Você está na página 1de 538

N.

W
A. S.No 1 2 3 4 5 5a 6 7 8 9 10 11 12 13 14 15 16 17 18 19

UPGRADATION OF THE ROAD FROM Tinthni (KM 0+00) TO Kalmala (KM73+8


BASIC RATE OF MATERIALS Description of item Cost of Water Unit KL Basic Usage rates (Rs.) 20.00 85.00 133.00 38.00 155.00 335.00 595.00 45.00 155.00 25.00 60.00 4750.00 3,600.00 38,448.00 34,178.00 38,899.00 32,000.00 25,000.00 58.00 454.00 700.00 3,100.00 3,560.00 4,820.00 446.00 300.00 300.00 300.00 750.00 677.00 535.00

Earth Cost or compensation for earth taken from private land Cum Granular Material Cum Structural steel PVC pipes 100mm dia PVC pipes 150mm dia G.I Pipes 100mm dia MS clamps Hot applied thermoplastic compound Reflectorising glass beads Nuts and bolts Strip seal expansion joint Cement TMT bar reinforcement conforming to IS1785. High tensile steel wires/ strands Bulk Bitumen Grade 60/70 Bulk Modified Bitumen (CRMB) Bitumen Emulsion (Slow Setting) Bitumen Emulsion (Rapid Setting) Curing Compund compressible fiber board 20 mm KG Metre Metre Metre No Ltre Kg Kg m MT MT MT MT MT MT MT Ltr sqm RM RM RM RM Cu.M MT MT MT Cu.M Cu.M Cu.M

20 21 22 23 24 25 26 27 28 29 30

Concrete Hume Pipe NP3 300 mm dia Concrete Hume Pipe NP4 900 mm dia Concrete Hume Pipe NP4 1000 mm dia Concrete Hume Pipe NP4 1200 mm dia Aggregate for concrete works 10 mm to 40mm Aggregate for GSB works Aggregate for WMM works Aggregate for Bituminous works Stone for RR Masonry FILTER MATERIAL FOR AGGREGATES Filling Sand or Crushed sand

31 32 33 34 35 39 40 41 42 43

Superplasticiser CONPLAST SP 430

Ltr

34.00 35.00 42.00 158.00 338.00 3750.00 66.00 145.00 180.00 180.00 1.75 0.90

Gelatin Kg Electronic detonator with 2 set of gelatin stick of 125 gm each each HDPE Pipe (110 mm dia) RM HDPE Pipe (160 mm dia) RM Filler MT painting primer Ltr paints synthetic asian Ltr POT/PTFE FIXED MT POT/PTFE FREE MT tape barricading rmt Elastomeric bearing CC

Total
B BASIC RATE OF FUEL 1 Diesel (Excluding Generator , loader etc. for Crushing Plant) 2 LDO (Furnace Oil) Total= C LEAD 1 Earth for Embnkmt lead from borrow to site 2 Avg lead of WMM plant to site 3 Avg lead of GSB Material from crusher plant to site 4 Avg lead of Bituminous Mix plant to site 5 Avg lead of Concrete mix from Batch Mix Plant to Site 6 Aggregate lead from Quarry to Plant = = = = = = 8.0 4.0 4.0 4.0 4.0 15.0 KL KL 39,250.0 39,250.0

SOME BASIC CONSIDERATION/PRESSUMPTIONS 1 Unit weight of Stone Aggregate 2 Average Bulk density of Stone chips of various sizes 3 Unit weight of consolidated GSB 4 Unit weight of consolidated WMM 5 Unit weight of consolidated BM 6 Unit weight of consolidated DBM 7 Unit weight of consolidated SDBC 8 Unit weight of consolidated BC 9 Wastage of Aggregate 10 Wsatage of Aggregate for GSB Work over & above sl 9.0 11 Wsatage of Aggregate for WMM Work over & above sl 9.0 12 Wsatage of Aggregate for Asphalt ork over & above sl 9.0 13 LDO as burning fuel considered as

T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3

2.6 1.56 2.10 2.23 2.23 2.32 2.38 2.38 1% 1% 1%

Ltr./MT 5.0

14 LDO as heating of Bitumen 15 LDO as heating of CRMB 16 Stone aggregate procured from Market

Ltr./MT 10.0 Ltr./MT 12.0 10%

E 1 2

SOME BASIC CONSIDERATION/PRESUMPTIONS Wastage of Cement Steel wastage Rolling Margin Nonrecoverable cutting wastage Chairs, Spacers, Laps etc. 3 Cement Concumption per M3 Mix 1:4:8 a Mix 1:3:6 b Mix 1:2:4 d M-15 Grade e M-20 Grade f M-25 Grade g M-30 Grade h M-35 Grade i M-40 Grade/RCC j M-40 Grade/PSC k M-45 Grade/PSC 4 Rate for formwork including labour charges a Foundation b Sub-structure c Sub-structure (height 5 m to 10 m) d Super-structure 5.0 Rebar for Approach Slab 6.0 Rebar for RCC Railing 7.0 Rebar for RCC Crash Barrier 8 HYSD for Wearing coat Rs./M2 Rs./M2 Rs./M2 Rs./M2 Kg./M3 Kg./M3 Kg./M3 Kg./M3 80.0 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 T/M3 0.166 0.230 0.270 0.270 0.340 0.400 0.420 0.440 0.450 0.450 0.465 Labour 70.0 80.0 100.0 120.0 85.0 190.0 90.0 2.0% 3.0% 5.0% 1% 10.0%

BASIC RATE OF STONE AGGREGATE CONSIDERING OUR Total required quantity of Stone aggreagte = MT 1,100,000 OWN PREODUCTION
Dead cost of land per Year No. of years required Height considered Acre M 500,000 1.5 5.0 Years

Volume per acre Unit weight (Specifc Gravity) Tonnage per acre Cost towards Dead Rent Blasting & loading into crusher hopper Rehandling cost % of rehandling considered Total cost towards Blasting & loading into crusher hopper including rehandling Crushing cost including fuel + materials Spare parts, operators etc. excluding dead hire charges of Loader, Geneartos & Crusher Ownership charges of Loader 1.7 Cu.M bucket capacity considering output of 25 MT per houri.e. 25 x 1.56 MT = 39 MT Ownership charges of Generator 550 KVA for 250 MT Crusher charges LS + Dismantling Charges + One side Erection Transportation + Making of service road Total qty to be produced ( 10 hrs in day x 25 days in month x 20 months) Cost of erection per MT Dead Hire charges of Crusher Cost of stone aggrgate final product excluding royalty Add royalty Cost of stone aggrgate final product including royalty Considering bulk density = Total Cost of aggregate (final product) per Cum at crusher location Market rate = Market rate = Consider procuremnt from Market = Consider our own production = Weighted rate per MT = Weighted rate per Cu.M =

M3 T/M3 T Rs./T Rs./T Rs./T Rs./T Rs./T Rs./T Rs./T

20,000.0 1.6 31,200.0 58.0 25.0 25%

200.0 2,000,000.0

MT

1,000,000.0

Rs./T Rs./T Rs./T Rs./T T/M3 Rs./ Cu.M Say 226.4 353.2 10% 90% #N/A #N/A 1.56

TO Kalmala (KM73+800) OF SH 61 & SH 15


Total Quantity #DIV/0! Total Amount

quotation from agencys

2,879.4 113,017,211.0 895.2 35,138,036.0 148,155,247.0

#N/A #N/A #N/A

Bitumen % BLACK BOOK 2.0 2.2 3.20% 4.25% 5.00% 5.50% 2.31 105.0%

Admix 0.00% 0.00% 0.00% 0.00% 0.50% 0.60% 0.80% 0.90% 0.90% 1.00% 1.20% Per Sq.m 'file:///j:/high ways%20hyd 'file:///j:/high %20division/ ways%20hyd 'file:///j:/high state %20division/ ways%20hyd 'file:///j:/high %20highway state %20division/ ways%20hyd s/karnataka/ %20highway state %20division/ highways/ksh s/karnataka/ %20highway state ipii/wep highways/ksh s/karnataka/ %20highway %204/workin ipii/wep highways/ksh s/karnataka/ g %204/workin ipii/wep highways/ksh %20boq/hgcl g %204/workin ipii/wep _orr_jbc_pkg %20boq/hgcl g %204/workin 1%20(patanc _orr_jbc_pkg %20boq/hgcl g heru%20to 1%20(patanc _orr_jbc_pkg %20boq/hgcl %20mallamp heru%20to 1%20(patanc _orr_jbc_pkg et)/orr_hyd_p %20mallamp heru%20to 1%20(patanc kg-i_analysis et)/orr_hyd_p %20mallamp heru%20to %20r(jbic)kg-i_analysis et)/orr_hyd_p %20mallamp (patancheru %20r(jbic)kg-i_analysis et)/orr_hyd_p %20to (patancheru %20r(jbic)kg-i_analysis %20mallamp %20to (patancheru %20r(jbic)et).xls'#$ra. %20mallamp %20to (patancheru $f$1375 et).xls'#$ra. %20mallamp %20to $f$1382 et).xls'#$ra. %20mallamp $f$1389 et).xls'#$ra.

Aggregate (MM) 40 40 20 40 20 1,890.0 #N/A 1,980.0 #N/A 2,025.0 #N/A 2,025.0 #N/A

1,215.0 #N/A

Specified Minimu m 120.0 144.0 Cement Content 205.0 270 400 420 440 450 450

230.0

#N/A

#DIV/0!

IDERING OUR

16.0

61.0 50.0 #N/A #N/A 94.0

#N/A #N/A 30.0 #N/A

#N/A #N/A Rs./MT Rs./M3

N.W

UPGRADATION OF THE ROAD FROM Tinthni (KM 0+00) TO Kalmala (KM73+8

BORROWED 1 EARTH
Borrowed Earth : Earth available lead 2 km

The borrowed earth is available along the alignment for embakment and subgrade shoulders with lead Total cost earth charges 35 85 0 cost with lead at site per cum 85

cost of earth (cum) royalty 50

Granular material
2 source name The borrowed earth available along the alighment of road from borrowed lead charges per cost with lead Cost of earth Royalty Total cost cum at site per cum 70 35 105 28 133

Fine aggregate(Sand)
3 sand Rate at sit Transportatio Total cost Basic cost n cost Royalty per cum 424.2 76.13 35 535

4 STONE AGGREGATE

Source

Grade 40

Quarry rate 227

Total aggregate has procure from COMPANY own operation of Trasportati on cost( rehadl Total cost per ing ) Royalty MT 5 35 240

20 12 10 quarry is near to the road area dust 6

267 267 267 267 267

5 PORTLAND CEMENT GRADE 53 CST @% AGAINST C Place of supply Basic rate MT Exise duty FORM Road freight PLACE :BANGALORE SITE 2980 STEEL HYSD/ LOCAL EQUIRE HYSD 6 MM Depot Transportatio n cost VAT 4% CST @% AGAINST C Total cost per FORM MT 35000

8 MM 10 MM 12 MM 16 MM 20 MM 28 MM 32MM Prestresing strands

35300 35300 34800 37500 34800 34800 34800

1000 1000 1000 1000 1000 1000 1000

1412 1412 1392 1500 1392 1392 1392

706 706 696 750 696 696 696

38418 38418 37888 40750 37888 37888 37888 38448.29

MECHINARY RATES C s 1 2 3 4 5 6 7 Description of Labour Mate / Supervisor Mazdoor skilled Mazdoor Blacksmith Mason Chiseller/driller/blas ter OPERATOR : i) Plant Operator ii) Grader iii) Road Roller iv) Loader v) Excavator vi) Helper Total Labour cost = Usage Rates of LABOUR Total Unit Usage Rate Heads Month day 200.00 day 175.00 day 150.00 day 250.00 day 300.00 day Per Month Rs./month Rs./month Rs./month Rs./month Rs./month 250.00 10,000.00 12,000.00 6,000.00 8,000.00 7,000.00 4,000.00 -

Total Amount

Sl. No.

Description of Machine

P&M-001 Air Compressor Batching and P&M-002 Mixing Plant (a) 30 Concrete Mixing cum capacity Batching and P&M-003 Mixing Plant (b) 15 - 20 cum capacity Bitumen Pressure P&M-004 Distributor Bitumen Boiler oil P&M-005 fired Concrete Paver P&M-006 Finisher with 40 HP Motor Concrete Pump of P&M-007 45 & 30 cum capacity Concrete Mixing

(A) Usage Rates of Plant and Machinery Output of Activity Output Machine capacity General Purpose 170/250 in cfm cum/hour cum/hour sqm/hour capacity in litre cum / hour cum / hour 20 13 1750 1500 20 33 / 22

Unit hour hour hour hour hour hour hour

Applying bitumen tack coat Bitumen Spraying Paving of concrete surface Pumping of concrete

P&M-008 Concrete Bucket Concrete Mixer (a) 0.4/0.28 cum Concrete Mixer (b) P&M-010 1 cum Crane (a) 80 P&M-011 tonnes Cranes b) 35 P&M-012 tonnes P&M-013 Cranes c) 3 tonnes P&M-009

For Pouring concrete Concrete Mixing Concrete Mixing Lifting Purpose Lifting Purpose

capacity in cum cum/hour cum/hour

1 2.5 7.5

hour hour hour hour hour hour

Lifting Purpose Spreading /Cutting / P&M-014 Dozer D - 80 - A 12 Clearing Spreading /Cutting / P&M-015 Dozer D - 50 - A 15 Clearing Emulsion Pressure Applying emulsion tack P&M-016 Distributor coat Front End loader 1 Soil loading / Aggregate P&M-017 cum bucket loading capacity Generator (a) 125 Genration of electric P&M-018 KVA Energy Generator( b) 63 Genration of electric P&M-019 KVA Energy P&M-020 GSB Plant 50 cum Producing GSB Hotmix Plant - 120 P&M-021 DBM/BM/SDC/ Premix TPH capacity Hotmix Plant - 100 P&M-022 DBM/BM/SDC/ Premix TPH capacity P&M-023 P&M-024 Hotmix Plant - 60 DBM/BM/SDC/ Premix to 90 TPH capacity DBM/BM/SDC/ Premix Surface Dressing

cum/hour cum/hour sqm/hour cum/hour KVA KVA cum/hour cum/hour cum/hour cum/hour cum/hour sqm/hour

300/ 150/250 200/ 120/150 1750 60 /25 100 50 40 40 30 25 17 1500

hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour hour

Hotmix Plant - 40 to 60 TPH capacity Hydraulic Chip P&M-025 Spreader Hydraulic P&M-026 Excavator of 1 cum bucket Integrated Stone P&M-027 Crusher 100THP Integrated Stone P&M-028 Crusher 200 HP Kerb Casting P&M-029 Machine P&M-030 Mastic Cooker Mechanical Broom Hydraulic Motor Grader 3.35 P&M-032 mtr blade Mobile slurry seal P&M-033 equipment Paver Finisher Hydrostatic with P&M-034 sensor control 100 TPH Paver Finisher P&M-035 Mechanical 100 TPH P&M-031

Soil Ordinary/Soil Marshy cum/hour 60 /60 /60 / Soil Unsuitable Crushing of Spalls Crushing of Spalls Kerb Making Mastic Wearing coat Surface Cleaning Clearing /Spreading /GSB /WBM Mixing and laying slurry seal TPH TPH Rm/hour capacity in tonne sqm/hour cum/hour sqm/hour 100 200 80 1 1250 200/200/5 0/50 2700 40 40/30

