Status from 28.12.11 to 10.01.

2012

Boiler Erection work

Bunker Fabrication

Bunker Erection progress

CHP Gallery Status

Condenser

Condenser Tubes

ESP

ESP 1ST FIELD COLLECTING PLATES

HP Heaters

SA & PA FAN FOUNDATION

TRANSFER TOWER COLUMNS GROUND PRE ASSY

DECK SLEEVES ERECTION

Status from 12.01.12 to 22.01.2012

Boiler Structure

Coal Bunker

ESP Bottom Hopper Pre Assembly

ESP Collecting Electrodes Erection

PA & SA Fan Foundations

Primary Crusher House Cum Foundations

Deaerator Platform

Cooling Tower

TG Building Structure

Stator

Generator Transformer

STG Deck Reinforcement

Status as on 31.01.2012

Boiler Structure

CHP Control Room

Ground Hopper

Screen House & Conveyor Trench Foundations

Coal Bunker Canopy Structure

Coal Bunker Erection

Cooling Tower

ESP Collecting Electrode Erection

Excavation For ID Fan Foundation

STG Deck

TG Building Staircase

Generator Transformer

Status from 04.02.12 to 19.02.12

Water Wall Panel Erection

BFP Suction Line

CHP Conveyor Trestles & Gallery Erection

Coal Bunker Hopper Plate Erection

Cyclone Top & Bottom Cones Pre Assembly

Cyclone Pre Assembly

ESP Control Room Foundations

CEP Base Frames Grouting

PA & SA Fan Foundations

ID Fan & Duct Supporting Foundations

STG Deck

TG Building Brick Work Towards North

Status from 20.02.12 to 29.02.12

Water Wall Panels Pre Assembly

RHS Water Wall Panels

Coal Bunker Structure, Bunker & Canopy

ESP Hopper Top Part Erection For Stream 1

Erection of ESP Collecting Electrodes For Stream 1

Blue Matching For CEP & DTP-1

Refractory Anchors Welding For Cyclone

Oil Purifier Foundations

Cribs Dismantling For STG Deck

TG Integral Non IBR Piping

TG Building Sheeting

Generator Packer Plates

Status from 03.03.12 to 11.03.12

Boiler Steam Drum

Boiler Refractory

Ground Hopper

Coal Bunker & Canopy Structure

Secondary Crusher

Economizer Coils Pre Assembly

ESP Control Room & Compressor ESP Stream -2 Bottom Hopper Erection Foundations

Condenser LP Heater 7

CEP Pump Base Frame Erection

Piping

ID Fan & Duct Supporting Column Foundations

Trestle -16 Erection

Turbine 2nd Bearing pedestal Packer Plates Grouting

TG Building South Side wall & Side Sheeting

Status from 12.03.12 to 18.03.12

Boiler

Boiler 1st Pass

Boiler 3rd Pass

BFP Suction Piping

DTP & CEP Pump Assembly

ESP Assay 1

ESP Assay 2

ESP Out Let Duct

Deaerator Level Stand Pipe

HP Heaters in 6 Mtrs

MOT Erected

Generator Cooling Chamber RCC Started Stator Assy Making Ready for Lifting

Stator Lifting to its Position

TG Building Towards North Side

Status from 22.03.12 to 10.04.12

Boiler Drum Lifting

Boiler Down Comers & Water Wall Panels

Coal Feeders

CEP & DTP Motors Erection

ESP Roof Insulation

Ducting

GSC Piping

Cooling Tower Sleeves Erection

PA & SA Fan Foundation

ID Fan Foundations

Oil Cooler Cooling water Piping

Stator Lifting @9.2 Mtrs

Turbine 1st Bearing Pedestals Erection Switch Yard Towers Auxiliary Foundations

Transfer Tower Columns Erection

Status from 12.04.12 to 22.04.12

Cage Wall Front Panel

Coal Bunker Canopy Side Sheeting

Down Comer Lifting

HP Feed Water Line

High Temperature Super Heater Coils Pre Assembly

Piping Pre Assembly

COT & DOT Tanks

ESP Control Room & Compressor Foundations

Drain Flash Tank Main Folder Line

DM Plant & DW Water Storage Tank Foundations

ID Fan & ESP Outlet Duct Supporting Columns Foundations

ID Fan2 Foundations

PA & SA Fan Foundations

Stator Alignment

Switch Yard

Status from 23.04.12 TO 30.04.12

Plant View West Side

Boiler Canopy Structure

Front Cage Wall Panel

ESP Control Room Foundations

Insulation & Cladding for ESP Casing

DM Plant & DM Water Storage Foundations

ID Fan1 & Duct Supporting Column Foundations

ID Fan 2 Foundations

Cable Trench

Cable Tray Support at TG Cellar

Excavation for UAT Foundations

LP Casing Base Frames

Status from 02.05.12 TO 13.05.12

Plant Overview

Coal Conveyor Gallery

Cage Water Wall Panels

Plenum Platen Tubes Pre Assembly

BFP-B Motor Blue Matching

ESP Control Room & Compressor Foundations

ESP Casing Insulation & Sheeting

ID Fan1 & Duct Supporting Column Foundations

DM Water Storage Tank

SA Fan Erection

LP Outer Casing

UAT Foundations

Status from 15.05.12 to 22.05.12