Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM UNIT NO. I.

1 TRANSIT HOSTEL EARTH WORK 1 2560 Clearing Jungle including uprooting of rank Sq.M vegetation, grass, brush wood, trees and sapplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. (Note: If however, only grass is met with, the area will be measured and paid for, under as a separate item.) 2 Felling trees of the following girth (measured at a height of 1M above ground level) including cutting of trunks and branches removing the roots, filling the pit and depression, stacking of the serviceable materials and disposal of unserviceable material etc., as directed for: a) 3 Felling Trees-beyond 30 cm upto including 60cm No girth RATE (In Figures & in Words)

AMOUNT

b)

3 Felling Trees-beyond 60 cm upto including 120cm No girth

c)

3 Felling Trees-beyond 120 cm upto including No 240cm girth

1325 Providing and injecting Chemical emulsion for PRE- Sq.M CONSTRUCTIONAL Anti-termite treatment and creating a chemical barrier on top surface of plinth filling, junction of inside wall and floor, on top of damp proof course (DPC) or on masonry at the level of plinth filling as per IS 6313 (Part-II) - 1981 using chemicals like chloropyripos emulsifiable (IS: 8944-1978) 20EC, mixed with water in 1:19 ratio (i.e. 1 litre of chemical to 19 litres of water). The emulsion is spread at 5 lit/sqm on top surface of plinth filling, top of Damp proof course and at 1 lit / linear meter along the junction of wall and floor, all as per specifications and directions. (Plinth area of the building at ground floor only shall be measured).

Page 1 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 4 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM Earthwork in excavation for FOUNDATION TRENCHES in ALL KINDS OF SOILS including dressing of sides, ramming of bottom and disposing the surplus excavated materials within a distance of 50m and lift upto 1.50m complete as per specifications. (Disposed soil to be leveled by breaking clods if any and neatly dressed).

UNIT

AMOUNT

885 Depth upto 1.5m

Cu.M

253 Earthwork in excavation for FOUNDATION Cu.M TRENCHES in ROCKS, OTHER THAN HARD ROCKS (ORDINARY ROCKS) either by manual labour or by muffled blasting upto a depth not exceeding 1.5m including stacking or disposing the excavated materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineer-in-Charge. 64 Earthwork in excavation for FOUNDATION Cu.M TRENCHES in HARD ROCK by muffled blasting upto an initial depth not exceeding 1.5m including stacking or disposing the excavated materials materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineerin-Charge. 64 Earthwork in excavation for FOUNDATION Cu.M TRENCHES in HARD ROCK by chiselling upto a depth not exceeding 1.5m including stacking or disposing the excavated materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineer-inCharge. 3920 Filling available excavated approved earth Cu.M (excluding rock) in trenches, sides of foundations, plinth, etc, in layers not exceeding 15cms depth breaking clods, consolidating each deposited layer by ramming, watering and dressing, etc., complete for lead upto 50m and all lifts etc., complete as per specifications.

Page 2 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM UNIT NO. MASONRY 9 Providing and constructing Solid Cement Concrete Block masonry in cement mortar 1:6 (1 Cement : 6 Coarse sand) using factory made, load bearing, approved quality Cement Concrete blocks of specified size, Grade D (4.0), Density of blocks not less than 1800 kg/cum. Minimum average Compressive strength of units - 4.0 N/sqmm and Minimum strength of individual units 3.2 N/sqmm, setting in position, curing, raking out joints wherever required etc., complete with all leads and all as per specifications and directions of the Engineer-in-charge. IN FOUNDATION AND PLINTH 200 For 200mm thick walls using (400 x 200 x 200) Cu.M mm size blocks. RATE (In Figures & in Words)

AMOUNT

10

Providing and constructing Solid Cement Concrete Block masonry in cement mortar 1:6 (1 Cement : 6 Coarse sand) using factory made, load bearing, approved quality, Grade D (4.0), Density of blocks not less than 1800 kg/cum. Minimum average Compressive strength of units - 4.0 N/sqmm and Minimum strength of individual units 3.2 N/sqmm, set to level plumb including setting in position, providing scaffolding, curing, raking out joints wherever required etc., complete with all leads and all as per specifications and directions of the Engineer-in-charge. IN SUPER STRUCTURE UPTO ALL HEIGHTS. 371 For 200mm thick walls using (400 x 200 x 200) Cu.M mm size blocks.

11

Providing and constructing Solid Cement Concrete Block masonry in cement mortar 1:4 (1 Cement : 4 Coarse sand) using factory made, load bearing approved Cement concrete blocks of specified size, Grade D (4.0), Density of blocks less than 1800 kg/cum, Minimum average Compressive strength of units - 4.0 N/sqmm and Minimum strength of individual units 3.2 N/sqmm, set to level, plumb, setting in position, providing scaffolding, curing, raking out joints wherever required etc., complete with all leads and all as per specifications and directions of the Engineer-incharge. IN SUPER STRUCTURE UPTO ALL HEIGHTS.

