Você está na página 1de 47

Substation Automation Products

REL670 - Line Distance Protection IED

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 1

Contents Introduction
REL670 functionality Distance protection in REL670 Additional protection functions Control & Supervision functions Summary

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 2

Main application
Line distance protection terminal for: All voltage levels Directly earthed networks OH-lines Cables Double circuit lines Single-, two- or three pole trip

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 3

Main Characteristics
Line IED for protection, monitoring and control Building block in Substation Automation Systems Completely full scheme Functional flexibility Configuration flexibility Extensive self- supervision

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 4

Contents
Introduction

REL670 functionality
Distance protection in REL670 Additional protection functions Control and Supervision functions Communications and Tools Summary

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 5

Protection functions
= Option = Included
Current reversal & WEI logic for earth fault (EFCA) Current reversal & WEI logic for earth fault (EFCA) Scheme communication for earth fault (EFC) Scheme communication for earth fault (EFC) 4 stage earth fault protection (TEF) 4 stage earth fault protection (TEF) Instantaneous non-dir residual O/C (IEF) Instantaneous non-dir residual O/C (IEF) and phase overcurrent protection (IOC) and phase overcurrent protection (IOC) Time delayed 4 stage O/C protection (TOC) Time delayed 4 stage O/C protection (TOC) Current reversal & weak-end infeed (ZCAL) Current reversal & weak-end infeed (ZCAL) Scheme communication logic, (ZCOM) Scheme communication logic, (ZCOM) Power swing detection, (PSD) Power swing detection, (PSD) Local acceleration logic (PLAL) Local acceleration logic (PLAL)
ABB Ltd., Bangalore - 2007

Automatic switch onto fault (SOFT) Automatic switch onto fault (SOFT) Distance protection (ZM, GFPS) Distance protection (ZM, GFPS)
PSS-SAP/NRV 6

Protection functions
= Option = Included
General current & voltage measuring function, General current & voltage measuring function, 1 or 2 CB, (GF) 1 or 2 CB, (GF) Two stage time delayed residual over-voltage, Two stage time delayed residual over-voltage, 1 or 2 CB, (TRV) 1 or 2 CB, (TRV)

Two stage time delayed over-voltage, 1 or 2 CB, (TOV) Two stage time delayed over-voltage, 1 or 2 CB, (TOV) Two stage time delayed under-voltage, 1 or 2 CB, (TUV) Two stage time delayed under-voltage, 1 or 2 CB, (TUV) Pole-discordance, 1 or 2 CB, (PD) Pole-discordance, 1 or 2 CB, (PD) Stub protection, 2 CB, (STB) Stub protection, 2 CB, (STB) Breaker failure protection, 1 or 2 CB, (BP) Breaker failure protection, 1 or 2 CB, (BP)

ABB Ltd., Bangalore - 2007

Thermal overload protection, 1 or 2 CB, (BP) Thermal overload protection, 1 or 2 CB, (BP) Distance protection with Mho characteristic Distance protection with Mho characteristic

PSS-SAP/NRV 7

Supervision and Control functions


= Option = Included

Apparatus control, single bay max 8 apparatuses Apparatus control, single bay max 8 apparatuses Autorecloser for 1, 2 &/or 3 ph, single, 1 or double CB, (AR) Autorecloser for 1, 2 &/or 3 ph, single, 1 or double CB, (AR) Synchrocheck & energizing check, 1,1 or double CB, (SYN) Synchrocheck & energizing check, 1,1 or double CB, (SYN) Fuse failure supervision, 1or 2 CB (FFD) Fuse failure supervision, 1or 2 CB (FFD) Current circuit supervision, 1 or 2 CB (CCS) Current circuit supervision, 1 or 2 CB (CCS)

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 8

Logics and monitoring functions


= Option = Included
Multiple command and transmit, single or double CB(CM, MT) Multiple command and transmit, single or double CB(CM, MT) Pulse-counter logic for metering, (PC) Pulse-counter logic for metering, (PC) Fault locator (FL) Fault locator (FL) Disturbance report (DR) Disturbance report (DR) Service value reading of U, I If, P,Q, S & power factor, (VP) Service value reading of U, f, P,Q, S & power factor, (VP) Trip matrix logic, 1or 2 CB, 12 instances (TR) Trip matrix logic, 1or 2 CB, 12 instances (TR) Single, two or three pole trip logic, 1 or 2 CB (TRP) Single, two or three pole trip logic, 1 or 2 CB (TRP)

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 9

Contents
Introduction Functionality

Main features in REL670


Distance protection in REL670 Additional protection functions Control and Supervision functions Communications and Tools Summary
ABB Ltd., Bangalore - 2007

