DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO

I.

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

/ m3

M 001

Rp

108,000

/m

M 002

Rp

150,000

/m

M 003

Rp

150,000

M 004

Rp

130,000

BAHAN / MATERIAL
1
2
3

Batu belah 15 - 20 cm
Batu pecah 5 - 7 cm
Batu pecah 4 - 6 cm

Batu pecah 3 - 5 cm

/m

Batu pecah 2 - 3 cm

/ m3

M 005

Rp

173,000

Batu pecah 1 - 2 cm

/ m3

M 006

Rp

195,000

/m

M 007

Rp

180,000

M 008

Rp

170,000

Batu pecah 0,5 - 1 cm / ciping

Abu batu

/m

Batu kerikil disaring

/ m3

M 009

Rp

63,000

Batu kerikil sirtu

/ m3

M 010

Rp

63,000

/m

M 011

Rp

63,000

M 012

Rp

63,000

10
11

Batu kerikil galian royalti

12

Sirtu royalti

/m

13

Kerikil berpasiran alami

/ m3

M 013

Rp

88,200

14

Hurugan pilihan

/ m3

M 014

Rp

25,200

15

Minyak tanah

/ ltr

M 016

Rp

9,450

Batu merah Kali Pucang

/ bj

M 018

Rp

550

Batu merah Kudus klas I

/ bj

M 019

Rp

650

10

Batu tempel 10 x 20 cm

/ m2

M 020

Rp

97,900

11

Batu tempel 20 x 20 cm

/ m2

M 021

Rp

102,500

/m

M 022

Rp

37,800

M 023

Rp

75,600

12

Batu lempeng

13

Pasir hurug / timbun

/m

10

Pasir beton / Muntilan

/ m3

M 024

Rp

210,000

11

Pasir pasang (lokal)

/ m3

M 025

Rp

137,500

/m

M 026

Rp

18,900

M 027

Rp

25,200

12

Tanah hurug

13

Tanah padas

/m

14

Sirtu

/ m3

M 028

Rp

63,000

15

Sirlak

/ kg

M 029

Rp

110,000

16

Spritus

/ ltr

M 030

Rp

10,920

14

S e m e n ( PC )

/ kg

M 031

Rp

1,638

15

Semen PC type II

/ kg

M 032

Rp

1,890

16

Semen PC warna

/ kg

M 033

Rp

8,100

17

Kapur

/ m3

M 034

Rp

495,000

18

Cat besi (emco/dextro)

/ kg

M 035

Rp

45,400

19

Cat kayu

/ kg

M 036

Rp

44,100

20

Cat Tembok Mowilex utk luar ruangan

/ kg

M 037

Rp

78,200

21

Cat Tembok Mowilex utk dalam ruangan (standar)

/ kg

M 038

Rp

53,000

22

Cat Tembok Mowilex utk dalam ruangan (pastel)

/ kg

M 039

Rp

55,100

23

Cat Tembok Mowilex utk dalam ruangan (warna khusus)

/ kg

M 040

Rp

62,500

15

Cat Tembok Decolith/sintex

/ kg

M 041

Rp

19,500

16

Plamur

/ kg

M 044

Rp

12,500

17

Amplas

/ lbr

M 045

Rp

3,360

NO

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

18

Meni

/ kg

M 046

Rp

23,940

19

Kawat Galvanis 3 mm

/ kg

M 047

Rp

21,420

20

Kawat Galvanis 4 mm

/ kg

M 048

Rp

21,500

21

Baut Baja

/ kg

M 049

Rp

20,160

22

Baja konstruksi / propil

/ kg

M 050

Rp

12,000

23

Baja tulangan beton / besi beton

/ kg

M 051

Rp

10,000

24

Paku usuk / reng

/ kg

M 052

Rp

16,200

25

Kawat baja / bindrat

/ kg

M 053

Rp

16,800

26

Multiplek 9 mm (90x220)

/ lbr

M 054

Rp

151,500

27

Triplek 3 mm (90 x 220)

/ lbr

M 055

Rp

58,300

28

Triplek 6 mm (90x220)

/ lbr

M 056

Rp

98,700

29

Triplek 9 mm (90x220)

/ lbr

M 057

Rp

144,000

30

Gypsum board tebal 9 mm

/ lbr

M 058

Rp

90,900

31

Teakwood

/ lbr

M 059

Rp

118,800

32

Lem kayu

/ kg

M 060

Rp

15,300

33

Tir

/ kg

M 061

Rp

12,700

34

Afduners

/ ltr

M 062

Rp

9,300

35

Tegel wafel 20 x 20 cm

/ bj

M 063

Rp

1,300

36

Tegel abu -abu 20 x 20 cm

/ bj

M 064

Rp

1,100

37

Tegel abu -abu 30 x 30 cm

/ bj

M 065

Rp

1,500

38

Tegel warna 30 x 30 cm

/ bj

M 066

Rp

2,000

39

Tegel warna 20 x 20 cm

/ bj

M 067

Rp

1,300

40

Tegel Plint (abu-abu)

/ bj

M 068

Rp

1,900

41

Tegel wafel warna 20x20 cm

/ bj

M 069

Rp

2,000

42

Tegel wafel warna 30x30 cm

/ bj

M 070

Rp

2,000

43

Ubin Granito 40/40

/ bh

M 071

Rp

29,800

44

Ubin keramik 40/40 putih (sekualitas Asia/Mulia)

/ bh

M 072

Rp

6,600

45

Ubin keramik 40/40 warna (sekualitas Asia/Mulia)

/ bh

M 073

Rp

8,900

19

Ubin keramik 30/30 cm putih (sekualitas Asia/Mulia)

/ bh

M 074

Rp

3,130

20

Ubin keramik warna 10/20 (sekualitas Asia/Mulia)

/ bh

M 075

Rp

850

21

Ubin keramik warna 20/20 (sekualitas Asia/Mulia)

/ bh

M 076

Rp

1,900

22

Ubin keramik warna 30/30 (sekualitas Asia/Mulia)

/ bh

M 077

Rp

3,750

M 078

Rp

237,800

23

Ubin granit

/m

24

Porselin

/ m2

M 079

Rp

48,900

25

Blok pafing tebal 6 cm K.125

/ m2

M 080

Rp

37,800

Blok pafing tebal 8 cm K.125

/m

M 081

Rp

39,500

M 082

Rp

50,300

26
27

Blok pafing warna tebal 6 cm K.125

/m

28

Blok pafing warna tebal 8 cm K.125

/ m2

M 083

Rp

57,300

29

Blok pafing blok tebal 6 cm K.200

/ m2

M 084

Rp

63,500

Blok pafing blok tebal 8 cm K.300

/m

M 085

Rp

93,000

M 086

Rp

106,000

30
31

Blok pafing blok tebal 8 cm K.400

/m

32

Kaca ryben 5 mm

/ m2

M 087

Rp

100,000

33

Buis beton 0,20

/ m'

M 088

Rp

40,600

34

Buis beton 0,30

/ m'

M 089

Rp

63,750

NO

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

35

Buis beton 0,60

/ m'

M 090

Rp

128,000

36

Buis beton 0,80

/ m'

M 091

Rp

209,375

37

Buis beton 1,00

/ m'

M 092

Rp

220,000

38

Buis beton U 15

/ m'

M 093

Rp

20,600

39

Buis beton U 20

/ m'

M 094

Rp

25,000

21

Buis beton U 30

/ m'

M 095

Rp

32,500

M 096

Rp

154,000

22

Batu klingker / Terakota

/m

23

Roster tanah merah

/ bh

M 097

Rp

3,125

24

Kloset INA jongkok

/ bh

M 098

Rp

134,000

25

Kloset duduk INA

/ bh

M 099

Rp

472,500

26

Kloset duduk mono blok INA

/ bh

M 100

Rp

1,375,000

27

Kloset duduk mono blok TOTO

/ bh

M 101

Rp

1,595,000

28

Urinoir

/ bh

M 102

Rp

349,800

29

Wastafel

/ bh

M 103

Rp

330,000

30

Bak CuciPiring Stainles

/ bh

M 104

Rp

235,000

31

Tempat sabun tanam

/ bh

M 105

Rp

45,000

32

Floor drain

/ bh

M 106

Rp

10,000

/m

M 107

Rp

55,900

/m

M 108

Rp

12,280

M 109

Rp

15,540

33
34

Seng BJLS 30
Eternit kerang super

35

Asbes plat tb 2 mm / atrisco

/m

36

Asbes plat tb 4 mm

/ m2

M 110

Rp

21,000

37

Harplek plat tb 4 mm

/ m2

M 111

Rp

18,300

38

Genting pres lokal

/ bh

M 112

Rp

780

39

Genting pres Jatiwangi (kecil) tak berwarna

/ bh

M 113

Rp

2,100

40

Genting pres Jatiwangi Natural (besar)

/ bh

M 114

Rp

4,800

41

Genting pres Jatiwangi (sedang)

/ bh

M 115

Rp

3,400

42

Genting bubung Jatiwangi/Kebumen berwarna

/ bh

M 116

Rp

17,400

43

Genting bubung Jatiwangi tak berwarna

/ bh

M 117

Rp

16,700

44

Genting bubung lokal

/ bh

M 118

Rp

6,900

45

Genteng beton

/ lbr

M 119

Rp

6,200

46

Genteng bubungan beton

/ lbr

M 120

Rp

7,600

47

Genteng keramik

/ bh

M 121

Rp

7,600

48

Genteng bubungan keramik

/ bh

M 122

Rp

24,400

49

Kayu perancah dengan meranti

/ m3

M 123

Rp

5,355,000

50

Kayu hutan

/ m3

M 124

Rp

4,273,500

Kayu randu

/m

M 125

Rp

976,500

M 126

Rp

5,625,000

51
52

Kayu Kruing eks Banjar Merah

/m

53

Kayu bengkirai

/ m3

M 128

Rp

9,625,000

54

Kayu kanfer

/ m3

M 129

Rp

10,080,000

/m

M 130

Rp

15,592,500

M 131

Rp

18,000,000

55

Kayu Jati klas III

56

Kayu Jati klas II panjang > 3 m

/m

57

Kayu Jati dolken 10-13 cm

/ m3

M 132

Rp

2,142,000

58

Kayu Jati dolken 14-16 cm

/ m3

M 133

Rp

4,273,000

M 134

Rp

10,080,000

59

Kayu Jati untuk reng

/m

NO

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

60

Kayu cepet kruing / kayu plipit

/ m'

M 135

Rp

5,000

61

Bambu

/ btg

M 136

Rp

12,500

62

Tali ijuk

/ kg

M 137

Rp

21,000

63

Sesek / gedek bambu

/ m2

M 138

Rp

8,500

/m

M 139

Rp

75,000

/m

M 140

Rp

65,000

M 141

Rp

57,000

64
65

Kaca bening 5 mm
Kaca bening 3 mm

66

Seng aluminium

/m

67

Kasa

/ m2

M 142

Rp

26,900

68

Engsel pintu kuningan lokal

/ bh

M 143

Rp

19,300

69

Engsel pintu biasa

/ bh

M 144

Rp

10,900

70

Engsel Angin

/ set

M 145

Rp

14,700

71

Engsel jendela

/ set

M 146

Rp

15,000

72

Kunci tanam royal / sekualitas

/ bh

M 147

Rp

110,000

73

Sloot / grendel pintu

/ bh

M 148

Rp

8,400

74

Kunci tanam Kamar Mandi

/ bh

M 149

Rp

57,750

75

Hak angin biasa

/ bh

M 150

Rp

6,000

76

Hak angin lipat

/ bh

M 151

Rp

13,400

77

Door Closer

/ bh

M 152

Rp

220,000

78

Rel Pintu Dorong

/ bh

M 153

Rp

275,000

79

Kran stainlesteel

/ bh

M 154

Rp

36,000

80

Kaca nako bening komplit

/ mata

M 155

Rp

51,000

81

Pipa PVC 3" AW

/ m'

M 156

Rp

48,500

82

Pipa PVC 4" AW

/ m'

M 157

Rp

70,400

83

Pipa PVC 6" AW

/ m'

M 158

Rp

125,400

84

Pipa PVC 8" AW

/ m'

M 159

Rp

275,000

85

Pipa PVC 10" AW

/ m'

M 160

Rp

330,000

86

Pipa beton bertulang diameter 60 cm

/ m'

M 161

Rp

134,000

M 162

Rp

34,900

87

Fiber glass plat

/m

88

Fiber glass gelombang

/ m2

M 163

Rp

44,100

89

Asbes Gelombang besar (2,25x0,92x5mm)

/ lbr

M 164

Rp

84,700

90

Asbes Gelombang besar (200x0,92x5mm)

/ lbr

M 165

Rp

79,300

91

Asbes Gelombang kecil (180x90x 4mm)

/ lbr

M 166

Rp

56,000

92

Asbes Gelombang kecil (210x105x 4mm)

/ lbr

M 167

Rp

64,000

93

Nok stel kecil / bubungan gelombang kecil

/ m'

M 168

Rp

83,000

94

Nok stel asbes

/ m'

M 169

Rp

81,900

95

Skrup fizzer

/ bh

M 170

Rp

6,900

96

Sealant

/ tube

M 171

Rp

44,100

97

Pintu lipat tebal 5 mm

/ m2

M 172

Rp

441,000

98

Pintu lipat tebal 8 mm

/ m2

M 173

Rp

567,000

/m

M 174

Rp

346,500

M 175

Rp

378,000

99

Rolling door alumunium tebal 5 mm

100

Rolling door alumunium tebal 7 mm

/m

101

Alumunium strip

/ m2

M 176

Rp

35,000

102

Profil alumunium

/ m'

M 177

Rp

104,900

M 178

Rp

17,400

103

Besi Strip 2 cm

/m

NO

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

104

Pagar BRC 90 x 240 Biasa

/ unit

M 179

Rp

285,500

105

Pagar BRC 120 x 240 Biasa

/ unit

M 180

Rp

372,600

106

Pagar BRC 90 x 240 hot dip galvanis

/ unit

M 181

Rp

750,000

107

Tiang BRC tinggi pagar 0.9 m 1 1/2" medium lengkap

/ unit

M 182

Rp

180,000

108

Tiang BRC tinggi pagar 0.9 m 2" medium lengkap

/ unit

M 183

Rp

310,000

109

Tiang BRC tinggi pagar 0.9 m 1 1/2" bisa lengkap

/ unit

M 184

Rp

125,000

110

Tiang BRC tinggi pagar 0.9 m 2" biasa lengkap

/ unit

M 185

Rp

225,000

111

Glass blox

/ bj

M 186

Rp

23,000

112

Paku sumbat / kait

/ bj

M 187

Rp

1,500

113

Seng gelombang besar BJLS 28

/ lbr

M 188

Rp

84,000

114

Seng gelombang kecil BJLS 30

/ lbr

M 189

Rp

78,500

115

Seng plat BJLS 28

/ lbr

M 190

Rp

40,000

116

Seng plat BJLS 29

/ lbr

M 191

Rp

45,000

/m

M 192

Rp

407,000

M 193

Rp

539,000

117

Canopy pipa besi hitam atap twinlite polycarbonat

118

Canopy pipa besi medium B atap twinlite polycarbonat

/m

119

Canopy pipa besi stainlesssteel atap twinlite polycarbonat

/ m2

M 194

Rp

671,000

120

Atap baja ringan

/ m2

M 195

Rp

244,800

/m

M 196

Rp

81,900

Besi L 50 x 50 x 5

/m

'

M 197

Rp

38,400

Air

/ liter

M 199

Rp

17

121
122
22

Penutup atap Galvalum 0.35

INSTALASI LISTRIK
206

Kabel Listrik NYA 1 x 1 1/2 mm

/ 100 m'

M 250

Rp

170,900

207

Kabel Listrik NYA 1 x 2 1/2 mm

/ 100 m'

M 251

Rp

252,000

208

Kabel Listrik NYA 1 x 4 mm

/ 100 m'

M 252

Rp

415,800

209

Kabel Listrik NYA 1 x 6 mm

/ 100 m'

M 253

Rp

693,000

210

Kabel Listrik NYY 2 x 1 1/2 mm

50m'

M 254

Rp

680,400

211

Kabel Listrik NYY 2 x 2 1/2 mm

50m'

M 255

Rp

850,500

212

Kabel Listrik NYY 2 x 4 mm

50m'

M 256

Rp

737,100

213

Kabel Listrik NYY 2 x 6 mm

50m'

M 257

Rp

932,400

214

Kabel Listrik NYM 2 x 1 1/2 mm

50m'

M 258

Rp

510,300

215

Kabel Listrik NYM 2 x 2 1/2 mm

50m'

M 259

Rp

680,400

216

Kabel Listrik NYM 2 x 4 mm

50m'

M 260

Rp

630,000

217

Kabel Listrik NYM 3 x 1 1/2 mm

50m'

M 261

Rp

567,000

218

Kabel Listrik NYM 3 x 2 1/2 mm

50m'

M 262

Rp

693,000

219

Kabel Listrik NYM 3 x 4 mm

50m'

M 263

Rp

819,000

220

Kabel Listrik NYM 3 x 6mm

50m'

M 264

Rp

1,052,100

221

Sakelar Outbow Seri

bh

M 265

Rp

15,750

222

Sakelar Outbow Engkel

bh

M 266

Rp

11,300

223

Sakelar Inbow Seri

bh

M 267

Rp

13,200

224

Sakelar Inbow Engkel

bh

M 268

Rp

9,400

225

Fuse Box 1 group

bh

M 269

Rp

30,200

226

Fuse Box 2 group

bh

M 270

Rp

50,400

227

Fuse Box 3 group

bh

M 271

Rp

73,000

NO

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

228

Steker Biasa

bh

M 272

Rp

1,250

229

Steker Arde

bh

M 273

Rp

5,000

230

Steker T biasa

bh

M 274

Rp

3,150

231

Steker T dg arde

bh

M 275

Rp

15,100

232

Fitting Floan

bh

M 276

Rp

7,500

233

Fitting Gantung

bh

M 277

Rp

1,250

234

Fitting Kap

bh

M 278

Rp

6,300

235

Fitting Kombinasi

bh

M 279

Rp

5,600

236

Stopkontak Arde Outbow Putih

bh

M 280

Rp

12,600

237

Stopkontak Arde Outbow Hitam

bh

M 281

Rp

5,600

238

Stopkontak Arde IB

bh

M 282

Rp

11,900

239

Stop Kontak Arde Putar

bh

M 283

Rp

16,300

240

Bola Lampu 2000 W METAL HALIDA

bh

M 284

Rp

5,520,000

241

Ballast Lampu 2000 W Flood Light

bh

M 285

Rp

5,993,000

242

Armatur Lampu HPST 250W/150 Lengkap (Dimming)

bh

M 286

Rp

4,410,000

243

KONTAKTOR

bh

M 287

Rp

630,000

244

KOMPAS GEOLOGI

bh

M 288

Rp

6,300,000

245

PLANIMETER

bh

M 289

Rp

10,080,000

Brunton Kompas 5006

bh

M 290

Rp

4,788,000

Brunton Kompas 5008

bh

M 291

Rp

3,528,000

Brunton Kompas 5010

bh

M 292

Rp

7,686,000

DQL -8

bh

M 293

Rp

18,900,000

E3-22P

bh

M 294

Rp

756,000

E3-20BLC

bh

M 295

Rp

756,000

bh

M 296

Rp

8,190,000

ALAT GEOLOGI DAN PERTAMBANGAN


a.

b.

c.