Page 3 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

120 For 100mm thick partition walls without RCC Sq.M stiffener using (400 x 100 x 200) mm size blocks.

PLAIN CEMENT CONCRETE 12 Providing and laying cement concrete using 40mm nominal size graded hard granite stone aggregate obtained from approved quarry including compaction, finishing top surface to level, curing but excluding cost of formwork, etc., complete as per specifications. Mix ratio specified is for (cement: coarse sand: graded stone aggregate). a) 72 In foundations with PCC 1:5:10 Cu.M

b)

218 In sub-base to floors & Hardstand with PCC 1:5:10 Cu.M

13

Providing and laying cement concrete using graded hard granite stone aggregate of 20mm nominal size obtained from approved quarry including formwork, compaction, finishing, curing, etc., IN BED BLOCKS, SILL BLOCKS COPING upto all heights complete all as per specifications. Mix ratio specified is for (cement: coarse sand: graded stone aggregate). The work includes providing throating/ drip mould wherever required as per standard engineering practice of size not be less than 40mm x 15mm. The rate is inclusive for making drip mould and no extra cost shall be paid for. a) 10 In coping with P.C.C (1:3:6) Cu.M

b)

1 In window cills with P.C.C (1:3:6)

Cu.M

Page 4 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM NO. c) 0.5 In blocks for fencing posts with P.C.C (1:2:4) RATE (In Figures & in Words)

UNIT Cu.M

AMOUNT

REINFORCED CEMENT CONCRETE 14 Providing & laying in position machine batched, machine mixed and machine vibrated design mix cement concrete / RMC of specified grade for reinforced cement concrete structural elements, using graded hard granite stone aggregates of maximum 20mm nominal (down graded) size obtained from approved quarry including fine aggregates conforming to latest IS 383 and cement all as per approved design mix proportions conforming to latest IS 10262 with minimum cement content for durability including supplying and providing concrete cover blocks etc., which shall be followed as per latest IS 456-2000 including mixing, transporting, placing vibrating, compaction, finishing to required levels, curing etc., complete all as per specifications but excluding cost of formwork and steel reinforcement. Rate to include labour for keeping embedments if any wherever required while casting Rate also to casting. include lift charges and scaffolding for heights, depths and levels from FFL/GL. (The design mix proportions shall clearly indicate cement: fine aggregate: coarse aggregate: water cement ratio and approval shall be obtained from Engineer-incharge for initial and subsequent mixes as and when there will be change in quarry/materials for M-25 grade reinforced cement concrete, etc., all work upto plinth level. a) 374 Footings Cu.M

b)

11 Pedestals

Cu.M

c)

163 Plinth beams

Cu.M

Page 5 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY NO. d) 5 Columns RATE (In Figures & in Words)

DESCRIPTION OF ITEM

UNIT Cu.M

AMOUNT

15

Providing & laying in position machine batched, machine mixed and machine vibrated design mix cement concrete / RMC of specified grade for reinforced cement concrete structural elements, using graded hard granite stone aggregates of maximum 20mm nominal (down graded) size obtained from approved quarry including fine aggregates conforming to latest IS 383 and cement all as per approved design mix proportions conforming to latest IS 10262 with minimum cement content for durability including supplying and providing concrete cover blocks etc., which shall be followed as per latest IS 456-2000 including mixing, transportation, placing, vibrating, compaction, finishing to required levels, curing etc., complete all as per specifications but excluding cost of formwork and steel reinforcement. Rate to include labour for keeping embedments if any wherever required while casting. Rate also to include lift charges and scaffolding for heights, g g g , depths and levels from FFL/GL. (The design mix proportions shall clearly indicate cement: fine aggregate: coarse aggregate: water cement ration and approval shall be obtained from Engineer-incharge for initial and subsequent mixes as and when there will be change in quarry/materials for M-25 grade reinforced cement concrete, etc., all work above plinth level upto all heights. a) 96 Walls (any thickness) including attached pilasters, Cu.M buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc., 365 Beams, suspended floors, roofs having slope upto Cu.M 18 degree, landings, balconies, shelves, chajja, lintels, bands, plain windows sills, staircases and spiral staircases etc., Same as item no. 15 above but using M20 grade of concrete. 16 Lintels & Staircases Cu.M

b)

16

Page 6 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 17 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

Providing and fixing in position approved quality premoulded bitumen pads (expansion joints filler board conforming to IS 1838 Part-I 1983) of specified thickness in expansion joints of all RCC works at all heights including applying necessary bitumen solution primer wherever required and finishing the exposed ends with Shalikot/Expandex or equivalent sealing compound conforming to IS 1834 -1961, Grade A, to make the joints water tight, complete all as per approved drawings, specificaitons and directions of Engineer-inCharge 68 25mm thick bitumen pad Sq.M

18

190 Providing Polysulphide sealent in Expansion joints RMT / RCC slabs / Beams etc. The joints shall be of size 25mm wide & 10mm deep using sealent of approved make. The work shall be executed strictly as per manufacturer's specifications etc. complete all as per directions of Engineer in charge at all Heights/ Levels.

FORM WORK 19 39 Extra for shuttering in circular works

Sq.M

20

a)

Providing rigid and water tight centering and shuttering using best quality wood/ plywood /steel forms and centering with steel props, acro tubes etc., including strutting, propping, bracing, staging etc., complete for all RCC items fixed in position as required including labour for careful removal of form work etc., complete all as per specifications at all heights. In Horizatal / Vertical / slanting surfaces. 832 Foundations, footings, bases of columns, mass Sq.M concreting, floorings, etc

b)

2430 Lintels, beams, plinth beams, girders, bressumers Sq.M and cantilevers

Page 7 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM UNIT NO. c) 1885 Suspended floors, roofs, landings, shelves and Sq.M their supports, balconies and chajjas. RATE (In Figures & in Words)

AMOUNT

d)

1230 Columns, pillars, abutments, posts and struts.

Sq.M

21

Extra for additional height in centering, shuttering wherever required with adequate bracing, propping with steel props, acrotubes etc., including cost of deshuttering and decentering at all levels, for suspended floors, roofs, landings, beams and balconies, etc., for NOTE: (1) Plan area to be measured (2) Floor height to be taken from finished floor level (3) This item is applicable only for roof / high bay slabs and beams and not applicable to other items such as columns, walls etc., 100 For all RCC items at 6.45m level over initial height Sq.M of 3.5Mtr

STEEL WORK 22

Steel reinforcement for all RCC items including decoiling, cutting, hooking, bending, cranking, fabricating to required shape, placing in position and tying the system with soft drawn annealed binding wire of diameter not less than 1.00mm with 2 strands etc., complete all as per specifications at all heights (binding wire will not be measured for 112 With TMT 415 bars.