Paving of DBM/ BM/SDC/ cum/hour Premix Paving of WMM /Paving of DLC cum/hour

Piling Rig with Bantonite Pump Pneumatic Road P&M-037 Roller Pneumatic Sinking P&M-038 Plant Pot Hole Repair P&M-039 Machine Prestressing Jack P&M-036

0.75 m dia to 1.2 m dia Boring attachment Rolling of Asphalt Surface Pneumatic Sinking of wells Repair of potholes

Rm/hour cum/hour cum/hour

2 to 3 25 4

hour hour hour hour hour

cum/hour 1.5 to 2.00

Stressing of steel P&M-040 with Pump & wires/stands access P&M-041 Ripper Scarifying P&M-042 Rotavator Scarifying Road marking P&M-043 Road marking machine Smooth Wheeled Soil Compaction /BM P&M-044 Roller 8 tonne Compaction Tandem Road P&M-045 Rolling of Aspalt Surface Roller Transportation of soil, P&M-046 Tipper - 5 cum GSB, WMM, Hotmix etc. Transportation of soil, P&M-047 Tipper - 5 cum GSB, WMM, Hotmix etc. Transportation of soil, P&M-048 Tipper - 5 cum GSB, WMM, Hotmix etc. Transit Mixer Transportation of P&M-049 4.0/4.5 cum Concrete Mix to site Transit Mixer 4/4.5 Transportation of P&M-050 cum Concrete Mix to site Transit Mixer 3.0 Transportation of P&M-051 cum Concrete Mix to site Transit Mixer 3.0 Transportation of P&M-052 cum Concrete Mix to site P&M-053 Tractor Pulling Tractor with Rate of Tractor + P&M-054 Rotevator Rotevator Rate of Tractor 6+ P&M-055 Tractor with Ripper Ripper Truck 5.5 cum per P&M-056 Material Transport 10 tonnes Truck 5.5 cum per P&M-057 Material Transport 10 tonnes Truck 5.5 cum per P&M-058 Material Transport 10 tonnes Vibratory Roller 8 Earth or soil / GSB / P&M-059 tonne WBM P&M-060 Water Tanker Water Transport P&M-061 Water Tanker Wet Mix Plant 60 P&M-062 TPH Water Transport Wet Mix

cum/hour cum/hour Sqm/hour cum/hour cum/hour Capacity in cum Capacity in cum Capacity in cum cum/hour cum/hour cum/hour cum/hour capacity in HP

60 25 100 70/25 30 5.5 5.5 5.5 4.5 4.5 3 3 50

hour hour hour hour hour km tonne.km hour hour tonne.km hour tonne.km hour hour hour

capacity/c 4.5 um capacity/c 4.5 um capacity/c 4.5 um cum/hour 100/60/60 capacity 6 in KL capacity 6 in KL cum/hour 25

km hour tonne.km hour hour km hour

) TO Kalmala (KM73+800) OF SH 61 & SH 15

nt for embakment

Quantity expected in land rate m3 lead average 2 km 500000 10000 50

ad from borrowed

lead 5 km

cft Rs

12 at querry area

om COMPANY own operation of land etc per cum 10

Break up details crusher


Description

COST PER CUM 361.00


a) Quarry Cost b) Quarrying Cost making required size and trasportation etc c) Crushing Cost(operations) d) Fuel cost e) Dead hire charges for f)civil works Genset,Crusher Plant,Loader g)staff,lAbours cost h)demobilization and rehandlingcost and land lease or TOTAL COST

unit
MT MT MT MT MT MT MT MT

cost
42 80 35 23 35

401.00 401.00 401.00 401.00 401.00 bulk dencity is 1.5 mt/cum

6
2

MT

Total cost MT 3600

227

Total cost 35000 Quotation from BANGALORE iNclude vat+transportation

38448

Rate 257 1450 1250 795 140 1942 173

MUMBAI RATES MACHINARY

11 172 180 866 577 241 2640 1565 593 624 562 264 804 16600 12280 10710 8580 1785 1250 5590 11760 250 50 276 1450 715 2070 2200 786 1000 11500

500 150

4230 922 2956 760 91 22 13 60 386 922 18.7 3.5 450 660 3.5 605 1.6 280 293 302 17.4 225 2.5 1200 250 15 1010 1000 200TPH 500 300 325 900

AMOUNT IN RUPEES
Quarry cost quaotation Quantity per acere 1,000,000 27,338 37 5 includes registration and etc

PER MT
over burden char TOTAL

42

N.W

UPGRADATION OF THE ROAD FROM Tinthni (KM 0+00) TO Kalmala (KM73+8


Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M15 Unit = cum Taking output = 15 cum a) Material Cement MT Coarse sand cum 40 mm Aggregate cum 20 mm Aggregate cum 10 mm Aggregate cum b) Labour Mate day Mason day Mazdoor day c) Machinery Batching Plant @ 30 cum/hour hour Generator 100 KVA hour Loader 1 cum capacity hour Transit Mixer 4 cum capacity for lead upto 1 km. hour Lead beyond 1 km, L-lead in km T-km

5.10 9.00 8.00 4.00 1.35 0.86 1.50 20.00 0.50 0.50 0.50 2.00 555.00

Concrete Pump total total per cum PCC Grade M20 Unit : cum

hour

0.50

Taking output = 120 cum a) Material Cement Coarse sand 20 mm Aggregate 10 mm Aggregate

MT cum cum cum

43.20 72.00 64.80 43.20

b) Labour Mate day Mason day Mazdoor day c) Machinery Batching Plant @ 30 cum/hour hour Generator 100 KVA hour Loader 1 cum capacity hour Transit Mixer 4 cum capacity for lead upto 1 km. hour Lead beyond 1 km, L-lead in km T-km Concrete Pump hour total rate per cum RCC M-25 Taking Output = 120 cum With Batching Plant, Transit Mixer and Conrete Pump Unit : cum Taking Output = 120 cum a) Material Cement MT Coarse sand cum 20 mm Aggregate cum 10 mm Aggregate cum Admixer Kg b) Labour Mate day Mason day Mazdoor day c) Machinery Batching Plant @ 30 cum/hour hour Generator 100 KVA hour Loader 1 cum capacity 1 cum hour Transit Mixer 4 cum capacity for lead upto 1 km. hour

8.00 8.00 22.00 8.00 8.00 9.00 15.00 5100.00 8.00

48.38 72.00 64.80 43.20 193.52 5.00 8.00 20.00 8.00 8.00 6.00 15.00

Transit Mixer 4 cum capacity lead beyond 1 Km, L - lead in Kilometer

T-Km

3600.00

Concrete Pump hour total rate per cum RCC M-30 Using Batching Plant, Transit Mixer and Conrete Pump Unit = cum Taking output = 120 cum a) Material Cement MT Coarse sand cum 20 mm Aggregate cum 10 mm Aggregate cum Admixer kg b) Labour Mate day Mason day Mazdoor day c) Machinery Batching Plant @ 30 cum/hour hour Generator 100 KVA hour Loader 1 cum capacity hour Transit Mixer 4 cum capacity for lead upto 1 km. hour Transit Mixer 4 cum capacity lead beyond T-Km 1 Km, L - lead in Kilometer Concrete Pump hour

8.00

48.80 72.00 64.80 43.20 194.00 8.00 8.00 20.00 8.00 8.00 6.00 15.00 3600.00 8.00 ###

Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c)

RCC M 35 Using Batching Plant, Transit Mixer and Conrete Pump Unit ; cum Taking Output = 120 cum a) Material Cement MT Coarse sand cum 20 mm Aggregate cum 10 mm Aggregate cum Admixer Kg b) Labour Mate day Mason day Mazdoor day c) Machinery Batching Plant @ 20 cum/hour hour Generator 100 KVA hour Loader 1 cum capacity hour Transit Mixer 4 cum capacity for lead upto 1 km. hour Transit Mixer 4 cum capacity lead beyond T-Km 1 Km, L - lead in Kilometer

54.00 72.00 64.80 43.20 216.00 8.00 9.00 20.00 8.00 8.00 8.00 15.00 5400.00

Concrete Pump Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c)

hour

8.00 ###

Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical SEC 1600 specifications

Output : MT Taking output = 1 MT a) Material MT 1.10 HYSD bars including 5% overlaps and wastage Binding wire kg 8.00 b) Labour for cutting, bending, shifting to site, tying and placing in position Mate day 1.00 Blacksmith day 4.00 Mazdoor day 10.00 c) Overheads @ 'file:///j:/highways%20hyd%20division/state%20highways/ d) Contractors profit @ 'file:///j:/highways%20hyd%20division/state%20hig Rate for per MT (a+b+c+d) 7

RCC M 40 Using Batching Plant, Transit Mixer and Conrete Pump Unit ; cum Taking Output = 120 cum a) Material Cement MT Coarse sand cum 20 mm Aggregate cum 10 mm Aggregate cum Admixer Kg b) Labour Mate day Mason day Mazdoor day c) Machinery Batching Plant @ 30cum/hour hour Generator 100 KVA hour Loader 1 cum capacity hour Transit Mixer 4 cum capacity for lead upto 1 km. hour

55.20 72.00 64.80 43.20 220.80 8.00 9.00 22.00 8.00 8.00 8.00 15.00

Transit Mixer 4 cum capacity lead beyond 1 Km, L - lead in Kilometer

T-Km

5700.00

Concrete Pump Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) PSC Grade M-45 Unit = 1 cum Taking output = 120 cum a) Material

hour

8.00 ###

Cement

tonne

60.00

Coarse sand

cum

72.00

20 mm Aggregate

cum

64.80

10 mm Aggregate

cum

43.20

Admixture @ 0.4 per cent of cement

kg

223.20

b) Labour Mate

day

8.00

Mason

day

9.00

Mazdoor

day

20.00

c)

Machinery

Batching Plant @ 30 cum/hour

hour

8.00

Generator 100 KVA

hour

8.00

Loader

hour

8.00

Transit Mixer ( capacity 4.0 cu.m ) Transit Mixer 4 cum capacity lead upto1 Km

hour

15.00

Lead beyond 1 Km, L - lead in Kilometer

tonne.k 5400.00 m

Concrete Pump

hour

8.00

Basic Cost of Labour, Material & Machinery (a+b+c) for 120 cum

3034.00

14.5

515 & 2702

Mastic Asphalt Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515. Unit = sqm Taking output = 72.46 sqm (2 tonnes) (0.869 cum) assuming a density of 2.3 tonnes/cum.

a) Labour Mate

day

0.49

Mazdoor

day

11.00

Mazdoor (Skilled)

day

1.25

b) Machinery Mechanical broom @ 1250 sqm per hour

hour

0.06

Air compressor 250 cfm

hour

0.06

Mastic cooker 1 tonne capacity

hour

6.00

Bitumen boiler 1500 litres capacity

hour

6.00

Tractor for towing and positioning of mastic cooker and bitumen boiler

hour

1.00

c) Material Base mastic (without coarse aggregates) = 60 per cent Coarse aggregate(3.35mm to 9.5 mm size) = 40 per cent .

Proportion of material required for mastic asphalt with coarse aggregates (based on mix design done by CRRI for a specific case) i) Bitumen 80/100 or 60/70 or 30/40 @ 10.2 per cent by weight of mix. 2 x 10.2/100 = 0.204

tonne

0.204

ii) Crusher stone dust @ 31.9 per cent by weight of mix = 2 x 31.9/100 = 0.638 tonnes = 0.638/1.625 = 0.39

cum

0.39

iii) Lime stone dust filler with calcium carbonate content not less than 80 per cent by weight @ 17.92 per cent by weight of mix = 2 x 17.92/100 = 0.36

tonne

0.36

iv) Coarse aggregates 9.5 mm to 3.35 mm size @ 40 per cent by weight of mix = 2 x 40/100 = 0.8 MT = 0.8/1.456 = 0.55

cum

0.55

v) Pre-coated stone chips of 9.5 mm nominal size for skid resistance = 72.46x0.005/10 = 0.036

cum

0.036

vi) Bitumen for coating of chips @ 2 per cent by weight = 0.036 x 1.456 x 2/100 = 0.001048MT = 1.05kg

kg

1.05

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshi pii/wep%204/working%20boq/standard %20data%20book%20(road%20& %20bridge).xls'#$input.$c$335 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshi pii/wep%204/working%20boq/standard %20data%20book%20(road%20& %20bridge).xls'#$input.$c$337 on (a+b+c+d) Cost for 72.46 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/72.46 Note 1.The rates for 6 mm or any other thickness may be worked out on pro-rata basis. 2. Where tack coat is required to be provided before laying mastic asphalt, the same is required to be measured and paid 3.The quantities of binder, filler and aggregates are for estimating purpose. Exact quantities shall be as per mix design. 4.This rate analysis is based on design made by CRRI for a specific case and is meant for estimating purposes only. Actual design is required to be done for each case. 5.The quantity of bitumen works out 17 per cent of the mastic asphalt blocks without aggregates and falls within the standards laid down by MoRTH Specifications. Drainage Spouts complete as per drawing and Technical specification Unit = 1 No. Taking output = 1 No. a) Material Corrosion resistant Structural steel including 5 per cent wastage

2705

Kg

4.00

GI pipe 100mm dia

metre

1.00

GI bolt 10 mm Dia

each

6.00

Galvanised MS flat clamp

each

2.00

b) Labour For fabrication

Mate

day

0.02

Skilled (Blacksmith, welder etc.)

day

0.02

Mazdoor

day

0.02

For fixing in position

Mate

day

0.01

Mason

day

0.01

Mazdoor

day

0.20

Add @ 5 per cent of cost of material and labour for electrodes, cutting gas, sealant, anti-corrosive bituminous paint, mild steel grating etc. c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard _data_book__road___bridge_.xls'#$input. $c$335 on (a+b)

d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard _data_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Rate per metre (a+b+c+d) 1. In case of viaducts in urban areas, the drainage spouts should be connected with suitably located pipelines to discharge the surface run-off to drains provided at ground level. 2. In case of bridges, sufficient length of G.I Pipe shall be provided to ensure that there is no splashing of water from the drainage spout on the structure. 1500,16 00,1700 & 2704 Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification Unit = 1 cum Taking output = 1 cum a) Material Cement concreteM30 Grade Refer relevant item of concrete in item 12.8(G)by using batching plant, excluding formwork i.e. per cum basic cost (a+b+c) (Excluding OH & CP)

cum

1.00

( Refer relevant item of concrete in item No. 13.8 (G) except that form work may be added at the rate of 2 per cent of cost against 3.5 per cent provided in the foundation concrete.