KOMPAS GEOLOGI

PALU GEOLOGI

PLANIMETER
Placom KP-90N

INSTALASI AIR BERSIH PERDESAAN/PERKOTAAN


a.

b.

" Pipa PVC "SII, S 12.5


Diameter nominal 1/2"

/ m'

M 300

Rp

5,900

Diameter nominal 3/4"

/ m'

M 301

Rp

7,200

Diameter nominal 1"

/ m'

M 302

Rp

10,700

Diameter nominal 1 1/2"

/ m'

M 303

Rp

18,600

Diameter nominal 2"

/ m'

M 304

Rp

26,500

Diameter nominal 3"

/ m'

M 305

Rp

60,900

Diameter nominal 4"

/ m'

M 306

Rp

80,600

Diameter nominal 1/2"

/ m'

M 308

Rp

22,100

Diameter nominal 3/4"

/ m'

M 309

Rp

28,800

Diameter nominal 1"

/ m'

M 310

Rp

44,400

" Pipa Galvanis " medium

NO

c.

d.

e.

f.

g.

h.

i.

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

Diameter nominal 1 1/2"

/ m'

M 311

Rp

66,700

Diameter nominal 2"

/ m'

M 312

Rp

88,900

Diameter nominal 3"

/ m'

M 313

Rp

144,600

Diameter nominal 4"

/ m'

M 314

Rp

211,400

Diameter nominal 6"

/ m'

M 315

Rp

344,900

Diameter nominal 1"

/ m'

M 317

Rp

11,800

Diameter nominal 1.1/2"

/ m'

M 318

Rp

24,600

Diameter nominal 2"

/ m'

M 319

Rp

39,600

Diameter nominal 2 1/2"

/ m'

M 320

Rp

52,300

Diameter nominal 3"

/ m'

M 321

Rp

78,800

Diameter nominal 4"

/ m'

M 322

Rp

117,900

Diameter nominal 6"

/ m'

M 323

Rp

248,300

Diameter nominal 3/4"

/ Bh

M 325

Rp

39,000

Diameter nominal 1"

/ Bh

M 326

Rp

65,000

Diameter nominal 1 1/2"

/ Bh

M 327

Rp

112,800

Diameter nominal 2"

/ Bh

M 328

Rp

190,900

Diameter nominal 3"

/ Bh

M 330

Rp

494,800

Diameter nominal 4"

/ Bh

M 331

Rp

633,700

Diameter nominal 6"

/ Bh

M 332

Rp

1,127,800

Diameter nominal 150 x 100 mm

/ Bh

M 334

Rp

187,400

Diameter nominal 100 x 75 mm

/ Bh

M 335

Rp

101,900

Diameter nominal 75 x 50 mm

/ Bh

M 336

Rp

64,200

Diameter nominal 50 x 40 mm

/ Bh

M 337

Rp

49,100

Diameter nominal 40 x 25 mm

/ Bh

M 338

Rp

29,400

Diameter nominal 25 x 20 mm

/ Bh

M 339

Rp

15,600

Diameter nominal 100 x 100 mm

/ Bh

M 341

Rp

198,900

Diameter nominal 75 x 75 mm

/ Bh

M 342

Rp

123,100

Diameter nominal 50 x 50 mm

/ Bh

M 343

Rp

74,600

Diameter nominal 40 x 40 mm

/ Bh

M 344

Rp

12,800

Diameter nominal 25 x 25 mm

/ Bh

M 345

Rp

8,800

Diameter nominal 75 mm RRJ

/ Bh

M 347

Rp

40,500

Diameter nominal 50 mm RRJ

/ Bh

M 348

Rp

30,000

Diameter nominal 40 mm

/ Bh

M 349

Rp

5,900

Diameter nominal 25 mm

/ Bh

M 350

Rp

3,700

Diameter nominal 20 mm

/ Bh

M 351

Rp

2,300

Diameter nominal 2"

/ Bh

M 353

Rp

11,500

Diameter nominal 1 1/2"

/ Bh

M 354

Rp

9,200

" Pipa PE " SII, S 8

" Stop valve "

" Gate valve "

" Reduser " PVC

" Tee all socket " PVC

" Bend all socket " PVC

" Bend all socket " GI

NO

j.

k.

l.

m.

n.

o.

p.

q.

r.

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

Diameter nominal 1"

/ Bh

M 355

Rp

6,000

Diameter nominal 3/4"

/ Bh

M 356

Rp

3,400

Diameter nominal 3" x 3/4"

/ Bh

M 358

Rp

26,000

Diameter nominal 2" x 3/4"

/ Bh

M 359

Rp

17,300

Diameter nominal 1 1/2" x 3/4"

/ Bh

M 360

Rp

13,700

Diameter nominal 1" x 3/4"

/ Bh

M 361

Rp

13,700

Diameter nominal 50 mm

/ Bh

M 363

Rp

17,300

Diameter nominal 40 mm

/ Bh

M 364

Rp

7,400

Diameter nominal 25 mm

/ Bh

M 365

Rp

3,400

Diameter nominal 20 mm

/ Bh

M 366

Rp

2,300

Diameter nominal 75 mm

/ Bh

M 368

Rp

109,100

Diameter nominal 100 mm

/ Bh

M 369

Rp

146,600

Diameter nominal 150 mm

/ Bh

M 370

Rp

269,300

Diameter nominal 50 mm

/ Bh

M 372

Rp

17,300

Diameter nominal 40 mm

/ Bh

M 373

Rp

7,400

Diameter nominal 25 mm

/ Bh

M 374

Rp

3,400

Diameter nominal 20 mm

/ Bh

M 375

Rp

2,300

Diameter nominal 100 mm

/ Bh

M 377

Rp

26,900

Diameter nominal 75 mm

/ Bh

M 378

Rp

15,700

Diameter nominal 50 mm

/ Bh

M 379

Rp

7,400

Diameter nominal 40 mm

/ Bh

M 380

Rp

5,900

Diameter nominal 25 mm

/ Bh

M 381

Rp

3,700

Diameter nominal 20 mm

/ Bh

M 382

Rp

2,300

Diameter nominal 3"

/ Bh

M 384

Rp

1,353,800

Diameter nominal 2"

/ Bh

M 385

Rp

1,030,800

Diameter nominal 1"

/ Bh

M 386

Rp

383,600

Diameter nominal 1/2"

/ Bh

M 387

Rp

120,100

Diameter nominal 3"

/ Bh

M 389

Rp

525,800

Diameter nominal 4"

/ Bh

M 390

Rp

676,900

Diameter nominal 6"

/ Bh

M 391

Rp

1,165,300

Diameter nominal 3"

/ Bh

M 393

Rp

99,600

Diameter nominal 4"

/ Bh

M 394

Rp

137,800

Diameter nominal 6"

/ Bh

M 395

Rp

222,100

Diameter nominal 1"

/ Bh

M 397

Rp

127,800

Diameter nominal 3/4"

/ Bh

M 398

Rp

120,100

" Clamp sadle " GI

" Valve socket " PVC

" Flange socket " PVC

" Faucet socket " PVC

" D o f " PVC

" Water meter "

" Chek valve "

" Bend all flange " CI - 45'

" Air valve " CI

NO

s.

t.

u.

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

" Stred boox "


Diameter nominal 3"

/ Bh

M 400

Rp

27,900

Diameter nominal 4"

/ Bh

M 401

Rp

34,000

Doble neple GI dia 3/4"

/ Bh

M 403

Rp

1,900

Tee all socket GI dia 3/4"

/ Bh

M 404

Rp

5,100

Valve socket GI dia 3/4"

/ Bh

M 405

Rp

2,800

Kran stainless steel

/ Bh

M 406

Rp

20,600

Verlop ring 1 " x 3/4"

/ Bh

M 407

Rp

9,200

Sock GIP dia 1"

/ Bh

M 408

Rp

3,600

Sock GIP dia 3/4"

/ Bh

M 409

Rp

2,800

Tee faucet dia 20 mm PVC

/ Bh

M 410

Rp

5,900

Bend faucet dia 20 mm PVC

/ Bh

M 411

Rp

3,700

Submersible pump 5.5 KW/1 Phase

/ Unit

M 412

Rp

32,786,600

Submersible pump 11 KW/3 Phase

/ Unit

M 413

Rp

59,617,600

Panel submersible pump 5.5 KW

/ Unit

M 414

Rp

3,182,800

Panel submersible pump 11 KW

/ Unit

M 415

Rp

5,209,300

Submersible pump 2.2 KW/1 Phase

Unit

M 416

Rp

24,806,200

Panel submersible pump 2.2 KW

Unit

M 417

Rp

2,480,600

Bend all sock GIP diameter 3"

Bh

M 418

Rp

23,700

Tee all sock GIP diameter 3"

Bh

M 419

Rp

19,800

Pasang tangga bahan pipa GIP dn 1"

Bh

M 420

Rp

220,500

Tutup man hole & tutup pengaman lengkap 3 mm

Unit

M 421

Rp

330,700

Speed Kran DN 20 mm

Bh

M 422

Rp

20,600

Gate Valev DN 50 mm

Bh

M 423

Rp

187,400

Flends diameter 150 mm

Bh

M 424

Rp

110,200

Pelurus / Centering tiap 30 mm

set

M 425

Rp

40,000

Reduser DN 100 x 150 mm

set

M 426

Rp

565,800

Filter Grevel

m3

M 427

Rp

200,000

Grouting

M 428

Rp

533,600

"Accessories"

Tangki fiberglas kapasitas 1 m3

/ m'

M 429

Rp

4,398,900

Tangki fiberglas kapasitas 2 m3

/ m'

M 430

Rp

5,209,300

Solar

/ ltr

M 432

Rp

5,500

Olie

/ ltr

M 433

Rp

33,600

Bentonite

/ kg

M 434

Rp

12,600

Veet/grease

/ kg

M 435

Rp

36,700

Gravel pack

/ m3

M 436

Rp

193,200

Kawat las

/ btg

M 437

Rp

900

Pipa jambang diameter 8" ( GI)

/ m'

M 438

Rp

642,600

Pipa jambang diameter 6" (GI)

/ m'

M 439

Rp

359,100

Pipa buta diamter 6" ( GI )

/ m'

M 440

Rp

344,400

Pipa buta diamter 4" (GI )

/ m'

M 441

Rp

315,000

Pipa saringan stainless steel diameter 6"

/ m'

M 442

Rp

1,911,000

"Pembuatan Sumur Produksi"

NO

BAHAN / MATERIAL

Pipa saringan stainless steel diameter 4"

SATUAN

/ m'

KODE

HARGA SATUAN BAHAN

M 443

Rp

1,312,500

NO

BAHAN / MATERIAL

SATUAN

KODE

HARGA SATUAN BAHAN

DAFTAR UPAH TENAGA KERJA

NO

JENIS TENAGA KERJA

SATUAN

KODE

HARGA SATUAN UPAH

Mandor

1 hari

L 061

Rp

50,000

Kepala tukang gali

1 hari

L 062

Rp

50,000

Tukang gali / pekerja

1 hari

L 063

Rp

35,000

Kepala tukang batu

1 hari

L 064

Rp

55,000

Tukang batu

1 hari

L 065

Rp

47,500

Laden tukang batu/pekerja

1 hari

L 066

Rp

40,000

Kepala tukang kayu

1 hari

L 067

Rp

50,000

Laden tukang kayu/pekerja

1 hari

L 068

Rp

40,000

Tukang kayu

1 hari

L 069

Rp

50,000

10

Kepala tukang besi

1 hari

L 070

Rp

50,000

11

Tukang besi

1 hari

L 071

Rp

47,500

12

Laden tukang besi/pekerja

1 hari

L 072

Rp

40,000

13

Kepala tukang cat

1 hari

L 073

Rp

55,000

14

Tukang cat

1 hari

L 074

Rp

50,000

15

Laden tukang cat /pekerja

1 hari

L 075

Rp

45,000

22

Mandor pipa

1 hari

L 082

Rp

45,000

23

Tukang pipa

1 hari

L 083

Rp

40,000

24

Laden tukang pipa/pekerja

1 hari

L 084

Rp

350,000

33

Site manager

1 hari

L 093

Rp

60,000

34

Geologist

1 hari

L 094

Rp

55,000

L 095

Rp

40,000

35

Administrasi

1 hari

36

Logistik

1 hari

L 096

Rp

40,000

37

Operator pemboran

1 hari

L 097

Rp

35,000

38

Mekanik

1 hari

L 098

Rp

35,000

39

Crew

1 hari

L 099

Rp

30,000

40

Buruh lokal

1 hari

L 100

Rp

30,000

41

Jaga malam

1 hari

L 101

Rp

25,000

42

Pengemudi

1 hari

L 102

Rp

30,000

HARGA SATUAN BAHAN BANGUNAN

KET

KET

KET

KET

KET

KET

KET

KET

KET

KET

FTAR UPAH TENAGA KERJA

KET

DAFTAR ANALISA BIAYA SATUAN PEKERJAAN


PEKERJAAN KONSTRUKSI
NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

03-2835-2002

PS. 2

PS. 3

PS. 4

PS. 5

PS. 6

PS. 7

PS. 8

PS. 9

PS. 10

DT 91-0006
2007

JUMLAH
8=4x7

PEKERJAAN PERSIAPAN
PS. 1

II

HARGA BAHAN/
UPAH
7

1.0000
0.0120
0.0200
0.0070

m'
m3
kg
m3

Pengukuran dan Pemasangan Bouwplank


kayu 5/7x4m kayu hutan
4,273,500.00
paku biasa 2"-5"
16,200.00
kayu papan 3/20 randu
976,500.00

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

tukang kayu
pekerja
kepala tukang
mandor

51,282.00
324.00
6,835.50

50,000.00
40,000.00
50,000.00
50,000.00

5,000.00
4,000.00
500.00
250.00

1.0000 m2
0.1000 OH
0.0500 OH

Membersihkan Lapangan dan Peralatan


pekerja
40,000.00
mandor
50,000.00

4,000.00
2,500.00

1.0000 m3
6.6670 OH
0.3330 OH

Bongkar Beton Bertulang


pekerja
mandor

40,000.00
50,000.00

266,680.00
16,650.00

1.0000 m3
membongkar dinding bata merah
6.6670 OH pekerja
0.0330 OH mandor

40,000.00
50,000.00

266,680.00
1,650.00

1.0000 m2
mengupas plesteran
0.0500 OH pekerja
0.0025 OH mandor

40,000.00
50,000.00

2,000.00
125.00

1.0000 m2
0.0250 OH
0.0025 OH
0.0500 OH
0.0050 OH

membongkar usuk dan reng


Tukang kayu
Kepala tukang kayu
pekerja
mandor

50,000.00
50,000.00
40,000.00
50,000.00

1,250.00
125.00
2,000.00
250.00

1.0000 m3
6.0000 OH
0.6000 OH
4.0000 OH
0.2000 OH

membongkar kuda-kuda
Tukang kayu
Kepala tukang kayu
pekerja
mandor

50,000.00
50,000.00
40,000.00
50,000.00

300,000.00
30,000.00
160,000.00
10,000.00

40,000.00
50,000.00

10,000.00
1,250.00

1.0000 m2
galian tanah keras/mengupas permukaan aspal
1.0000 OH pekerja
40,000.00
0.0330 OH mandor
50,000.00