M.T

23

Supplying, fabricating, assembling, hoisting / erecting and fixing in position at all heights and with all leads, structural steel works of welded builtup sections, all as per structural drawings and as per detailed specifications (for materials and workmanship) in the situations described hereinafter including a) Cutting of components to required lengths/ widths and shapes/ profiles b) Smooth machining of edges/ faces c) Welding (electric arc welding) at joints of builtup sections/ single sections for required weld lengths and sizes and

Page 8 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM d) Painting all over with two coats of synthetic enamel paint of approved quality, make and colour / shade over one coat of red oxide zinc chromate primer with surfaces duly pressed to receive painting etc., complete all as directed by the Engineer-in-Charge. NOTE: The Contractor shall submit fabrication shop drawings for work involved based on construction drawings (that may be issued during construction period) for approval by Engineer-incharge. The fabrication work shall start only after approval to the fabrication drawings. Any change required in the fabrication drawings shall be carried out at no extra cost over the quoted rates. Fabrication shall be in a perfectly workmanship like manner and as provided in Section V and VI of IS 800 and IS 7215. Welding shall be carried out by qualified welders. Electrodes for welding, the procedure, selection, test and inspection shall conform to provisions in IS 816. IS 818, IS 822 and IS 833. Erection / hoisting shall commence only after passing of fabricated parts by the Engineer-in-charge.

UNIT

AMOUNT

a)

0.77 Structural steel works with MS angles, Tees and M.T other sections

b)

0.15 Structural steel works with medium class MS pipes M.T of any diameter

24

Providing and fixing hand rail by welding etc., to steel ladder railing, balcony railing and staircase railing including applying a priming coat of approved (zinc chromate) steel primer etc., and as per specification above item 1188.00 M.S. Tubes (medium) : 40mm nominal bore Kgs

Page 9 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM UNIT NO. FLOORINGS 25 Providing and laying cement concrete in pavements and ramps in panels not exceeding 10 sqm per panel and plinth protection in panels not exceeding 3 sqm per panel using graded hard granite stone aggregate including providing necessary formwork, making 10mm wide grooves in panels for depth of 1/3rd of thickness of pavement or 40mm whichever is more and filling the grooves with approved hot poured sealing compound confirming to grade A or B of IS-1834, consolidation, curing and treatment for the top with broom finish, etc., complete all as per specifications, Mix ration specified is for (cement: coarse sand: graded stone aggregate). 25 Using 20mm nominal size aggregate In CC 1:3:6 Cu.M for Plinth protection RATE (In Figures & in Words)

AMOUNT

26

Providing plain cement mortar skirting 20mm thick in a mix of 1:3 including a base layer and finished smooth to required level and plumb at corners and at face in cement slurry mixed at the rate of 10Kgs p per 10 Sqm inclusive of hand rubbing, curing, etc., q g, g, , complete all as per specifications. ( Rate to include cost of chasing of walls wherever required). 66 In skirting 100mm high.

Mtr.

27

Providing and laying Indian patent stone flooring with cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) using graded granite stone aggregate obtained from approved quarry laid to level or slope in bays not exceeding 3sqm per panel including providing 3mm thick aluminium dividing strips to the full depth of the flooring and finished smooth, curing, etc., complete all as per specifications. 65 40mm thick (Using 20mm nominal size stone Sq.M aggregate)

Page 10 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 28 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

29

78 Providing and laying pre-polished decorative Sq.M designer cement concrete tiles flooring of thickness (22 +/- 2mm) of M/s. EUROCON tiles of euivalent conforming to IS 1237 - 1980 of approved tiles over a bed of 25mm thick cement mortar 1:6 with cement slurry at 3.3 kg/sqm jointed and pointed with matching grey / white cement slurry mixed with matching pigment and finishing to required level, curing, etc., complete all as per manufacturers specifications, drawing and direction of Engineer in charge. Providing and laying 18mm to 20mm thick mirror polished granite stone slab flooring of approved colour and shade using mirror polished granite stone slabs of size 1800mm x 1200mm / 1800mm x 2400mm and smaller sizes as per site condition (cut from the bigger sizes of mirror polished water jet cut stone slab of approximate size 6.5ft x 10.5ft) approved colour / texture and pattern of RANDOM GRANITE SLABS, water cut quality, machine cut to required size, laid over a bed of 20mm thick cement: mortar 1:6 and cement slurry at the rate of 4.4kg/sqm for bedding and jointing including grouting the joints pigments to match the shade of the slabs, finishing to required level and slope, curing, cleaning, mopping, etc., complete all l i l i i t l t ll as per specifications at all heights in all floors.

a)

38 18 to 20mm thick Polished granite for platform

Sq.M

b)

6 Polished jet black granite stone flooring in risers of Sq.M steps.

c)

20 Polished ruby red granite stone flooring in treads Sq.M of steps, not exceeding 300mm in width.

d)