HYSD bar reinforcement Rate as per item No 14.2(Excluding OH & CP)

tonne

0.05

bitumens filler joiint

rms

150.00

b) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard _data_book__road___bridge_.xls'#$input. $c$335 on (a) c) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard _data_book__road___bridge_.xls'#$input. $c$337 on(a+b) Rate per cum (a+b+c) Note The grade of reinforced cement concrete may be adopted as M30 for severe conditions and M25 for moderate conditions. Cement Mortar 1:3 (1 cement : 3 sand) Unit = 1 cum Taking output = 1 cum a) Materials Cement

12.6

tonne

0.51

Sand

cum

1.05

b) Labour Mate

day

0.04

Mazdoor

day

0.90

Total Material and Labour = (a+b)

TO Kalmala (KM73+800) OF SH 61 & SH 15

3600 ### 535.00 4815.00 361.00 2888.00 401.00 1604.00 401.00 541.35 200.00 172.00 300.00 450.00 150.00 3000.00 1450.00 725.00 562.00 281.00 624.00 312.00 660.00 1320.00 2.50 1387.50 L= 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $c$339 173.00 86.50 ### 2396.00

1387.5

3600.00 535.00 401.00 401.00

### ### ### ###

200.00 1600.00 300.00 2400.00 175.00 3850.00 1450.00 562.00 624.00 660.00 3.50 173.00 ### 4496.00 5616.00 9900.00 ### 1384.00 ### 2467.00

3600.00 ### 535.00 ### 401.00 ### 401.00 ### 34.00 6579.68 200.00 1000.00 300.00 2400.00 175.00 3500.00 1450.00 ### 562.00 4496.00 624.00 3744.00 60.00 900.00

3.50

### L= 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $c$339

173.00 1384.00 ### 2535.00

3600.00 ### 535.00 ### 401.00 ### 401.00 ### 34.00 6596.00 200.00 1600.00 300.00 2400.00 175.00 3500.00 1450.00 ### 562.00 4496.00 624.00 3744.00 660.00 9900.00 3.50 ### 173.00 1384.00 ###

3600.00 ### 535.00 ### 401.00 ### 401.00 ### 34.00 7344.00 200.00 1600.00 300.00 2700.00 175.00 3500.00 1450.00 ### 562.00 4496.00 624.00 4992.00 660.00 9900.00 3.50 ### L= 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $c$339 173.00 1384.00

### 50.00

### 400.00

200.00 200.00 250.00 1000.00 150.00 1500.00 vision/state%20highways/karnataka/highways/kshipii/wep%204/working%20boq/gdcl%20infra/standard%20d 0.00 d%20division/state%20highways/karnataka/highways/kshipii/wep%204/working%20boq/gdcl%20infra/standar 0.00 ### say ###

3600.00 ### 535.00 ### 401.00 ### 401.00 ### 34.00 7507.20 200.00 1600.00 300.00 2700.00 175.00 3850.00 1450.00 ### 562.00 4496.00 624.00 4992.00 660.00 9900.00

3.50

### L= 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $c$339

173.00 1384.00

3600.00

### 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$216 ### 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$137

535.00

401.00

### 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$187 ### 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$185

401.00

34.00 7588.80 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$315 200.00 1600.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

300.00 2700.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$122 150.00 3000.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

1450.00

### 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$15

562.00 4496.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$94

624.00 4992.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$30 660.00 9900.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$62

3.50

###

Lead ='file:///j :/highwa ys %20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $c$339 km & 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$63

173.00 1384.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$20

200.00

98.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

175.00 1925.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

150.00

187.50 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$126

276.00

16.56 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$44

257.00

15.42 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$14 300.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$43

50.00

140.00

840.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$18 280.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$66

280.00

### 6972.31 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$209 401.00 156.39 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$155

3600.00 1296.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$323 401.00 220.55 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$185

401.00

14.44 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$277 35.70 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ standard %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$209/ 1000

34.00

### 170.55 say 342.00

36.00

144.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t. $a$222/ 1000

595.00

595.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$191 270.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$245 90.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$236

45.00

45.00

200.00

4.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 5.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$113 3.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

250.00

175.00

200.00

2.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 3.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$122 35.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 57.58

300.00

175.00

1209.08 say 1209.00

2628.00 2628.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$366 52.56

### 2269.65 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$388 150.00

5100.21 say 5100.00

3600.00 1836.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$216

535.00

561.75 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$138 8.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 135.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

200.00

150.00

say 2541.00

N.W

UPGRADATION OF THE ROAD FROM Tinthni (KM 0+00) TO Ka


BILL NO 1 PRELIMINARY &GENERAL

1.01

Procure (Purchase) and Supply brand new vehicles for Employer Site staff. including Registration, Full Comprehensive Insurance (1st year) Number plate, Road Tax , etc. a) Mahindra Scorpio SLX Turbo 2.6 - 7 seater option 4x4 wheel drive CRDE EURO II or "Equivalent approved"

No.

1.02

Supply of digital colour record photographs fixed in albums and copied on to a CD as per Tech. Spec. Cl. 125 (on an avg. 75photographs / month)

No.

1.03

Supply of video cassette: Taking video film of important activities for playing time of 180 minutes each as per Tech.Spec. Cl. 126 a) Start of the Contract b) During execution of Works c) End of the Contract

No

1.04

Maintenance of Earthen shoulders by filling with new gravelly soil by making up loss of material/irregularities on shoulder to design level by adding new soil and compacting with plate compactor to the desired field density with all lead and lift as per Tech Spec. Cl. 3003.1

Sq.m

1.05 a)

Filling and Patching of Potholes as per Technical Specification Cl. 3004.2 Depth upto 100mm trimming of the sides of pot hole tack coat wmm rate mss total rate per sqm

Sq.m sqm sqm sqm sqm


0.25 1 0.08 1

More than 100mm trimming of the sides of pot hole wmm ratein two layers tack coat mss total rate per sqm

sqm sqm sqm sqm sqm

0.25 0.13 1 1

BILL NO 1 1.01

BILL NO 2

SITE CLEARANCE AND DISMANTLING 2.01 Clearing and Grubbing Road Land . By Mechanical Means a) Labour Mate Mazdoor b) Machinery Dozer 80 HP with attachment for removal of trees & stumps Tractor-trolley c) Overhead charges @ input on (a+b) d) Contractor's profit @ input on (a+b+c) Rate per Hectare = a+b+c+d

day 0.160 day 4.000 hour ###

hour 1.000

1.02

a)

Dismantling of Structures Unit = cum Taking output = 1.25 cum Dismantling Stone Masonry/BRICK 2.03 MASONARY Rubble stone masonry in lime mortar a) Labour Mate Mazdoor for dismantling, loading and unloading. b) Machinery Tractor-trolley

day 0.024 day 0.600 hour 0.270

b) c,d)

Cost for 1.25 cum = a+b+c+d Rate per cum = (a+b+c+d)/ 1.25 stone slab in structure Prestressed / reinforced cement concrete grade M-20 & above a) Labour Mate Mazdoor with Pneumatic breaker Blacksmith Mazdoor for loading and unloading b) Machinery hydralic excavator Air Compressor 250 cfm with 2 leads of pneumatic breaker @ 1.00 cum per hour Tractor-trolley Rate per cum = (a+b+c+d)/ 1.25

sqm

day day day day

0.050 0.660 0.250 0.250

hour 0.500 hour 1.000 hour 0.270

4.06

e)

Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 10000 metres, stacking serviceable and unserviceable materials separately By Mechanical Means Bituminous course a) Labour Mate

day 0.010

Mazdoor

day 0.100

b) Machinery Tractor-trolley

hour 0.380

Farm tractor with ripper @ 60 cum per hour

hour 0.017

c) Overhead charges @ 'file:///j:/highways %20hyd%20division/state %20highways/karnataka/highways/kshipii/we p%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b) d) Contractor's profit @ 'file:///j:/highways %20hyd%20division/state %20highways/karnataka/highways/kshipii/we p%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c) Rate per cum = a+b+c+d

k)

dismantling of hume pipes/ GI pipes over 300 mm dia lm 2.04

Scarification existing Bituminous Surface as per Technical Specification. Cl 305.4.3.


Cutting of Trees, including cutting of Trunks, Branches and Removal

1.04

Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the Unit = Each Girth from 300 mm to 600 mm a) Labour Mate Mazdoors for cutting trees including cutting, refilling, compaction of backfilling and stacking of serviceable materials within 1000 metres lead by manual means. b) Machinery Tractor-trolley c) Overhead charges @ input on (a+b) d) Contractor's profit @ input on (a+b+c) Rate for each tree = a+b+c+d Girth from 600 mm to 900 mm a) Labour Mate Mazdoors for cutting trees including cutting, refilling, compaction of backfilling, and stacking of serviceable materials within 1000 metres lead by manual means b) Machinery Tractor-trolley c) Overhead charges @ input on (a+b) d) Contractor's profit @ input on (a+b+c) Rate for each tree = a+b+c+d Girth from 900 mm to 1800 mm a) Labour Mate Mazdoors for cutting trees including cutting, refilling, compaction of backfilling and stacking of serviceable materials within 1000 metres b) Machinery Tractor-trolley c) Overhead charges @ input on (a+b) d) Contractor's profit @ input on (a+b+c) Rate for each tree = a+b+c+d Girth above 1800 mm a) Labour Mate Mazdoors for cutting trees including cutting, refilling, compaction of backfilling and stacking of serviceable materials within 1000 metres b) Machinery

day 2.000 day 2.000

hour 1.000

day 3.000 day 2.000

hour 1.000

day 3.000 day 3.000

hour 1.250

day 3.000 day 5.000

Tractor-trolley c) Overhead charges @ input on (a+b) d) Contractor's profit @ input on (a+b+c) Rate for each tree = a+b+c+d Construction of temp diversion includes causway/temp CD works as per tech spec112 unit per running metere subgrade average GSB WMM Premix carpet seal coat/mss shoulders tempary CD WORK 12 RM 900 HEAD WALL( 1.5+.6) HEGHT 2.5 CONCRETE QUANTITYM 20 CUM 5.25 PER RMT RATE OF CD TRAFFIC SAFTY LUMSUM TOTAL RATE PER RMT BILL NO 2 2.01 BILL NO 3 a) EARTH WORKS E. EXCAVATION IN SOILS Unit = cum Taking output = 360 cum a) Labour Mate Mazdoor b) Machinery Hydraulic excavator 0.9 cum bucket capacity @ 60 cum per hour Tipper 5.5 cum capacity, 4 trips per hour. c) Overhead charges @ input on (a+b) rate per cum Ordinary rock for road way all complete Unit = cum Taking output = 240 cum a) Labour Mate Mazdoor b) Machinery Hydraulic Excavator 0.90 cum bucket capacity @ 36 cum per hour Tipper 5.5 cum capacity, 4 trips per hour. c) Overhead charges @ input on (a+b) d) Contractor's profit @ input on (a+b+c) Cost for 240 cum = a+b+c+d Rate per cum = (a+b+c+d)/240

hour 1.250

1.05

cum cum cum sqm cum RMT CUM RMT LUMSUM

10 2.19 1.62 8 4 12.5 6 1

day 4.000 day 5.000 hour 8.000 hour ###

b)

day 3.000 day 4.000 hour 8.000 hour ###

Excavation in Hard Rock (requiring blasting) with disposal upto 10000 metres Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with = cum Unit requirements of lines, grades and cross sections, loading and disposal of cut road with in Taking 0utput = 180 cum all lifts and leads upto 1000 metres a) Labour Mate Mazdoor Driller Blaster b) Machinery Dozer, 80 HP @ 30 cum per hour Air compressor, 250 cfm with 2 jack hammer Front end loader 1 cum bucket capacity Tipper10 tonne capacity c) Materials Gelatin 80 per cent Electric Detonators @ 1 detonator for 2 gelatin sticks of 125 gms each Credit for excavated rock found suitable for use @ 50 per cent quantity blasted d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Cost for 180 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/180

day day day day

5.000 5.000 5.000 7.000

hour 9.000 hour 9.000 hour 9.000 hour ###

kg each cum

### ### ###

2.03

Construction of Embankment with Material 3.02 obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to Unit = cum required slope and compacting to meet Taking outputtable 300-2. requirement of = 100 cum a) Labour Mate day Mazdoor day b) Machinery Hydraulic Excavator1 cum bucket capacity @ 60 hour cum per hour Tipper 10 tonne capacity tonne. km Add 10 per cent of cost of carriage to cover cost of loading and unloading Dozer 80 HP for spreading @ 200 cum per hour hour Motor grader for grading @ 100 cum per hour Water tanker6 KL capacity

0.040 1.000 1.500 ###

0.500

hour 1.000 hour 4.000

Vibratory roller 8 -10 tonnes @ 100 cum per hour c) Material Cost of water Compensation for earth taken from private land d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Cost for 100 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/100 Compensation for earth will vary from place to place and will have to be assessed realistically as Construction of Embankment with Material is per particular ground situation. In case earth 3.03 Deposited from Roadway Cutting available from Govt. land, compensation for earth Construction of embankment with approved will not be required. The position is required to be materials deposited costsite from roadway cutting clearly stated in the at estimate. and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Unit = cum Taking output = 100 cum a) Labour Mate Mazdoor b) Machinery Dozer 80 HP for spreading @ 200 cum per hour Tipper 10 tonne capacity Motor grader for grading @ 100 cum per hour Water tanker6 KL capacity Vibratory roller 8-10 tonnes @ 100 cum per hour c) Material Cost of water d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Rate for 100 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/100 2.05(a) 3.04,3.05 Construction of Subgrade and Earthen Shoulders of sub-grade and earthen shoulders Construction with approved material obtained from borrow pits with = cum Unit all lifts & leads, transporting to site, spreading, grading to required slope and Taking output = 100 cum compacted to meet requirement of table No. 300-2 a) Labour Mate Mazdoor b) Machinery Hydraulic excavator1 cum bucket capacity @ 60 cum per hour

hour 1.000 KL cum ### ###

2.04

day 0.020 day 0.500 hour 0.500 tonne. ### km hour 1.000 hour 4.000 hour 1.000

KL

###

day 0.040 day 1.000 hour 1.670

Tipper 10 tonne capacity Add 10 per cent of cost of carriage to cover cost of loading and unloading Dozer 80 HP for spreading @ 200 cum per hour Motor grader for grading @ 50 cum per hour Water tanker with 6 km lead Vibratory roller 8-10 tonnes @ 80 cum per hour c) Material Cost of water Compensation for earth taken from private land d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Cost for 100 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/100 2.08 3.06 Compacting Original Ground Compacting original ground supporting subgrade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and Unit = cum layers to meet requirement of table compacted in Taking output = 600 cum 300-2 for sub-grade construction. a) Labour Mate Mazdoor b) Machinery Tractor with ripper attachment Motor grader for grading Water tanker 6 KL capacity Vibratory roller 8-10 tonne @ 80 cum/hour c) Material Cost of water d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Cost for 600 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/600

tonne. km

### ###

hour 0.500 hour 1.000 hour 4.000 hour 1.250

KL cum

### ###

day 3.000 day 3.000 hour ###

hour 8.000 hour 4.000 hour 7.500

KL

###

Construction of Subgrade with approved available Cum material obtained from Road way excavation complete as per drawing and technical specification clause 305 3.07 including leads and lifts complete
REFER 3.03 ITEM

