WASKITA - GXED/TKL CONSORTIUM

Document No.
Headtank Hydraulic Analysis

HPP-GYM-DC-ENG-ED-056

Rev.: 0
Page Number
Page 1 of 6

CLIENT

PT. PLN (Persero)

PROJECT NAME

GENYEM HYDRO POWER PROJECT (2x10MW)

PROJECT TITLE

HPP

LOCATION

GENYEM, PAPUA

PLN DOCUMENT NO

2168-GY02-M-07-GATH-001

REV

DATE

DESCRIPTION

PREPD

CHKD

APPD

WASKITA - GXED/TKL CONSORTIUM


Document No.
HPP-GYM-DC-ENG-ED-056

Headtank Hydraulic Analysis

Rev.: 0
Page Number
Page 2 of 6

Table of Content
TABLE OF CONTENT......................................................................................2
1 HEADTANK AND PENSTOCK INTAKE.............................................................3

WASKITA - GXED/TKL CONSORTIUM


Document No.
Headtank Hydraulic Analysis

HPP-GYM-DC-ENG-ED-056

Rev.: 0
Page Number
Page 3 of 6

HEADTANK AND PENSTOCK INTAKE

1.1

SUBMERGENCE

S = 0.54 V D --> (MHEPP Resources Dev. Manual APP 46.9)


Symmetrical Approach
Data :
Q

= 13.00 m3/sec

Qdesign = 1.1* (9.44)

= 14.3 m3/sec (for 1 turbine)

= 2250 mm (diameter penstock)

= 3.60 m/sec

= 0.54 x 3.602.25 = 2.91 m

S+D

= 2.91 + 2.25 = 5.16 m

Penstock Intake Invert Elevation


NOL (S + D )

= 412.93 5.16 - = 407.77

NOL (Normal Operating Level)

= +412.93

Design intake invert elevation

= + 407.125

Design headtank base elevation

= + 406.00

Minimum water submergence to the penstock inlet is also checked.


Qmin

= 0.2* (13)

= 2.6 m3/sec (for 1 turbine)

= 2250 mm (diameter penstock)

= 0.65 m/sec

= 0.54 x 0.652.25 = 0.53 m

S+D

= 0.53 + 2.25 = 2.78 m

Max invert elevation = 411.3 - 2.78 = + 408.52 > 407.125, hence penstock invert
elevation designed to be at + 407.125.

WASKITA - GXED/TKL CONSORTIUM


Document No.
HPP-GYM-DC-ENG-ED-056

1.2

Headtank Hydraulic Analysis

Rev.: 0
Page Number
Page 4 of 6

MINIMUM HEADTANK DIMENSION

The main function of a headtank in a MHPP is to maintain flow availabitity and consistency.
The effective volume minimum that a headtank is
Vsc 10 sec x Qdesign m3
Vsc = L x B x dsc
L x B x dsc = 103.84 m3

where :
L

= Headtank length

= Headtank width

dsc

= effective operational headtank height (NWL-LWL)

dsc

= 412.93 411.30
= 1.63 m

Hence:
L

= 21 m

=7m

To give:
Vsc = 239.56 m3

WASKITA - GXED/TKL CONSORTIUM


Document No.
HPP-GYM-DC-ENG-ED-056

1.3

Headtank Hydraulic Analysis

Rev.: 0
Page Number
Page 5 of 6

HEADTANK SPILLWAY

0.4

g
9.81

c
5.9

m
0

b
7.00

x
3

Spill equation for spillway

Where
qi

Flow through spillway per x (m3/s)

Discharge coefficient

Numerical distance

Gravity (m)

ho

Downstream water elevation

Side spillway crest elevation

Data
Q 500 yr

= 14.474 m3/sec entering the tunnel through the de-sedimentation basin

WASKITA - GXED/TKL CONSORTIUM


Rev.: 0
Page Number

Document No.
Headtank Hydraulic Analysis

HPP-GYM-DC-ENG-ED-056

Page 6 of 6

Table 1. Headtank Spillway Calculation

0.4

9.81

2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5

Qo
10.38
12.21
14.04
15.86
17.68
19.48
21.29
23.08

5.9

7.00

6.46
6.46
6.46
6.46
6.46
6.46
6.46
6.46

ho
6.45
6.45
6.45
6.45
6.45
6.45
6.45
6.44

ho-c
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.54

Ho

He
3 0.558219

qx
1.82
1.83
1.82
1.82
1.81
1.80
1.79
1.78

Qo+qx
12.21
14.04
15.86
17.68
19.48
21.29
23.08
24.86

Ax
45.17
45.18
45.17
45.16
45.15
45.14
45.13
45.11

vx
0.23
0.27
0.31
0.35
0.39
0.43
0.47
0.51

hx
6.45
6.45
6.45
6.45
6.45
6.45
6.44
6.44

q
1.82
3.65
5.48
7.29
9.10
10.90
12.69
14.47

2.5
5
7.5
10
12.5
15
17.5
20

Hence the requirement of the desand spillway is 20 meters long and 1.10 meters high.

Table 2. Headtank Spillway Channel Capacity


B (m)

h (m)

v (m/s)

Q (m3/s)

3.00
3.00
3.00
3.00
3.00
3.00

0.00
0.50
0.75
1.00
1.10
1.16

0.00
0.00
0.00
0.00
1.00
1.00

0.03
0.03
0.03
0.03
0.03
0.03

0.010
0.010
0.010
0.010
0.010
0.010

0.00
1.50
2.25
3.00
4.51
4.83

3.00
4.00
4.50
5.00
6.11
6.28

0.00
1.86
2.25
2.54
2.92
3.00

0.00
2.78
5.06
7.62
13.15
14.47

= 14.47 m/s

Slope channel

= 0.01