58 Extra for nosing in granite stone for treads and Sq.M platform

Page 11 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM UNIT NO. e) 10 Extra for providing opening of required size and Nos shape for wash basins / kitchen sink in kitchen platform, vanity counters and similar locations in marble / stone work including necessary holes for pillar taps etc., including rubbing and polishing of cut edges etc., complete per opening 30 Providing and laying vitrified ceramic tile flooring / skirting using approved quality vitrified ceramic tiles of approved size and thickness according to size manufactured by M/s. Johnsons Ceramic / Somani / Khajaria or equivalent make laying the tiles over a bed of 20mm thick cement mortar 1:3 with cement slurry @ 3.3 Kg/sqm, jointed and pointed with matching grey / white cement slurry mixed with matching pigment and finishing to required level, curing etc., as per manufacturer's specifications, drawings etc., at all heights for a) 980 Tile size of 600 x 600mm of marble series for Sq.M flooring RATE (In Figures & in Words)

AMOUNT

b)

17 Anti skid tiles of size 600 x 600mm for flooring

Sq.M

c)

71 Tile size of 600 x 100mm of marble series for Sq.M skirting

31

Providing and laying Ceramic tile flooring / dadoing of approve quality, size, colour and thickness according to the dimensions of tiles and having scratch hardness and other parameter conforming to IS 13630 ( Bell or Navin or spartek or Jhonson or kajaria or somany or equivalent make) laid over a bed/backing as specified below, with cement slurry at 3.30 kg/sqm, close jointed and pointed with matching white cement slurry mixed with approved pigment and finishing to required level, curing etc., complete all as per specification and as directed by EIC at all floors.

Page 12 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM UNIT NO. a) 161 In flooring with approved colour Matt finish / Anti- Sq.M Skid premium floor tiles of size 300mm x 300mm as per IS 13755-1993 over bed/backing of 20mm thick in CM 1:4. b) 445 In dado with approved colour wall tiles (Regular / Sq.M plain or dark colour / glossy or mat series ) size 300mm x 200mm as per IS 13753-1993 over a bed/backing of 12mm thick in CM 1:3. 7 In skirting with approved colour wall tiles (Regular Sq.M / plain or dark colour / glossy or mat series ) size 300mm x 100mm as per IS 13753-1993 over a bed/backing of 12mm thick in CM 1:3. Providing and laying 20 to 30mm thick polished Kota stone slab flooring / skirting / dadoing / riser / tread using slabs, machine cut to required size, laid over a bed of 20mm thick cement mortar 1:4, and cement slurry at the rate of 4.4 kg/sqm for bedding and 2 kg/sqm for joints, close jointed and pointed with grey cement slurry mixed with pigments to match the shade of the slabs, finishing to required level and slope, curing, rubbing, cleaning with oxalic acid and wax polishing etc; complete all as per specifications. a) 40 In flooring Sq.M RATE (In Figures & in Words)

AMOUNT

c)

32

b)

25 In Skirting 80mm high

RMT

Page 13 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 33 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM Providing, fabricating and fixing in position ferrocement shelves thickness specified below as per detailed drawing. Slab made out of 10g x 10 g x 10cm x 10cm MS weldmesh placed and 26g hexagonal wire mesh on each side of weldmesh as reinforcement and cement mortar prepared of cement and river sand seived through a sieve of 2.36 aperture, shall be mixed dry in CM 1:2 proportion by weight and after with a water cement ratio of 0.48 including curing the same after 24 houors for a period of 7 days using continuous water spray complete with neat finishing in line and level with even thickness including fixing in position at all heights including cost of shuttering, mould, platform etc., complete as per the drawings and directions of Engineer-in-Charge at all heights, at all floors.

UNIT

AMOUNT

106 25mm thick shelves

Sq.M

WOOD WORK & JOINERY 34 Providing and fixing M.S. grills of required pattern in wooden / steel frames of windows, ventilators, clerestory windows, etc; with M.S. flats, square or round bars with round headed bolts and nuts or by screws, etc., complete all as per drawings and directions of Engineer-in-charge. 607 Plain grill ( With vertical, horizontal members or a combination of both) Kgs

35

Providing seasoned teak wood (Ballarshad) of class specified below in frames of doors, windows, ventilators and other frames etc., wrought, framed and fixed in position with 40mm x 3mm and 400mm long MS Hold fasts embedded in cement concrete blocks of size 345/230/115mm x 230mm x 150mm in PCC 1:3:6 mix for wall locations. Further if the frames are butting to the RCC / PCC columns / mullions, 8mm dia anchor fastner shall be provided instead of hold fasts or with MS bolts / Teak wood plugs and GI screws as required including tarring back of the frames, etc., complete all as per specifications

Page 14 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM Class seasoned Teak

UNIT wood Cu.M

AMOUNT

4 Using First (Ballarshad)

36

Providing and fixing at all heights/ in all floors with all leads coloured anodized aluminium doors/ windows/ partitions manufactured from best extruded Aluminium sections confirming to ISI, cut to length, joints mitred and corners grinded with joints water proof the outer frame and shutter frame stiffened with corner angle strips or provided for in the frame for fixing the frame to RCC columns/ masonry on sides, RCC lintels on top and PCC cills or floor at bottom, the frame work fixed with standard approved fastenings all generally as per details shown in drawings and specifications with all the sections pretreated for removal of any rust and prevention of further rust formation and coated with greasy materials for non-adherence of mortar or any other sticky materials and this coat to be removed after installations of the subdividing frames by tennoned and rivetted into frames all aluminium surface be thoroughly cleaned free or rust scale or dirt and mill scale by pickling surface finished with anodized dull matt finishing 15 MICRON thick including cost of pull and push plates and fixtures for hinged openings (arrangement with steel bearings wherever necessary), cost of labour for fixing of mortice lever locks, aluminium handles, door fittings like tower bolts etc., supplied free for fixing including screws/ bolts (or theses materials measured separately elsewhere) where shutters are involved etc., complete, cost of providing and fixing of glass of selected glazing quality of thickness and type of glass specified hereinafter or panel boards including nylon or PVC or rubber lining of approved quality wooden grounds, rubber gasketc, aluminium glazing clips, mastic etc., and fixing with aluminium glazing clips and also snap-on type with holes as per drawing and specifications provided for separately in the sub items following the main items of frame work for partition and door shutters as below: NOTE: All fitting works shall be carried out as per IS specifications including necessary rivets, screws, lugs, scaffolding, etc., complete all generally as per drawings.