2.12

:Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC Unit then compacted by rolling so as to achieve and = cum Taking output = 600as given in Table 300-2 for minimum dry density cum a) Labour embankment construction. Mate Mazdoor b) Machinery Tractor with ripper attachment Vibratory road roller 8-10 tonne capacity Water tanker6 KL capacity c) Material Cost of water d) Overhead charges @ input on (a+b+c) e) Contractor's profit @ input on (a+b+c+d) Cost for 600 cum = (a+b+c+d+e) Rate per sqm = (a+b+c+d+e)/600

day 2.000 day 2.000 hour ###

hour 7.500 hour 4.000

KL

###

ni (KM 0+00) TO Kalmala (KM73+800) OF SH 61 & SH 15

50000

25

10000

176.00

150.00 9 785 95

37.5 9 58.88 95 200

150.00 785.00 9 95

37.5 98.13 9 95 240

200.00 175.00 2640.00 302.00

32.00 700.00

L-12 L-13

26400.00 P&M-014 302.00 P&M-053 0.00 0.00 0.00 #N/A 27434.00

say

200.00 175.00 280.00

4.80 L-12 105.00 L-13 0.00 75.60 P&M-053 185.40 0.00 148.00 75.00

200.00 250.00 250.00 175.00 1250.00 257.00 280.00

10.00 L-12 165.00 L-14 62.50 L-02 43.75 L-13 0.00 625.00 257.00 P&M-001 75.60 P&M-053 991.00

200.00

2.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

150.00

15.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124 106.40 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$66

280.00

1250.00

21.25 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$68 0.00

0.00

say

144.65 145.00

350.00

95.00

200.00 175.00

400.00 350.00

L-12 L-13

280.00

0.00 280.00 P&M-053

0.00 0.00 0.00 say 1030.00 1030.00 200.00 175.00 600.00 350.00 L-12 L-13

280.00

0.00 280.00 P&M-053

0.00 0.00 0.00 say 1230.00

200.00 175.00

600.00 525.00

L-12 L-13

280.00

0.00 350.00 P&M-053

0.00 0.00 0.00 say 1475.00

200.00 175.00

600.00 875.00 0.00

L-12 L-13

280.00

350.00 P&M-053

0.00 0.00 0.00 say 1825.00

176.00 677 785 100 176.00 3500 2535

1760 1482.63 1271.7 800 704

704 43750 0 15210

152.1
500 500

6670

200.00 175.00 1250.00 450.00

800.00 L-12 875.00 L-13 0.00 10000.00 P&M-026 8100.00 P&M-048 19775.00 55.00

200.00 175.00 1250.00 450.00

600.00 L-12 700.00 L-13 0.00 10000.00 P&M-026 6750.00 P&M-048

0.00 0.00 18050.00 75.21 say 75.00

200.00 175.00 250.00 250.00 2640.00 257.00 624.00 450.00

1000.00 L-12 875.00 L-13 1250.00 L-06 1750.00 L-03 0.00 23760.00 P&M-014 2313.00 P&M-001 5616.00 P&M-017 6750.00 P&M-048 0.00 2205.00 M-104 10584.00 M-094 / 100 1350.00 M-089 0.00 57453.00

35.00 42.00 15.00

say

319.00

200.00 175.00 1250.00 3.50

1565.00 1450.00 250.00

8.00 L-12 175.00 L-13 0.00 1875.00 P&M-026 2240.00 Lead =input km & 0.00 P&M-058 782.50 P&M-014 1450.00 P&M-032 1000.00 P&M-060

1200.00 15.00 85.00

1200.00 P&M-059 0.00 360.00 8500.00 0.00 0.00 17590.50 M-189 M-092

say

176.00

200.00 175.00 1565.00 3.50 1450.00 250.00 1200.00

4.00 L-12 87.50 L-13 0.00 782.50 P&M-014 2240.00 1450.00 P&M-032 1000.00 P&M-060 1200.00 P&M-059 0.00 360.00 0.00 0.00 7124.00 #N/A 71.00

15.00

M-189

say

200.00 175.00 1250.00

8.00 L-12 175.00 L-13 0.00 2087.50 P&M-026

3.50 0.10 1565.00 1450.00 250.00 1200.00

2450.00

Lead =input 245.00 km & P&M-058 782.50 P&M-014 1450.00 P&M-032 1000.00 P&M-060 1500.00 P&M-059 0.00 360.00 8500.00 0.00 0.00

15.00 85.00

M-189 M-092

18558.00 #N/A say 186.00

200.00 175.00 302.00 1450.00 250.00 1200.00

600.00 L-12 525.00 L-13 0.00 3624.00 P&M-055 11600.00 P&M-032 1000.00 P&M-060 9000.00 P&M-059 0.00 360.00 0.00 0.00 26709.00

15.00

M-189

say

45.00

71.00

200.00 175.00 302.00 1200.00 250.00

400.00 L-12 350.00 L-13 0.00 3624.00 P&M-055 9000.00 P&M-059 1000.00 P&M-060 0.00 360.00 0.00 0.00 14734.00

15.00

M-189

say

25.00

BILL NO 3 3.01

GRANULAR SUB-BASE COURSE@SUB BASE Granular Sub-Base with Close Graded Material (Table:- 400-1) Unit = cum Taking output = 300 cum a) Labour Mate

day

0.480

200.00

Mazdoor skilled

day

2.000

175.00

Mazdoor unskilled

day 10.000

150.00

b)

Machinery

Motor Grader 110 HP @ 50 cum

hour

6.000 1450.00

Vibratory roller 8 -10 tonne

hour

6.000 1200.00

Tractor - Rotavator

hour 12.000

293.00

Tipper 10 tonne Add 10 per cent of cost of carriage to cover loading and unloading

tonne.k m

###

3.50

Water tanker 6 KL capacity

hour

3.000

250.00

c) Material Close graded Granular sub-base Material as per table 400-1 For Grading-I Material

53 mm to 9.5 mm @ 50 per cent

cum 192.000

361.00

9.5 mm to 2.36 mm @ 20 per cent

cum 76.000

401.00

2.36 mm below @ 30 per cent

cum 115.200

401.00

Cost of water

KL 18.000

15.00

Rte per cum =(a+b+c)/300 3.02

Construction of Wet Mix Macadam (WMM) base with approved material complete as per drawing and 4.02 Technical Specification clause 406.
Unit = cum Taking output = 225 cum (495 tonnes) a) Labour

Mate

day

0.480

200.00

Mazdoor skilled

day

2.000

175.00

Mazdoor

day 10.000

150.00

b)

Machinery

Wet mix plant of 75 tonne hourly capacity

hour

9.000 1010.00

Electric generator 125 KVA

hour

6.000

562.00

Front end loader 1 cum capacity

hour

6.000

624.00

Paver finisher

hour

8.000

786.00

Vibratory roller 8 - 10 tonne

hour

6x0.65 1200.00

or Smooth 3 wheeled steel roller @ 8-10 tonnes.

hour 12.000

Water tanker 6 KL capacity

hour

3.000

250.00

Tipper

tonne.k m

###

3.50

Add 10 per cent of cost of carriage to cover cost of loading and unloading c) Material ( Table 400-11) 45 mm to 22.4 mm@ 30 per cent

cum 89.100

361.00

22.4 mm to 2.36 mm @ 40 per cent

cum 118.800

401.00

2.36 mm to 75 micron@ 30 per cent

cum 89.100

401.00

Cost of water

KL 18.000

15.00

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 225 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/225 say 1. Though vibratory roller is required only for 3 hours as per norms, the same is required to be available at site for 6 hours to match with other machines. The usage rates of vibratory roller may be multiplied with a factor of 0.65

2. As three wheeled smooth steel rollers are commonly in use, the same has been provided as an alternative which can be used if the thickness of individual layer does not exceed 100 mm.. BILL NO 5 BASE AND SURFACE COURSES (BITUMINOUS) BILL NO 4 4.01 Prime Coat Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 5.01 0.60 kg/sqm using mechanical means. Unit = sqm Taking output = 3500 sqm a) Labour Mate

day

0.080

200.00

Mazdoor

day

2.000

175.00

b)

Machinery

Mechanical broom @ 1250 sqm per hour

hour

2.800

276.00

Air compressor 250 cfm

hour

2.800

257.00

Bitumen pressure distributor @ 1750 sqm per hour

hour

2.000

795.00

Water tanker 6 KL capacity @ 1 trip per hour

hour

1.000

250.00

c)

Material

Bitumen emulsion @ 0.75 kg per sqm

tonne

2.700

###

Cost of water

KL

6.000

15.00

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 3500 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/3500 say

4.02

Bitumen primer has been provided @ 0.60 kg per sqm as per clause 502.8. Payment shall be made with adjustment, plus or minus, for the variation between this quantity and the actual quantity approved by the Engineer after the preliminary trials referred to in clause No. 502.4.3. 5.02 Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Unit = sqm Taking output = 3500 sqm a) Labour Mate

day

4.000

200.00

Mazdoor

day

4.000

175.00

b)

Machinery

Mechanical broom @ 1250 sqm per hour

hour

2.800

276.00

Air compressor 250 cfm

hour

2.800

257.00

Emulsion pressure distributor @ 1750 sqm per hour

hour

4.000

795.00

c)

Material

Bitumen emulsion @ 0.2 kg per sqm

tonne

0.960

###

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 3500 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/3500 say

4.03

1. Bitumen emulsion has been provided @ 0.20 kg per sqm as per clause 503.8. Payment shall be made with adjustment, plus or minus, for the variation between this quantity and actual quantity approved by the Engineer after preliminary trials referred to in clause No. 503.4.3 2. An output of 3500 sqm has been considered in case of prime coat and tack coat which can be covered by bituminous courses on the same day. Bituminous Macadam Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction Unit = cum Taking output = 205 cum (450 tonnes) a) Labour Mate

day

0.840

200.00

Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction

day 16.000

150.00

Skilled mazdoor for checking line & levels

day

5.000

175.00

b)

Machinery

Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output

hour

6.000

###

Mechanical broom hydraulic @ 1250 sqm per hour

hour

2.200

276.00

Air compressor 250 cfm

hour

2.200

257.00

Paver finisher hydrostatic with sensor control @ 75 cum per hour

hour

6.000 2070.00

Generator 250 KVA

hour

6.000

562.00

Front end loader 1 cum bucket capacity

hour

6.000

624.00

Tipper 10 tonne capacity

tonne.k m

###

3.50

Add 10 per cent of cost of carriage to cover cost of loading and unloading Smooth wheeled roller 8-10 tonnes for initial break down rolling.

hour 6.00x0.65* 386.00

Vibratory roller 8 tonnes for intermediate rolling.

hour 6.00x0.65* 922.00

Finish rolling with 6-8 tonnes smooth wheeled tandem roller.

hour 6.00x0.65* 922.00

c)

Material

i) Bitumen@ 3.3 per cent of mix

tonne 14.850

###

weight of mix = 205 x 2.2 = 450 tonne ii) Aggregate Total weight of mix = 450 tonnes Weight of bitumen = 14.85 tonnes Weight of aggregate = 450 -14.85 = 435.15 tonnes Taking density of aggregate = 1.5 ton/cum Volume of aggregate = 290.1 cum *Grading I ( 40 mm nominal size )

37.5 - 25 mm 15 per cent

cum 43.510

361.00

25 - 10 mm 45 per cent

cum 130.550

401.00

10 - 5 mm 25 per cent

cum 72.530

401.00

5 mm and below15 per cent

cum 43.510

401.00

or GradingII(19 mm nominal size)

25 - 10 mm 40 per cent

cum 116.040

401.00

10 - 5 mm 40 per cent

cum 116.040

401.00

5 mm and below 20 per cent

cum 58.020

401.00

* Any one of the alternative may be adopted as per approved design for Grading I ( 40 mm nominal size ) d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/205 (For Grading I) say for GradingII(19 mm nominal size)

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/205 (For Grading-II) say *1. Although the rollers are required only for 3 hours as per norms of output, but the same have to be available at site for six hours as the hot mix plant and paver will take six hours for mixing and paving the output of 450 tonnes considered in this analysis. To cater for the idle period of these rollers, their usage rates have been multiplied by a factor of 0.65. 2.Quantity of Bitumen has been taken for analysis purpose. The actual quantity will depend upon job mix formula. 3. Labour for traffic control, watch and ward and other miscellaneous duties at site including sundries have been included in administrative overheads of the contractor. 4. In case BM is laid over freshly laid tack coat, provision of Mechanical broom and 2 mazdoors for the same shall be deleted as the same has been included in the cost of tack coat. 5.03 Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Unit = cum Taking output = 195 cum (450 tonnes) a) Labour

4.04

Mate

day

0.840

200.00

Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction

day 16.000

175.00

Skilled mazdoor for checking line & levels

day

5.000

150.00

b)

Machinery

Batch mix HMP @ 75 tonne per hour

hour

6.000

###

Paver finisher hydrostatic with sensor control @ 75 cum per hour

hour

6.000 2070.00

Generator 250 KVA

hour

6.000

562.00

Front end loader 1 cum bucket capacity

hour

6.000

624.00

Tipper 10 tonne capacity

tonne.k m

###

3.50

Add 10 per cent of cost of carriage to cover cost of loading and unloading smooth wheeled roller 8-10 tonnes for initial break down rolling.

hour 6.00x0.65* 386.00

Vibratory roller 8 tonnes for intermediate rolling.

hour 6.00x0.65* 922.00

Finish rolling with 6-8 tonnes smooth wheeled tandem roller.

hour 6.00x0.65* 922.00

c)

Materials

Bitumen @ 4.25 per cent of weight of mix

tonne 19.130

###

Aggregate Total weight of mix = 450 tonnes Weight of bitumen = 19.13 tonnes Weight of aggregate = 450 -19.13 = 430.87 tonnes Taking density of aggregate = 1.5 ton/cum Volume of aggregate = 287.25 cum Grading - I40 mm (Nominal Size)

37.5 - 25 mm 22 per cent

cum 63.190

401.00

25 - 10 mm 13 per cent

cum 37.340

401.00

10 -4.75 mm 19 per cent

cum 54.580

401.00

4.75 mm and below 44 per cent

cum 126.390

401.00

Filler @ 2 per cent of weight of aggregates.

tonne

8.620

401.00

or Grading - II19 mm (Nominal Size)

25 - 10 mm 30 per cent

cum 86.160

401.00

10 - 5 mm 28 per cent

cum 80.430

401.00

5 mm and below 40 per cent

cum 114.900

401.00

Filler @ 2 per cent of weight of aggregates.

tonne

8.620

401.00

* Any one of the alternative may be adopted as per approved design For Grading I ( 40 mm nominal size ) d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/195 (For Grading I) say For GradingII(19 mm nominal size)

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/195 (For Grading-II) say *1. Although the roller are required only for 3 hours as per norms of output, but the same have to be available at site forbeen taken the 2.Quantity of Bitumen has six hours as for hot mix plant and paver will take quantity will analysis purpose. The actual six hours for mixing and paving the output of 450 tonnes depend upon job mix formula. considered in traffic control, cater and ward 3. Labour for this analysis. To watchfor the idle periodcasemiscellaneoustheir usage rates have and other these rollers, dutiesfreshly laid tack 4. In of DBM is laid over at site including been multipliedbeen mechanical broom and 2 0.65. sundries individual a densityof for administrative coat, provision by factor 5. The have of included in each size of overheads shall be used for as the same has mazdoors ofto be deleted construction I.e. aggregates the contractor. been included25-10 percentage coat. found in 37.5-25 mm, in themm etc.tack of be 6. The individual cost of should aggregates the laboratory and accordingly total quantities should be calculated from the the weight of 5.04 Bituminous Concrete for use the field. The should be ammended dry aggregates i.e.. excluding in weight of Providing density of 1.5 filler will concrete2with average The weight of tonne/cum is only a bitumen. and laying bituminous also be per 100-120 weight of in this type Book. mix plant reference density dry aggregates. cent by TPH batch Data hot producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, Unit = cum rolling with smooth wheeled, vibratory and tandem cum (450 tonnes) the Taking output = 191 rollers to achieve desired compaction as per MORTH specification a) Labour clause No. 509 complete in all respects

