Document No.
Headtank Hydraulic Analysis
HPP-GYM-DC-ENG-ED-056
Rev.: 0
Page Number
Page 1 of 6
CLIENT
PROJECT NAME
PROJECT TITLE
HPP
LOCATION
GENYEM, PAPUA
PLN DOCUMENT NO
2168-GY02-M-07-GATH-001
REV
DATE
DESCRIPTION
PREPD
CHKD
APPD
Rev.: 0
Page Number
Page 2 of 6
Table of Content
TABLE OF CONTENT......................................................................................2
1 HEADTANK AND PENSTOCK INTAKE.............................................................3
HPP-GYM-DC-ENG-ED-056
Rev.: 0
Page Number
Page 3 of 6
1.1
SUBMERGENCE
= 13.00 m3/sec
= 3.60 m/sec
S+D
= +412.93
= + 407.125
= + 406.00
= 0.2* (13)
= 0.65 m/sec
S+D
Max invert elevation = 411.3 - 2.78 = + 408.52 > 407.125, hence penstock invert
elevation designed to be at + 407.125.
1.2
Rev.: 0
Page Number
Page 4 of 6
The main function of a headtank in a MHPP is to maintain flow availabitity and consistency.
The effective volume minimum that a headtank is
Vsc 10 sec x Qdesign m3
Vsc = L x B x dsc
L x B x dsc = 103.84 m3
where :
L
= Headtank length
= Headtank width
dsc
dsc
= 412.93 411.30
= 1.63 m
Hence:
L
= 21 m
=7m
To give:
Vsc = 239.56 m3
1.3
Rev.: 0
Page Number
Page 5 of 6
HEADTANK SPILLWAY
0.4
g
9.81
c
5.9
m
0
b
7.00
x
3
Where
qi
Discharge coefficient
Numerical distance
Gravity (m)
ho
Data
Q 500 yr
Document No.
Headtank Hydraulic Analysis
HPP-GYM-DC-ENG-ED-056
Page 6 of 6
0.4
9.81
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
Qo
10.38
12.21
14.04
15.86
17.68
19.48
21.29
23.08
5.9
7.00
6.46
6.46
6.46
6.46
6.46
6.46
6.46
6.46
ho
6.45
6.45
6.45
6.45
6.45
6.45
6.45
6.44
ho-c
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.54
Ho
He
3 0.558219
qx
1.82
1.83
1.82
1.82
1.81
1.80
1.79
1.78
Qo+qx
12.21
14.04
15.86
17.68
19.48
21.29
23.08
24.86
Ax
45.17
45.18
45.17
45.16
45.15
45.14
45.13
45.11
vx
0.23
0.27
0.31
0.35
0.39
0.43
0.47
0.51
hx
6.45
6.45
6.45
6.45
6.45
6.45
6.44
6.44
q
1.82
3.65
5.48
7.29
9.10
10.90
12.69
14.47
2.5
5
7.5
10
12.5
15
17.5
20
Hence the requirement of the desand spillway is 20 meters long and 1.10 meters high.
h (m)
v (m/s)
Q (m3/s)
3.00
3.00
3.00
3.00
3.00
3.00
0.00
0.50
0.75
1.00
1.10
1.16
0.00
0.00
0.00
0.00
1.00
1.00
0.03
0.03
0.03
0.03
0.03
0.03
0.010
0.010
0.010
0.010
0.010
0.010
0.00
1.50
2.25
3.00
4.51
4.83
3.00
4.00
4.50
5.00
6.11
6.28
0.00
1.86
2.25
2.54
2.92
3.00
0.00
2.78
5.06
7.62
13.15
14.47
= 14.47 m/s
Slope channel
= 0.01