Page 15 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

a)

The sizes of the components should confirm as per details in drawings. 1640 Providing and fixing of coloured Anodised aluminium (Matt finish) frame work (Horizontal and Verticals) for partitions Doors/ Windows with required sections of JINDAL/INDAL make or equivalent including all items and contingencies described above complete (Aluminium beadings and glazing clips measured under this item only) 1422 Providing and fixing of frame work (Styles and rails) for Doors shutters/ window shutters with required sections of JINDAL/INDAL make or equivalent including providing all items and hinged/ pivotes arrangements for operation of shutters and labour cost for fixing of door fittings and locks (Which shall be free issues for fixing or paid separately) etc., complete. (Aluminium beadings and glazing clips measured under this item only).

Kgs

b)

Kgs

c)

231 Providing and fixing Glass panes of selected Sq.M glazing quality and thickness as specified below including providing and fixing Nylon/ rubber/ PVC lining of approved quality and fixing with aluminium glazing clips/ Aluminium beadings (Supply cost of aluminium clips/ Al i i l i i li / Aluminium b di beadings are measured in items above for DOORS/ WINDOWS/ PARTITIONS etc., Using 4mm thick plain glass 15 Providing and fixing 8mm thick etched glass for Sq.M main door including all necessary fixtures etc., complete.

d)

37

50 Supplying of factory made composite door shutter Sq.M with frame and single shutter manufactured by M/s. Fimen Fibre Products Pvt. Ltd. Or equivalent with door frame of size 70x50mm. The door shutter shall be of rigid G.R.P. sandwich composte structure of 26mm thick (minimum) laminated on all sides with G.R.P. skin fabricated using U.V. stabilized Isopthalic gel coat and one layer of 450 GSM E glass chopped strand mat (CSM) impregnated with polyster resin. The thickness of skins shall not be less than 1.5mm

Page 16 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM Expanded polysterene structural foam panel of density 20kg/cum shall be used as core material for the whole areas of door except the wooden frame structure. The wooden reinforcements made of seasoned salwood block of minimum cross section of 70x26 for lock side 40x26 all round forming the framework for shutter and minimum of 75mm wide intermediate strip for the width of the door for fixing locks and fixture and shall conform to IS-4020-1998. The finish of the shutter be without grains and of approved colour etc., complete all as per manufacturers specifications at all heights.

UNIT

AMOUNT

38

Supplying and fixing solid hard core non decorative type (BN) interior grade commercial BLOCK BOARD FLUSH DOOR SHUTTERS of approved make conforming to IS 2202 (part-I) 1991 with teak wood (Ballarshad) internal lipping on all sides and solid teak wood (Ballarshad) inserts for mounting locks, etc., having well matched commercial ply veneering with cross bands and face veneers on both faces, including cost of labour for fixing builders hardware and locking arrangements etc., complete all as per specifications, b t excluding cost of b ild ifi ti but l di t f builders hardware and locking arrangements issued with screws by the department free of cost. Note: Samples as stipulated in IS code should be furnished for tests free of cost by the contractor as the tested samples are destroyed during testing. 16 Single shutter 35mm thick Sq.M

Page 17 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 39 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM Supplying and fixing solid hard core non decorative type (BD) interior grade commercial BLOCK BOARD FLUSH DOOR SHUTTERS of approved make conforming to IS 2202 (part-I) 1991 with teak wood (Ballarshad) internal lipping on all sides and solid teak wood (Ballarshad) inserts for mounting locks, etc., having well matched commercial ply veneering on one face and teak ply veneering on other face with cross bands and face veneering including cost of labour for fixing builders hardware and locking arrangements etc., complete all as per specifications, but excluding cost of builders hardware and locking arrangements issued with screws by the department free of cost. Note: Samples as stipulated in IS code should be furnished for tests free of cost by the contractor as the tested samples are destroyed during testing.

UNIT

AMOUNT

55 Single shutter 35mm thick

Sq.M

40

Supplying and fixing solid hard core decorative type (BD) interior grade commercial BLOCK BOARD FLUSH DOOR SHUTTERS of approved make conforming to IS 2202 (part-I) - 1991 with teak wood (Ballarshad) internal lipping on all sides and solid teak wood (Ballarshad) inserts for mounting locks having well matched teak ply veneering with cross bands and face veneers on both faces, including cost of labour for fixing builders hardware and locking arrangements etc., complete all as per specifications, but excluding cost of builders hardware and locking arrangements issued with screws by the department free of cost. Note: Samples as stipulated in IS code should be furnished for tests free of cost by the contractor as the tested samples are destroyed during testing. 65 Single shutter 40mm thick Sq.M

Page 18 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 41 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