40,000.00
1,650.00

1.0000
1.0000
0.2500

m2 Membuat Andang Dari Bambu


btg bambu 6-8/600 cm
kg paku

12,500.00
16,200.00

12,500.00
4,050.00

0.1700
0.2500
0.0020
0.0013

OH
OH
OH
OH

tukang kayu
pekerja
kepala tukang
mandor

50,000.00
40,000.00
50,000.00
50,000.00

8,500.00
10,000.00
100.00
65.00

1.0000 m3
0.7500 OH
0.0250 OH

Galian Tanah Biasa Sedalam 1 m


pekerja
mandor

35,000.00
50,000.00

26,250.00
1,250.00

1.0000 OH
0.0320 OH

Galian Tanah Keras Sedalam 1 m


pekerja
mandor

35,000.00
50,000.00

35,000.00
1,600.00

1.0000 m3
1.5000 OH
0.0500 OH

Galian tanah berbatu


pekerja
mandor

35,000.00
50,000.00

52,500.00
2,500.00

1.0000 m3
1.5000 OH

Galian Tanah Cadas Sedalam 1 m


pekerja

35,000.00

52,500.00

1.0000 m2
membongkar plafond eternit
0.2500 OH pekerja
0.0250 OH mandor

PEKERJAAN TANAH
T.1

T.2

T.3

T.4

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

0.0600 OH

mandor

50,000.00

3,000.00

1.0000 m3
1.2000 OH
0.0450 OH

Galian Tanah Lumpur Sedalam 1 m


pekerja
mandor

35,000.00
50,000.00

42,000.00
2,250.00

1.0000 m2
0.0500 OH
0.0050 OH

Pekerjaan striping setinggi 1 m


pekerja
mandor

35,000.00
50,000.00

1,750.00
250.00

1.0000 m3
0.3300 OH
0.0100 OH

membuang tanah sejauh 30m'


pekerja
mandor

35,000.00
50,000.00

11,550.00
500.00

T.8

1.0000 m3

T.9

1.0000 m3

T.10

1.2000
1.2000
0.0714
0.0178
0.0178
0.2289
0.0061
0.0100
0.0070
1.0000

m3
m3
jam
jam
jam
jam
jam
jam
jam
ls

tanah diangkut sejauh lebih dari 250 m


k a/275 ( L + 75)
Rp 35,000.00 / 275 (250 + 75)
tanah hurugan diangkut sejauh 30 m
T.1
+
T. 7
Rp 27,500.00 + ########
Urugan tanah biasa dan dipadatkan
tanah biasa
18,900.00
pekerja
35,000.00
mandor
50,000.00
whell loader
192,500.00
dump truck
71,500.00
motor grader
236,500.00
vibro roller
170,500.00
water tangker
82,500.00
alat bantu
1,500.00

22,680.00
2,499.00
890.00
3,426.50
16,366.35
1,442.65
1,705.00
577.50
1,500.00

1.2000
1.2000
0.0714
0.0178
0.0178
0.2289
0.0061
0.0100
0.0070
1.0000

m3
m3
jam
jam
jam
jam
jam
jam
jam
ls

Urugan tanah padas dan dipadatkan


tanah padas
25,200.00
pekerja
35,000.00
mandor
50,000.00
whell loader
192,500.00
dump truck
71,500.00
motor grader
236,500.00
vibro roller
170,500.00
water tangker
82,500.00
alat bantu
1,500.00

30,240.00
2,499.00
890.00
3,426.50
16,366.35
1,442.65
1,705.00
577.50
1,500.00

T.5

T.6

T.7

T.11

T.12

T.13

T.14

T.15

T.16

T.17

T.18

T.19

T.20

1.0000 m3
0.3000 OH
0.0100 OH

tanah diratakan dan ditimbris


pekerja
mandor

35,000.00
50,000.00

10,500.00
500.00

1.0000 m3
0.2500 OH
0.0083 OH

Urugan Kembali
pekerja
mandor

35,000.00
50,000.00

8,750.00
416.67

1.0000
1.2000
0.3000
0.0100

m3
m3
OH
OH

Urugan Pasir Hurug


pasir hurug
pekerja
mandor

75,600.00
35,000.00
50,000.00

90,720.00
10,500.00
500.00

1.0000
1.2000
0.2500
0.0250

m3
m3
OH
OH

Urugan Sirtu padat


sirtu
pekerja
mandor

63,000.00
40,000.00
50,000.00

75,600.00
10,000.00
1,250.00

1.0000
1.2000
0.3000
0.0100

m3
m3
OH
OH

urugan pasir menggunakan pasir pasang


pasir pasang
137,500.00
pekerja
35,000.00
mandor
50,000.00

165,000.00
10,500.00
500.00

1.0000 m2
0.1500 OH
0.0100 OH

memasang lempengan rumput termasuk mengambilnya


pekerja
35,000.00
mandor
50,000.00

1.0000 m2

mengangkut lempengan rumput sejauh 30 m


1/10 x A.6 = 1/10 x
12,050.00

/ 10

mengangkut lempengan rumput lebih dari 250 m


1/10 x A.7 = 1/10 x
41,363.64

/ 10

1.0000 m2

1.0000 m2

5,250.00
500.00

Mengambil mengangkut & memasang lempengan rumput jarak 30m


T.18
+
T. 19

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

6
Rp

8=4x7

########

1.0000 m2

Mengambil mengangkut & memasang lempengan rumput lebih dari 250m


T.18
+
T. 20
Rp 5,750.00 + ########

T.22

1.0000 m3
0.0190 OH
0.0019 OH

Timbunan tanah untuk tanggul jarak angkut 0-100 m


Tukang gali
35,000.00
mandor
50,000.00

0.0196
0.0185
0.0157
0.0314
1.0000

Buldozer
Excavator
Roler vibrator
Dump truck
Alat bantu

T.24

T.25

DT 91-0007
2007

JUMLAH

T.21

T.23

III

5,750.00 +

HARGA BAHAN/
UPAH
7

jam
jam
jam
jam
ls

665.00
95.00

236,500.00
275,000.00
170,500.00
71,500.00
2,000.00

4,635.40
5,087.50
2,676.85
2,245.10
2,000.00

1.0000 ttk
0.1250 OH
0.0125 OH

Pemasangan trucuk bambu 10 cm panjang 6 m


Pekerja
40,000.00
mandor
50,000.00

5,000.00
625.00

1.0000 btg
0.1000 jam
0.0165 jam

Bambu
alat pancang
alat bantu

12,500.00
9,000.00
250.00

12,500.00
900.00
4.13

1.0000 m3
0.0100 OH
0.0010 OH

Timbunan karung isi pasir


Pekerja
mandor

40,000.00
50,000.00

400.00
50.00

1.0000 bh
1.0000 m3
1.0000 ls

Karung
Pasir urug
alat bantu

3,000.00
75,600.00
500.00

3,000.00
75,600.00
500.00

1.0000 m2
0.0600 OH
0.0060 OH

Pemasangan sesek bambu


Pekerja
mandor

40,000.00
50,000.00

2,400.00
300.00

1.1000 m2

Sesek bambu

8,500.00

9,350.00

108,000.00
75,600.00

129,600.00
32,659.20

40,000.00
50,000.00
55,000.00
50,000.00

31,200.00
19,500.00
2,145.00
1,950.00

PEKERJAAN PONDASI
Pd.1

Pd.2

Pd.3

Pd.4

1.0000 m3
1.2000 m3
0.4320 m3

Aanstampeng batu belah


batu belah15/20
pasir hurug

0.7800
0.3900
0.0390
0.0390

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
15.0000
0.7333
0.6000
0.0267
1.0000
1.5000
0.0250

m3
kg
OH
OH
OH
m3
OH
OH

Membuat bronjong dari kawat galvanis diisi dg batu


kawat 4 mm
21,500.00
penganyam
47,500.00
pekerja penganyam
40,000.00
mandor
50,000.00
batu belah
108,000.00
pekerja pengisi
40,000.00
mandor
50,000.00

322,500.00
34,833.33
24,000.00
1,333.33
108,000.00
60,000.00
1,250.00

1.0000
1.2000
91.0000
0.5840

m3
m3
kg
m3

Pasang Pondasi Batu Kali 1Pc : 8 Ps


batu belah
108,000.00
semen / PC
1,638.00
pasir pasang
137,500.00

129,600.00
149,058.00
80,300.00

1.5000
0.7500
0.0750
0.0750

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

60,000.00
35,625.00
4,125.00
3,750.00

1.0000
1.2000
202.0000
0.4850

m3
m3
kg
m3

Pasang Pondasi Batu Kali 1 Pc : 3 Ps


batu belah
108,000.00
semen / PC
1,638.00
pasir pasang
137,500.00

129,600.00
330,876.00
66,687.50

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

Pd.5

Pd.5.b

Pd.6

Pd.7

Pd.8

Pd.9

HARGA BAHAN/
UPAH
7

8=4x7

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
1.2000
163.0000
0.5220

m3
m3
kg
m3

Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir beton


batu belah
108,000.00
129,600.00
semen / PC
1,638.00
266,994.00
pasir muntilan
210,000.00
109,620.00

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
1.2000
163.0000
0.5220

m3
m3
kg
m3

Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir pasang


batu belah
108,000.00
129,600.00
semen / PC
1,638.00
266,994.00
pasir pasang
137,500.00
71,775.00

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

60,000.00
28,500.00
3,300.00
3,750.00

1.0000
1.2000
136.0000
0.5440

m3
m3
kg
m3

Pasang Pondasi Batu Kali 1 Pc : 5 Ps


batu belah
108,000.00
semen / PC
1,638.00
pasir pasang
137,500.00

129,600.00
222,768.00
74,800.00

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
500.0000
156.0000
0.3300

m3
m3
kg
m3

Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps


bata merah
550.00
275,000.00
semen / PC
1,638.00
255,528.00
pasir pasang
137,500.00
45,375.00

4.5000
1.5000
0.1500
0.2250

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000 m'
0.3410 m'
0.0180
0.0020

Pasang suling-suling
Pipa PVC 2"
Pekerja
mandor

1.0000 m3
1.8000
1.0450

Pekerjaan pancang
Pekerja
mandor

40,000.00
47,500.00
55,000.00
50,000.00

JUMLAH

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
55,000.00
50,000.00

60,000.00
28,500.00
3,300.00
3,750.00

60,000.00
28,500.00
3,300.00
3,750.00

60,000.00
28,500.00
3,300.00
3,750.00

40,000.00
47,500.00
55,000.00
50,000.00

180,000.00
71,250.00
8,250.00
11,250.00

26,500.00
350,000.00
50,000.00

9,036.50
6,300.00
100.00

35,000.00
50,000.00

63,000.00
52,250.00

pekerjaan 1 m3 pemancangan diambil 1/4 kalinya


IV

DT 91-0009
2007

PEKERJAAN DINDING
D.1

D.2

1.0000
150.0000
26.5500
0.0930

m2
bh
kg
m3

Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps


biji bata merah Kali Pucang
550.00
82,500.00
semen / PC
1,638.00
43,488.90
pasir pasang
137,500.00
12,787.50

0.6000
0.2000
0.0200
0.0300

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000 m2
150.0000 bh
10.0800 kg

40,000.00
47,500.00
55,000.00
50,000.00

24,000.00
9,500.00
1,100.00
1,500.00

Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 3 kp : 10 Ps


biji bata merahKali Pucang
550.00
82,500.00
semen / PC
1,638.00
16,511.04

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

D.3

D.4

D.5

D.6

D.7

D.8

D.9

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

0.0925 m3
0.0275 m3

pasir pasang
kapur

137,500.00
495,000.00

12,718.75
13,612.50

0.6000
0.2000
0.0200
0.0300

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

24,000.00
9,500.00
1,100.00
1,500.00

1.0000
75.0000
18.9500
0.0380

m2
bh
kg
m3

Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 2 Ps


biji bata merah Kali Pucang
550.00
41,250.00
semen / PC
1,638.00
31,040.10
pasir pasang
137,500.00
5,225.00

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
75.0000
14.3700
0.0400

m2
bh
kg
m3

Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps


biji bata merah Kali Pucang
550.00
41,250.00
semen / PC
1,638.00
23,538.06
pasir pasang
137,500.00
5,500.00

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
75.0000
6.5000
0.0500

m2
bh
kg
m3

Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps


biji bata merah Kali Pucang
550.00
41,250.00
semen / PC
1,638.00
10,647.00
pasir pasang
137,500.00
6,875.00

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
130.0000
26.5500
0.0930

m2
bh
kg
m3

Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 4 Ps


biji bata merah Kudus
650.00
semen / PC
1,638.00
pasir pasang
137,500.00

84,500.00
43,488.90
12,787.50

0.6000
0.2000
0.0200
0.0300

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

24,000.00
9,500.00
1,100.00
1,500.00

1.0000
130.0000
10.0800
0.0950
0.0275

m2
bh
kg
m3
m3

Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 3 kp : 10 Ps


biji bata merah Kudus
650.00
84,500.00
semen / PC
1,638.00
16,511.04
pasir pasang
137,500.00
13,062.50
kapur
495,000.00
13,612.50

0.6000
0.2000
0.0200
0.0300

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
65.0000
18.9500
0.0380

m2
bh
kg
m3

Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 2 Ps


biji bata merah Kudus
650.00
semen / PC
1,638.00
pasir pasang
137,500.00

42,250.00
31,040.10
5,225.00

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

12,000.00
4,750.00
550.00
750.00

1.0000 m2
65.0000 bh
14.3700 kg

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
55,000.00
50,000.00

Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 3 Ps


biji bata merah Kudus
650.00
semen / PC
1,638.00

12,000.00
4,750.00
550.00
750.00

12,000.00
4,750.00
550.00
750.00

12,000.00
4,750.00
550.00
750.00

24,000.00
9,500.00
1,100.00
1,500.00

42,250.00
23,538.06

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

D.10

D.11

DT 91-0010
2007

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

0.0400 m3

pasir pasang

137,500.00

5,500.00

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

12,000.00
4,750.00
550.00
750.00

1.0000
65.0000
6.5000
0.0500

m2
bh
kg
m3

Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc :8 Ps


biji bata merah Kudus
650.00
semen / PC
1,638.00
pasir pasang
137,500.00

42,250.00
10,647.00
6,875.00

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

12,000.00
4,750.00
550.00
750.00

1.0000
30.0000
14.0000
0.0320

m2
bh
kg
m3

Pasangan Roster uk. ( 12 x 11 x 24 ), 1Pc : 4 Ps


roster
3,125.00
semen / PC
1,638.00
pasir pasang
137,500.00

93,750.00
22,932.00
4,400.00

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

12,000.00
4,750.00
550.00
750.00

1,638.00
137,500.00

10,647.00
2,667.50

PEKERJAAN PLESTERAN
PL.1

PL.2

PL.3

PL.4

1.0000 m2
6.5000 kg
0.0194 m3

Plesteran 1 Pc : 3 Ps
semen/PC
pasir pasang

0.4000 OH
0.2000 OH

pekerja
tukang batu

40,000.00
47,500.00

16,000.00
9,500.00

0.0200 OH
0.0200 OH

kepala tukang
mandor

55,000.00
50,000.00

1,100.00
1,000.00

1.0000 m2
7.1860 kg
0.0280 m3

Plesteran 1 Pc : 8 Ps di aci PC
semen/PC
pasir pasang

1,638.00
137,500.00

11,770.67
3,850.00

0.3000
0.1500
0.0150
0.0150

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

12,000.00
7,125.00
825.00
750.00

1,638.00
137,500.00

10,384.92
1,650.00

40,000.00
47,500.00
55,000.00
50,000.00

8,000.00
7,125.00
825.00
500.00

1.0000 m2
9.3000 kg
0.0180 m3

Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm


semen
1,638.00
pasir pasang
137,500.00

15,233.40
2,475.00

0.2000 OH
0.1500 OH

pekerja
tukang batu

OH
OH
OH
OH

1.0000 m2
6.3400 kg
0.0120 m3

Plester Siar Adukan 1 Pc : 2 Ps


semen
pasir pasang

0.2000
0.1500
0.0150
0.0100

pekerja
tukang batu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
47,500.00

8,000.00
7,125.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

PL.5

VI

DT 91-0011
2007

0.0150 OH
0.0100 OH

kepala tukang
mandor

1.0000 m2
4.3200 kg
0.0060 m3

Plesteran Ciprat 1 Pc : 2 Ps
semen
pasir pasang

0.2500
0.1000
0.0100
0.0130

OH
OH
OH
OH

m3
OH
OH
OH
OH

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

55,000.00
50,000.00

825.00
500.00

1,638.00
137,500.00

7,076.16
825.00

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,000.00
4,750.00
550.00
650.00

gantungan pyan
tukang kayu
tukang kepala
pekerja
mandor

50,000.00
50,000.00
40,000.00
50,000.00

750,000.00
75,000.00
200,000.00
12,500.00

PEKERJAAN KAYU
KY.1

KY.2

KY.3

KY.4

KY.5

KY.6

1.0000
15.0000
1.5000
5.0000
0.2500

1.1000 m3
0.1500 kg

kayu kruing
paku

5,625,000.00
16,200.00

6,187,500.00
2,430.00

1.0000
1.2000
1.2500
1.0000

m3
m3
kg
kg

Pasang Kusen Pintu dan Jendela kayu Bengkirai


kayu bengkirai
9,625,000.00
paku
16,200.00
lem kayu
15,300.00

11,550,000.00
20,250.00
15,300.00

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

240,000.00
1,000,000.00
110,000.00
15,000.00

1.0000
1.1000
1.2500
1.0000

m3
m3
kg
kg

Pasang Kusen Pintu dan Jendela kayu Jati


kayu jati
15,592,500.00
paku
16,200.00
lem kayu
15,300.00

17,151,750.00
20,250.00
15,300.00

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

240,000.00
1,000,000.00
110,000.00
15,000.00

1.0000
1.2000
1.2500
1.0000

m3
m3
kg
kg

Pasang Kusen Pintu dan Jendela kayu Kanfer


kayu kanfer
10,080,000.00
paku
16,200.00
lem kayu
15,300.00

12,096,000.00
20,250.00
15,300.00

6.0000
18.0000
2.0000
0.3000

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

240,000.00
900,000.00
110,000.00
15,000.00

1.0000
0.1000
0.0100
0.1000
0.0050

m2
OH
OH
OH
OH

Pas usuk reng atap genteng keramik


tukang kayu
tukang kepala
pekerja
mandor

50,000.00
50,000.00
40,000.00
50,000.00

5,000.00
500.00
4,000.00
250.00

9,625,000.00
5,625,000.00
16,200.00

134,750.00
320,625.00
4,050.00

50,000.00
50,000.00
40,000.00
50,000.00

5,000.00
500.00
4,000.00
250.00

9,625,000.00
5,625,000.00

134,750.00
320,625.00

0.0140 m3
0.0570 m3
0.2500 kg

kayu bengkirai untuk usuk (5/7)


kayu kruing untuk reng (3/4)
paku

1.0000
0.1000
0.0100
0.1000
0.0050

Pas usuk reng atap genteng beton


tukang kayu
tukang kepala
pekerja
mandor

m2
OH
OH
OH
OH

0.0140 m3
0.0570 m3

kayu bengkirai untuk usuk (5/7)


kayu kruing untuk reng (3/4)

