Presented by Andy Ginder Vice President, ABB Reliability Consulting 281-450-1081 Andy.p.ginder@us.abb.com
1
Objectives
Learn the main elements and features of TPM Know the stages and steps of a TPM program and their purpose, and appreciate the benefits of the process Understand how preventive maintenance, 5S, SMED and other activities apply to TPM Understand how the feedback process works, and how equipment effectiveness is measured
2
Equipment Reliability
The probability that equipment or systems will perform required functions satisfactorily under specific conditions within a certain period of time. Intrinsic: based on design
Determined during the design, fabrication, and installation stages.
Evolution of TPM
A P D A P D C
C A P D
Define Core Values Develop Strategies Create Key Performance Indicators Define Critical Activities
13
16
Support Tools
Basic hand tools Detailed inspection sheets or checklists Equipment logs Specific written procedures Visual graphics, routes, diagrams
Color coding (marked lube points), equipment numbers
19
What is 5S?
A process designed to organize the workplace, keep it neat and clean, maintain standardized conditions, and instill the discipline required to enable each individual to achieve and maintain a world class work environment.
20
Before
After
22
23
24
25
26
Internal Setup: Operations that are performed while a machine is stopped External Setup: Operations that are performed while a machine is running
SMED
SMED was originally designed to improve die press setups but its principles apply to changeovers in all types of processes 27
3 Phases of SMED
Separating Internal and External Setup Converting Internal Setup to External Setup Streamlining all Aspect of the Setup Operation
SMED
28
Preventive Maintenance
PM Analysis Procedure Clarify the problem Conduct a physical analysis of the problem List every condition potentially related to the problem Evaluate equipment, materials, and methods Plan the investigation Investigate malfunctions Formulate improvement plan
29
Questions
31