42

71 Providing and fixing best quality of decorative Sq.M laminated sheet 1.50mm thick formica or equivalent, matt finish, of approved colour conforming to I.S. code, fixing to flush shutter, etc; using adhesive fevicol - SH or equivalent, complete all as per specifications. Providing and fixing 18mm thick door shutters (single or double) for wardrobe / cupboards / shoe racks made out of malemine faced prelaminated wood based graded particle board of BHUTAN or NOVAPAN or equivalent or melamine aced prelaminated wooden based flat pressed three layered particle board of NOVOPAN or equivalent, particle bonded with phenol formaldehyde with decorative laminate on one side and white balancing laminate on the other side. The boards shall be manufactured conforming to IS 3087 with teak wood lipping of 18 x 10mm on all edges and painting the beading with synthetic enamel paint to match the colour of decorative laminate including cost of labour for fixing builders hardware like hinges, knobs, handles, locks, tower bolts, etc., complete all as per specifications but excluding cost of builders hardware and locking arrangements which will be issued with screws by the Department f th D t t free of cost etc., at all h i ht and f t t t ll heights d levels for 95 Cupboard / Wardrobe shutter with decorative Sq.M lamionate on one side and balancing white on other side

Page 19 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 43 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

68 Supplying and fixing of Aluminium structural Sq.M glazing with double framing system made out with heavy extruded box section specially detailed for double framing system using section of 101.6 x 57 x 2.5 mm weighing 2.664 Kg/m as main structural member and of size 26.5 x 20.5 mm weghing 0.531 Kg/m as sub frame of approved make, all colour anodised 20 micron with all standard accessories like special steel cleating system with anchor fasteners and 6mm x 4mm spacer tape Nortan make (polyuthelene tape) with GE 4000 silicon sealent including providing and fixing of 6mm thick toughned reflective glass of specified colour (Grey / Bronze / Blue / Green ) all complete.Item includes cost of supplying, installation, fixing of alluminium frame with structural members, mullions, transsom, subframe grid supply instalation of glass including cost of sealants, brackets, fastners, screws, sleeve, spacer tap, backer rod, bolts, gasket, fixtures, double stage scaffolding , including all Taxes etc., complete in all respects and to the satisfaction of the Engineer-in-charge. Providing and fixing steel door system made out of standard rolled steel sections. Th d t d d ll d t l ti The door f frame, shutter frame and diagonal stiffeners for the shutters, styles and rails and for shutters shall be MS angles / Tees. The shutter frame shall be covered with MS sheet (single / double skin) electrically welded. The door frame shall have base tie made out of 12mm square MS rod embedded in flooring and 3nos. of 15mm x 3.15mm lugs of 100mm long on each side embedded in cement concrete blocks of size 150 x 100 x 100mm of 1:3:6 mix (1 cement : 3 coarse sand : 6 hard granite stone aggregate 20mm nominal size) or with anchor fasteners or with fixing clips with bolts and nuts as required.

44

Page 20 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

The work includes providing approved pivots as required and iron oxidized butt hinges 125mm long, 3nos. for each shutter conforming to IS 13411970 etc., including cutting the steel sections to required lengths, joints mitred and electrically welded, ground and cleaning the surface thoroughly free from rust scales and painted with two coats of synthetic enamel over a coat of red oxide zinc chromate primer, after pre treatment of the surface by pickling and phosphating etc., conforming to IS specifications including providing and fixing MS aldrops, MS tower bolts and MS handles etc., complete all as per specifications, drawings and instructions of Engineer in charge at all heights. 160 a) Fully openable (single / double) shutter and Kgs Using MS sheet covered on single or both sides

45

Providing, fixing and erecting at site frameless glass pivoted door and fixed glazing consisting of diecast patch fitting of DORMA or approved equivalent make with stainless steel cover and corner lock with euro profile cylinder of approved make. The fittings will be mounted on 12mm thick toughened glass with all necessary required accessories. The door will also consist of floor spring, top pivot, top patch, bottom patch, strike plate and handle of approved make with all necessary glass mounting accessories for the self closing feature complete. The glass shall be grouted at the floor with aluminum u channel etc all complete as shown in the drawings and to the satisfaction of Engineer-in-Charge. 10 Double door with patch fittings Sq.M

Page 21 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 46 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

Supplying and fixing standard steel rolling shutter made out mild steel stips slats or laths of deep convex corrugations made from from tested steel sheets confirming to IS-277 specifications for galvanised steel sheets 63mm to 75mm wide, 1.25mm thick, machined rolled and straightened with an effective bridge depth not less than 15mm including interlocking the laths through out the length, mounting on specially designed pipe shaft including all accessories such as top cover of required size, side guides of size 63.5mm x 25.4mm (2.5" x 1" ) made out of 10g thick plate and "L" reinforced angle iron fixed out side brackets, suspension shafts, top rolling springs made out of strong and best tested continental spring, hood covers made out of mild steel sheets not less than 0.9mm thick, bottom rails, locking arrangements, painting with one coat of factory finish red oxide zinc chromate primer of approved make, etc., complete all as per specifications in all floors. 5 Gear opearated type (Mechanical type) with ball Sq.M bearings, operated by a bevel gear box and crank handle upto a clear area of 25sqm.

47

50 Providing and fixing SS mosquito proof and fly Sq.M proof mesh to aluminium frame work including cost of mesh, and labour for fixing builders harware and locking arrangements etc., complete all as per specifications but excluding cost of builders hardware and locking arrangement issued by the Department free of cost. (Aluminium frame work shall be measured under the relevant item) 41 Supply, fabrication and erection of Lexan 10mm Sq.M thick Multiwall Bronze Colour Polycarboante Sheet, skylight frame structure using MS hollow sections of medium class bent to curvature fabricated and erected in protections. The structure is with one coat of zinc chromate primer and painted two coats of enamel paint of approved colour. 10mm thick polycarbonate sheet fixed with the help of aluminium profile section and EPDM gaskets and silicon sealant of winsil 20 from GE Bayer all complete as per drawing. NOTE: Area of the Polycarbonate sheet only will be measured for payment.