PSS-SAP/NRV 10

Main features in REL670


Typical operate time: One cycle Full scheme with simultaneous measurement in each loop and advanced phase selection Very low requirement of time to saturation for CTs including maximum remanence Complete software library for all applications Full Bay control functionality available(Option).
ABB Ltd., Bangalore - 2007

PSS-SAP/NRV 11

Contents
Introduction Functionality Main features in REL670

Distance protection in REL670


Other protection functions Control and monitoring functions Communications and Tools Summary
ABB Ltd., Bangalore - 2007

PSS-SAP/NRV 12

Distance Protection algorithm


Measuring algorithm

Same reliable algorithm as REL5xx

I XS XL RL

ABB Ltd., Bangalore - 2007

X . di u = i .R + . o dt
PSS-SAP/NRV 13

Export and import of load


A
Export
ZL Um Z< Um Z<

Import

B
No compensation

Export

Adaptive compensation

Import

ZL

ABB Ltd., Bangalore - 2007

PSS-SAP/NRV 14

ZM: Operation characteristic for Ph-Ph loops


jX ( / phase)
RFPP/2 R1 RFPP/2

Characteristic for Ph-Ph loops Fault resistance for reverse direction is defined from the Yaxes Few setting parameters = easy handling
R ( / phase)

ArgNegRes

X1

ArgDir X1

Setting parameters for forward direction in blue

R1+RFPP/2
ABB Ltd., Bangalore - 2007

RFPP/2

PSS-SAP/NRV 15

ZM:Operating characteristic Ph-E


Quadrilateral characteristic improves sensitivity Independent setting of:
Reactive reach direction Resistive reach direction Directionality

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 16

ZM: Setting parameters Setting parameters for measuring zones:


Positive sequence resistive reach: R1 ( /phase) Positive sequence reactive reach: X1 ( /phase) Zero sequence resistive reach: R0 ( /phase) Zero sequence reactive reach: X0 ( /phase) Fault resistance for phase-phase fault: RFPP ( /loop) Fault resistance for phase-earth fault: RFPE ( /loop)

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 17

ZM: Setting parameters


Each zone can
be set On/Off be set NonDir/ Forw/Rev

For each zone


The Ph-Ph and Ph-E fault loops can individually be set On/Off

Individual timers for Ph-Ph and Ph-E fault loop Both Ph-Ph and Ph-E fault loops have a settable minimum operating current IMinOpPP, respective IMinOpPE and IMinOpIN
ABB Ltd., Bangalore - 2007

PSS-SAP/NRV 18

Phase selection (PS)


The main objective is
To release the Measuring zones for phase selective tripping To give indication of faulty phase(s)

To ensure secure operation of the phase selector in case of combination of line to earth fault and phase to phase fault there is a check of the relation between IN and Iph which is used to release the correct fault loop

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 19

Phase Selection
Phase to earth fault
X

Phase to phase fault


X

/loop
X1 RFFwPE

/phase
Kr X1 RFFwPP/2

RFRvPE

Kr

RFRvPP/2

X1+XN 60 deg R

X1 60 deg R X1 60 deg

/loop
X1+XN 60 deg Kr = 1 / tan(60deg)

/phase

Kr = 1 / tan(60deg)

ABB Ltd., Bangalore - 2007

RFRvPE

Kr

X1

RFFwPE

RFRvPP/2

Kr X1

RFFwPP/2

PSS-SAP/NRV 20

General Fault & Phase Selection


Three phase fault
X

Easy to coordinate GFPS-ZM


X

90 deg

2 X1 K3

RFFwPP K3 R

RFRvPP K3

K3 = 2 / sqrt(3)

30 deg

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 21

Load encroachment
X
ZM3 ZM4

Maximum Load Angle

ZM2

ZM1

LOAD R

TRIP ZM4
ZM5
ABB Ltd., Bangalore - 2007

Fault Resistance (RFPE, RFPP/2)

Minimum Load Resistance

PSS-SAP/NRV 22

Load encroachment
Load encroachment allows
better fault resistance coverage without interference with load

Releases the measuring zones including the phase selection for phase selective tripping

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 23

Contents
Introduction Functionality Main features in REL670 Distance protection in REL670

Other protection functions


Control and monitoring functions Communications and Tools Summary
ABB Ltd., Bangalore - 2007

PSS-SAP/NRV 24

4-step Earth fault protection (TEF)

Four stage Earth overcurrent.

IF

Each stage can be set Off, Nondirectional, Forward or Reverse Each stage can be Definite- or Inverse time delayed. Taylor made curve is available Each stage can be blocked from second harmonic inrush currents.