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

KY.7

KY.8

KY.9

KY.10

KY.11

KY.12

KY.13

KY.13.b

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

0.2500 kg

paku reng

16,200.00

4,050.00

1.0000 m2
0.0120 m3
0.1500 kg

Pasang Kasau & Reng Kayu Kruing


kayu kruing
5,625,000.00
paku
16,200.00

67,500.00
2,430.00

0.1000
0.1000
0.0100
0.0050

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00
50,000.00

4,000.00
5,000.00
550.00
250.00

1.0000 m2
0.0120 m3
0.1500 kg

Pasang Kasau & Reng Kayu Bengkirai


kayu bengkirai
9,625,000.00
paku
16,200.00

115,500.00
2,430.00

0.1000
0.1000
0.0100
0.0050

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00
50,000.00

4,000.00
5,000.00
550.00
250.00

1.0000 m2
0.0030 m3
0.1500 kg

Pasang Kasau lama & Reng baru Kayu Bengkirai


kayu bengkirai
9,625,000.00
paku
16,200.00

28,875.00
2,430.00

0.1000
0.1000
0.0100
0.0050

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00
50,000.00

4,000.00
5,000.00
550.00
250.00

1.0000 m2
0.0120 m3
0.1500 kg

Pasang Kasau & Reng Kayu Kamper


kayu kamper
10,080,000.00
paku
16,200.00

120,960.00
2,430.00

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

4,000.00
5,000.00
550.00
250.00

1.0000
1.1000
15.0000
5.6000

m3
m3
kg
kg

Pasang Konstruksi Kuda-Kuda Kayu Bengkirai


kayu bengkirai
9,625,000.00
baut / angkur
20,160.00
paku
16,200.00

10,587,500.00
302,400.00
90,720.00

4.0000
12.0000
1.2000
0.2000

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

160,000.00
600,000.00
66,000.00
10,000.00

1.0000
1.1000
15.0000
5.6000

m3
m3
kg
kg

Pasang Konstruksi Kuda-Kuda Kayu Jati


kayu jati
15,592,500.00
baut / angkur
20,160.00
paku
16,200.00

17,151,750.00
302,400.00
90,720.00

4.0000
12.0000
1.2000
0.2000

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

160,000.00
600,000.00
66,000.00
10,000.00

1.0000
1.1000
15.0000
5.6000

m3
m3
kg
kg

Pasang Konstruksi Kuda-Kuda Kayu Kruing


kayu kruing
5,625,000.00
baut / angkur
20,160.00
paku
16,200.00

6,187,500.00
302,400.00
90,720.00

4.0000
12.0000
1.2000
0.2000

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

1.0000 m3
1.1000 m3

40,000.00
50,000.00
55,000.00
50,000.00

160,000.00
600,000.00
66,000.00
10,000.00

Pasang Konstruksi Kuda-Kuda Kayu lokal


kayu lokal
3,800,000.00

4,180,000.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

KY.14

KY.17

KY.18

KY.19

KY.20

8=4x7

baut / angkur
paku

20,160.00
16,200.00

302,400.00
90,720.00

4.0000
12.0000
1.2000
0.2000

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

160,000.00
600,000.00
66,000.00
10,000.00

5,625,000.00
20,160.00

6,187,500.00
161,280.00

40,000.00
50,000.00
55,000.00
50,000.00

240,000.00
900,000.00
99,000.00
15,000.00

9,625,000.00
118,800.00

10,587,500.00
950,400.00

40,000.00
50,000.00
55,000.00
50,000.00

240,000.00
900,000.00
99,000.00
15,000.00

1.0000 m2
0.0600 m3
0.1500 kg

Pasang Jalusi mati Kosen Kayu Kanfer


kayu kanfer
10,080,000.00
paku
16,200.00

604,800.00
2,430.00

0.5000
2.0000
0.2000
0.0250

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

20,000.00
100,000.00
11,000.00
1,250.00

1.0000 m2
0.0600 m3
0.1500 kg

Pasang Jalusi mati Kosen Kayu Bengkirai


kayu bengkirai
9,625,000.00
paku
16,200.00

577,500.00
2,430.00

0.5000
2.0000
0.2000
0.0250

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

20,000.00
100,000.00
11,000.00
1,250.00

1.0000 m2
0.0600 m3
0.1500 kg

Pasang Jalusi mati Kosen Kayu Jati


kayu jati
15,592,500.00
paku
16,200.00

935,550.00
2,430.00

0.5000
2.0000
0.2000
0.0250

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

20,000.00
100,000.00
11,000.00
1,250.00

1.0000 m2
0.0600 m3
0.1500 kg

Pasang Jalusi mati Kosen Kayu Kruing


kayu kruing
5,625,000.00
paku
16,200.00

337,500.00
2,430.00

0.5000
2.0000
0.2000
0.0250

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

20,000.00
100,000.00
11,000.00
1,250.00

1.0000
0.0140
0.2500
0.0500

m2
m3
lbr
kg

Bikin daun pintu rangka kayu jati tb 3,5 cm panil multiplek tb 9mm
kayu jati kl III
15,592,500.00
218,295.00
multiplek
151,500.00
37,875.00
paku
16,200.00
810.00

OH
OH
OH
OH

1.0000 m3
1.1000 m3
8.0000 kg
OH
OH
OH
OH

1.0000 m3
1.1000 m3
8.0000 kg
6.0000
18.0000
1.8000
0.3000

KY.16

JUMLAH

15.0000 kg
5.6000 kg

6.0000
18.0000
1.8000
0.3000

KY.15

HARGA BAHAN/
UPAH
7

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

2.5000 OH
7.5000 OH
0.7500 OH

Pasang konsol kayu kruing


kayu kruing
baut, beugel
pekerja
tukang kayu
kepala tukang
mandor

Pasang konsol kayu bengkirai


kayu bengkirai
baut, beugel
pekerja
tukang kayu
kepala tukang
mandor

pekerja
tukang kayu
kepala tukang

40,000.00
50,000.00
55,000.00
50,000.00

40,000.00
50,000.00
55,000.00

100,000.00
375,000.00
41,250.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

KY.21

KY.22

KY.23

KY.24

KY.26

KY.27

KY.28

8=4x7

mandor

1.0000 m2
0.0090 m3
0.2500 lbr
0.0500 kg

Bikin daun pintu rangka kayu jati tb 3 cm panil multiplek tb 9 mm


Upah tenaga
kayu jati kl III
15,592,500.00
140,332.50
multiplek
151,500.00
37,875.00
paku
16,200.00
810.00

1.0000
0.0140
0.2500
0.0500

m2
m3
lbr
kg

Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm
kayu bengkirai
9,625,000.00
134,750.00
mulitplek
151,500.00
37,875.00
paku
16,200.00
810.00

2.5000
7.5000
0.7500
0.1250

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

1.0000
0.0250
1.0000
0.0300
0.5000

m2
m3
lbr
kg
kg

Bikin daun pintu double teakwood rangka kayu bengkirai tb 3 cm


kayu bengkirai
9,625,000.00
240,625.00
teakwood
118,800.00
118,800.00
paku
16,200.00
486.00
lem
15,300.00
7,650.00

0.6000
2.0000
0.2000
0.0300

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

1.0000 m2
m3
lbr
m2
kg
kg

50,000.00

JUMLAH

0.1250 OH

0.0250
1.0000
1.0000
0.0300
0.3000

KY.25

HARGA BAHAN/
UPAH
7

40,000.00
50,000.00
55,000.00
50,000.00

40,000.00
50,000.00
55,000.00
50,000.00

6,250.00

100,000.00
375,000.00
41,250.00
6,250.00

24,000.00
100,000.00
11,000.00
1,500.00

Bikin daun pintu double teakwood rangka kayu bengkirai tb 3 cm dilapisi seng aluminium
Upah tenaga
kayu bengkirai
9,625,000.00
240,625.00
triplek 9 mm
144,000.00
144,000.00
seng aluminium
57,000.00
57,000.00
paku
16,200.00
486.00
lem
15,300.00
4,590.00

1.0000 m2
0.0400 m3
0.5000 kg

Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm


kayu kanfer
10,080,000.00
lem
15,300.00

403,200.00
7,650.00

1.0000
2.5000
0.2500
0.0500

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

40,000.00
125,000.00
13,750.00
2,500.00

1.0000 m2
0.0400 m3
0.5000 kg

Pasang Pintu Panyl Kayu Jati tb.4 cm


kayu jati
15,592,500.00
lem
15,300.00

623,700.00
7,650.00

1.0000
2.5000
0.2500
0.0500

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
125,000.00
13,750.00
2,500.00

OH
OH
OH
OH

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00
50,000.00

1.0000 m2
0.0240 m3
0.3000 kg

Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm


kayu kanfer
10,080,000.00
lem
15,300.00

241,920.00
4,590.00

0.8000
2.0000
0.2000
0.0400

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

32,000.00
100,000.00
10,000.00
2,000.00

1.0000 m2
0.0240 m3
0.3000 kg

Pasang Pintu & Jendela Kaca Kayu Jati tb.3 cm


kayu jati
15,592,500.00
lem
15,300.00

374,220.00
4,590.00

0.8000 OH
2.0000 OH
0.2000 OH

pekerja
tukang kayu
kepala tukang

32,000.00
100,000.00
11,000.00

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

KY.29

KY.30

KY.30.b

KY.31

KY.32

KY.33

KY.34

KY.35

HARGA BAHAN/
UPAH
7

0.0400 OH

mandor

1.0000 m2
0.0110 m3
0.2000 kg

Pas pyan papan kayu jati tb 1 cm


kayu jati klas III
paku

0.0600
1.8000
0.1800
0.3000

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

JUMLAH
8=4x7

50,000.00

2,000.00

15,592,500.00
16,200.00

171,517.50
3,240.00

40,000.00
50,000.00
55,000.00
50,000.00

2,400.00
90,000.00
9,900.00
15,000.00

118,800.00
16,200.00

130,680.00
8,100.00

1.0000 m2
1.1000 m2
0.5000 kg

Pasang Plywood untuk dinding


teawood
paku

0.0250
0.0750
0.0075
0.0013

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

1,000.00
3,750.00
412.50
65.00

1.0000 m2
1.0000 lbr
0.5000 kg

Pasang triplek untuk dinding


triplek 3mm
paku

58,300.00
16,200.00

58,300.00
8,100.00

0.0250
0.0750
0.0075
0.0013

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
55,000.00
50,000.00

1,000.00
3,750.00
412.50
65.00

1.0000 m'
0.0108 m3
0.1000 kg

Pasang Lisplank Uk. 3/20 Kayu Jati


kayu jati
15,592,500.00
paku
16,200.00

168,399.00
1,620.00

0.1000
0.2000
0.0250
0.0050

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00
50,000.00

4,000.00
10,000.00
1,375.00
250.00

1.0000 m'
0.0110 m3
0.0500 kg

Pasang Lisplank Uk. 3/30 Kayu Jati


kayu jati
15,592,500.00
paku
16,200.00

171,517.50
810.00

0.1000
0.2000
0.0200
0.0050

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00
50,000.00

4,000.00
10,000.00
1,100.00
250.00

1.0000 m'
0.0108 m3
0.1000 kg

Pasang Lisplank Uk. 3/20 Kayu Bengkirai


kayu bengkirai
9,625,000.00
paku
16,200.00

103,950.00
1,620.00

0.0100
0.2000
0.0250
0.0050

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
50,000.00
55,000.00
50,000.00

400.00
10,000.00
1,375.00
250.00

1.0000 m'
0.0110 m3
0.0500 kg

Pasang Lisplank Uk. 3/30 Kayu Bengkirai


kayu bengkirai
9,625,000.00
paku
16,200.00

105,875.00
810.00

0.1000
0.2000
0.0200
0.0050

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

1.0000 m'
0.0050 m3
0.0500 kg

Pasang papan sirip


kayu kruing
paku

40,000.00
50,000.00
55,000.00
50,000.00

4,000.00
10,000.00
1,100.00
250.00

5,625,000.00
16,200.00

28,125.00
810.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

0.1000
0.1000
0.0100
0.0500

VII

DT 91-0008
2007

HARGA BAHAN/
UPAH
7
40,000.00
50,000.00
55,000.00
50,000.00

JUMLAH
8=4x7

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

4,000.00
5,000.00
550.00
2,500.00

1.0000
247.0000
0.6210
0.7400
215.0000

m3
kg
m3
m3
ltr

Membuat beton tumbuk Mutu k.100 ( 1pc : 3.5ps : 4kr)


Pc
1,638.00
pasir beton
210,000.00
batu pecah 1-2
195,000.00
air
17.00

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
326.0000
0.6514
0.7622
215.0000

m3
kg
m3
m3
ltr

Membuat beton Mutu k.175 ( 1 Pc : 2,5 Ps : 3 Kr )


Pc
1,638.00
pasir beton
210,000.00
batu pecah 1-2
195,000.00
air
17.00

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

66,000.00
11,875.00
1,375.00
4,000.00

1.0000
371.0000
0.5983
0.7756
215.0000

m3
kg
m3
m3
ltr

Membuat beton Mutu k.225 ( 1pc : 2ps : 3kr)


Pc
1,638.00
pasir beton
210,000.00
batu pecah 1-2
195,000.00
air
17.00

607,698.00
125,640.00
151,233.33
3,655.00

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

66,000.00
11,875.00
1,375.00
4,000.00

1.0000
406.0000
0.5863
0.7600
215.0000

m3
kg
m3
m3
ltr

Membuat beton Mutu k.275 ( 1pc : 1.5ps : 2.5kr)


Pc
1,638.00
pasir beton
210,000.00
batu pecah 1-2
195,000.00
air
17.00

665,028.00
123,120.00
148,200.00
3,655.00

1.6500
0.2500
0.0300
0.0800

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

66,000.00
11,875.00
1,650.00
4,000.00

1.0000
413.0000
0.5837
0.7563
215.0000

m3
kg
m3
m3
ltr

Membuat beton Mutu k.300 ( 1pc : 1.5ps : 2kr )


Pc
1,638.00
pasir beton
210,000.00
batu pecah 1-2
195,000.00
air
17.00

676,494.00
122,580.00
147,477.78
3,655.00

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

66,000.00
11,875.00
1,375.00
4,000.00

1.0000 kg
1.0500 kg
0.0150 kg

Pembesian dg Besi Polos atau Ulir


besi beton
kawat bindrat

10,000.00
16,800.00

10,500.00
252.00

0.0070
0.0070
0.0007
0.0004

pekerja
tukang besi
kepala tukang
mandor

40,000.00
47,500.00
50,000.00
50,000.00

280.00
332.50
35.00
20.00

PEKERJAAN BETON
B.1

B.2

B.3

B.4

B.5

B.6

OH
OH
OH
OH

40,000.00
47,500.00
55,000.00
50,000.00

404,586.00
130,410.00
144,300.00
3,655.00
66,000.00
13,062.50
1,540.00
4,150.00

533,988.00
136,800.00
148,633.33
3,655.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

B.7

B.8

B.9

B.10

B.11

1.0000
0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090

m'
m3
kg
kg
kg
kg
m3
m3

Kolom praktis (11 x 11 cm)


papan kayu randu
paku
besi beton
kawat bindrat
Pc
pasir beton
batu pecah 1-2

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

OH
OH
OH
OH
OH
OH

pekerja
tukang batu
tukang kayu
tukang besi
kepala tukang
mandor

1.0000
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

976,500.00
16,200.00
10,000.00
16,800.00
1,638.00
210,000.00
195,000.00

1,953.00
162.00
30,000.00
7,560.00
6,552.00
1,260.00
1,755.00

40,000.00
47,500.00
50,000.00
47,500.00
55,000.00
50,000.00

7,200.00
950.00
1,000.00
950.00
330.00
450.00

m'
m3
kg
kg
kg
kg
m3
m3

Sloof / ring balk beton bertulang (10 x 15 cm)


papan kayu randu
976,500.00
paku
16,200.00
besi beton
10,000.00
kawat bindrat
16,800.00
Pc
1,638.00
pasir beton
210,000.00
batu pecah 1-2
195,000.00

