2012
Bunker Fabrication
Condenser
Condenser Tubes
ESP
HP Heaters
Boiler Structure
Coal Bunker
Deaerator Platform
Cooling Tower
TG Building Structure
Stator
Generator Transformer
Status as on 31.01.2012
Boiler Structure
Ground Hopper
Cooling Tower
STG Deck
TG Building Staircase
Generator Transformer
STG Deck
TG Building Sheeting
Boiler Refractory
Ground Hopper
Secondary Crusher
ESP Control Room & Compressor ESP Stream -2 Bottom Hopper Erection Foundations
Condenser LP Heater 7
Piping
Boiler
ESP Assay 1
ESP Assay 2
HP Heaters in 6 Mtrs
MOT Erected
Generator Cooling Chamber RCC Started Stator Assy Making Ready for Lifting
Coal Feeders
Ducting
GSC Piping
ID Fan Foundations
Turbine 1st Bearing Pedestals Erection Switch Yard Towers Auxiliary Foundations
ID Fan2 Foundations
Stator Alignment
Switch Yard
ID Fan 2 Foundations
Cable Trench
Plant Overview
SA Fan Erection
LP Outer Casing
UAT Foundations