4.05

Mate

day

0.840

200.00

Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction

day 16.000

175.00

Skilled mazdoor for checking line & levels

day

5.000

150.00

b)

Machinery

Batch mix HMP @ 120 tonne per hour

hour

6.000

###

Paver finisher hydrostatic with sensor control @ 75 cum per hour

hour

6.000 2070.00

Generator 250 KVA

hour

6.000

562.00

Front end loader 1 cum bucket capacity

hour

6.000

624.00

Tipper 10 tonne capacity

tonne.k m

###

2.50

Add 10 per cent of cost of carriage to cover cost of loading and unloading Smooth wheeled roller 8-10 tonnes for initial break down rolling.

hour 6.00x0.65* 386.00

Vibratory roller 8 tonnes for intermediate rolling.

hour 6.00x0.65* 922.00

Finish rolling with 6-8 tonnes smooth wheeled tandem roller.

hour 6.00x0.65* 922.00

c)

Material

i) Bitumen@ 5 per cent of weight of mix

tonne 22.500

###

ii) Aggregate Total weight of mix = 450 tonnes Weight of bitumen = 22.5 tonnes Weight of aggregate = 450 -22.50 = 427.50 tonnes Taking density of aggregate = 1.5 ton/cum Volume of aggregate = 285 cum * Grading - I-19 mm (Nominal Size)

20 - 10 mm 35 per cent

cum 99.750

401.00

10 - 5 mm 23 per cent

cum 65.550

401.00

5 mm and below 40 per cent

cum 114.000

401.00

Filler @ 2 per cent of weight of aggregates.

tonne

8.620 3600.00

or Grading - II-13 mm (Nominal Size)

13.2 - 10 mm30 per cent

cum 85.500

401.00

10 - 5 mm 25 per cent

cum 71.250

401.00

5 mm and below43 per cent

cum 122.550

401.00

Filler @ 2 per cent of weight of aggregates.

tonne

8.620 3600.00

*Any one of the alternative may be adopted as per approved design for Grading-I ( 13 mm nominal size ) d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/191 say for Grading-II(10 mm nominal size)

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/191 (For Grading-II) say 4.07 Semi-Dense Bituminous Concrete Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Unit = cum Taking output = 195 cum (450 tonnes) a) Labour

Mate

day

0.840

200.00

Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction

day 16.000

175.00

Skilled mazdoor for checking line & levels

day

5.000

150.00

b)

Machinery

Batch mix HMP @ 120 tonne per hour

hour

6.000

###

Paver finisher hydrostatic with sensor control @ 75 cum per hour

hour

6.000 2070.00

Generator 250 KVA

hour

6.000

562.00

Front end loader 1 cum bucket capacity

hour

6.000

624.00

Tipper 10 tonne capacity

tonne.k m

###

2.50

Add 10 per cent of cost of carriage to cover cost of loading and unloading Smooth wheeled roller 8-10 tonnes for initial break down rolling.

hour 6.00x0.65* 386.00

Vibratory roller 8 tonnes for intermediate rolling.

hour 6.00x0.65* 922.00

Finish rolling with 6-8 tonnes smooth wheeled tandem roller

hour 6.00x0.65* 922.00

c) Material * Grading I: 13 mm (Nominal Size)

i) Bitumen@ 4.5 per cent of weight of mix

tonne 20.250

###

ii) Aggregate Total weight of mix = 450 tonnes Weight of bitumen = 20.25 tonnes Weight of aggregate = 450-20.25 = 429.75 tonnes Taking density of aggregate = 1.5 ton/cum Volume of aggregate = 286.5 cum

13.2 - 10 mm20 per cent

cum 57.300

401.00

10 - 5 mm 38 per cent

cum 108.870

401.00

5 mm and below 40 per cent

cum 114.600

401.00

Filler @ 2 per cent of weight of aggregates.

tonne

8.620

267.16

or Grading II: 10 mm (Nominal Size)

Bitumen@5 per cent of weight of mix

tonne 22.500

###

weight of mix = 450 tonne Aggregate Total weight of mix = 450 tonnes Weight of bitumen = 22.5 tonnes Weight of aggregate = 450 -22.50 = 427.50 tonnes Taking density of aggregate = 1.5 ton/cum Volume of aggregate = 285 cum

9.5 - 4.75 mm@ 57 per cent

cum 162.450

401.00

4.75 and below@ 41 per cent

cum 116.850

401.00

Filler @ 2 per cent of weight of aggregates.

tonne

8.620

267.16

*Any one of the alternative may be adopted as per approved design for Grading I ( 13 mm nominal size ) d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/195 (For Grading I) say for GradingII(10 mm nominal size)

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$334 on (a+b+c+d) Cost for 205 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/195 (For Grading-II) say per sqm rate of 25 mm 4.08 5.06

Providing and laying Mix seal Surface using penetration grade 60/70 Bitumen as per Tech Spec.
Close Graded Premix Surfacing/Mixed Seal Surfacing Mechanical means using HMP of appropriate capacity not less than 75 tonnes/hour. Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade. Unit = sqm Taking output = 10250 sqm (205 cum) a) Labour

Mate

day

0.840

200.00

Mazdoor working with HMP, road sweeper, paver and roller

day 16.000

200.00

Skilled mazdoor for checking line & levels

day

5.000

175.00

b) Machinery i) HMP of appropicate capacity.

hour

6.000 8580.00

ii) Electric Generator Set 250 KVA

hour

6.000

804.00

iii) Front end loader 1 cum bucket capacity

hour

6.000

624.00

iv) Tipper 10 tonne capacity

tonne.k m

###

3.50

Add 10 per cent of cost of carriage to cover cost of loading and unloading v) Paver finisher hydrostatic with sensor attachment

hour

6.000

786.00

iv) Smooth wheeled8-10 tonnes weight

hour

6.000

386.00

c) Material Type - A

* Bitumen@ 22 kg per 10 sqm

tonne 22.500

###

Stone crushed aggregates 11.2 mm to 0.09 @ 0.27 cum per 10 sqm

cum 276.750

401.00

or Type - B

Bitumen @ 19 kg per 10 sqm

tonne 19.480

###

Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum per 10 sqm

cum 276.750

401.00

d) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_d ata_book__road___bridge_.xls'#$input. $c$333 on (a+b+c) e) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_d ata_book__road___bridge_.xls'#$input. $c$334 on (a+b+c+d) Cost for 10250 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/10250 say * Any one of the alternative may be adopted

96.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

350.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 6

1500.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

8700.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$45

7200.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$72

3516.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$67 ### 3150.00

750.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$73

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$14 7

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$15 1

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$15 4

270.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 4 ### 677.00

96.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

350.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 6

1500.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

9090.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$10 8

3372.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$31

3744.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$30

6288.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$48

4680.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$72

750.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$73

### Lead ='file:/ //j:/hig hways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $c$33 9 km & 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok

2811.20

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 8

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 5

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$15 6

270.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 4 0.00

0.00

### 784.87 785.00

16.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

350.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

772.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$44

719.60 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$14

1590.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17

250.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$73

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$21 2

90.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 4 0.00

0.00

### 25.77 26.00

800.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

700.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

772.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$44

719.60 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$14

3180.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$21 2 0.00

0.00

### 8.62 9.00

168.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

2400.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

875.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 6

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$34

607.20 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$44

565.40 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$14

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$47

3372.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$95

3744.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$30

### Lead ='file:/ //j:/hig hways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $c$33 9 km & 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok

2520.00 1505.40 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$57

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$72

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$58

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$20 9

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$18 3

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$18 0

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$18 0

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

0.00

0.00

### 3816.11 ###

0.00

0.00

### 3824.60 ###

168.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

2800.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

750.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 6

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$35

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$47

3372.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$95

3744.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$30

### Lead ='file:/ //j:/hig hways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $c$33 9 km & 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok

2520.00 1505.40 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$57

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$72

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$58

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$20 9

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$18 3

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$18 0

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

3456.62 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 3

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$18 0

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

3456.62 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 3

0.00

0.00

### 4766.33 ###

0.00

0.00

### 4766.31 ###

168.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

2800.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

750.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 6

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$35

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$47

3372.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$95

3744.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$30

### Lead ='file:/ //j:/hig hways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $c$33 9 km & 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok

1800.00 1505.40 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$57

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$72

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$58

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$20 9

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 9

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 3

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 8

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 3

0.00

0.00

### 6123.61 ###

0.00

0.00

### 6123.61 ###

168.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 3

2800.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 4

750.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$12 6

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$35

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$47

3372.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$95

3744.00 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$30

### Lead ='file:/ //j:/hig hways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $c$33 9 km & 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok

1575.00 1505.40 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$57

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$72

3595.80 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$58

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$20 9

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 8

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

2302.90 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 3

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$20 9

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$17 4

### 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$16 4

2302.90 'file:///j :/high ways %20hy d %20di vision/ state %20hi ghway s/karn ataka/ highw ays/ks hipii/w ep %204/ workin g %20bo q/gdcl %20inf ra/sta ndard %20da ta %20bo ok %20(r oad %20& %20br idge).x ls'#$in put. $a$32 3

0.00

0.00

### 4901.91 ###

0.00

0.00

### 5293.25 ### 123.00 132 123

168.00 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$12 3 3200.00 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$12 4

875.00 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$12 6 ### 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$34 4824.00 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$95

3744.00 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$30 ### Lead ='file:/ //c:/do cumen ts %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $c$33 9 km & 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$71

2362.50 4716.00 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$47 2316.00 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$57

### 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$20 9 ### 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$17 5

### 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$20 9 ### 'file:/// c:/doc ument s %20an d %20se ttings/ abred dy/des ktop/st andar d_data _book_ _road_ __brid ge_.xls '#$inp ut. $a$17 6

### 95.35 95.00

BILLNO.6 -CULVERTS
6.01 Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, o the extent required and utilising the remaining Ordinary soil earth locally for road work. Mechanical Means (Depth upto 3 m) Unit = cum Taking output = 300 cum a) Labour Mate

day

5.000

Mazdoor

day

8.000

b) Machinery Hydraulic excavator 1.0 cum bucket capacity

hour

8.000

c) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$333 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$334 on (a+b+c) Cost for 300 cum = a+b+c+d Rate per cum = (a+b+c+d)/300 6.01 B ORDINARY ROCK Unit = cum Taking output = 216 cum a) Labour Mate

day

4.000

Mazdoor

day

8.000

b) Machinery Hydraulic excavator 1.0 cum bucket capacity

hour 12.000

c) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$333 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$334 on (a+b+c) Cost for 216 cum = a+b+c+d Rate per cum = (a+b+c+d)/216 1.Cost of dewatering upto 5 per cent of (a+b), may be added, where required Assessment for dewatering shall be made as per site conditions. 2.In case of rock, foundation beyond3 m is not dug and hence not included. BACKFILLING BEHIND ABUTMENTS WING WALL AS PER SPEC 305 UNIT CUM Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Unit = cum Taking output = 1 cum a) Material

6.02

6.03

Graded stone aggregate of required size

cum

1.20

b) Labour Mate

day

0.05

Mazdoor (Skilled)

day

0.25

Mazdoor *

day

1.00

c) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$335 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$337 on (a+b+c) Rate per cum = (a+b+c+d) Includes Mazdoor required for trimming of slope to proper profile and preparation of bed. pcc M15 grade flooring/leveling foundation course Form work unit cum PCC/RCC M-20 CLAUS 1500,1700 unit cum Form work RCC M 30 Form work Providing and laying rcc in super structures pcc/rcc M 25 UNIT CUM FORM WORK RCC M30 Form work HYSD/TMT SPEC 1600 REF DIRECT ITEM Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. Unit = Running meter Taking output = 12 m 0r 3. sqm a) Labour For carrying, placing & fixing.

6.04

SQM

6.05 a b

SQM CUM SQM

2.5 1 2.5

6.06

SQM cum SQM

2.5 1 3.5

b)

6.07

6.08

Mate

day

0.008

Mazdoor

day

0.10

Mazdoor (Skilled)

day

0.10

b)

Material

20 mm thick compressible fibre board 12 m long x 25 cm deep.

sqm

3.00

Area = 12 x 0.25 = 3 sqm c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$337 on (a+b+c) Cost for 12 m = (a+b+c+d) Rate per m = (a+b+c+d)/12 6.09 providing fixing tar paper bearing Mazdoor material bitumen laminated kraft paper cost per sqm

day sqm

0.1 1

Providing and fixing galvanized drainage spouts complete as per drawing and
6.10 refer direct used items approach slab M25 inlcudes reinforcement jiont filler joint refer dir items p/l jioning rcc NP4 PIPES np4 900 mm dia rate per run m layining by crain required capacity joining by mortater cost per rm np4 1000 mm dia rate per run m layining by crain required capacity

6.11

6.12 a)

rm hours

0.5

b)

rm hours

0.5

joining by mortater cost per rm c) np41200 mm dia rate per run m layining by crain required capacity joining by mortater cost per rm Providing and fixing PVC pipe of 100mm dia. for weep holes in abutment, unit =no Mazdoor cost of pipe cost per no

rm hours

0.5

6.13

0.2 rmt

175.00

5.09

unit mts Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. Unit = Running meter Taking output = 12 m a) Labour

Mate

day

0.052

Mazdoor

day

1.00

Mazdoor (Skilled)

day

0.30

b) Material Crushed stone aggregate 12.5 mm nominal size

cum

0.75

Polymer modified bitumen

kg

77.50

Galvanised structural steel plate 200 mm wide,6 mm thick, 12 m long (2.4 sqm) @ 47.10 kg/sqm including 5 per cent wastage

kg

113.00

Add 1 per cent for welding and foam caulking/backer rod and other c) Machinery Mastic cooker 1 tonne capacity

hour

1.00

Smooth 3-wheeled steel roller 8-10 capacity

hour

0.50

d) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$335 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$337 on (a+b+c+d) Cost for 12 m asphalt plug joint = (a+b+c+d+e) Rate per m = (a+b+c+d+e)/12 The nominal size of aggregates shall be 12.5 mm for depth of joint upto 75 mm and 20 mm for joints of depth more than 75 mm. a

2503

6.14 A

Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. Unit = cum Taking output = 1 cum a) Material Stone

cum

1.00

Stone Spalls

cum

0.20

b) Labour Mate

day

0.04

Mason

day

0.35

Mazdoor *

day

0.75

c) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$335 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$337 on (a+b+c) Rate per cum = (a+b+c+d) * Note Including excavation for trimming for preparation of bed. Nominal excavation required for preparation of bed has been taken into account while making provision for labour.