2,929.50
324.00
36,000.00
840.00
9,009.00
1,890.00
2,925.00

0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

OH
OH
OH
OH
OH
OH

pekerja
tukang batu
tukang kayu
tukang besi
kepala tukang
mandor

35,000.00
47,500.00
50,000.00
47,500.00
55,000.00
50,000.00

10,395.00
1,567.50
1,650.00
1,567.50
550.00
750.00

1.0000
0.0400
0.4000
0.0150
0.3500
3.0000

m2
m3
kg
m3
lbr
btg

Begisting untuk plat lantai


papan kayu randu
paku
balok kayu
triplek
bambu 8-10 cm pj. 8 m

976,500.00
16,200.00
976,500.00
58,300.00
12,500.00

39,060.00
6,480.00
14,647.50
20,405.00
37,500.00

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

26,400.00
16,500.00
1,650.00
1,650.00

1.0000
0.4000
0.0150
2.0000

m2
kg
m3
btg

Steiger dari bambu


paku
balok kayu
bambu 8-10 cm pj. 8 m

16,200.00
976,500.00
12,500.00

6,480.00
14,647.50
25,000.00

0.2500
0.1700
0.0020
0.0013

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

10,000.00
8,500.00
100.00
65.00

1.0000 m2
0.0220 m3
0.4000 kg

Cetakan beton (bekisting) dengan kayu randu tebal 2 cm


kayu randu tebal 2 cm
976,500.00
paku
16,200.00

21,483.00
6,480.00

0.5000
0.0500
0.2000
0.0100

tukang kayu
tukang kepala
pekerja
mandor

50,000.00
50,000.00
40,000.00
50,000.00

25,000.00
2,500.00
8,000.00
500.00

Pas atap genteng Jatiwangi tak berwarna kecil


tukang kayu
50,000.00
tukang kepala
50,000.00

3,750.00
400.00

OH
OH
OH
OH

VIII 03-3436-2002 PEKERJAAN PENUTUP ATAP


PA.1

1.0000 m2
0.0750 OH
0.0080 OH

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

0.1500 OH
0.0080 OH
25.0000 bj
PA.2

1.0000
0.0600
0.0060
0.1500
0.0080

m2
OH
OH
OH
OH

18.0000 bj
PA.3

1.0000 m2
14.0000 bj

PA.4

1.0000 m2
25.0000 bj

PA.5

1.0000 m2
25.0000 bj

PA.6

1.0000 m2
25.0000 bj

PA.7

PA.8

1.0000
0.2000
0.0200
0.4000
0.0020

m'
OH
OH
OH
OH

PA.11

PA.12

40,000.00
50,000.00

genteng pres Jatiwangi kecil

8=4x7
6,000.00
400.00

2,100.00

Pas atap genteng Jatiwangi tak berwarna sedang


tukang kayu
50,000.00
tukang kepala
50,000.00
pekerja
40,000.00
mandor
50,000.00
genteng pres Jatiwangi sedang

3,400.00

Pas atap genteng Jatiwangi type Turbo


Upah tenaga
genteng Jatiwangi

4,800.00

3,000.00
300.00
6,000.00
400.00

Pas atap genteng Kebumen tak berwarna kecil


Upah tenaga
genteng Kebumen
2,100.00
Pas atap genteng lokal
Upah tenaga
genteng lokal

780.00

Pas atap genteng lokal kudus


Upah tenaga
genteng kudus

950.00

Pas krepus Jatiwangi tak berwarna


tukang batu
tukang kepala
pekerja
mandor

47,500.00
55,000.00
40,000.00
50,000.00

9,500.00
1,100.00
16,000.00
100.00

semen / PC
pasir
krepus

1,638.00
137,500.00
16,700.00

13,104.00
4,400.00
58,450.00

1.0000 m'

Pas krepus Jatiwangi/Kebumen berwarna


Upah tenaga
semen/PC
1,638.00
pasir
137,500.00
krepus warna
17,400.00

5,896.80
4,125.00
60,900.00

Pas krepus lokal


Upah tenaga
semen
pasir
krepus Kudus/lokal

1,638.00
137,500.00
6,900.00

5,896.80
4,125.00
24,150.00

Pasang Atap Genteng Beton


genteng beton standard
paku

6,200.00
16,200.00

68,200.00
486.00

40,000.00
50,000.00
50,000.00
50,000.00

8,000.00
5,000.00
500.00
400.00

7,600.00
16,200.00
1,638.00
137,500.00
8,100.00

26,600.00
810.00
17,690.40
4,400.00
8,100.00

1.0000 m'
3.6000 kg
0.0300 m3
3.5000 bj

PA.10

pekerja
mandor

JUMLAH

8.0000 kg
0.0320 m3
3.5000 bj

3.6000 kg
0.0300 m3
3.5000 bj

PA.9

HARGA BAHAN/
UPAH
7

1.0000 m2
11.0000 bh
0.0300 kg
0.2000
0.1000
0.0100
0.0080

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

1.0000
3.5000
0.0500
10.8000
0.0320
1.0000

m2
bh
kg
kg
m3
kg

Pasang Bubungan Genteng Beton


bubungan genteng beton
paku
PC
pasir pasang
semen warna

0.4000
0.2000
0.0200
0.0200

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

16,000.00
10,000.00
1,000.00
1,000.00

Bubungan fiber gelombang


bubungan fiber

83,000.00

91,300.00

1.0000 m'
1.1000 m'

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

PA.13

PA.14

PA.15

PA.16

PA.17

PA.18

PA.19

PA.20

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

4.0000
0.2500
0.0250
0.2500
0.0125

bj
OH
OH
OH
OH

paku kait
tukang kayu
tukang kepala
pekerja
mandor

1,500.00
50,000.00
50,000.00
40,000.00
50,000.00

6,000.00
12,500.00
1,250.00
10,000.00
625.00

1.0000
0.4200
0.3750
0.0375
0.0250
0.0110

m'
lbr
OH
OH
OH
OH

Corong talang diameter /kotak 4"


seng BJLS 30
tukang besi
tukang kepala
pekerja
mandor

55,900.00
47,500.00
50,000.00
40,000.00
50,000.00

23,478.00
17,812.50
1,875.00
1,000.00
550.00

1.0000 m2
0.5500 lbr
0.1200 kg

Pasang Asbes Gelombang Besar (2,25x0,92x 5 mm)


asbes gelombang
84,700.00
paku pancing
1,500.00

0.1400
0.0750
0.0080
0.0080

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
50,000.00
50,000.00
50,000.00

1.0000 m2
0.6000 lbr
0.1200 kg

Pasang Asbes Gelombang Besar(2,00x0,92x 5 mm


asbes gelombang
79,300.00
paku pancing
1,500.00

0.1400
0.0700
0.0070
0.0070

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

46,585.00
180.00
5,600.00
3,750.00
400.00
400.00

47,580.00
180.00

40,000.00
50,000.00
50,000.00
50,000.00

5,600.00
3,500.00
350.00
350.00

1.0000 m2
0.6500 lbr
0.1200 kg

Pasang asbes Gelombang kecil (180x90x 4mm)


asbes gelombang
56,000.00
paku pancing
1,500.00

36,400.00
180.00

0.1400
0.0700
0.0070
0.0070

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
50,000.00
50,000.00
50,000.00

5,600.00
3,500.00
350.00
350.00

1.0000 m2
0.5000 lbr
0.1200 kg

Pasang asbes Gelombang kecil (210x105x 4mm)


asbes gelombang
64,000.00
paku pancing
1,500.00

32,000.00
180.00

0.1400
0.6700
0.0070
0.0070

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

5,600.00
33,500.00
350.00
350.00

1.0000 m2
0.7000 lbr
0.0200 kg

Pasang Atap Seng


seng gelombang BJLS 28
paku sumbat

84,000.00
1,500.00

58,800.00
30.00

0.1200
0.0600
0.0060
0.0060

pekerja
tukang kayu
tukang kepala
mandor

40,000.00
50,000.00
50,000.00
50,000.00

4,800.00
3,000.00
300.00
300.00

1.0000 m'
0.3000 lbr
0.0400 kg

Pasang Atap Nok Seng


seng plat
paku

40,000.00
16,200.00

12,000.00
648.00

0.1500
0.0700
0.0080
0.0060

OH
OH
OH
OH

pekerja
tukang kayu
tukang kepala
mandor

40,000.00
50,000.00
50,000.00
50,000.00

6,000.00
3,500.00
400.00
300.00

1.0000
1.0000
4.0000
0.2500
0.0250

m'
m'
bj
OH
OH

Bubungan asbes gelombang


bubungan asbes
paku kait
tukang kayu
tukang kepala

81,900.00
1,500.00
50,000.00
50,000.00

81,900.00
6,000.00
12,500.00
1,250.00

OH
OH
OH
OH

OH
OH
OH
OH

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

0.2500 OH
0.0125 OH

IX

DT 91-0013
2007

LL.2

LL.3

LL.4

LL.5

8=4x7

40,000.00
50,000.00

10,000.00
625.00

1.0000 m2
1.1000 lbr
0.0100 kg

Langit-Langit Asbes (1,00x1,00)m, tb. 4 mm


plat asbes tb 4 mm
21,000.00
paku
16,200.00

23,100.00
162.00

0.0300
0.0700
0.0070
0.0015

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

1,200.00
3,500.00
350.00
75.00

1.0000
0.4000
0.0400
0.1400
0.0070

m2
OH
OH
OH
OH

pas pyan eternit kerang super


tukang kayu
tukang kepala
pekerja
mandor

50,000.00
50,000.00
40,000.00
50,000.00

20,000.00
2,000.00
5,600.00
350.00

16,200.00
5,625,000.00
12,280.00

3,240.00
39,375.00
12,280.00

50,000.00
50,000.00
40,000.00
50,000.00

20,000.00
2,000.00
5,600.00
350.00

16,200.00
5,625,000.00
15,540.00

3,240.00
39,375.00
15,540.00

50,000.00
50,000.00
40,000.00
50,000.00

20,000.00
2,000.00
5,600.00
350.00

16,200.00
5,625,000.00
18,300.00

3,240.00
39,375.00
18,300.00

0.2000 kg
0.0070 m3
1.0000 m2

paku
kayu kruing 4/6 + 5/7
eternit kerang super

1.0000
0.4000
0.0400
0.1400
0.0070

pas pyan eternit atrisco


tukang kayu
tukang kepala
pekerja
mandor

m2
OH
OH
OH
OH

0.2000 kg
0.0070 m3
1.0000 m2

paku
kayu kruing 4/6 + 5/7
eternit atrisco

1.0000
0.4000
0.0400
0.1400
0.0070

pas pyan harplek plat tanpa cepet


tukang kayu
tukang kepala
pekerja
mandor

m2
OH
OH
OH
OH

0.2000 kg
0.0070 m3
1.0000 m2

paku
kayu kruing 4/6 + 5/7
harplek plat

1.0000
0.1000
0.0500
0.0050
0.0050

Langit-langit gypsum board tebal 9 mm


Pekerja
Tukang kayu
Kepala tukang
Mandor

40,000.00
50,000.00
50,000.00
50,000.00

4,000.00
2,500.00
250.00
250.00

Gypsum board
Paku sekrup

90,900.00
16,200.00

33,087.60
1,782.00

472,500.00
472,500.00

472,500.00
28,350.00

40,000.00
47,500.00
55,000.00
50,000.00

132,000.00
52,250.00
55.00
8,000.00

1.0000 unit
1.0000 bh
0.0600

Memasang Closet Duduk / Mono Block INA


kloset duduk / monoblock
1,375,000.00
kelengkapan 6% hrg kloset
1,375,000.00

1,375,000.00
82,500.00

3.3000
1.1000
0.0010
0.1600

pekerja
tukang batu
kepala tukang
mandor

m2
OH
OH
OH
OH

0.3640 Lbr
0.1100 kg

03-

pekerja
mandor

JUMLAH

PEKERJAAN LANGIT-LANGIT
LL.1

HARGA BAHAN/
UPAH
7

PEKERJAAN SANITASI
S.1

S.1.b

1.0000 unit
1.0000 bh
0.0600

Memasang Closet Duduk


kloset duduk / monoblock
kelengkapan 6% hrg kloset

3.3000
1.1000
0.0010
0.1600

pekerja
tukang batu
kepala tukang
mandor

OH
OH
OH
OH

OH
OH
OH
OH

40,000.00
47,500.00
55,000.00
50,000.00

132,000.00
52,250.00
55.00
8,000.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

S.2

S.3

S.4

S.5

S.6

XI

DT 91-0014
2007

HARGA BAHAN/
UPAH
7

1.0000
1.0000
6.0000
0.0100

unit
bh
kg
m3

Memasang Closet Jongkok Porcelen


kloset jongkok
134,000.00
pc
1,638.00
pasir pasang
137,500.00

1.0000
1.5000
1.5000
0.1600

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
1.0000
0.3000
6.0000
0.0100

unit
bh
kg
m3

Memasang Urinoir
urinoir
perlengkapan 30%
pc
pasir pasang

1.0000
1.0000
0.1000
0.1000

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

1.0000
1.0000
0.3000
6.0000
0.0100

unit
bh
kg
m3

Memasang Wastafel
wastafel
perlengkapan 30%
pc
pasir pasang

1.0000
1.0000
0.1000
0.1000

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

JUMLAH
8=4x7

134,000.00
9,828.00
1,375.00

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
71,250.00
82,500.00
8,000.00