48

Page 22 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. QUANTITY DESCRIPTION OF ITEM UNIT NO. ROOFING 49 Providing and laying water proofing treatment over RCC roof in 3 courses, as specified below, after thoroughly cleaning surface of the roof slab with wire brush, cleaning of dust and foreign matters, raking and cleaning of construction joints if any etc., complete to make the surface suitable for receiving water proofing treatment. I Course: The existing covering on slab to be removed and the surface of the RCC slab exposed. Construction joints if any are to be raked and cleaned. A coat of cement slurry at the rate of 4.4kg/sqm mixed with acrylic water proofing compound (as per manufacturers specification) is spread uniformly over the RCC roof area and ensuring that the slurry penetrates in to the RCC slab below and fills all micron cracks and all other porous areas. Over this a layer of 15mm thick cement mortar 1:5, mixed with acrylic water proofing compound as per manufacturers specifications shall be laid to place the II course. II Course: A single layer of brick on edge with 15mm wide gaps filled with CM 1:5 mixed with acrylic water compound is laid (i.e. bricks placed vertically on it 75 115 ti ll its 75x115mm side or 75 230 id 75x230mm side id as the case may be, to suit the required thickness of courses), when the bottom layer (I course) is still green and laid to slope of 1 in 60 as per roof drainage scheme using approved well burnt bricks (wear absorption not more than 20%) with minimum thickness of 65mm at outer edge including the top and bottom plastering (I&III course) to get required gradient, laying the bricks with not less than 15mm gap alround, which shall be properly filled completely and compacted with CM 1:5 mixed with acrylic water proofing compound as per manufacturers specification using full bricks or bricks cut to required size to lay the course with single layer with gradient said above for adequate drainage. RATE (In Figures & in Words)

AMOUNT

Page 23 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM III Course: 20mm thick cement mortar 1:4 mixed with acrylic water proofing compound with a layer of Chicken mesh 12mmx26G and marked with 300mmx300mm false squares including curing etc., for not less than 7 days, complete all as per specifications and directions of Engineer-incharge. The 20mm thick layer shall be carried out in two layers of 10mm thick with an inter layer of chicken mesh of 12mmx26G laid in between the two layers of cement mortar. NOTE: The acrylic water proofing compound to be used shall be; a). CHEMSEAL - Manufactured by M/s. Overseas Water Proofing Corporation, Mumbai. The proportion of CHEMSEAL shall be 2% by weight of cement. OR CONPLAST X 421 IC - integral water proofing compound manufactured by M/s. FOSROC Chemicals (India) Ltd., Bangalore. The proportion of CONPLAST x 421 IC shall be 130ml per 50 kgs of manufactured by M/s. ROFFE Construction Chemicals Pvt. Ltd., liquid integral water proofing compound at 140ml per 50kg of cement or Equivalent. b)The b)Th second course of th t t d f the treatment shall b l id t h ll be laid in single course using full bricks/cut bricks as may be required for laying the course in 1 in 60 slope. c) The rate to include all labour, material and contingent coats for execution of work in a workman like manner including curing, etc., complete for respective courses. d) The plane horizontal measurements of roof slab only shall be measured for payment. e) The theoretical cement consumption required for the above work will be worked out based on coefficient for each layer of work as per specification.

UNIT

AMOUNT

f) The work shall be got executed through specilised water proofing agency. 2060 g) The contractor should finish a guarantee bond Sq.M in the prescribed format for satisfactory water proofing performance for 10 years.

Page 24 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 50 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

a)

Providing and fixing rigid PVC SWR (soil, waste and rain water) drainage/ rain water pipe conforming to type-A of IS 13592-1992, including accessories like bends and fixing with pipe clips, adhesive at joints all as per manufacturer's specifications to required length etc., complete all as per specifications and directions of Engineer-incharge. 78 110mm OD pipes with minimum wall thickness of Mtr 2.20mm.

b)

49 160mm OD pipes with minimum wall thickness of Mtr 3.20mm.

51

Providing and making khurras of size specified below with 12mm thick CM 1:3 plaster finish over PCC 1:2:4 using 10mm nominal size stone aggregate (1 cement: 2 coarse sand: 4 stone aggregate) of 600mmx600mm of varying thickness of 40mm at WPC side to 30mm at pipe end, laid to slope, compacted over PVC sheet of 1000x1000mm x 400 micron laid over top of slab after cleaning the surface of concrete slab. The top surface of CM 1:3 plaster shall be finished smooth with cement punning, rounding of edges etc., complete all as per specifications and directions of Engineer-in-charge. [Note: The RWP shall be fixed during construction of parapet to ensure filling the joints and around pipe properly]. 32 600mmx600mm size Each

52

5 Providing and fixing 75mm dia (O.D) Unplasticised Mtr PVC pipe water spouts conforming to IS 49851988 inclusive of specials (Tee) conforming to IS 7834 (part IV) 1987 of working pressure 6kg/sqcm. The outlet end shall be provided with PVC Tee and the inlet end shall be flush with inner face of facias/ parapets, fixing in cement mortar 1:3 etc; complete all as per specifications.