UL1+UL2+UL3

IN>
ABB Ltd., Bangalore - 2007

Directional polarizing from calculated UL1+UL2+UL3 or by external Open delta to a separate Analogue input.

4
PSS-SAP/NRV 25

Distance protection - Communication schemes


Permissive system
A B

The communication schemes are of two basic types: Permissive schemes, where a permissive condition to trip is sent. Gives high security but lower dependability.
underreaching, overreaching,

Z<

Z<

Carrier send CS = Z< Forward, under- or overreach Trip = Z< Forward Z1, Z2 or Z3 & Carrier received

Blocking system
B

Blocking schemes, where a blocking signal preventing "instantaneous tripping" is sent. Gives high dependability but lower security.

Z<
ABB Ltd., Bangalore - 2007

Z<

Carrier send CS = Z< Reverse zone

Trip = Z< Forward Z1, Z2 or Z3 & Carrier received &T0


PSS-SAP/NRV 26

_____________

Distance protection - Unblocking schemes


Permissive system
A B

21

21

Z<

Z<

The loss of communication guard is considered equal to a received signal and accelerate the tripping Continuously During a time window The signal PLC Guard is connected to the GRG input in ZCOM logic.

Carrier send CS = Z< Forward, under or overreach Trip = Z< Forward Z1, Z2 or Z3 & Carrier received or Loss of PLC Guard signal.

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 27

Local acceleration logic Features


Instantaneous trips for faults on the whole line length without telecommunication

Operation mode zone extension


An overreaching zone allows to trip instantaneous

Operation mode loss of load


An overreaching zone allows to trip instantaneous if the current in one or two phases get low

Selective trip at auto reclosing


ABB Ltd., Bangalore - 2007

PSS-SAP/NRV 28

Current reversal logic


21 21
21

Z< Z<
21

Z<
CS CR
21

Z< Z<
21

Z<
CS CR?

21

21

Z<

Z<

ZM2

CR 60 & 40
ABB Ltd., Bangalore - 2007

&

Trip

ZM3R

&

Carrier send

PSS-SAP/NRV 29

Weak-End Infeed
L1N/L2N A Forw L1N/L2N B
L1N

Z<

Z< WEI

Z<

Z< WEI

For cases when one side has a weak, or non-existant source a WEI logic is advantageous. Strong side will send Permissive OVERREACH signal. At Weak-end the signal received will be
ABB Ltd., Bangalore - 2007

mirrored back on detection of low voltage to accelerate the strong end tripping Tripping with local undervoltage (Ph-Ph, Ph-E) check logic
PSS-SAP/NRV 30

Power swing detection


jX
ZL X1InFw * KLdRFw X1InFw R1FInRv R1FInRv * KLdRRv KLdRRv*RLdOutRv R1FInFw

Based on the same principles as REL5xx but:


L L
ARGLd

Load encroachment algorithm introduced


Allows better fault resistance coverage without interference with load
R

RLdOutRv

L
R1LIn

RLdOutFw KLdRFw*RLdOutFw

X1InRv
ABB Ltd., Bangalore - 2007

X1InRv * KLdRRv

PSS-SAP/NRV 31

Switch On To Fault (SOTF)


U=0 V

Z<
jX ( / phase)
Zone2 or Zone3 Zone1 ArgNegRes

A basic protection function which enables instantaneous trip at closing of breaker. Non directional to cover zero voltage due to forgotten earthing switch Two versions: A binary input (bc) which releases the SOTF overreaching zone at breaker closing command Internal measurement detects that no voltage and no current is available for a certain time(DLD). The instantaneous, non directional measurement is then activated internally.

L
R ( / phase)
ArgDir

ABB Ltd., Bangalore - 2007

An overreaching zone shall be used to allow operation also at AR achieving trip for all line faults

PSS-SAP/NRV 32

STUB protection
Instantaneous overcurrent protection of busbar connection (STUB) when a line disconnector is open Required in Multi-breaker arrangements with CVT (VT) on line side of DS Z< (21) function cannot measure when line disconnector is open and must be blocked.
Trip

Line discon.

open
ABB Ltd., Bangalore - 2007

25 ms

&

I STUB >

PSS-SAP/NRV 33

Fuse Failure Supervision


Measuring quantities are selectable between:

IL

zero sequence voltage and current: U0 > Uref and I0 = 0 negative sequence voltage and current: U2 > Uref and I2 = 0 Sudden change in current and voltage:

>Z
ABB Ltd., Bangalore - 2007

DI/Dt and DU/Dt Programmable influence on the operation of zone measuring elements