349,800.00
349,800.00
1,638.00
137,500.00

349,800.00
104,940.00
9,828.00
1,375.00

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
5,500.00
5,000.00

330,000.00
330,000.00
1,638.00
137,500.00

330,000.00
99,000.00
9,828.00
1,375.00

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
5,500.00
5,000.00

1.0000 unit
1.0000 bh
0.3000 set

Memasang Bak Cuci Piring Stainlees


bak cuci piring
235,000.00
water drain + asesories
235,000.00

235,000.00
70,500.00

1.0000
1.0000
0.1000
0.1000

pekerja
tukang batu
kepala tukang
mandor

OH
OH
OH
OH

40,000.00
47,500.00
55,000.00
50,000.00

40,000.00
47,500.00
5,500.00
5,000.00

1.0000 buah Memasang floor drain


1.0000 bh
floor drain

10,000.00

10,000.00

0.0100
0.1000
0.0100
0.0050

40,000.00
47,500.00
55,000.00
50,000.00

400.00
4,750.00
550.00
250.00

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

PEKERJAAN BESI DAN ALUMINIUM


BS.1

BS.2

BS.3

1.0000 kg
1.1500 bh

Pasang Rangka Kuda-kuda Baja IWF


besi profil IWF

12,000.00

13,800.00

0.0600
0.0600
0.0060
0.0030

pekerja
tukang besi
kepala tukang
mandor

40,000.00
47,500.00
50,000.00
50,000.00

2,400.00
2,850.00
300.00
150.00

441,000.00

441,000.00

40,000.00
47,500.00
50,000.00
50,000.00

17,600.00
20,900.00
2,200.00
1,100.00

346,500.00

346,500.00

OH
OH
OH
OH

1.0000 m2
1.0000 m2

Pasang Pintu Lipat Besi


pintu lipat besi

0.4400
0.4400
0.0440
0.0220

pekerja
tukang besi
kepala tukang
mandor

OH
OH
OH
OH

1.0000 m2
1.0000 m2

Pasang Roling Door tebal 5 mm


roling door

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

1.2000
1.2000
0.1200
0.0060

BS.4

BS.5

BS.6

BS.7

BS.8

BS.9

BS.10

BS.11

OH
OH
OH
OH

pekerja
tukang besi
kepala tukang
mandor

1.0000 m2
1.0000 m2

Pasang Roling Door tebal 8 mm


roling door

1.2000
1.2000
0.1200
0.0060

OH
OH
OH
OH

pekerja
tukang besi
kepala tukang
mandor

1.0000
1.1000
2.0000
0.0600

m1
m1
bh
tube

Pasang kusen alumunium


profil alumunium
skrup fizzer
sealent

0.0430
0.0430
0.0043
0.0021

OH
OH
OH
OH

pekerja
tukang besi
kepala tukang
mandor

1.0000 m2
4.4000 m1
14.6000

Pasang pintu alumunium


profil alumunium
Alumunium strip

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

40,000.00
47,500.00
50,000.00
50,000.00

48,000.00
57,000.00
6,000.00
300.00

378,000.00

378,000.00

40,000.00
47,500.00
50,000.00
50,000.00

48,000.00
57,000.00
6,000.00
300.00

104,900.00
6,900.00
44,100.00

115,390.00
13,800.00
2,646.00

40,000.00
47,500.00
50,000.00
50,000.00

1,720.00
2,042.50
215.00
105.00

104,900.00
35,000.00

461,560.00
511,000.00

0.0850
0.0850
0.0085
0.0050

OH
OH
OH
OH

pekerja
tukang besi
kepala tukang
mandor

47,500.00
47,500.00
50,000.00
40,000.00

4,037.50
4,037.50
425.00
200.00

1.0000
1.1000
0.0200
0.0250

m2
m2
kg
m2

Pasang Jendela Nako + Tralis


jendela nako
paku
besi strip

51,000.00
16,200.00
17,400.00

56,100.00
324.00
435.00

0.2000
0.2000
0.0200
0.0010

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

8,000.00
10,000.00
1,000.00
50.00

1.0000
0.5000
0.0150
0.0190

m'
lbr
kg
m3

Pasang Talang Datar / Jurai Seng BJLS 28


seng plat BJLS 28
40,000.00
paku
16,200.00
kayu kruing
5,625,000.00

20,000.00
243.00
106,875.00

0.2000
0.4000
0.0250
0.0100

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

8,000.00
20,000.00
1,250.00
500.00

1.0000
0.5000
0.0150
0.0190

m'
lbr
kg
m3

Pasang Talang Miring Seng BJLS 28


seng plat BJLS 28
40,000.00
paku
16,200.00
kayu kruing
5,625,000.00

20,000.00
243.00
106,875.00

0.2000
0.4000
0.0250
0.0013

OH
OH
OH
OH

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

8,000.00
20,000.00
1,250.00
62.50

1.0000
1.1000
0.0900
0.0300
0.0900

kg
kg
OH
OH
OH

Baut-baut / angkur
baut baja
tukang besi
tukang kepala
pekerja

20,160.00
47,500.00
50,000.00
40,000.00

22,176.00
4,275.00
1,500.00
3,600.00

1.0000
0.2500
0.0100
0.6500

m'
lbr
kg
m1

Pasang Talang Talang Gantung 15 cm


seng plat BJLS 28
40,000.00
paku
16,200.00
besi strip
17,400.00

10,000.00
162.00
11,310.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

0.1500
0.3000
0.0300
0.0080

XII

03-

OH
OH
OH
OH

HARGA BAHAN/
UPAH
7

pekerja
tukang besi
kepala tukang
mandor

JUMLAH
8=4x7

40,000.00
47,500.00
50,000.00
50,000.00

6,000.00
14,250.00
1,500.00
400.00

110,000.00

110,000.00

PEKERJAAN KUNCI DAN KACA


KK.1

KK.2

KK.3

KK.4

KK.5

KK.6

KK.7

KK.8

1.0000 bh
1.0000 bh

Pasang Kunci Tanam Biasa


kunci tanam biasa

0.0100
0.5000
0.0100
0.0050

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

400.00
25,000.00
500.00
250.00

1.0000 bh
1.0000 bh

Pasang Kunci Tanam Kamar Mandi


kunci tanam kamar mandi

57,750.00

57,750.00

0.0050
0.5000
0.0050
0.0025

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

200.00
25,000.00
250.00
125.00

1.0000 bh
1.0000 bh

Pasang Engsel Pintu


engsel pintu

19,300.00

19,300.00

0.0150
0.1500
0.0150
0.0008

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

600.00
7,500.00
750.00
37.50

1.0000 set
1.0000 set

Pasang Engsel Jendela Kupu-Kupu


engsel jendela

15,000.00

15,000.00

0.0100
0.1000
0.0100
0.0050

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

400.00
5,000.00
500.00
250.00

1.0000 set
1.0000 set

Pasang Engsel Angin


engsel angin

14,700.00

14,700.00

0.0200
0.2000
0.0200
0.0100

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

800.00
10,000.00
1,000.00
500.00

6,000.00

6,000.00

40,000.00
50,000.00
50,000.00
50,000.00

600.00
7,500.00
750.00
37.50

220,000.00

220,000.00

40,000.00
50,000.00
50,000.00
50,000.00

2,000.00
25,000.00
2,500.00
125.00

8,400.00

8,400.00

40,000.00
50,000.00
50,000.00

800.00
10,000.00
1,000.00

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

1.0000 bh
1.0000 bh

Pasang Kait Angin


kait angin

0.0150
0.1500
0.0150
0.0008

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

1.0000 bh
1.0000 bh

Pasang Door Closer


door closer

0.0500
0.5000
0.0500
0.0025

pekerja
tukang kayu
kepala tukang
mandor

OH
OH
OH
OH

1.0000 bh
1.0000 bh

Pasang Kunci Sloot


kunci sloot

0.0200 OH
0.2000 OH
0.0200 OH

pekerja
tukang kayu
kepala tukang

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

KK.9

KK.10

KK.11

XIII

DT 91-0012
2007

0.0010 OH

mandor

1.0000 bh
1.0000 bh

Pasang Rel Pintu Dorong


rel pintu dorong

0.0600
0.6000
0.0600
0.0030

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

50,000.00

50.00

275,000.00

275,000.00

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

2,400.00
30,000.00
3,000.00
150.00

1.0000 m2
1.1000 bh

Pasang Kaca tb. 3 mm


kaca 3 mm

65,000.00

71,500.00

0.0150
0.1500
0.0150
0.0008

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

600.00
7,500.00
750.00
37.50

1.0000 m2
1.1000 bh

Pasang Kaca tb. 5 mm


kaca 5 mm

75,000.00

82,500.00

0.0150
0.1500
0.0150
0.0008

pekerja
tukang kayu
kepala tukang
mandor

40,000.00
50,000.00
50,000.00
50,000.00

600.00
7,500.00
750.00
37.50

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

PEKERJAAN PENUTUP LANTAI DAN DINDING


L.1

L.2

L.3

L.4

1.0000
26.5000
10.4000
0.0450

m2
bh
kg
m3

Pasang Lantai Ubin PC Abu-Abu 20x20


ubin abu-abu 20/20
1,100.00
pc
1,638.00
pasir pasang
137,500.00

29,150.00
17,035.20
6,187.50

0.2700
0.1300
0.0130
0.0140

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,800.00
6,175.00
715.00
700.00

1.0000
6.6300
9.8000
0.0450
1.3000

m2
bh
kg
m3
kg

Pasang Lantai Ubin PC Granito uk. 40x40


ubin granito 40/40
29,800.00
pc
1,638.00
pasir pasang
137,500.00
semen warna
8,100.00

197,574.00
16,052.40
6,187.50
10,530.00

0.2500
0.1200
0.0120
0.0125

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,000.00
5,700.00
660.00
625.00

1.0000
6.6300
9.8000
0.0450
1.3000

m2
bh
kg
m3
kg

Pasang Lantai Keramik uk. 40x40 Putih


keramik 40/40
6,600.00
pc
1,638.00
pasir pasang
137,500.00
semen warna
8,100.00

43,758.00
16,052.40
6,187.50
10,530.00

0.2500
0.1250
0.0125
0.0125

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,000.00
5,937.50
687.50
625.00

1.0000
6.6300
9.8000
0.0450
1.3000

m2
bh
kg
m3
kg

Pasang Lantai Keramik uk. 40x40 Warna


keramik 40/40
8,900.00
pc
1,638.00
pasir pasang
137,500.00
semen warna
8,100.00

59,007.00
16,052.40
6,187.50
10,530.00

0.2500
0.1200
0.0120
0.0125

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

10,000.00
5,700.00
660.00
625.00

40,000.00
47,500.00
55,000.00
50,000.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

L.5

L.6

L.7

L.8

L.9

L.10

L.11

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

1.0000
7.2600
9.8000
0.0450
1.3000

m2
bh
kg
m3
kg

Pasang Lantai Keramik uk. 40x40 Warna pola


keramik 40/40
8,900.00
pc
1,638.00
pasir pasang
137,500.00
semen warna
8,100.00

64,614.00
16,052.40
6,187.50
10,530.00

0.2500
0.1200
0.0120
0.0125

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,000.00
5,700.00
660.00
625.00

1.0000
26.5000
10.4000
0.0450
1.6200

m2
bh
kg
m3
kg

Pasang Lantai Keramik 20x20


keramik 20/20
pc
pasir pasang
semen warna

1,900.00
1,638.00
137,500.00
8,100.00

50,350.00
17,035.20
6,187.50
13,122.00

0.2500
0.1200
0.0120
0.0125

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,000.00
5,700.00
660.00
625.00

1.0000
11.8700
10.0000
0.0450
1.5000

m2
bh
kg
m3
kg

Pasang Lantai Keramik 30x30 Warna


keramik warna 30/30
3,750.00
pc
1,638.00
pasir pasang
137,500.00
semen warna
8,100.00

44,512.50
16,380.00
6,187.50
12,150.00

0.2600
0.1300
0.0130
0.0130

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,400.00
6,175.00
715.00
650.00

1.0000
11.8700
10.0000
0.0450
1.5000

m2
bh
kg
m3
kg

Pasang Lantai Keramik 30x30 Putih


keramik putih 30/30
pc
pasir pasang
semen warna

3,130.00
1,638.00
137,500.00
8,100.00

37,153.10
16,380.00
6,187.50
12,150.00

0.2600
0.1300
0.0130
0.0130

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,400.00
6,175.00
715.00
650.00

1.0000
12.1000
10.0000
0.0450
1.5000

m2
bh
kg
m3
kg

Pasang Lantai Keramik 30x30 warna pola


keramik putih 30/30
3,750.00
pc
1,638.00
pasir pasang
137,500.00
semen warna
8,100.00

45,375.00
16,380.00
6,187.50
12,150.00

0.2600
0.1300
0.0130
0.0130

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

10,400.00
6,175.00
715.00
650.00

1.0000
53.0000
9.3000
0.0180
2.7500

m2
bh
kg
m3
kg

Pasang Dinding Keramik 10x20


keramik 10/20
pc
pasir pasang
semen warna

850.00
1,638.00
137,500.00
8,100.00

45,050.00
15,233.40
2,475.00
22,275.00

0.9000
0.4500
0.0450
0.0450

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

36,000.00
21,375.00
2,475.00
2,250.00

1,900.00
1,638.00

50,350.00
15,233.40

1.0000 m2
26.5000 bh
9.3000 kg

Pasang Dinding Keramik 20x20


keramik 20/20
pc

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

L.12

L.13

L.14

L.16

JUMLAH
8=4x7

0.0180 m3
1.9400 kg

pasir pasang
semen warna

137,500.00
8,100.00

2,475.00
15,714.00

0.9000
0.4500
0.0450
0.0450

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

40,000.00
47,500.00
55,000.00
50,000.00

36,000.00
21,375.00
2,475.00
2,250.00

1.0000
1.1000
11.7000
0.0350

m2
bh
kg
m3

pasang batu tempel muntilan


batu tempel
pc
pasir pasang

97,900.00
1,638.00
137,500.00

107,690.00
19,164.60
4,812.50

0.7000
0.3500
0.0350
0.0350

OH
OH
OH
OH

pekerja
tukang batu
kepala tukang
mandor

350,000.00
40,000.00
45,000.00
55,000.00

245,000.00
14,000.00
1,575.00
1,925.00

1.0000
0.1600
0.0160
0.4000
0.0250

m2
OH
OH
OH
OH

pasang lantai batu merah 1 : 3 : 10


tukang batu
tukang kepala
pekerja
mandor

47,500.00
55,000.00
40,000.00
50,000.00

7,600.00
880.00
16,000.00
1,250.00

30.0000
3.6000
0.0080
0.0600

bh
kg
m3
m3

batu merah
semen/PC
kapur
pasir

550.00
1,638.00
495,000.00
137,500.00

16,500.00
5,896.80
3,960.00
8,250.00

1.0000
1.0000
0.1000
1.5000
0.0750

m'
OH
OH
OH
OH

pas tegel plint 20 x 20


tukang batu
tukang kepala
pekerja
mandor
Upah tenaga 1/5 nya

47,500.00
55,000.00
40,000.00
50,000.00

47,500.00
5,500.00
60,000.00
3,750.00
116,750.00

tegel plint
semen/PC
pasir

1,900.00
1,638.00
137,500.00

9,500.00
2,047.50
275.00

495,000.00
137,500.00
1,100.00
1,638.00

9,652.50
5,362.50
12,100.00
3,276.00

47,500.00
55,000.00
40,000.00
50,000.00

7,125.00
825.00
20,000.00
1,250.00

495,000.00
137,500.00
2,000.00
8,100.00

9,652.50
5,362.50
22,000.00
16,200.00

pasang lantai tegel wafel warna khusus 30 x 30


kapur x 1 1/2
495,000.00
pasir x 1 1/2
137,500.00
tegel wafel warna
2,000.00
PC warna
8,100.00

9,652.50
5,362.50
22,000.00
16,200.00

5.0000 bj
1.2500 kg
0.0020 m3

L.15

HARGA BAHAN/
UPAH
7

1.0000
0.0130
0.0260
11.0000
2.0000

m2
m3
m3
bh
kg

pasang lantai tegel 30 x 30


kapur x 1 1/2
pasir x 1 1/2
tegel abu-abu 30x30
semen

0.1500
0.0150
0.5000
0.0250

OH
OH
OH
OH

tukang batu
tukang kepala
pekerja
mandor

1.0000
0.0130
0.0260
11.0000
2.0000

m2
m3
m3
bh
kg

pasang lantai tegel warna 30 x 30


kapur x 1 1/2
pasir x 1 1/2
tegel warna 30x30
PC warna
Upah tenaga

L.17

1.0000
0.0130
0.0260
11.0000
2.0000

m2
m3
m3
bh
kg

Upah tenaga
L.18

1.0000 m2
0.0050 m3
1.0000 m2

pasang blok pafing tebal 6 cm K.125


pasir muntilan utk nat
pafing
Upah tenaga

210,000.00
37,800.00

1,050.00
37,800.00

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

L.19

1.0000 m2
0.0050 m3
1.0000 m2

HARGA BAHAN/
UPAH
7

pasang blok pafing tebal 8 cm K.125


pasir muntilan utk nat
pafing

JUMLAH
8=4x7

210,000.00
39,500.00

1,050.00
39,500.00

495,000.00
137,500.00
1,300.00
8,100.00

9,652.50
5,362.50
32,500.00
16,200.00

495,000.00
137,500.00
1,300.00
8,100.00

9,652.50
5,362.50
32,500.00
16,200.00

blok paving tebal 6 cm dengan paving mutu K 200


pasir muntilan utk nat
210,000.00
paving K 200
63,500.00

1,050.00
63,500.00

Upah tenaga
L.20

1.0000
0.0130
0.0260
25.0000
2.0000

m2
m3
m3
bh
kg

pas lantai tegel 20x20 cm kembang


kapur x 1 1/2
pasir x 1 1/2
tegel kembang
PC warna
Upah tenaga

L.21

1.0000
0.0130
0.0260
25.0000
2.0000

m2
m3
m3
bh
kg

pas lantai tegel 20x20 cm warna


kapur x 1 1/2
pasir x 1 1/2
tegel warna
PC warna
Upah tenaga

L.22

1.0000 m2
0.0050 m3
1.0000 m2

Upah tenaga
L.23

1.0000 m2
0.0050 m3
1.0000 m2

blok paving tebal 8 cm dengan paving mutu K 300


pasir muntilan utk nat
210,000.00
paving K 300
93,000.00

1,050.00
93,000.00

Upah tenaga
L.24

1.0000 m2
0.0050 m3
1.0000 m2

blok paving warna tebal 6 cm K.125


pasir muntilan utk nat
paving warna

210,000.00
50,300.00

1,050.00
50,300.00

210,000.00
57,300.00

1,050.00
57,300.00

1,638.00
137,500.00

951,022.80
130,625.00

37,800.00
1,081,647.80
8,100.00

37,800.00
10,816.48
8,100.00

47,500.00
55,000.00
40,000.00
50,000.00

21,375.00
2,475.00
24,000.00
1,500.00

Upah tenaga
L.25

1.0000 m2
0.0050 m3
1.0000 m2

blok paving warna tebal 8 cm K.125


pasir muntilan utk nat
paving warna
Upah tenaga

L.26

L.27

L.28

L.29

XIV

03-

-2002

1.0000 m3
580.6000 kg
0.9500 m3

perekat portland 1 : 2
semen / PC
pasir

1.0000
1.0000
0.0100
1.0000

m2
m2
m3
kg

pas lantai batu lempeng


batu lempeng
perekat L.25
semen warna

0.4500
0.0450
0.6000
0.0300

OH
OH
OH
OH

tukang batu
tukang kepala
pekerja
mandor

1.0000
1.0000
0.1310
0.5000
0.0200

m'
m'
m3
m2
m3

pasang saluran U-20 cm


Buis beton U-20 cm
Pasang batu bata 1:3
Plesteran 1:3
Hurugan pasir
Ongkos pasang Buis U-20

25,000.00
846,653.00
40,914.50
101,720.00
7,500.00

25,000.00
110,911.54
20,457.25
2,034.40
7,500.00

1.0000
1.0000
0.1310
0.5000
0.0200

m'
m'
m3
m2
m3

pasang saluran U-30 cm


Buis beton U-30 cm
Pasang batu bata 1:3
Plesteran 1:3
Hurugan pasir
Ongkos pasang Buis U-20

