Work Breakdown Structure 1. Opening Meeting 1.1 Introduce project team members 1.

2 Project Manager Steve Pokorski, Vice President of Operations; Plant EngineeringJoe Downs; Regional Sales manager Rhonda Smith; Marketing Director Mary Doonan 1.3 Discuss Huntsville Plant Design and Budget. 2. Hire Recruiters for personnel recruiting for plant Operations 2.1 Hire Architects for plant design 2.2 Research new products along with needed equipment 3. First draft of the design specs for new products along with equipment needed. 3.1 First draft of the design specs for the new plant. 3.2 Review the status and budget of the plant 4. Check Contractors permit status date for new plant. 4.1 Contact City Planning department for updates 4.2 Understand the Citys inspection program and methodology 5. Second draft of the design specs for the new products along with equipment needed. 5.1 Second draft of the design specs for plant. 5.2 Review the status and budget of the plant 6. Final deadline to have the permit approved. 6.1 Review permits 6.2 Review Code compliance inspection schedule 7. Final draft of the design specs for the new plastic container for products. 7.1 Final draft of the design specs for the new plant. 7.2 Review the status and budget of the plant 8. Desired Start Date for the Project

8.1 Schedule groundbreaking for April 18, 2011 8.2 Opening ceremony with media, company photographers, and city council members 9. The Huntsvilles Plant to be completed (up and operational). 9.1 June 15, 2012; get current and new hire employees into facility for training and certification 9.2 The Huntsvilles Plant completed (up and operational): June 30, 2012

Você também pode gostar