PSS-SAP/NRV 34

Single Pole Tripping


Simultaneous and independent measurement for all fault loops in separate phase selectors is necessary for correct phase selection and single pole tripping because:
Line faults represent 85% of all faults in power systems 75% of the line faults are single phase to earth faults 5% of the line faults are evolving faults 80-95% are transient.
ABB Ltd., Bangalore - 2007

T R S

R S T

PSS-SAP/NRV 35

Auto-Reclosing
Input signals typical connections

CB ready CB closed

ABB Ltd., Bangalore - 2007

From high priority AR


PSS-SAP/NRV 36

Auto Reclosing
Single-/ Two-/ Three-phase reclosing programs
Program
1 2

1st attempt

2nd attempt

3rd and 4st attempt

3 phase 1/2/3 phase

3 phase 1 phase 2 phase 3 phase 1 phase 2 phase 1 phase 2 phase 1 phase 2 phase 3 phase 1 phase 2 phase 3 phase

3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase ---3 phase 3 phase ---3 phase -------

3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase ---3 phase 3 phase ---3 phase -------

3 4 5

1/2 phase (No 3 phase) 1/2 phase (No 3 phase) 1/2/3 phase

6
ABB Ltd., Bangalore - 2007

1/2/3 phase

PSS-SAP/NRV 37

Auto-Reclosing new in REx670


Start Quick AR without synchrocheck Skip a step and continue with next (at multiple shots)

ABB Ltd., Bangalore - 2007

Put AR on hold e.g. waiting for Thermal relays to reset to have less sag before reclosing
PSS-SAP/NRV 38

Energizing Check
UA A ILoad
Inductive and Capacitive charging of dead line

UB B

Uhigh
27 SC/VC

Ulow

The dead line and Live bus conditions are checked. Uhigh and Ulow are verified

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 39

Synchronism Check
UA A ILoad B UB

UAL

Icap

25 SC/VC

d dU

Paralleling (synchronism conditions are checked , f, U and Uhigh are within set values

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 40

Synchrocheck function
U-Line U-Bus

Energizing check High voltage Low voltage Operate time

U> 50-120% of Ub U< 10- 80% of Ub 80 ms (typical)

SYNC

U-Bus Line reference voltage

Paralleling (Synchronism) Check Frequency difference f < 3-1000mHz Voltage difference U < 2 - 50 % of Ub Phase difference < 5 - 90o Operate time 80 ms (typical)
Accuracy of frequency measurement about 0,5 mHz!

BLOCK
ABB Ltd., Bangalore - 2007

Fuse fail

PSS-SAP/NRV 41

Synchrocheck Function block


Block inputs DS Bus 1 at DB arrangement DS Bus 2 at DB arrangement DS Line at 1 1/2 arrangement DS alt Line at 1 1/2 arrangement Bus1 VT Fuse fail alt. OK Bus2 VT Fuse fail alt. OK Line 1 VT Fuse fail alt. OK Line 2 VT Fuse fail alt. OK Test mode inputs
ABB Ltd., Bangalore - 2007

Conditions for AR Conditions for Man close Test conditions fulfilled Fuse fail on sel fuse Information that the voltage is included in the synchrocheck Information that the conditions for voltage, diff voltage phase angle diff etc are fulfilled

PSS-SAP/NRV 42

Synchrocheck Voltage selection


1U 1U UB1 UB2 B1Q B2Q

SYN1
ULN1

3U

IED

1U UB1

1U UB2

SYN1
ULN1
ABB Ltd., Bangalore - 2007

SYN2

LN1Q

3U

PSS-SAP/NRV 43

Synchrocheck Voltage selection


IED 1 3U
UB2

1U

IED

ULN1 B1Q

1U
UB1

SYN1

SYN1

3U
LN1Q

IED 2

1U

SYN1

1U 1U

SYN2

IED 3

1U LN2Q B2Q

SYN1
3U 1U

1 U ULN2 UB2 1U

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 44

Synchrocheck Voltage selection

REC670

1U 3U

SYN1

SYN2

SYN3

3U 1U

ABB Ltd., Bangalore - 2007 PSS-SAP/NRV 45

Summary
Platform of products for all type of objects. Increased user friendliness with common PC tool box Configuration flexibility Pre-defined user-friendly packages Serial communication flexibility for easy integration in Substation Automation Systems New IEC61850-8-1 Station Bus Extensive self-supervision allows minimal scheduled maintenance. Improved tool communication speed
PSS-SAP/NRV 46

ABB Ltd., Bangalore - 2007

Você também pode gostar