32,500.00
846,653.00
40,914.50
101,720.00
7,500.00

32,500.00
110,911.54
20,457.25
2,034.40
7,500.00

PEKERJAAN PENGECATAN

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

C.1

C.1.b

C.2

C.2.b

C.3

C.4

C.5

C.5.b

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

1.0000
0.2600
0.1740
0.0600
0.0750
0.2000

m2
kg
ltr
kg
kg
lbr

mengecat kayu 3 x
cat
afduner
plamur
meni
amplas

44,100.00
9,300.00
12,500.00
23,940.00
3,360.00

11,466.00
1,618.20
750.00
1,795.50
672.00

0.0750
0.0075
0.0500
0.0025

OH
OH
OH
OH

tukang cat
tukang kepala
pekerja
mandor

50,000.00
55,000.00
45,000.00
50,000.00

3,750.00
412.50
2,250.00
125.00

1.0000
0.1730
0.1160
0.0400
0.2000

m2
kg
ltr
kg
lbr

mengecat kayu 2 x
cat
afduner
plamur
amplas

44,100.00
9,300.00
12,500.00
3,360.00

7,629.30
1,078.80
500.00
672.00

0.0500
0.0050
0.0330
0.0016

OH
OH
OH
OH

tukang cat
tukang kepala
pekerja
mandor

50,000.00
55,000.00
45,000.00
50,000.00

2,500.00
275.00
1,485.00
80.00

1.0000
0.2600
0.2500
0.1740

m2
kg
m2
ltr

mengecat trotoir 3 x
cat Beebrand dan sejenisnya
amplas
afduner

45,400.00
3,360.00
9,300.00

11,804.00
840.00
1,618.20

0.0750
0.0075
0.0500
0.0025

OH
OH
OH
OH

tukang cat
tukang kepala
pekerja
mandor

50,000.00
55,000.00
45,000.00
50,000.00

3,750.00
412.50
2,250.00
125.00

1.0000 m2
0.1300 kg
0.0870 ltr

mengecat trotoir ulang


cat Beebrand dan sejenisnya
afduner

45,400.00
9,300.00

5,902.00
809.10

0.0375
0.0038
0.0250
0.0013

OH
OH
OH
OH

tukang cat
tukang kepala
pekerja
mandor

50,000.00
55,000.00
45,000.00
50,000.00

1,875.00
206.25
1,125.00
62.50

1.0000
0.2600
0.1740
0.0750
0.2000

m2
kg
ltr
kg
lbr

mengecat besi 3 x
cat
afduner
meni
amplas

45,400.00
9,300.00
23,940.00
3,360.00

11,804.00
1,618.20
1,795.50
672.00

0.0750
0.0075
0.0500
0.0025

OH
OH
OH
OH

tukang cat
tukang kepala
pekerja
mandor

50,000.00
55,000.00
45,000.00
50,000.00

3,750.00
412.50
2,250.00
125.00

1.0000
0.2000
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025

m2
kg
kg
lbr
OH
OH
OH
OH

mengecat tembok dg Mowilex utk dalam ruangan


cat tembok Mowilex
53,000.00
plamur
12,500.00
amplas
3,360.00
tukang cat
50,000.00
tukang kepala
55,000.00
pekerja
45,000.00
mandor
50,000.00

10,600.00
2,812.50
840.00
3,750.00
412.50
2,250.00
122.50

1.0000
0.3500
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025

m2
kg
kg
lbr
OH
OH
OH
OH

mengecat tembok dg Mowilex utk luar ruangan


cat tembok Mowilex
78,200.00
plamur
12,500.00
amplas
3,360.00
tukang cat
50,000.00
tukang kepala
55,000.00
pekerja
45,000.00
mandor
50,000.00

27,370.00
2,812.50
840.00
3,750.00
412.50
2,250.00
125.00

1.0000 m2

mengecat tembok ulang dg Mowilex

NO

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

HARGA BAHAN/
UPAH
7

JUMLAH
8=4x7

1/2 x C.5
C.6

1.0000
0.3000
0.2250
0.2500
0.0750
0.0075
0.0500
0.0025

m2
kg
kg
lbr
OH
OH
OH
OH

mengecat tembok dg Decolith


cat tembok Decolith
plamur
amplas
tukang cat
tukang kepala
pekerja
mandor

19,500.00
12,500.00
3,360.00
50,000.00
55,000.00
45,000.00
50,000.00

5,850.00
2,812.50
840.00
3,750.00
412.50
2,250.00
125.00

C.7

1.0000 m2

cat tembok ulang 1/2 x C.6

C.8

1.0000
0.2000
0.0750
0.0075
0.0500
0.0025

m2
kg
OH
OH
OH
OH

mengecat pohon anyoman


cat tembok decholith
tukang cat
tukang kepala
pekerja
mandor

19,500.00
50,000.00
55,000.00
45,000.00
50,000.00

3,900.00
3,750.00
412.50
2,250.00
125.00

1.0000
0.4000
0.2000
0.0100

m2
kg
OH
OH

mengetir 2 kali
tir arang
pekerja
mandor

12,700.00
45,000.00
50,000.00

5,080.00
9,000.00
500.00

C.9

LISA BIAYA SATUAN PEKERJAAN


KERJAAN KONSTRUKSI
JUMLAH TOTAL
9

58,441.50

9,750.00
68,191.50

6,500.00

283,330.00

268,330.00

2,125.00

3,625.00

500,000.00

11,250.00

41,650.00

16,550.00

18,665.00
35,215.00

27,500.00

36,600.00

55,000.00

JUMLAH TOTAL
9

55,500.00

44,250.00

2,000.00

12,050.00

41,363.64

39,550.00

51,087.00

58,647.00

11,000.00

9,166.67

101,720.00

86,850.00

176,000.00

5,750.00

1,205.00

4,136.36

JUMLAH TOTAL
9
6,955.00

engambil mengangkut & memasang lempengan rumput lebih dari 250m


9,886.36

760.00

16,644.85
17,404.85

5,625.00

13,404.13
19,029.13

450.00

79,100.00
79,550.00

2,700.00
9,350.00
12,050.00

162,259.20

54,795.00
217,054.20

551,916.67

358,958.00

103,500.00
462,458.00

527,163.50

JUMLAH TOTAL
9

95,550.00
622,713.50

506,214.00

95,550.00
601,764.00

468,369.00

95,550.00
563,919.00

427,168.00

95,550.00
522,718.00

575,903.00

270,750.00
846,653.00

15,436.50

115,250.00
28,812.50

138,776.40

36,100.00
174,876.40

JUMLAH TOTAL
9

125,342.29

36,100.00
161,442.29

77,515.10

18,050.00
95,565.10

70,288.06

18,050.00
88,338.06

58,772.00

18,050.00
76,822.00

140,776.40

36,100.00
176,876.40

127,686.04

36,100.00
163,786.04

78,515.10

18,050.00
96,565.10

JUMLAH TOTAL
9

71,288.06

18,050.00
89,338.06

59,772.00

18,050.00
77,822.00

121,082.00

18,050.00
139,132.00

13,314.50

27,600.00
40,914.50

15,620.67

20,700.00
36,320.67

12,034.92

16,450.00
28,484.92

17,708.40

JUMLAH TOTAL
9

16,450.00
34,158.40

7,901.16

15,950.00
23,851.16

1,037,500.00

6,189,930.00
7,227,430.00

11,585,550.00

1,365,000.00
12,950,550.00

17,187,300.00

1,365,000.00
18,552,300.00

12,131,550.00

1,265,000.00
13,396,550.00

9,750.00

459,425.00
469,175.00

9,750.00

JUMLAH TOTAL
9

459,425.00
469,175.00

69,930.00

9,800.00
79,730.00

117,930.00

9,800.00
127,730.00

31,305.00

9,800.00
41,105.00

123,390.00

9,800.00
133,190.00

10,980,620.00

836,000.00
11,816,620.00

17,544,870.00

836,000.00
18,380,870.00

6,580,620.00

836,000.00
7,416,620.00

JUMLAH TOTAL
9

4,573,120.00

836,000.00
5,409,120.00

6,348,780.00

1,254,000.00
7,602,780.00

11,537,900.00

1,254,000.00
12,791,900.00

607,230.00

132,250.00
739,480.00

579,930.00

132,250.00
712,180.00

937,980.00

132,250.00
1,070,230.00

339,930.00

132,250.00
472,180.00

256,980.00

JUMLAH TOTAL
9

522,500.00
779,480.00
522,500.00

179,017.50
701,517.50

kin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm

173,435.00

522,500.00
695,935.00

367,561.00

136,500.00
367,561.00
kin daun pintu double teakwood rangka kayu bengkirai tb 3 cm dilapisi seng aluminium
136,500.00

446,701.00
583,201.00

410,850.00

181,250.00
592,100.00

631,350.00

181,250.00
812,600.00

246,510.00

144,000.00
390,510.00

378,810.00

JUMLAH TOTAL
9

145,000.00
523,810.00

174,757.50

117,300.00
174,757.50

138,780.00

5,227.50
144,007.50

66,400.00

5,227.50
71,627.50

170,019.00

15,625.00
185,644.00

172,327.50

15,350.00
187,677.50

105,570.00

12,025.00
117,595.00

106,685.00

15,350.00
122,035.00

28,935.00

JUMLAH TOTAL
9

12,050.00
40,985.00

682,951.00

84,752.50
767,703.50

823,076.33

83,250.00
906,326.33

888,226.33

83,250.00
971,476.33

940,003.00

83,525.00
1,023,528.00

950,206.78

83,250.00
1,033,456.78

10,752.00

667.50

JUMLAH TOTAL
9
11,419.50

49,242.00

10,880.00
60,122.00

53,917.50

16,480.00
70,397.50

118,092.50

46,200.00
164,292.50

46,127.50

18,665.00
64,792.50

27,963.00

36,000.00
63,963.00

JUMLAH TOTAL
9

10,550.00
52,500.00
63,050.00

9,700.00
61,200.00
70,900.00
10,550.00
67,200.00
77,750.00
10,550.00
52,500.00
63,050.00
10,550.00
19,500.00
30,050.00
10,550.00
23,750.00
34,300.00

26,700.00

75,954.00
102,654.00
26,700.00

70,921.80
97,621.80
26,700.00

34,171.80
60,871.80

68,686.00

13,900.00
82,586.00

57,600.40

28,000.00
85,600.40

JUMLAH TOTAL
9

121,675.00

44,715.50

46,765.00

10,150.00
56,915.00

47,760.00

9,800.00
57,560.00

36,580.00

9,800.00
46,380.00

32,180.00

39,800.00
71,980.00

58,830.00

8,400.00
67,230.00

12,648.00

10,200.00
22,848.00

JUMLAH TOTAL
9

112,275.00

23,262.00

5,125.00
28,387.00

27,950.00

54,895.00
82,845.00

27,950.00

58,155.00
86,105.00

27,950.00

60,915.00
88,865.00

7,000.00

34,869.60
41,869.60

500,850.00

192,305.00
693,155.00

1,457,500.00

192,305.00

JUMLAH TOTAL
9
1,649,805.00

145,203.00

201,750.00
346,953.00

465,943.00

98,000.00
563,943.00

440,203.00

98,000.00
538,203.00

305,500.00

98,000.00
403,500.00

10,000.00

5,950.00
15,950.00

13,800.00

5,700.00
19,500.00

441,000.00

41,800.00
482,800.00

346,500.00

JUMLAH TOTAL
9

111,300.00
457,800.00

378,000.00

111,300.00
489,300.00

115,390.00

4,082.50
119,472.50

461,560.00

8,700.00
470,260.00

56,859.00

19,050.00
75,909.00

127,118.00

29,750.00
156,868.00

127,118.00

29,312.50
156,430.50

31,551.00

JUMLAH TOTAL
9
21,472.00

22,150.00
43,622.00

110,000.00

26,150.00
136,150.00

57,750.00

25,575.00
83,325.00

19,300.00

8,887.50
28,187.50

15,000.00

6,150.00
21,150.00

14,700.00

12,300.00
27,000.00

6,000.00

8,887.50
14,887.50

220,000.00

29,625.00
249,625.00

8,400.00

JUMLAH TOTAL
9

11,850.00
20,250.00

275,000.00

35,550.00
310,550.00

71,500.00

8,887.50
80,387.50

82,500.00

8,887.50
91,387.50

52,372.70

18,390.00
70,762.70

230,343.90

16,985.00
247,328.90

76,527.90

17,250.00
93,777.90

91,776.90

JUMLAH TOTAL
9
16,985.00
108,761.90

97,383.90

16,985.00
114,368.90

86,694.70

16,985.00
103,679.70

79,230.00

17,940.00
97,170.00

71,870.60

17,940.00
89,810.60

80,092.50

17,940.00
98,032.50

85,033.40

62,100.00
147,133.40

JUMLAH TOTAL
9

83,772.40

62,100.00
145,872.40

131,667.10

262,500.00
394,167.10

25,730.00

34,606.80
60,336.80

23,350.00

11,822.50
35,172.50

30,391.00

29,200.00
59,591.00

53,215.00
29,200.00
82,415.00

53,215.00
29,200.00
82,415.00

38,850.00
29,200.00
68,050.00

JUMLAH TOTAL
9

40,550.00
29,200.00
69,750.00

63,715.00
29,200.00
92,915.00

63,715.00
29,200.00
92,915.00

64,550.00
29,200.00
93,750.00

94,050.00
29,200.00
123,250.00

51,350.00
29,200.00
80,550.00

58,350.00
29,200.00
87,550.00

1,081,647.80

56,716.48

49,350.00
106,066.48

165,903.19

173,403.19

JUMLAH TOTAL
9

16,301.70

6,537.50
22,839.20

9,880.10

4,340.00
14,220.10

14,262.20

6,537.50
20,799.70

6,711.10

3,268.75
9,979.85

15,889.70

6,537.50
22,427.20

20,787.50

37,560.00

JUMLAH TOTAL
9
18,780.00

16,040.00
8,020.00

10,437.50

14,580.00

PEKERJAAN : PEMBUATAN SUMUR PRODUKSI


An.1

Jenis pekerjaan

NO

URAIAN

UPAH
Site manager
Operator pemboran
Crew pengeboran
Pengemudi
II.
PERALATAN
1 Sewa kendaraan
angkut ( truk )

: Mobilisasi/demobilisasi driling rig & peralatan pemboran

SATUAN

KUANTITAS

HARGA SAT.

JUML. HARGA

1
2
3
4

Hari
Hari
Hari
Hari

1.00
1.00
4.00
2.00

x
x
x
x

1.00
1.00
1.00
2.00

60,000.00
35,000.00
30,000.00
30,000.00

60,000.00
35,000.00
120,000.00
120,000.00

Hari

2.00

2.00

250,000.00

1,000,000.00

JUMLAH

1,335,000.00

An.2

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.

UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran

:Pemboran pilot hole diameter 6", 0 -- 50 m


SATUAN

KUANTITAS

HARGA SAT.

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

x
x
x
x
x
x
x
x

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00

Ltr
Ltr
Kg
Kg

70.00
5.00
2.00
40.00

x
x
x
x

1.00
1.00
1.00
1.00

5,500.00
33,600.00
36,700.00
12,600.00

385,000.00
168,000.00
73,400.00
504,000.00

Unit

1.00

1.00

400,000.00

400,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER

An.3

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.

UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN

JUML. HARGA

1,915,400.00
191,540.00

:Pemboran pilot hole diameter 6", 50 -- 100 m


SATUAN

KUANTITAS

HARGA SAT.

JUML. HARGA

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

x
x
x
x
x
x
x
x

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00

Ltr
Ltr
Kg
Kg

75.00
5.00
2.00
50.00

x
x
x
x

1.00
1.00
1.00
1.00

5,500.00
33,600.00
36,700.00
12,600.00

412,500.00
168,000.00
73,400.00
630,000.00

Peralatan pemboran

Unit

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER

1.00

1.00

375,000.00

375,000.00

2,043,900.00
204,390.00

An.4

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.

UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran

:Pemboran pilot hole diameter 6", 100 -- 150 m


SATUAN

KUANTITAS

HARGA SAT.

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

x
x
x
x
x
x
x
x

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00

Ltr
Ltr
Kg
Kg

85.00
6.00
3.00
60.00

x
x
x
x

1.00
1.00
1.00
1.00

5,500.00
33,600.00
36,700.00
12,600.00

467,500.00
201,600.00
110,100.00
756,000.00

Unit

1.00

1.00

375,000.00

375,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER

An.5

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.

UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal
PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran

2,295,200.00
229,520.00

: Pekerjaan reaming, 0 -- 65 m
SATUAN

KUANTITAS

HARGA SAT.

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
6
7
8

UPAH
Site manager
Geologist
Keuangan
Logistik
Operator pemboran
Mekanik
Crew pengeboran
Buruh lokal

JUML. HARGA

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

x
x
x
x
x
x
x
x

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00

Ltr
Ltr
Kg
Kg

60.00
4.00
2.00
40.00

x
x
x
x

1.00
1.00
1.00
1.00

5,500.00
33,600.00
36,700.00
12,600.00

330,000.00
134,400.00
73,400.00
504,000.00

Unit

1.00

1.00

375,000.00

375,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER

An.6

JUML. HARGA

1,801,800.00
180,180.00

: Pekerjaan reaming ,65 -- 130 m


SATUAN

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

KUANTITAS

1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

x
x
x
x
x
x
x
x

HARGA SAT.

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
30,000.00
30,000.00

JUML. HARGA

60,000.00
55,000.00
40,000.00
40,000.00
35,000.00
35,000.00
60,000.00
60,000.00

II.
1
2
3
4
III.

PERALATAN
Solar
Olie mesin
Veet
Bentonite
PERALATAN
Peralatan pemboran

Ltr
Ltr
Kg
Kg

75.00
6.00
3.00
55.00

x
x
x
x

1.00
1.00
1.00
1.00

5,500.00
33,600.00
36,700.00
12,600.00

412,500.00
201,600.00
110,100.00
693,000.00

Unit

1.00

1.00

375,000.00

375,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER

2,177,200.00
217,720.00

An.7

Jenis pekerjaan

NO

URAIAN

UPAH
Site manager
Geologist
Operator pemboran
Crew pengeboran
II.
PERALATAN
1 Recorder paper
2 Alat tulis
III.
PERALATAN
Mesin peralatan logging
Tranportasi peralatan logging

: Electric logging
SATUAN

KUANTITAS

HARGA SAT.