Page 25 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 53 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

905 Providing and laying angular fillet 7.5 x 7.5cm Mtr cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) 20mm nominal size, including compaction, finishing, curing, etc; complete all as per specifications. Plastering 12mm thick with cement mortar specified below, finished rough including scaffolding, curing, etc. complete for EXTERNAL SURFACES inclusive of sills, jambs, soffits, ceilings, etc., complete all as per specifications for IN ALL FLOORS AND AT ALL HEIGHTS. Mix specified is for cement : coarse sand. NOTE : i) CM 1 : 3 OR CM 1:4 is generally applicable for ceilings and RCC surfaces unless otherwise specified. With CM (1:5) to brick walls 1254 Upto 10 m Level Sq.M

FINISHING 54

a)

b)

With CM (1:4) to RCC surfaces 138 Upto 10 m Level

Sq.M

55

a)

Plastering 12mm thick with cement mortar specified below, finished smooth with lime neeru including scaffolding, curing, etc., complete for INTERNAL SURFACES of walls, beam, ribs, sills, jambs, ceiling, etc., complete all as per specifications at ALL HEIGHTS. Mix specified is for cement: fine sand. 2366 With CM 1:5 to masonry walls Sq.M

b)

760 With CM 1:4 to RCC surfaces

Sq.M

c)

1272 With CM 1:4 to ceiling

Sq.M

Page 26 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 56 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

35 Providing and fixing GI hexagonal chicken wire Sq.M mesh of size 12mm x 22g at the junction of disimilar surfaces of brick masonry wall and RCC column by beams and the like including necessary nails for fixing etc, complete all as per specification and direction of Engineer - in - charge for all floors at all heights.

57

3953 Providing and applying two coats of M/s Birla Wall Sq.M care putty or approved equivalent of 1.5mm thickness over plastered surface to prepare the surface even and smooth complete.

58

3953 Painting internal plastered surfaces with two or Sq.M more coats of super acrylic emulsion paint of approved brand and colour (Berger or Asian or equivalent) to give an even shade with required finish over a caoat of water thinnable cement primer including cleaning the surfaces, filling the crevices with approve dfiller, scaffolding, curing, etc., complete all as per specifications. 892 P i ti Painting external plastered surfaces with t t l l t d f ith two or S M Sq.M more coats of 100% acrylic exterior emulsion paint of approved make and colour (weather coat of Berger or apcolite apex of Asian or equivalent) having protection against fungal, growth, flaking, fading, alkali and UV degradation and to give an even shade with required finish including cleaning the surfaces, filling the crevices with approved filler, scaffolding, curing, etc., complete all as per specifications at all heights. 500 Providing & applying exterior textured paint with Sq.M natural stone graunals wall finish of Altek/ Spectrum/ Renovo or approved make in required numbers of coats as per specification of approved manufacturer and texture as approved by Engineerin-charge on external surface of any portion including scaffolding & preparatory work as required to complete for finshed item of work. 165 Polishing on wood work with 2 coats of melamine Sq.M polishing including cost of all materials and labour sand papering for surface preparation implements etc., in all floors as directed by the Engineer for the finished item of work.

59

60

61

Page 27 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. 62 RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM

UNIT

AMOUNT

85 Painting wood work with TWO or more coats of Sq.M SYNTHETIC ENAMEL PAINT of Ist quality and approved colour to give an even shade over a coat of synthetic enamel primer including cleaning the surfaces, filling the crevices with approved filler, applying a coat of approved putty on whole surface and rubbing the surface to achive desired smooth surface, scaffolding, etc., complete all as per specifications. (Rate to include cost of synthetic enamel primer, putty also). 146 Painting steel work with TWO or more coats of Sq.M SYNTHETIC ENAMEL PAINT of Ist quality and approved colour to give an even shade over a coat of red oxide zinc chromate primer including cleaning the surfaces, applying a coat of approved putty on whole surface and rubbing the surface to achive desired smooth surface, scaffolding, etc., complete all as per specifications. (Rate to include cost of zinc chromate primer, putty also).

63

FALSE CEILING 64 340 Providing and fixing at all heights / in all floors with Sq.M all leads seamless type M/F suspended False ceiling of India Gypsum or equivalent using GI perimeter channel of size 0 55 i t h l f i 0.55mm thi k (h i thick (having one flange of 20mm and another flange of 30mm and a web of 27mm) along with perimeter of ceiling, screws fixed to brick wall / partitions with the help of nylon sleeves and screws at 610mm c/c. Then suspending GI intermediate channels of size 45mm (0.9mm thick with two flanges of 15mm each) from the soffit at 1220mm c/c with ceiling angle of width 25 x 10 x 0.5mm thick fixed to soffit with GI cleat and steel expansion fasteners. Ceiling section of 0.55mm thickness having knurled web of 51.5mm and two of flanges of 26mm each with lips of 10.5mm are then fixed to the intermediate channel with the help of connecting clips and in direction of perpendicular to the intermediate channel at 457mm c/c

Page 28 of 29

Package - II - Part -I Civil Works Construction of Transit Hostel Building SL. NO. RATE (In Figures & in Words)

QUANTITY

DESCRIPTION OF ITEM 12.5mm tapered edge gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall screws at 230mm centres. Screws fixing is done mechanically either with screw driver or drilling machine with suitable attanchment. Finally the boards of 12.5mm thick gypboard are to be jointed and finished so as to have a flush look which includes filling and finishing the tapered and square edges of the boards with jointing compound, joint paper tape and two coats of drywall topcoat suitable for gypboard including providing scaffolding and executing the work at all heights. (Please refer drawing for details and recommended practices of India Gypsum or equivalent).

UNIT

AMOUNT

65

Providing and laying light duty Non-pressure NP-2 class RCC hume pipes with collars jointed with stiff mixture of CM 1:2 (1 cement: 2 fine sand) inlcuding joints etc., complete. 50 300mm dia Rm

TOTAL

Page 29 of 29