6.15

Providing and fixing Marker Post for buried culvert as per drawing, IRC:7-1971 and directions of the Engineer including painting the necessary details with synthetic enamel as per directions of the Engineer.
Unit = no rate for this is lum sum

6.16

Painting of culvert no. and span arrangement as per Technical Specification section 800.
unit +no lumsum

6.17

Painting with water proof cement paint of approved band and shade in two coat on all exposed surfaces, including cost of materials, labour complete as per specification.
Unit = sqm Taking output = 10 sqm a) Labour Mate Painter Mazdoor (Skilled) b) Material Water based paint of approved quality for cement concrete surface c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$335 on (a+b)

day day day Litres

0.01 0.25 0.25 5.00

d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$337 on (a+b+c) Cost for 10 sqm (a+b+c+d) Rate per sqm (a+b+c+d)/10

6.18

Painting with two coats of new concrete surface after filling the surface with Synthetic enamel paint in all shades on new plastered concrete surface
Unit = sqm Taking output = 10 sqm a) Labour Mate

day

0.01

Painter

day

0.25

Mazdoor (Skilled)

day

0.25

b) Material synthetic enamel paint in all shades on new plastered concrete surface

Litres

5.00

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$337 on (a+b+c) Cost for 10 sqm (a+b+c+d) Rate per sqm (a+b+c+d)/10 6.19 a)

providing laying rcc np 3 pipes dia m 900 mm refer to Filling in foundation with sand and granite boulders of 100 to 150mm size in foundation including watering, tamping with all leads and lifts, etc., complete as per technical specifications.
Unit = cum Taking output = 1 cum a) Labour

6.21

Mate

day

0.01

Mazdoor

day

0.30

b) Material Sand (assuming 20 per cent voids)

cum

1.20

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standar d_data_book__road___bridge_.xls'#$inp ut.$c$337 on (a+b+c) Rate per cum = a+b+c+d

5.14

SQM FORM WORK RATE PER CUM FILTER MATERIAL UNDERNEATH STONE PITHCING Unit = cum Taking output = 1 cum a) Material Graded stone aggregate of required size cum

1.20

b)

Labour

Mate

day

0.05

Mazdoor (Skilled)

day

0.25

Mazdoor *

day

1.00

c) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$335 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$337 on (a+b+c) Rate per cum = (a+b+c+d) Includes Mazdoor required for trimming of slope to proper profile and preparation of bed.

5.15

UNIT =CUM STONE PITCHING SLOPES

300

MM

THICK

ON

Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder Unit = cum Taking output = 1 cum a) Material Stone weighing not less than 40kg

cum

1.00

Stone spalls of minimum 25 mm size

cum

0.20

b) Labour Mate

day

0.04

Mason

day

0.35

Mazdoor

day

0.75

c) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$335 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$337 on (a+b+c) Rate per cum = (a+b+c+d) 5.15 B Boulder Apron Laid in Wire Crates Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Unit = cum Taking output = 3 mx1.5mx1.25m = 5.63 cum a) Material

4mm GI wire crates woven in mesh size of 100 mm x 100 mm.

sqm

22.00

Stone

cum

5.63

Stone Spalls

cum

1.13

b) Labour Mate

day

0.18

Mazdoor (Skilled)

day

1.50

Mazdoor

day

*3.00

c) Overhead charges @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$335 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd %20division/state %20highways/karnataka/highways/ksh ipii/wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20& %20bridge).xls'#$input.$c$337 on (a+b+c) Cost for 5.63 cum = a+b+c+d Rate per cum = (a+b+c+d)/5.63 Including excavation for trimming for preparation of bed. Readymade woven wire crate rolls have been considered in the rate analysis. In case readymade rolls are not available, GI wire 4mm dia. @ 32 kg per 10 sqm may be WEEP HOLES provided. In that case 2 per cent of the FIXING LOBER may be added for weaving cost of GI wire the wire crates. UNIT = NOS WEARING COAT 65 MM 50MM BC 15 MM MASTIC ASHALT UNIT -SQMT 0.05 0.8

5.16

5.17

200.00

1000.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

150.00

1200.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

1250.00 10000.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$39

0.00

0.00

12200.00 40.67 say 41.00

200.00

800.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

150.00

1200.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

1250.00 15000.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$39

0.00

0.00

17000.00 78.70 say 82.95

677.00 35 712.00

677.00

812.40 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$145 10.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

200.00

175.00

43.75 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$126 150.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

150.00

0.00

0.00

1016.15 say 1016.00

250

2396 250

2646
250 2,628.00 250 2467 625 3092 2,628.00 625.00 3,253.00 2535 625

250

3160
2,628.00 2,628.00 875 250

3,503.00 45393

200.00

1.60 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 17.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 15.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126

175.00

150.00

454.00

1362.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$219

say 175 30

1396.10 465.37 465.00

17.5 30 47.5

1209 5100

3,100.00 120.5 241 50 3,271.00

3,560.00 120.5 241

50 3,731.00

241

4,820.00 120.5 50 4,991.00

155.00 35.00 190.00

95

200.00

10.40 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123 175.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

175.00

175.00

52.50 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$126 300.75 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$186

401.00

38.90

3014.67 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$213/ 1000 4294.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$238

38.00

78.47

50.00

50.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$43

386.00

193.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$57 0.00

0.00

8168.80 680.73 681.00

say

235.00

235.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$136

185.00

37.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$141 8.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

200.00

300.00

105.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$122 112.50 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

150.00

0.00

0.00

say

497.50 498.00

1250.00 50.00 1300.00

450.00

200.00 300.00 175.00 40.00

2.00 75.00 43.75 200.00

say

320.75 32.08 32.00

200.00

2.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 75.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$129

300.00

150.00

37.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126 725.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$325

145.00

say

839.50 83.95 84.00

200.00

2.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 52.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 642.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$139

175.00

535.00

say

696.50 697.00

250

250

250

361.00

433.20 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$145

200.00

10.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123 43.75 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$126

175.00

150.00

150.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124 0.00

0.00

say

636.95 637.00

235.00

235.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$136

361.00

72.20 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$141 8.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

200.00

300.00

105.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$122 112.50 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

150.00

0.00

0.00

say

532.70 533.00

95.00

2090.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$237 1323.05 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$136

235.00

361.00

407.93 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$141 36.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

200.00

175.00

262.50 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$126 450.0 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

150.00

0.0

0.00

say

4569.48 811.63 812.00

155.00 15

170.00
6124 342 306 273.6

579.6

BRIDGES BILL NO 7 Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Unit = cum Depth 3 m to 6 m Unit = cum Taking output = 210 cum a) Labour Mate

7.01 a)

day

4.00

Mazdoor

day

8.00

b) Machinery Hydraulic excavator 1.0 cum bucket capacity

hour

12.00

tipper 5 cum

hours

8.00

c) Overhead charges @ 'file:///j:/highways%20hyd%20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///j:/highways%20hyd%20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$337 on (a+b+c) Cost for 210 cum = a+b+c+d Rate per cum = (a+b+c+d)/210 Cost of dewatering upto 7.5 per cent of (a+b) may be added, where required. Assessment for dewatering shall be made as per site conditions.. ordinary rock(not requiring blasting) refer item 5.01 b cost per cum 7.01 c Hard Rock ( requiring blasting ) Manual Means Unit = cum Taking output = 10 cum a) Labour

7.01 b)

Mate

day

2.00

Driller

day

4.00

Blaster

day

3.00

Mazdoor

day

8.00

b)

Machinery

Air Compressor 250 cfm with 2 jack hammer for drilling.

hour

1.00

c) Material Blasting Material

kg

3.50

Detonator electric

each

14.00

d) Overhead charges @ 'file:///j:/highways%20hyd%20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$335 on (a+b+c) e) Contractor's profit @ 'file:///j:/highways%20hyd%20division/state %20highways/karnataka/highways/kshipii/ wep%204/working%20boq/gdcl %20infra/standard%20data%20book %20(road%20&%20bridge).xls'#$input. $c$337 on (a+b+c+d) Cost for 10 cum = a+b+c+d+e Rate per cum = (a+b+c+d+e)/10 Cost of dewatering @ 10 per cent of (a+b) may be added, where required Assessment for dewatering shall be made as per site conditions. 1. Cost of dewatering upto10 per cent of (a+b), may be added, where required Assessment for dewatering shall be made as per site conditions. 2.In case of rock, foundation beyond3 m is not dug and hence not included. BACK FILLING ABUTMENTS

7.02 REFER

7.03 REFER 7.04 REFER 6.05 a

PER CUM RATE Rate per cum FILTER MEDIA per cum rate M 15 LEVELING COURSE PER CUM form work

sqm

7.05 DIRECT c

Providing and laying cement concrete / reinforced cement concrete for foundation and sub-structure excluding cost of reinforcement with all leads and lifts as per drawing and Technical Specification section 1500, 1700 2100, 2200 & 2300. and as directed by Engineer
UNIT CUM M30 FORM WORK RATE PER CUM RATE sqm 3

7.06 REF DIRECT a

Providing and laying reinforced cement concrete in superstructure complete etc.. excluding reinforcement as per drawing and Technical Specification section 1500, 1700 2100, 2200 & 2300. M 25 form work cost per cum M 30 FORM WORK
SQM 3

sqm

COST PER CUM


c) Super structure M35 UNIT CUM M35 FORMWORK RATE PER CUM RATE HYSD/ STEEL FOUNDATION , RATE MTS TAR PAPER BEARING PER SQM a refer item b c providing and fixing 20 mm compressible fiber board rate per sqm providing ashalt pluge jiont compression seal joint providing filling joint sealing compound with coarse sand with 6% weight rate per sqm

sqm

3.5

7.08 DIRECT

REFER

7.1

7.11

7.12

7.13

DRAINAGE SPOUT UNIT NOS FIXING

7.14

Providing, laying and erecting cement concrete grade M-40 in Crash Barrier excluding the cost of reinforcement complete as per drawing and Technical Specification clause 809 and sections 1500,1600 and 1700.
comcrete laying machinary cost per rm curing compound Rate per rm cum rm ltr 0.26 1 0.3

7.15 refer direct item

Providing & laying reinforced cement concrete (grade M-30) in approach slab including reinforcement & bituminous joint filler between approach slab & dirt wall complete as per drawing and Technical Specification section 1500,1600, 1700 & 2704.
concrete rate M 30 FORM WORK REINFORCEMENT IN KGS BITUMEN FILLER

CUM KGS LM 80

7.16

7.17

P/F PVC 100 MM WEEP HOLES UNIT PER NO RATE P/F PVC 150 MM UTILITY DUCTS IN FOOTPATHS RATE PER LM BRIDGE SPAN ARRAGEMENT RATE PER NO LUM SUM

NO

LM

7.18

Providing Wearing Coat (56mm) consisting of 50mm thick Asphaltic concrete and 6mm thick Mastic Asphalt including prime coat as per Tech. Spec. Cl.2700
7.19 RATE FROM BC 50 MM MASTIC ASPHALT RATE 6 MM tact coat COST PER SQM 7.20 sqm sqm sqm 0.05 1 1

Construction Gabion wall (mattress) with segments of wire crates as per Tech Spec Cl. 2503
Unit = cum Taking output = 3 mx1.5mx1.25m = 5.63 cum a) Material

4mm GI wire crates woven in mesh size of 100 mm x 100 mm.

sqm

3.75

Stone

cum

5.63

Stone Spalls

cum

1.13

b)

Labour

Mate

day

0.18

Mazdoor (Skilled)

day

1.50

Mazdoor

day

*3.00

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Cost for 5.63 cum = a+b+c+d Rate per cum = (a+b+c+d)/5.63

7.21

Construction of Gabion mattress 170 mm thick as per Tech Spec. 2503


Taking output = 5 x 2 x 0.17 a) Labour Mate day 0.14

Mazdoor

day

2.50

Mazdoor (Skilled)

day

1.00

b)

Material

Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of required size to cover 6.00 cum.

sqm

20.00

Stone boulders with least dimension of 200 mm

cum

3.40

Stone spalls of minimum size 25 mm

cum

0.60

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Cost for 6.00 cum (a+b+c+d) Rate per cum (a+b+c+d)/6.00

7.22

Construction of Gabion mattress 230 mm thick as per Tech Spec. 2503


Unit = cum Taking output = 5 x 2 x 0.23 x 2 Nos. = 6.00 cum a) Labour Mate

day

0.14

Mazdoor

day

2.50

Mazdoor (Skilled)

day

1.00

b)

Material

Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of required size to cover 6.00 cum.

sqm

20.00

Stone boulders with least dimension of 200 mm

cum

4.60

Stone spalls of minimum size 25 mm

cum

1.00

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Cost for 6.00 cum (a+b+c+d) Rate per cum (a+b+c+d)/6.00

7.23

Providing Geotextile over filter material as per specification


RATE PER SQM total cast SQM no 1 0.1

7.24 REFER

Painting with water proof cement paint of approved band and shade in two coat on all exposed surfaces, including cost of materials, labour complete as per specification. 6.17 RATE PER QSM SQM Painting with two coats of new concrete surface after filling the surface with Synthetic enamel paint in all shades on new plastered concrete surface

7.25

6.18 RATE PER SQM

SQM

7.26

Provide and maintain temporary diversion of road at site of bridge reconstruction location including structure if needed and dismantling after completion as per Tech. Spec. 112 and as directed by Engineer.
RATE PER LM per 100 rm EMBK SUBGRADE GSB WMM MSS SIGHBOARDS STRUCTURE rate per rm /100

LM cum cum cum cum sqm limsum lumsum

500 650 120 135 700 4 1

7.27

Granite Stone masonry work in (1:3) CM in substructure complete excluding pointing and plastering as per drawing & Technical Specification Section 1400.
Unit = cum Taking output = 5 cum a) Material Stone

cum

5.50

Through and bond stone

each

35.00

(35nos.x0.24mx0.24mx0.39m = 0.79 cu.m) Cement mortar 1:3 (Rate as in Item 12.6 A sub-analysis)

cum

1.55

b) Labour Mate

day

0.62

Mason

day

6.00

Mazdoor

day

9.00

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Cost for 5 cum = a+b+c+d Rate per cum (a+b+c+d)/5

7.29

Pointing with cement mortar (1:3 ) on STONE work in substructure as per Technical Specifications Unit = 10 sqm Taking output = 10 sqm a) Material

Cement mortar 1:3 (Rate as in Item 12.6 )

cum

0.06

b) Labour Mate

day

0.04

Mason

day

0.50

Mazdoor

day

0.50

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Rate per 10 sqm (a+b+c+d) Rate per sqm The labour already considered in cement mortar has been taken into account while proposing labour for masonry works. Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications Unit = 10 sqm Taking output = 10 sqm a) Material Cement mortar 1:3 (Rate as in Item 12.6)

7.30

cum

0.144

b)

Labour

Mate

day

0.04

Mason

day

0.50

Mazdoor

day

0.50

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Rate per 10 sqm (a+b+c+d) scaffolding 5% on material and louber

Rate per sqm 1.Scaffolding is already included in item no. 13.1 2.The number of masons and Mazdoors already catered in the cement mortar have been taken into account while providing these categories in brick masonry, pointing and plastering.

