Agenda 1. Overview 2. BH Definition 3. Node B Capacity Assessment Methodology 1. CPULoad_CCM & CPULoad_CEM 2. CEM R99 Capacity Assessment 3. CEM HSXPA Capacity Assessment 4. HSDPA OVSF Code Assessment 5. DL Power Assessment 6. UL load Assessment 7. IUB Assessment 4. NodeB Capacity Assessment Results
Page 2
1. Overview
Page 3
Overview
Objective The purpose of NodeB capacity assessment is - to analyze the BTS resources usages at BH for all NodeBs of Vodafone UK RNC EH4 (except Micro BTS and non integrated NodeB) - to identify the resources that require a HW addition Inputs - NPO counters of load and blocking for W28-29 2010 Outputs CPULoad_CCM & CPULoad_CEM Assessment CEM R99 CE Assessment CEM HSXPA Resource Assessment HSDPA OVSF Code Assessment DL Power Assessment UL load Assessment IUB Assessment RNC #NodeB #Cells EH4 158 632
The capacity Assessment will allow VdF UK to understand the current capacity status of 3G access network
Page 5 All Rights Reserved Alcatel-Lucent 2010
Overview
REPORT GENERATION
Configuration Data
CAPACITY STATUS
Observation Period
Node B
Page 6
Monofreq NodeB
LCG0
2. BH Definition
Page 8
BH Definition
Two BH have been identified: BH_All = RB013_DLCsVoice + RB013_DLPS BH_HSXPA= RB013_HSDPA+ RB013_HSUPA BH_All is used to evaluate CPU Load CCM & CEM, CEM R99 capacity, DL Power, Ul Load BH_HSXPA is used to evaluate CEM HSXPA capacity, OVSF HSDPA codes, DL HSDPA Power (for mono Freq NodeB) IUB capacity is evaluated based on the max value of Received cells and Sent Cells of the weeks observed
Page 9
Page 10
no
(#10403) (#10403)
Stop
yes no
VS.CpuLoad.CEM.Avg > 70 % (Resp. VS.CpuLoad.CCM.Avg > 70 %)
Stop
yes
Add CEM board (resp CCM)
Page 11
Page 12
CEMUsedDch.Max > x %
X = 70% for iCEM only X = 90% for xCEM + mix
no
Stop
yes
no
Stop
yes
Increase #R99CE, add CEM card
NodeB to be handled first are the ones that present already R99 CEM Resource blocking:
CEMAlloc> 0
Page 13
Page 14
no
stop
yes
VdF UK case
yes
no
In VdF UK, capacity licensing is not activated Scr 5AllocLicensingrefusal =0 as it only pegs when license<HW capacity The same way Scr2 CumLicensing=Scr1 CumHWCapacity
Page 15
no
Stop
yes
VdF UK case
yes
no
(Scr#5 + Scr#6)/(Scr#4+Scr#5+Scr#6) formula allows to measure the ratio of congested TTIs from the total active TTIs handled by the board. Threshold value (10%) can be changed by VdF UK
Page 16 All Rights Reserved Alcatel-Lucent 2010
Monitoring : The methodology is based on the following indicator at cell level and at BH_HSXPA:
DCTM001 : number of codes used of the total available HSDPDSCH codes (Case3) VS.HsdpaHSPDSCHCodesPerTTI.Avg/VS.NumHsPdschCodes.Avg HSDPA076_CR (extended metric): Code load computed when Fair Sharing is enabled (Case1)
HSDPA Code Management Parameters: Depends on the activation of Dynamic Code tree Management (DCTM) and Fair Sharing (FS) which are mutually exclusive
Case1: DCTM ON, FS OFF (all NodeB except RBS1711) RNC/ RadioAccessService/ DedicatedConf/ HsdpaCellClass/ HsPdschDynamicManagement/ maxNumberofHsPdschCodes: range[1,15] :15 in VdF UK RNC/ RadioAccessService/ isHsPdschDynamicManagementAllowed=True BTSEquipment / hsdpaCodeTreeManagementActivation= False
Case2: DCTM OFF, FS ON (RBS1711) RNC/ RadioAccessService/ isHsPdschDynamicManagementAllowed=False BTSEquipment / hsdpaCodeTreeManagementActivation= True
Yes
DCTM001 > 80% maxNumberofHsPdschCodes < 15
Yes
no
Add additional carrier
Yes
HSDPA076_CR > 80%
NodeB to be handled first are the ones that present already OVSF Code blocking:
RB Establishment Unsuccess.UnavailableDlCodeResources > 0
UPower001_B_Avg (baseline indicator): percentage of averaged used power comparing to Max power VS.PaPowerCapacity Screening: CumHWcapacity/CumLicensing
These methodology is also based on the following parameters: BTSEquipment / Capacity / PaPowerCapacityLicensing BTSEquipment / PAResource / maxPowerAmplification
Page 19 All Rights Reserved Alcatel-Lucent 2010
Stop
Yes
PaResource.maxAmplificationPower = 0 / Full Mode No Yes Increase PaPowerCapacityLicensing parameter - Increase PaPowerCapacityLicensing parameter and, - Increase maxPowerAmplification parameter Increase maxPowerAmplification parameter
