Designation:
: : : : :
1x700 MW CCPP at BIDADI KARNATAKA POWER CORPORATION LTD. BIDADI KARNATAKA Gas Combined cycle Power plant 1x700 MW
Table of Contents: General ................................................................................................................................... 2 Schedules ................................................................................................................................ 2 Incorporation in the SubContract .............................................................................................. 3
abcd
2/18
BID/00/W/-------T51/TS/001
General 1.1 The Subcontractor will clearly answer the questions and provide the information required in Schedules A to Q (as applicable) including separate sheets or documents as necessary. Care will be taken to clearly relate the answers to the relevant items in the schedules and to list the answers to each schedule under the appropriate schedule number. Schedules The following schedules are enclosed:
Schedule A Schedule B Schedule C Schedule D Schedule E Schedule F Schedule G Schedule H Schedule I Schedule J Schedule K Schedule L Schedule M Schedule N Schedule O Schedule P Schedule Q
2.1
- Details of the Subcontractor's Temporary Site Establishment - De-watering of Excavations (General) - Nominated Senior Staff and Project Team Organisation - Steelwork Fabricator - Deleted - Deleted - Quality Assurance and Quality Plan Procedures - Health & Safety - Deleted - Deleted - Deleted - List of Principal Items of Plant - Materials for Concrete and Grout - Crane Proposals - Subcontractors - Deleted - Tender Programme
abcd
3/18
BID/00/W/-------T51/TS/001
Incorporation in the SubContract 3.1 The schedules together with the information provided by the Subcontractor will be considered as information regarding the Subcontractor's intentions for carrying out the work and will not be incorporated into the contract.
abcd
4/18
BID/00/W/-------T51/TS/001
Schedule A Page 1 of 3
abcd
5/18
BID/00/W/-------T51/TS/001
Schedule A Page 2 of 3
DETAILS OF ELECTRICAL REQUIREMENTS FOR EQUIPMENT IN SUBCONTRACTOR'S SITE COMPOUND WITH ANTICIPATED LOADINGS
Period on Site
Description of Equipment
Electrical Load
1. 1.1
Electricity Maximum demand kVA required (Site Establishment) ......................................... Maximum demand kVA (Power Island) ................................................................
1.2 Variation in demand during the period of the Contract (Graph reference number to be inserted here if appropriate) (Site Establishment) ........................................................................................... (Power Island) 1.3 Diversity factor applied .......................................................................................
1.4 Night Loading ..................................................................................................... 1.5 Proposed amount of space heating to be used on the Site (kW) ..........................................................................................................................
abcd
6/18
BID/00/W/-------T51/TS/001
Schedule A Page 3 of 3 2.0 2.1 2.2 2.3 3. 3.1 3.2 Water Maximum water demand (excluding water for testing/flushing) m/h Maximum water demand for testing/flushing Variation in demand during the period of the Contract m/h Site Establishment Approximate area required for central administration area (m) Approximate area required for storage / workshops / messing (m) off site (to be located by the Subcontractor) .............................................. .............................................. .............................................. ..............................................
..............................................
abcd
7/18
BID/00/W/-------T51/TS/001
Schedule B Page 1 of 1
abcd
8/18
BID/00/W/-------T51/TS/001
Schedule C Page 1 of 1
** To include personnel at the site and at any major pre-casting/fabrication yards remote from the site.
abcd
9/18
BID/00/W/-------T51/TS/001
Schedule D Page 1 of 1
STEELWORK FABRICATOR
The Subcontractor will submit with full details the organisation of who will undertake steelwork fabrication. Details will include the following:
name of organisation location of fabrication yards annual output tonnage of steel name and curriculum vitae of senior steelwork designer power station experience and references quality control procedures
abcd
10/18
BID/00/W/-------T51/TS/001
Schedule G Page 1 of 1
abcd
11/18
BID/00/W/-------T51/TS/001
Schedule H Page 1 of 3
The Subcontractor is to reply to the questionnaire and append his full proposals for the safe management of the Works. Submission of such information will in no way affect the Subcontractor's obligations under the contract, nor does it affect his responsibility for the adequate suitability of such proposals to meet the requirements of the contract.
abcd
12/18
BID/00/W/-------T51/TS/001
Schedule H Page 2 of 3
10. Relating to the safety function, please state types of meetings held and frequency. 11. Has your Company or any Company employee been prosecuted for any safety related offence during the past three years? 12. Has your Company been served any enforcement notices during the past three years? If so please state whether prohibition or improvement, and dates. 13. Are your employees and line management issued with a Site Safety Handbook? 14. Does your Company monitor the effectiveness of its Safety Policy Document? If so please state measures taken.
abcd
13/18
BID/00/W/-------T51/TS/001
Schedule H Page 3 of 3
abcd
14/18
BID/00/W/-------T51/TS/001
Schedule L Page 1 of 1
Description
Number
abcd
15/18
BID/00/W/-------T51/TS/001
Schedule M Page 1 of 1
abcd
16/18
BID/00/W/-------T51/TS/001
Schedule N Page 1 of 1
CRANE PROPOSALS
The Subcontractor will complete the following details and include them in his tender so that the Company and his advisors may assess the restraints imposed on operations in the area and the effects on the activities of both the Subcontractor and others on site. Acceptance by the Company of these proposals in no way affects the Subcontractor's obligations under the Contract, nor does it affect the responsibility for the adequacy or suitability of such proposals to meet the requirements of the Contract, which responsibility remains entirely with the Subcontractor.
Type of Crane
Proposed location
Date up to which crane is proposed to remain operational to suit the Contractors own operations
abcd
17/18
BID/00/W/-------T51/TS/001
Schedule O Page 1 of 1
SUBCONTRACTORS
The Subcontractor will fill in below the name of all Sub Subcontractors he proposes to employ:
Name of firm
Address
abcd
18/18
BID/00/W/-------T51/TS/001
Schedule Q Page 1 of 1
TENDER PROGRAMME
The Subcontractor shall provide with his Tender an Execution programme in accordance with the following: 1. shall be in Gant Chart form Critical Path Network (CPN) or similar showing in logical sequence the all of the Works in accordance with the Subcontractors programme requirements. shall be included with the Tender in a bar chart form. shall include all phases of the Works (design, procurement, transport, construction, etc.) shall identify the float against each activity. each activity shall be resourced.
2. 3. 4. 5.
In addition the above mentioned Tender programme, the Subcontractor shall furnish with his Tender an information release schedule and a labour histogram. The labour histogram shall include all on-site and off-site activities and shall identify the different trades involved.