7.31

Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder Unit = cum Taking output = 1 cum a) Material Stone weighing not less than 40kg

cum

1.00

Stone spalls of minimum 25 mm size

cum

0.20

b)

Labour

Mate

day

0.04

Mason

day

0.35

Mazdoor

day

0.75

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Rate per cum = (a+b+c+d)

7.32

Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Unit = cum Taking output = 1 cum a) Material Graded stone aggregate of required size

cum

1.20

b) Labour Mate

day

0.05

Mazdoor (Skilled)

day

0.25

Mazdoor *

day

1.00

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Rate per cum = (a+b+c+d) Includes Mazdoor required for trimming of slope to proper profile and preparation of bed. Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching. Unit = sqm Taking output = 10 sqm. a) Labour Mate

7.33

day

0.02

Mazdoor

day

0.30

Mazdoor (Skilled)

day

0.10

b) Material Permeable synthetic geotextile including 5 per cent for overlap and wastage

sqm

11.00

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$335 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Cost for 10 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/10

7.34

Eproxy bonding of new concrete to old concrete Unit = sqm Taking output = 10 sqm a) Material Epoxy resin with pot life not less than 60-90 minutes and satisfying testing as per clause 2803.9

kg

8.00

Add 3 per cent of (a ) above for wastage. b) Labour Mate

day

0.04

Mazdoor (Skilled)

day

0.50

Mazdoor

day

0.50

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$336 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (a+b+c) Cost for 10 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/10 7.35 Repair of RCC Railing Carrying out repair of RCC M30 railing to bring it to the original shape. Unit = Running meter. Taking output = 10 M. It is assumed that damage is to the extent of 10 per cent . a) Material M-30 grade cement concrete excluding OH & CP (Rate as per items 14.1 C (i)

cum

0.10

HYSD bar reinforcement Rate as per item No 14.2(Excluding OH & CP)

tonne

0.03

b) Labour* Mate

day

2.000

mazdoor

day

2.00

For dismantling and trimming the surface to a regular shape and removal of damaged material. c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$336 on (b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_da ta_book__road___bridge_.xls'#$input. $c$337 on (b+c)

Cost for 10 m = a+b+c+d Rate per m = (a+b+c+d)/10 Repair of Steel Railing

7.37 REFER

Providing and laying filter media below stone pitching as per drawing and Technical Specification clauses 309 6.21 and 2504.

200.00

800.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123

175.00

1400.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124 ### 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$39

1250.00

0.00

0.00

say

### 81.90 82.00

82.95

200.00

400.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$123 1000.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$117

250.00

250.00

750.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$114 1400.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$124

175.00

257.00

257.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$14 122.50 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$239

35.00

42.00

588.00 'file:///j:/ highway s%20hyd %20divis ion/state %20high ways/kar nataka/h ighways/ kshipii/w ep %204/w orking %20boq/ gdcl %20infra /standar d %20data %20boo k %20(roa d%20& %20brid ge).xls'# $input. $a$229/ 100 0.00

0.00

4517.50 451.75 say 452.00

712.00 1016
250 2396 250

2646

250

2,628.00 750

###

250

2535 750 3285

250

2,628.00 750

###

250

2,856.00 875 3,731.00

45393
25 2 27 465

681 27

55 1250 100

1350

2,905.00 90 35

766.92 90.00 10.5 867.00

5100

95

335.00 500

6124 200 9

306.2 200 9 515

883.00

3311.25 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$237 1689.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$136 452.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$141

300.00

400.00

200.00

36.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 262.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126 450.0 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

175.00

150.00

6200.75 1101.38 say 1101.00

200.00

28.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 375.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 175.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126

150.00

175.00

387.00

7740.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$237 1020.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$136 240.60 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$141

300.00

401.00

9578.60 478.93 say 479.00

200.00

28.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 375.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 175.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126

150.00

175.00

405.00

8100.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$237 1380.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$136 401.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$141

quotations

300.00

401.00

say

### 522.95 523.00

65 150

65 15 80

32

84

176 186 677 785 95 500 100000

88000 120900 81240 105975 66500 2000 100000 5646

550.00

3025.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$283

20.00

700.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$317 3938.55 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$348 124.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123

2541.00

200.00

300.00

1800.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$122 1350.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

150.00

### 2187.51 say 2188.00

2541.00

152.46 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$348 8.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 150.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$122

200.00

300.00

150.00

75.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

say

385.46 385.00 38.50

2541.00

365.90 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$348

200.00

8.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 150.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$122 75.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

300.00

150.00

say

598.90 599.00 629.00

63.00

300.00

300.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$136 80.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$141

400.00

200.00

8.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 122.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$122 112.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

350.00

150.00

say

623.00 623.00

401.00

481.20 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$145 10.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 43.75 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126

200.00

175.00

150.00

150.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

say

684.95 685.00

200.00

4.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123

150.00

45.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 17.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126 605.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$316

175.00

55.00

671.50 67.15

say

67.00

950.00

7600.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$233 228.00

200.00

8.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 87.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$126

175.00

150.00

75.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

7998.50 799.85 say 800.00

2628.00

262.80 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$386

### 1134.83 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$388 200.00 400.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 300.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

150.00

2097.63 209.76 say 210.00

697

BILL NO 8

DRAINAGE AND PROTECTION WORKS Turfing Lawns with Fine Grassing including Ploughing, Dressing Turfing lawns with fine grassing including ploughing, dressing including breaking of clods, removal of rubbish, dressing and supplying doobs grass roots at 10 cm apart, including supplying and spreading of farm yard manure at rate of0.6 cum Unit = sqm Taking output = 100 sqm a) Labour Mate

8.01

day

Mazdoor for preparation of ground

day

Mali for fetching doobs grass roots hedges and grassing at 10 cm apart

day

b)

Machinery

Water tanker6 KL capacity

hour

Tractor with tiller

hour

c) Material Supply of farm yard manure at site of work @ 0.6 cum per 100 sqm

cum

Fine grass

sqm

d) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_data_ book__road___bridge_.xls'#$input.$c$333 on (a+b+c) e) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_data_ book__road___bridge_.xls'#$input.$c$334 on (a+b+c+d) Cost for 100 sqm = a+b+c+d+e Rate per sqm = (a+b+c+d+e)/100

8.02

Metal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 Unit = Running metre Taking output = 4.5 metre length a) Labour

Mate

day

Blacksmith

day

Mazdoor

day

b)

Machinery

Tractor-trolley

hour

c) Material CONCRETE FOR FOUNDATIONS w beam rate per rm 8.03 A

CUM rm

Construction of lined drains and footpath, Toe walls as per drawings Cement Concrete grade M15 including form work for levelling coarse as per Tech Spec. 1500 & 1700.
RATE m15 form work total cost per cum sqm

Cement Concrete grade M20 including form work for substructure as per Tech Spec. 1500 & 1700.
rate from direct item M 20 FORM WORK COST PER CUM CUM SQM

Providing, casting and fixing in position Kerb Type II with cement concrete M30 grade per Tech Spec. 408, 1500 & 1700.
KERB TYPE II WITH M 30 machinar hire curing compound LM ltr

Providing, casting and fixing in position RCC cover slab with cement concrete M25 grade per Tech Spec. 1500 & 1700. (excluding reinforcement)
CONCRETE RATE CUM FORM WORK COST PER CUKM CUM SQM

TMT steel reinforcement bars complete as per bending schedule drawings Tech Spec. 1600, 1800 & 2300.
FROM DIRECT ITEM TMT

Providing and fixing in position MS gratings of size 1500 x 300 mm made out of MS Flats 25 x 80 mm as per drawing.
RATE PER NO COST PER NO

Providing and fixing 50 mm dia PVC pipes as per drawing


RATE PER LM LM

Providing and laying in position interlocking paver blocks 75 mm thick using cement and coarse sand for manufacturing of blocks of approved size, shape and colour with a minimum compressive strength of 281 kgs/sqm over 50 mm thick sand bed and compacting with plate vibrator having 3 ton compacting coarse.
rate from market rate for sand 50 mm thik laying cost

sqm sqm sqm

Cement Concrete grade M20 including form work for substructure as per Tech Spec. 1500 & 1700.
rate from direct form work cost per cum cum sqm

Providing and fixing 150 mm dia PVC pipes as per drawing


rate from quotation lm

lm

0.250

200.00

50.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 150.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 225.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$120

1.000

150.00

1.500

150.00

0.500

250.00

125.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$73 3.02 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$66 240.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$302 10000.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$248

0.010

302.00

0.600

400.00

100.000

100.00

10793.02 107.93 say 108.00

200.00

0.060

12.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 125.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$113

250.00

0.500

150.00

1.000

150.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 28.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$66 174.91 5850

280.00

0.100

0.073 4.500

2396 1300

1409.00

1.5

250

2396 375

2771

250

2467 1500

3967

0.03 1 0.3

2,628.00 40 58.00

69.64 40.00 17.40 127.00

250

2535 750

3285

45393

1500 100

1 0.05 1

380 535 50

380 26.75 50 457

250

2467 1000

3467.00

335.00

QUOTATION FROM Z-TECH INDIA

BILL NO

TRAFFIC SIGNS MARKINGS AND OTHER APPURTENCES

9.01

Providing and laying plain cement concrete ( M-15 grade ) in foundations for Kerb complete as per drawing and Technical Specification clauses 408 sections 1500, 1700 and 400
FOUNDATION FOR KERB M15 FORM WORK COST PER CUM CUM SQM 1

9.02

Providing and laying plain cement concrete Kerb (M-30 Grade) complete as per drawing.
RATE M 30 LM MACHINARY HIRE CURING COMPOUND SQM 0.04 1 0.35

9.03 A I

Supplying and fixing sign boards including the cost of posts, fixtures, foundation, fitting and fixing. Sheeting will be made of encapsulated lens type of Retroreflective type and messages/ borders will be screen printed complete as per Technical Specification clause 801 and as directed by Engineer. Mandatory/Regulatory Traffic Signs Type III Octagonal 900x 900 mm No.

II

Circular 600 dia

No.

(a) Informatory Signs, Facility Signs, Direction Signs, Advance Direction/ Destination Signs, Route Marker Sq.m Signs etc. Type III

Cautionary warning signs (Triangular 900 sides) Type No. III

Chevrons

No.

Object Marker

No.

9.04 i

Providing and laying pavement marking with hot applied thermoplastic paints conforming to ASTM D36/ BS 3262 (Part-I) complete as per drawing and Technical Specification clause 803 Lane/ centreline / edge marking / transverse and any Sq.m other marking. quotation from automark

ii iii

Directional arrows, lettering etc. as per drawing and No. Tech. Spec. Cl. 803. quotations from automark Stop Line Major/Minor Junctions No.

2.2 1.3

iv

Stop Letters

No.

Diagonal/Chevron Marking

No.

5.5

9.05

Providing and Fixing single granite stone with all exposed faces three line dressing , of Standard dimension/size as per IRC:8-1980 and IRC:26, excavation and fixing in position in M15 concrete, curing, painting and printing letters, etc. complete including the cost of all materials, labour, loading, unloading, lead ,lift, transporting etc., complete Hectometre stone (Granite stone) No.

Ordinary kilometre Stone (Granite stone)

No.

5th kilometre Stone (Granite stone)

No.

10

9.06 i

Providing and fixing Road Delineators complete as per drawing and Technical Specification clause 805 and direction of the Engineer For Curves-Type1 No.

m15 m20 paint area reflective sheet steel

kgs

0.10 0.02 0.44 1 5

ii

For Culverts/bridges-Type2

No.

9.07

Providing and erecting R. C. boundary stone/ pillars including cost of reinforcement and two coats of No. painting with ready mix oil bound paint complete as per drawing and Technical Specification clause 806.

9.08

Providing and laying of a reinforced cement concrete NP-3 pipe duct , 450mm dia across the road, extending from drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as pre IRC:98-1997, bedded on a 0.3m thick layer of granular material free of rock pieces, outer to outer distance of pipeat least half dia of pipe subject to minimum 450mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt as pre approved drawings including Marker Post, cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete.

cost of pipe np3 of 450 mm e.w .e granular material head walls marker post total cost

rm cum cum cum no

1 0.5 0.5 1.35 1

9.09

Supplying and fixing of Road Studs (Raised Pavement Markers) Conforming to ASTM D4280 type "H" in position as indicated in the drawings or as directed by Engineer as per Technical Specification clause 812.

9.10

Provide Bus bays as per drawing no. U\T\05 including lane/ line marking and painting
granular filling concrete M15 PLASTERING no CU,M SQM 7.5 3.71 38

ROAD PAITING PAITING KERB

SQM SQM

17 3.38

9.12

Providing passenger shelter in Bus Bays as per drawing U\T\06 and Technical Specification and as per direction of Engineer.
no 18

9.13

Providing and laying Island fill/Median Fill with available earth materials complete as per Technical Cum Specification clause 407.

9.14

Providing and Fixing of Relective Median Marker, Made up of high impact black material, fulfilling the requirement of 60 Kg-f Impact Strength as per ASTM D-256. The retro-reflective sheeting used in the Median marker shall conform to ASTM D4956 Type XI specifications. The coefficient of retro reflective shall Nos. be in accordance with ASTM E-810. The installation of the Median Marker shall be done by a combination of epoxy adhesive and mechanical anchoring including cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete.

9.15

Providing and fixing guard post as per drawing and Technical Specification and as directed by Engineer. m15 m20 pait steel (Item No. 9.16 , Not Used)

No. cum cum sqm kg


0.13 0.04 0.5 5

9.17

Providing and Fixing Median Barrier as per drawing and Technical Specification and as directed by Lm Engineer

9.18 i

Providing and Constructing traffic calming measures as per drawing and Technical Specifications and as per direction of the Engineer. Road Humps

a) Tack Coat direct rates

Sq.m

b) Dense Bituminous Macadam

Cum

c) Road Marking

Sqm

ii

Rumble Strips

No.

BILL NO 10

SAFETY IN ROAD CONSTRUCTION ZONE

10.01

10.02

Supplying and fixing sign boards including the cost of posts, fixtures, foundation, fitting and fixing. Sheeting will be made of encapsulated lens type of Retroreflective type and messages/ borders will be screen printed complete as per Technical Specification clause 801 and as directed by Engineer. Octagonal 900x 900 mm Circular 600 dia Informatory as per drawing Cautionary warning signs (Triangular 900 sides) TypeIII Providing of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene(LDPE) material with a square base of 390x390x35mm and a height of 770mm, 4Kg in weight, placed at 1.5m interval, all as per BS 873 including cost of all materials, labour, loading, unloading, lead, lift, transporting etc complete Technical Specification section & IRC SP 55-2001.
Unit = Running metre Taking output = 68 Nos. a) Labour

No. No. Sq.m No.

No.

