
Not-for-profit institutions; Individuals collection; and (6) Reporting and/or
or household; State, Local, or Tribal AGENCY: Department of Education. Recordkeeping burden. ED invites
Gov’t, SEAs or LEAs. ACTION: Notice of proposed information public comment.
Reporting and Recordkeeping Hour collection requests. The Department of Education is
Burden: especially interested in public comment
SUMMARY: The Acting Leader,
Responses: 7,875. addressing the following issues: (1) Is
Information Management Case Services this collection necessary to the proper
Burden Hours: 16,250.
Team, Regulatory Information functions of the Department; (2) will
Abstract: The data collections under Management Services, Office of
this request are governed by Section this information be processed and used
Management, invites comments on the in a timely manner; (3) is the estimate
304.1–304.32 of the December 9, 1999 proposed information collection
regulations that implement section of burden accurate; (4) how might the
requests as required by the Paperwork Department enhance the quality, utility,
673(h) of the IDEA amendments of 1997 Reduction Act of 1995.
which requires that individuals who and clarity of the information to be
DATES: An emergency review has been collected; and (5) how might the
receive a scholarship through the
Personnel Development Program funded requested in accordance with the Act Department minimize the burden of this
under the Act subsequently provide (44 U.S.C. Chapter 3507 (j)), since collection on respondents, including
special education and related services to public harm is reasonably likely to through the use of information
children with disabilities for a period of result if normal clearance procedures technology.
two years for every year for which are followed. Approval by the Office of
Dated: June 14, 2007.
assistance was received. Scholarship Management and Budget (OMB) has
James Hyler,
recipients who do not satisfy the been requested by July 19, 2007. A
regular clearance process is also Acting Leader, Information Management Case
requirements of the regulations must Services Team,Regulatory Information
repay all or part of the cost of assistance beginning. Interested persons are
Management Services,Office of Management.
in accordance with regulations issued invited to submit comments on or before
August 20, 2007. Office of Postsecondary Education
by the Secretary. These regulations
implement requirements governing ADDRESSES: Written comments Type of Review: New.
among other things, the service regarding the emergency review should Title: Postsecondary Student
obligation for scholars, oversight by be addressed to the Office of Achievement and Institutional
grantees, and repayment of scholarship. Information and Regulatory Affairs, Performance Pilot Program.
In order for the Federal government to Attention: Nicole Cafarella, Desk Abstract: This is a new Special Focus
ensure the goals of the program are Officer, Department of Education, Office Competition, administered by the Fund
achieved, certain data collection, record of Management and Budget; 725 17th for the Improvement for Postsecondary
keeping, and documentation are Street, NW., Room 10222, New Education (FIPSE). This competition
necessary. Executive Office Building, Washington, will support at least one consortium of
Requests for copies of the proposed DC 20503 or faxed to (202) 395–6974. institutions of higher education,
information collection request may be SUPPLEMENTARY INFORMATION: Section associations, public and private non-
accessed from http://edicsweb.ed.gov, 3506 of the Paperwork Reduction Act of profit organizations and/or states to
rwilkins on PROD1PC63 with NOTICES

by selecting the ‘‘Browse Pending 1995 (44 U.S.C. Chapter 35) requires develop methods and implement
Collections’’ link and by clicking on that the Director of OMB provide mechanisms to systematically measure,
link number 3380. When you access the interested Federal agencies and the assess and report student achievement
information collection, click on public an early opportunity to comment and institutional performance at the
‘‘Download Attachments’’ to view. on information collection requests. The postsecondary level.

VerDate Aug<31>2005 18:25 Jun 19, 2007 Jkt 211001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\20JNN1.SGM 20JNN1

Você também pode gostar