NodeB to be handled first are the ones that present already DL power blocking:
RadioBearerEstablishment.unavailableDlPowerResource + RRCFailConnEstab.DLPowRsrc >0
Page 20
(#2629) No
0.1% * VS.CellUlLoad.TotalLoad. TotalLoad_avg #0 > 80%
Stop
(#2631) Yes
Check TotalRoTMAX Add freq or radio optim
NodeB to be handled in priority1 are the ones that present already UL load blocking: RAB_FailEstab_CS_ULLoad + RAB_FailEstab_PS_ULLoad> 0
Page 21
no
Stop
yes
Add extra E1s Hybrid Iub
Page 22
Page 23
The CPUs of CCM and CEM is a monitoring indicator for the load of NBAP signalling For all NodeB of EH4, the CPUs of CCM and CEM are not limiting the node B capacity ( Max < 90% and avg < 70 % )
Page 24
NodeB Name
NodeB Type
Action
Add CEM Add CEM Add CEM Add CEM Add CEM
P1 P1 P1 P1 P1
Page 25
NodeB Name
NodeB Type
CEMUse dDCH_ Max @BH 87% 77% 89% 74% 79% 72% 84% 96%
CEM Used dcH avg 55% 57% 53% 51% 55% 52% 57% 53%
Action
Add CEM board Add CEM Board Add CEM Board Add CEM Board Add CEM Board Add CEM Board Add CEM Board Add CEM Board
Page 26
iCEM capacity with HSxPA activated Capacity in case of full iCEM configuration 1 iCEM128 (2 BBU) is required to provide HSxPA (1 H-BBU and 1 E-BBU) For R99 capacity the capacity left is brought by the other iCEM cards 1iCEM64=64CE 1iCEM128=128CE
Card1: iCEM128
The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again.
Card2: iCEM128
The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again.
(BBU#1)
(BBU#1)
HSDPA cell 2
D-BBU D-BBU
D-BBU H-BBU
LCG2
(BBU#2)
The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again.
(BBU#2)
HSUPA cell 1
HSUPA cell 2
LCG3
Action Swap iCEM by xCEM Swap iCEM by xCEM Swap iCEM by xCEM
Page 28
Page 29
RBS00788-01 RBS01709-01 RBS03591-01 RBS05507-01 RBS05510-01 RBS06512-01 RBS10187-01 RBS11592-01 RBS11867-01 RBS32296-01 RBS32653-01 RBS33279-01 RBS35245-01 RBS46925-01 RBS46934-01 RBS46949-01
iCEM iCEM+xCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM iCEM
For RBS1709-01, from the counters it looks like HSxPA is allocated to iCEM where it should be on xCEM to benefit from max capacity
Page 30 All Rights Reserved Alcatel-Lucent 2010
Fair Sharing feature is not activated except on site RBS1711 The OVSF code usage for HSDPA does not limit the NodeB capacity. No sector have a codeload > 80%
Page 31
HSDPA activated
Power001_Avg
RB Blocked
Cell Name
#PA 45W
#PA 60W
#Freq
W01711011 W01711012 W01711022 W04657011 W04657021 W05987021 W05989012 W07921032 W11591032 W23158022
66% 2006 70% 3408 68% 20614 60% 145 70% 120 68% 115 60% 82% 76% 81% 51 420 289 506
6 6 6 3 3 3 0 0 6 0
0 0 0 0 0 0 6 6 0 4
2 Swap MCPA45W by MCPA60W 2 Swap MCPA45W by MCPA60W 2 Swap MCPA45W by MCPA60W 1 Swap MCPA45W by MCPA60W 1 Swap MCPA45W by MCPA60W 1 Swap MCPA45W by MCPA60W Change PAAmplification from 2 max30W to max45W Change PAAmplification from 2 max30W to max45W 2 Swap MCPA45W by MCPA60W Change PAAmplification from 2 max30W to max45W
Page 32
Action
Cell Name86%
Action
1 2 2 2 2 2
All day at 96% : investigate High UL load during Busy Hour, invetstigate CSSR High UL load during Busy Hour, invetstigate CSSR High UL load during Busy Hour, invetstigate CSSR High UL load during Busy Hour, invetstigate CSSR Review load sharing with cell 31
Parameter used by VdF TotalRoTMAax = 6 dB for F1 layer (HSxPA+R99), 8 dB for F2 layer (R99 only) maxULInterferenceLevel = - 60 dBm
Page 33
IUB Received_avg/#E1
NdeB Name
4 2 5 3 5 4
Note that the introduction of IP transport in Iub provides additional transport capacity hence PCM addition is less required
Page 34
Action
#PCM
RBS01202-01 RBS72825-01 RBS1711-01 RBS4657-01 RBS5987-01 RBS07921-01 RBS11591-01 RBS23815-01 RBS06573-01 RBS31554-01 RBS46936-01 RBS01707-01 RBS11867-01 RBS01198-01 RBS01200-01 RBS03449-01 RBS06069-01 RBS10187-01 RBS35847-01 RBS46934-01 RBS72998-01 RBS23159-01 RBS46951-01 RBS45734-01
Page 35
RBS00788-01 RBS01709-01 RBS03591-01 RBS05507-01 RBS05510-01 RBS06512-01 RBS10187-01 RBS11592-01 RBS11867-01 RBS32296-01 RBS32653-01 RBS33279-01 RBS35245-01 RBS46925-01 RBS46934-01 RBS31094-01 RBS31520-01
Page 36
Thank you
Page 37