Mate

day

0.020

Mazdoor

day

0.500

b)

Material

Traffic cones with 150 mm reflective sleeve

each

68.000

c)

Machinery

Tractor-trolley

hour

0.100

d) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_dat a_book__road___bridge_.xls'#$input.$c$333 on (a+b+c) e) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_dat a_book__road___bridge_.xls'#$input.$c$334 on (a+b+c+d) Cost for 68 Nos. = a+b+c+d+e Rate per metre = (a+b+c+d+e)/68

10.03

Installation of a steel portable barricade with horizontal rail 300mm wide, 2.5m in length fitted on a frame made with 45X45X5 mm angle iron section, 1.5m in height, horizontal rail painted(2coat) with yellow and white strips, 150mm in width at angle of 45degree, A No. frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 including cost of all materials, labour, loading, unloading, lead, lift, transporting etc complete.
Unit = each Taking output = one steel portable barricade a) Labour

Mate

day

0.020

Mazdoor

day

0.250

Painter

day

0.500

Welder

day

0.250

b)

Material

Angle iron 45 x 45 x 5 mm

kg

25.000

MS sheet 300 mm wide,2.5 m long and 2.6 mm thick

kg

15.000

Paint

litre

0.500

Add 2 per cent of cost of steel for welding consumables, nuts & bolts and drilling holes c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_dat a_book__road___bridge_.xls'#$input.$c$333 on (a+b)

d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_dat a_book__road___bridge_.xls'#$input.$c$334 on (a+b+c) Rate per barricade = a+b+c+d

10.04

Provision of metal drum/empty bitumen drum delineator, 300mm in diameter, 800mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100mm wide 2 coats fitted No. with reflectors 3 Nos of 7.5cm dia, all as per IRC:SP:55-2001 including cost of all materials, labour, loading, unloading, lead lift, transporting etc., complete
Unit = each Taking output = one drum delineator a) Labour

Mate

day

0.020

Mazdoor

day

0.250

Painter

day

0.250

b)

Material

Steel drum 300 mm dia 1.2 m high/empty bitumen drum

each

1.000

Paint

litre

0.500

c) Overhead charges @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_dat a_book__road___bridge_.xls'#$input.$c$333 on (a+b) d) Contractor's profit @ 'file:///c:/documents%20and %20settings/abreddy/desktop/standard_dat a_book__road___bridge_.xls'#$input.$c$334 on (a+b+c) Rate per drum delineator = a+b+c+d

10.05

Providing plastic crash barrier as per drawing and per the directions of the Engineer(1000X490X780MM No. size)(LWH)

250

2396 250

2646

2,628.00 90 58.00

99.86 90.00 20.30 210.00

295

295 295

649 384

295

590

295

1623

2396 2467 65 75 46

239.6 56.74 28.6 75 230 630 600

1750

950 55 677 2100 1200

950 27.5 338.5 2835 1200 5351

677 2396 60

5077.5 8889.16 2280

286 66

4862 222.75 21331

6500

117000

71

2396 2467 65 45

299.5 88.81 32.5 225 646

4766

295

5000

'file:///c:/documents%20and%20settings/abreddy/desktop/standard_data_book__road___bridge_.xls'#$input.$h$ 0.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123

'file:///c:/documents%20and%20settings/abreddy/desktop/standard_data_book__road___bridge_.xls'#$input.$h$ 0.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

'file:///c:/documents%20and%20settings/abreddy/desktop/standard_data_book__road___bridge_.xls'#$input.$h$ 0.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$321

'file:///c:/documents%20and%20settings/abreddy/desktop/standard_data_book__road___bridge_.xls'#$input.$h$ 0.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$66

Err:502

Err:502 Err:502 Err:502 say Err:502

200.00

4.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123

150.00

37.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124 175.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$129 87.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$113

350.00

350.00

37.00

925.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$314 /1000 675.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$314 /1000 33.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$266 32.00

45.00

66.00

1969.00

200.00

4.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$123 37.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$124

150.00

350.00

87.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$129 450.00 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$307 32.50 'file:///c:/ docume nts %20and %20setti ngs/abre ddy/desk top/stan dard_dat a_book__ road___b ridge_.xl s'#$inpu t.$a$266

450.00

65.00

611.50 612.00 say

Bill. No. 11. Implementation of Environmental Management Action Plan to be executed under Civil Works Contract A. Carting away the unserviceable materials from work site to the nearest disposal site (up to a lead of 5km) and disposing the same in disposal pits or borrow areas including depositing unserviceable materials in layers and manual compaction. Appendix:1
lead charges up 5 km

Cum

11.01 a

B. The 30 cm top layer of disposal pit shall be provided with good earth, suitable for development of vegetation/plantation. All work shall be carried out as per specifications and approval of the Engineer in sqm Charge layer thicknes 300mm (top removal soils) Turfing at ground level at disposal pits for unserviceable material as per specifications and approval of the Engineer in Charge.

0.3

11.02

Sq.m

11.03

Regular water sprinkling (at least 4 times) per day at all construction sites for suppression of visible dust levels. Note: This item is to be operated after the completion of earthwork to suppress the visible dust levels. Cost of watering during compaction of earthwork is deemed to km be already covered under civil works.

11.04

construction of recharge pits at selectec water bodies

nos

11.05

silt traps at discharge points of channel into to fresh

11.06

Providing informatory sign boards (informatory /caution messages) for road users for providing information about ecologically sensitive areas, wild life crossing points (if any), important tourist locations, etc as applicable. The specifications of sign boards shall conform to relevant IRC specifications. The locations for informatory sign boards are given in Appendix-4

Sq.m

11.07

Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal of scarified bitumen including carriage (up to a lead of 10km), depositing bitumen in layers of 15 cms with manual compaction and covering the pit with 20cm thick good earth as top layer at ground level all complete as per Typical nos Drawing as given in the Appenxix:5

11.08

Turfing at ground level at disposal pits for scarified bitumen as per specifications and approval of the Engineer in Charge.

Sq.m

11.11

periodic air quality monitorings

no

11.12

Utilisation of unserviceable material obtained from Road way excavation for widening and construction of Cross roads.
water monitoring once in a quarter for 2 years

Cum
nos

11.13

11.14

noice quality monitoring

nos

11.16

Providing Oil Interceptors at the fuel/oil storage camps or Construction camps as per Typical Drawing in Appendix:8

Nos.

11.17

providing personal protective equepments to louber cost/per/annum

11.18

provind two health ckeck ups cost per person

11.19

Enhancement of Road Side Ponds including, gardening, Costruction of Parking lots, internal roads, as per Drawing No. U/T/18 Complete with all leads and lift and as directed by Engineer.

No.

der Civil Works Contract

AW

7.05 DIRECT a

Providing and laying cement concrete / reinforced cement concrete for foundation and sub-structure excluding cost of reinforcement with all leads and lifts as per drawing and Technical Specification section 1500, 1700 2100, 2200 & 2300. and as directed by

7.07

UNIT CUM M25 sqm FORM WORK RATE PER CUM RATE Precast - pretensioned Girders Providing, precasting, transportation and placing in position precast pretensioned concrete girders as per drawing and technical specifications Unit = 1 cum Taking output = 1 cum Grade of concrete - M40 a) Material Cement tonne Coarse sand cum 20 mm Aggregate cum 10 mm Aggregate cum Admixture @ 0.4 per cent of cement Kg b) Labour (i) Cutting, bending, making reinforcement cage, placing in position, binding etc. complete Taking quantity of steel 100 Kg/cum of concrete including laps and wastage Mate day Mazdoor (Skilled) day Mazdoor day (iv) Concreting by Batching plant and stationary concrete pump Mate day Mazdoor (Skilled) day Mazdoor day (v) Steam curing and manual curing Mate day Mazdoor day c) Machinery i) At casting yard Generator 100 KVA hour Batching Plant @ 20 cum/hour hour Transit Mixer 4 cum capacity hour Concrete Pump stationary hour ii) For transportation and placement at site Crane 35 tonne capacity hour Trailer 30 tonne capacity for transporting to tonne.km site. Page 527

AW (L - Lead in Kilometer) Trailor 30 tonne capacity during placement. Cost of formwork, steam curing arrangement, pretensioning arrangement etc @ 5 per cent of cost material, labour d) Overhead charges @ on (a+b+c) e) Contractor's profit @ on (a+b+c+d) Rate per cum = (a+b+c+d+e) FORM WORK RATE hour

7.09

1800

High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications Unit = 1 MT Taking output = 0.377 MT Details of cost for 12T13 strand 40 m long cable (weight = 0.377 MT) a) Material H.T. Strand @ 9.42 kg/m including 2 per cent for wastage and extra length for jacking Sheathing duct ID 66 mm along with 5 per cent extra length 40 x 1.05 = 42 m. Tube anchorage set complete with bearing plate, permanent wedges etc Cement for grouting including 3 per cent wastage @ 3.00 kg/m = 3 x 1.03 x 40 = 123.60 kg (say, = 125 kg) Add 0.50 per cent cost of material for Spacers, Insulation tape and miscellaneous items b) Labour i) For making and fixing cables, anchorages Mate Blacksmith Mazdoor ii) For prestressing Mate/Supervisor Prestressing operator / Fitter Mazdoor iii) For grouting Mate/Supervisor Mason Mazdoor c) Machinery Stressing jack with pump Grouting pump with agitator Page 528

tonne metre each tonne

day day day day day day day day day hour hour

AW Generator 33 KVA. d) Overhead charges @ on (a+b+c) e) Contractor's profit @ on (a+b+c+d) Cost for 0.377 MT (a+b+c+d+e) Rate per MT = (a+b+c+d+e)/0.377 Note 7.10.a 2000 & 2200 Cost of HT steel has been taken for delivery at site. Hence carriage has not been considered. Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. Unit: one cubic centimetre Considering an elastomeric bearing of size 500 x 400 x 96 mm for this analysis. Overall volume - 19200 cu.cm Volume of 6 nos. 488 x 388 x 4 mm size reinforcing steel plates = 4545 cu.cm. Hence volume of elastometer = 14655 cu.cm. a) Labour Mate Mazdoor Mazdoor (Skilled) b) Material Elastomeric bearing assembly consisting of 7 layers of elastomer bonded to 6 nos. internal reinforcing steel laminates by the process of vulcanisation, complete with all components as per drawing and Technical Specifications. Add 1 per cent of cost of bearing assembly for foundation anchorage bolts and consumables. c) Overhead charges @ on (a+b) d) Contractor's profit @ on (a+b+c) cost for 19200cc of elastomeric bearing = a+b+c+d Rate per cc of elastomeric bearing = (a+b+c+d)/19200 Octagonal 900 x 900 mm a) Labour Mate Mazdoor Mazdoor (Skilled) b) Material Packing & Transportation Service tax + Vat hour

day day day each.

9.03 a

day day day No. LS

Page 529

AW b Circular 600 mm dia. a) Labour Mate Mazdoor Mazdoor (Skilled) b) Material Packing & Transportation Service tax + Vat

day day day No. LS

Informatory Signs, Facility Signs, Direction Signs a) Labour Mate Mazdoor Mazdoor (Skilled) b) Material Packing & Transportation Service tax + Vat

day day day No. LS

Cautionary Warning Signs a) Labour Mate Mazdoor Mazdoor (Skilled) b) Material Packing & Transportation Service tax + Vat

day day day No. LS

Chevrons a) Labour Mate Mazdoor Mazdoor (Skilled) b) Material Packing & Transportation Service tax + Vat

day day day No. LS

Object Marker a) Labour Mate Mazdoor Mazdoor (Skilled) b) Material Page 530

day day day

AW Packing & Transportation Service tax + Vat No. LS

9.09

Suggestiv e

Road Markers/Road Stud with Lense Reflector Providing and fixing of road stud 100x 100 mm, die-cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973 Unit = Nos Taking output = 50Nos a) Labour Mate Mazdoor b) Material Aluminium studs 100 x 100 mm fitted with lense reflectors Add 10 per cent of cost of material for fixing and installation c) Overhead charges @ on (a+b) d) Contractor's profit @ on (a+b+c) Cost for 50 studs = a+b+c+d Rate per studs = (a+b+c+d)/50 Overhead Gantry Signages Excavation PCC M25 Colu. Pedestal M25 RCC Footing

day day each

9.19

3.15 3.15 0.8 3 1.1 0.3 0.3

Base Plate 25 mm thk. (700 x 700mm) MS Bolt 500 Long 32mm dia Stiffeners 10 Thk. (200 mm Long) Grout MS Pipe 250 mm OD of length 6.5 m Truss for 5m X 1.5m 2mm thk. Alu. Alloy sheet for Truss Painting for MS Pipe Reinforcement steel 2 2 1 1 Page 531

0.8

24 25 16 14

AW 1 1 2 Excavation PCC RCC M 25 Grout Base Plate 25 mm thk. (700 x 700mm) MS Bolt 500 Long 32mm dia Stiffeners 10 Thk. (200 mm Long) MS Pipe 250 mm OD of length 6.5 m Truss for 5m X 1.5m 2mm thk. Alu. Alloy sheet for Truss Painting for MS Pipe Reinforcement steel 14 14 14 15.83 1.58 4.09 0.03 1 12 4 1 1 1 1 430

Page 532

AW

250

2,535.00 750

3,285.00

0.47 0.45 0.54 0.36 1.88

3600.00 535.00 401.00 401.00 34.00

1692.00 240.75 216.54 144.36 63.92

0.00 0.00 0.00 0.00 0.00

0.06 0.35 1.40

200.00 175.00 150.00

12.00 61.25 210.00

0.00 0.00 0.00

0.03 0.05 0.60 0.01 0.35

200.00 175.00 150.00 200.00 175.00

6.00 8.75 90.00 2.00 61.25

0.00 0.00 0.00 0.00 0.00

0.05 0.05 0.10 0.05 0.15 2.5xL

562.00 1450.00 660.00 173.00 0.00 0.00

28.10 72.50 66.00 8.65

d 11.00 0.00 16.00

0.00 20.00 0.00 Lead = km &a Page 533

AW 0.15 0.00 149.20 0.00 0.00 3133.27 3133.00 750 3883 4.00

say

0.39 42.00 2.00 0.125

38448.00 0.00 0.00 3600.00

14802.48 0.00 0.00 450.00 762.62

0.00 0.00 0.00 0.00

0.16 1.00 3.00 0.05 0.25 1.00 0.05 0.25 1.00 2.50 1.00

200.00 250.00 150.00 200.00 0.00 150.00 200.00 300.00 150.00 #N/A 0.00

32.00 250.00 450.00 10.00 0.00 150.00 10.00 75.00 150.00 #N/A 0.00

0.00 F 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 Page 534

AW 3.50 562.00 1967.00 #N/A #N/A #N/A #N/A #N/A b

say

0.06 1.00 0.50 1.00

200.00 150.00 175.00 0.90

12.00 150.00 87.50 0.90

0.00 0.00 0.00 0.00

0.01 0.00 0.00 250.41 0.01 say 0.05 1 1 1 200 150 175 3000 0.00 10 150 175 3000 500 375 4210 Page 535

AW 4210

0.05 1 1 1

200 150 175 1550

10 150 175 1550 500 193.75 2578.75 2579

0.05 2 1 1

200 150 175 3800

10 300 175 3800 500 475 5260 5260

0.05 1 1 1

200 150 175 1950

10 150 175 1950 500 243.75 3028.75 3029

0.05 1 1 1

200 150 175 1250

10 150 175 1250 500 156.25 2241.25 2241

0.05 1 1

200 150 175

10 150 175

Page 536

AW 1 600 600 500 75 1510 1510

2222

0.040 1.000 50.000

200.00 150.00 225.00

8.00 150.00 11250.00 1125.00 0.00 0.00 12533.00 250.66 251.00

0.00 0.00 0.00

say 3.35 3.35 0.8 3.2 1.1 0.42 1.48 1.5 0.15 2.15 0.15 0.3 3.2 3.2

0.8

0.05

15.83 1.58 1.38 1.44 0.36 0.2 0.71 1 12 4 0.03 1 1 1 1 0.88 0.88 2.5 0.4 133.06 129.8 120 15.12 Page 537

3.15 2.95 3 2.7

151.2 147.5 48 37.8

AW 2 2 0.75 cu.m. cu.m. cu.m. cu.m. No. No. No. No. No. No. No. Kg. 28 28 21 82 2646 3285 3500 0.4 0.4 0.4 1298.06 4180.68 13435.65 105 0 0 0 0 0 0 0 19780 38799.39 11.2 11.2 8.4 428.78

46

Page 538