JUML. HARGA

1
2
3
4

Hari
Hari
Hari
Hari

1.00
1.00
1.00
2.00

x
x
x
x

1.00
1.00
1.00
1.00

60,000.00
55,000.00
35,000.00
30,000.00

60,000.00
55,000.00
35,000.00
60,000.00

Unit
Unit

1.00
1.00

x
x

1.00
1.00

20,000.00
15,000.00

20,000.00
15,000.00

Unit
Unit

1.00
1.00

x
x

1.00
1.00

700,000.00
150,000.00

700,000.00
150,000.00

JUMLAH
1 HARI RATA-RATA 50 M' ----> JADI PER METER

An.8

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
II.
1
2
3
4
III.

UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Pipa jambang diameter 8"
PERALATAN
Peralatan pemboran
Sewa mesin las

1,095,000.00
21,900.00

: Pengadaan dan pemasangan pipa jambang diametr 8"


SATUAN

KUANTITAS

HARGA SAT.

JUML. HARGA

Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
3.00
2.00

x
x
x
x
x

1.00
1.00
1.00
1.00
1.00

60,000.00
35,000.00
35,000.00
30,000.00
25,000.00

60,000.00
35,000.00
35,000.00
90,000.00
50,000.00

Ltr
Ltr
Kg
Btg
Mtr

120.00
3.00
2.00
120.00
60.00

x
x
x
x
x

1.00
1.00
1.00
1.00

5,500.00
33,600.00
36,700.00
900.00
642,600.00

660,000.00
100,800.00
73,400.00
108,000.00
38,556,000.00

Unit
Unit

1.00
1.00

x
x

1.00
1.00

375,000.00
50,000.00

375,000.00
50,000.00

JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN

An.9

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
II.
1
2
3
4
5
III.

UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Pipa buta diameter 6"
PERALATAN
Peralatan pemboran
Sewa mesin las

40,193,200.00
669,886.67
669,000.00

: Pengadaan dan pemasangan pipa buta diametr 6"


SATUAN

KUANTITAS

Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
3.00
2.00

x
x
x
x
x

Ltr
Ltr
Kg
Btg
Mtr

40.00
1.00
0.60
60.00
30.00

x
x
x
x
x

Unit
Unit

1.00
1.00

x
x

HARGA SAT.

1.00
1.00
1.00
1.00
1.00

1.00
1.00

JUML. HARGA

60,000.00
35,000.00
35,000.00
30,000.00
25,000.00

60,000.00
35,000.00
35,000.00
90,000.00
50,000.00

5,500.00
33,600.00
36,700.00
900.00
344,400.00

220,000.00
33,600.00
22,020.00
54,000.00
10,332,000.00

375,000.00
50,000.00

375,000.00
50,000.00

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN

11,356,620.00
378,554.00
378,000.00

An.10

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
II.
1
2
3
4
5
III.

UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Screen stainless steel dia 6 :
PERALATAN
Peralatan pemboran
Sewa mesin las

: Pengad. dan pemasangan screen stainless steel diametr 6"


SATUAN

KUANTITAS

Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
3.00
2.00

x
x
x
x
x

Ltr
Ltr
Kg
Btg
Mtr

40.00
1.00
0.60
60.00
30.00

x
x
x
x
x

Unit
Unit

1.00
1.00

x
x

HARGA SAT.

1.00
1.00
1.00
1.00
1.00

1.00
1.00

60,000.00
35,000.00
35,000.00
30,000.00
25,000.00

60,000.00
35,000.00
35,000.00
90,000.00
50,000.00

5,500.00
33,600.00
36,700.00
900.00
1,911,000.00

220,000.00
33,600.00
22,020.00
54,000.00
57,330,000.00

375,000.00
50,000.00

375,000.00
50,000.00

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN

An.8'

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
II.
1
2
3
4
5
III.

UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Pipa jambang diameter 6"
PERALATAN
Peralatan pemboran
Sewa mesin las

58,354,620.00
1,945,154.00
1,945,000.00

: Pengadaan dan pemasangan pipa jambang diametr 6" (GIP)


SATUAN

KUANTITAS

HARGA SAT.

Jenis pekerjaan

NO

URAIAN

UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
II.
PERALATAN
1 Solar
2 Olie mesin
3 Veet

JUML. HARGA

Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
3.00
2.00

x
x
x
x
x

1.00
1.00
1.00
1.00
1.00

60,000.00
35,000.00
35,000.00
30,000.00
25,000.00

60,000.00
35,000.00
35,000.00
90,000.00
50,000.00

Ltr
Ltr
Kg
Btg
Mtr

120.00
3.00
2.00
120.00
60.00

x
x
x
x
x

1.00
1.00
1.00
1.00

5,500.00
33,600.00
36,700.00
900.00
359,100.00

660,000.00
100,800.00
73,400.00
108,000.00
21,546,000.00

Unit
Unit

1.00
1.00

x
x

1.00
1.00

375,000.00
50,000.00

375,000.00
50,000.00

JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN

An.9'

JUML. HARGA

23,183,200.00
386,386.67
386,000.00

: Pengadaan dan pemasangan pipa buta diametr 4" (GIP)


SATUAN

KUANTITAS

HARGA SAT.

JUML. HARGA

1
2
3
4
5

Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
3.00
2.00

x
x
x
x
x

Ltr
Ltr
Kg

40.00
1.00
0.60

x
x
x

1.00
1.00
1.00
1.00
1.00

60,000.00
35,000.00
35,000.00
30,000.00
25,000.00

60,000.00
35,000.00
35,000.00
90,000.00
50,000.00

5,500.00
33,600.00
36,700.00

220,000.00
33,600.00
22,020.00

4 Kawat las
5 Pipa buta diameter 4"
III.
PERALATAN
Peralatan pemboran
Sewa mesin las

Btg
Mtr

60.00
30.00

x
x

Unit
Unit

1.00
1.00

x
x

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN

1.00
1.00

900.00
315,000.00

54,000.00
9,450,000.00

375,000.00
50,000.00

375,000.00
50,000.00

10,474,620.00
349,154.00
349,000.00

An.10'

Jenis pekerjaan

NO

URAIAN

I
1
2
3
4
5
II.
1
2
3
4
5
III.

UPAH
Site manager
Operator pemboran
Mekanik
Crew pengeboran
Penjaga malam
PERALATAN
Solar
Olie mesin
Veet
Kawat las
Screen stainless steel dia 4" :
PERALATAN
Peralatan pemboran
Sewa mesin las

: Pengad. dan pemasangan screen stainless steel diametr 4"


SATUAN

KUANTITAS

Hari
Hari
Hari
Hari
Hari

1.00
1.00
1.00
3.00
2.00

x
x
x
x
x

Ltr
Ltr
Kg
Btg
Mtr

40.00
1.00
0.60
60.00
30.00

x
x
x
x
x

Unit
Unit

1.00
1.00

x
x

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN

HARGA SAT.

1.00
1.00
1.00
1.00
1.00

1.00
1.00

JUML. HARGA

60,000.00
35,000.00
35,000.00
30,000.00
25,000.00

60,000.00
35,000.00
35,000.00
90,000.00
50,000.00

5,500.00
33,600.00
36,700.00
900.00
1,312,500.00

220,000.00
33,600.00
22,020.00
54,000.00
39,375,000.00

375,000.00
50,000.00

375,000.00
50,000.00

40,399,620.00
1,346,654.00
1,346,000.00

DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI


URAIAN PEKERJAAN

NO

I
1
2
3
4
5
6
7
8
9
II
1
2
1
4
5
6
7
8
9
2
11
12
3
14
15
16
17
18
19
20
21
22
III
1
2
3
2
5
6
7
8
9
10
IV
1
2
3
1
5
6
7
8
9
10
11
V
1
2
3
4
5
VI
1
2
3
5

PEKERJAAN PERSIAPAN (03-2835-2002)


Pengukuran dan Pemasangan Bouwplank
Membersihkan Lapangan dan Peralatan
Bongkar Beton Bertulang
Mengupas plesteran
Membongkar usuk dan reng
Membongkar kuda-kuda
Membongkar plafond eternit
Mengupas permukaan aspal
Membuat Andang Dari Bambu
PEKERJAAN TANAH (03-2835-1992)
Galian Tanah Biasa Sedalam 1 m
Galian Tanah Keras Sedalam 1 m
Galian tanah berbatu
Galian Tanah Cadas Sedalam 1 m
Galian Tanah Lumpur Sedalam 1 m
Pekerjaan striping setinggi 1 m
Tanah diangkut sejauh lebih dari 30 m
Tanah diangkut sejauh lebih dari 250 m
Galian tanah diangkut sejauh 30 m
Urugan tanah biasa dipadatkan
Urugan tanah padas dipadatkan
Tanah diratakan dan ditimbris
Urugan Kembali
Urugan Pasir Hurug
Urugan Sirtu
Urugan pasir menggunakan pasir pasang
Mengambil, mengangkut, memasang lemp rumput jrk 30 m
Mengambil, mengangkut, memasang lemp rumput > 250 m
Timbunan tanah untuk tanggul jarak angkut 0-100 m
Pemasangan trucuk bambu 10 cm panjang 6 m
Timbunan karung isi pasir
Pemasangan sesek bambu
PEKERJAAN PONDASI (03-2836-2002)
Aanstampeng batu belah
Buat bronjong dari kawat 4 mm galvanis di isi batu
Pasang Pondasi Batu Kali 1Pc : 8 Ps
Pasang Pondasi Batu Kali 1 Pc : 3 Ps
Pasang pondasi batu belah 1:4 pasir beton
Pasang pondasi batu belah 1:4 pasir pasang
Pasang Pondasi Batu Kali 1 Pc : 5 Ps
Pasang pondasi rolag tashraam batu merah 1:3
Pasang suling-suling
Pekerjaan Pancang
PEKERJAAN DINDING (03-2837-2002)
Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps
Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 3 kp : 10 Ps
Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 2 Ps
Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps
Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps
Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 4 Ps
Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 3 kp : 10 Ps
Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 2 Ps
Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 3 Ps
Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc :8 Ps
Pasangan Roster uk. ( 12 x 11 x 24 ), 1Pc : 4 Ps
PEKERJAAN PLESTERAN (03-2837-2002)
Plesteran 1 Pc : 3 Ps diaci
Plesteran 1 Pc : 8 Ps diaci
Plester Siar Adukan 1 Pc : 2 Ps
Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm
Plesteran Ciprat 1 Pc : 2 Ps
PEKERJAAN KAYU ( 03-3434-2002 )
Pasang gantungan pyan
Pasang Kusen Pintu dan Jendela kayu Bengkirai
Pasang Kusen Pintu dan Jendela kayu Jati
Pasang Kusen Pintu dan Jendela kayu Kanfer

SATUAN

1 m'
1 m2
1 m3

KODE
ANALISA

HARGA SATUAN
PEKERJAAN

1m
1 m2
1 m3
1 m2
1 m2
1 m2

PS. 1
PS. 2
PS. 3
PS. 5 Rp.
PS. 6 Rp.
PS. 7 Rp.
PS. 8 Rp.
PS. 9
PS. 10

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

68,191.50
6,500.00
283,330.00
2,125.00
3,625.00
500,000.00
11,250.00
41,650.00
35,215.00

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m2
1 m2
1 m3
1 ttk
1 m3
1 m2

T.1
T.2
T.3
T.4
T.5
T.6
T.7
T.8
T.9
T.10
T.11
T.12
T.13
T.14
T.15
T.16
T.20
T.21
T.22
T.23
T.24
T.25

Rp.
Rp.
Rp.
Rp.

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

27,500.00
36,600.00
55,000.00
55,500.00
44,250.00
2,000.00
12,050.00
41,363.64
39,550.00
51,087.00
58,647.00
11,000.00
9,166.67
101,720.00
86,850.00
176,000.00
6,955.00
9,886.36
17,404.85
19,029.13
79,550.00
12,050.00

1 m3

Pd.1

Rp. Rp

217,054.20

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m'
3
1m

Pd.2
Pd.3
Pd.4
Pd.5
Pd.5.b
Pd.6
Pd.7
Pd.8
Pd.9

Rp.
Rp.
Rp.
Rp.
Rp.

Rp
Rp
Rp
Rp
Rp
Rp
Rp. Rp
Rp
Rp

551,916.67
462,458.00
622,713.50
601,764.00
563,919.00
522,718.00
846,653.00
15,436.50
28,812.50

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

D.1
D.2
D.3
D.4
D.5
D.6
D.7
D.8
D.9
D.10
D.11

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

174,876.40
161,442.29
95,565.10
88,338.06
76,822.00
176,876.40
163,786.04
96,565.10
89,338.06
77,822.00
139,132.00

1 m2
1 m2
1 m2
1 m2
1 m2

PL.1
PL.2
PL.3
PL.4
PL.5

Rp. Rp
Rp. Rp
Rp. Rp
Rp
Rp

40,914.50
36,320.67
28,484.92
34,158.40
23,851.16

1 m3
1 m3

KY.1
KY.2
KY.3
KY.4

Rp. Rp 7,227,430.00
Rp 12,950,550.00
Rp 18,552,300.00
Rp 13,396,550.00

1 m3
1 m3

Rp.

Rp.

Rp.
Rp.
Rp.

KETERANGAN

NO

7
8
9
10
10
11
12
13
14
15
15
17
18
19
20
21
22
23
25
26
27
28
29
30
31
32
33
34
35
36
37
VII
1
2
1
4
5
2
7
8
9
10
3
VIII
1
2
3
4
5
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
IX
1
2
3
4

URAIAN PEKERJAAN

SATUAN

Pas usuk reng rangka atap genteng keramik


Pas usuk reng rangka atap genteng beton
Pasang Kasau & Reng Kayu Kruing
Pasang Kasau & Reng Kayu Bengkirai
Pasang Kasau lama & Reng baru Kayu Bengkirai
Pasang Kasau & Reng Kayu Kamper
Pasang Konstruksi Kuda-Kuda Kayu Bengkirai
Pasang Konstruksi Kuda-Kuda Kayu Jati
Pasang Konstruksi Kuda-Kuda Kayu Kruing
Pasang konsol kayu kruing
Pasang konsol kayu bengkirai
Pasang Jalusi mati Kosen Kayu Kanfer
Pasang Jalusi mati Kosen Kayu Bengkirai
Pasang Jalusi mati Kosen Kayu Jati
Pasang Jalusi mati Kosen Kayu Kruing
Bikin daun pintu rangka kayu jati tb 3,5 cm panil multiplek tb 9mm
Bikin daun pintu rangka kayu jati tb 3 cm panil multiplek tb 9mm
Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9 mm
Bikin daun pintu double teakwood rangka bengkirai tb 3 cm
Bikin daun pintu double triplek rangka bengk tb 3cm lapis seng aluminium
Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm
Pasang Pintu Panyl Kayu Jati tb.4 cm
Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm
Pasang Pintu & Jendela Kaca Kayu Jati tb.3 cm
Pasang pyan papan kayu jati tb 1 cm
Pasang Plywood untuk dinding
Pasang Lisplank Uk. 3/20 Kayu Jati
Pasang Lisplank Uk. 3/30 Kayu Jati
Pasang Lisplank Uk. 3/20 Kayu Bengkirai
Pasang Lisplank Uk. 3/30 Kayu Bengkirai
Pasang papan sirip
PEKERJAAN BETON ( 03-3435-2002 )
Membuat beton tumbuk Mutu k.100
Membuat beton Mutu k.175
Membuat beton Mutu k.225
Membuat beton Mutu k.275
Membuat beton Mutu k.300
Pembesian dg Besi Polos atau Ulir
Kolom praktis
Sloof / ring balk beton bertulang
Begisting untuk plat lantai
Steiger dari bambu
Cetakan beton (bekisting) dengan kayu randu tebal 2 cm
PEKERJAAN PENUTUP ATAP (03-3436-2002)
Pas atap genteng Jatiwangi tak berwarna kecil
Pas atap genteng Jatiwangi tak berwarna sedang
Pasang atap genteng pres jatiwangi type turbo
Pasang atap genteng Kebumen tak berwarna
Pasang atap genteng lokal
Pasang atap genteng Kudus
Pas krepus Jatiwangi tak berwarna
Pasang krepus jatiwangi / kebumen berwarna
Pasang krepus lokal
Pasang Atap Genteng Beton
Pasang Bubungan Genteng Beton
Bubungan fiber gelombang kecil
Bikin corong talang
Pasang Asbes Gelombang (2,25x0,92)m x 5 mm (gelombang besar)
Pasang Asbes Gelombang (2,00x0,92)m x 5 mm (gelombang besar)
Pasang Asbes Gelombang (180x90)m x 4 mm
Pasang Asbes Gelombang (2,10x1,05)m x 4 mm
Pasang Atap Seng
Pasang Atap Nok Seng
Bubungan asbes gelombang
PEKERJAAN LANGIT-LANGIT ( 03-2838-2002 )
Langit-Langit Asbes (1,00x1,00)m, tb. 4 mm
Pasang pyan eternit kerang super
Pasang pyan eternit atrisco
Pasang pyan harplek

KODE
ANALISA

HARGA SATUAN
PEKERJAAN

1 m2
1 m2
1 m2
2
1m
2
1m
2
1m
3
1m
3
1m
1 m3
1 m3
1 m3
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1m'
1m'
1m'
1m'
1m'

KY.5
KY.6
KY.7
KY.8
KY.9
KY.10
KY.11
KY.12
KY.13
KY.14
KY.15
KY.16
KY.17
KY.18
KY.19
KY.20
KY.21
KY.22
KY.23
KY.24
KY.25
KY.26
KY.27
KY.28
KY.29
KY.30
KY.31
KY.32
KY.33
KY.34
KY.35

1 m3
1 m3
1 m3
3
1m
3
1m
1 kg
1 m'
1 m'
1 m2
1 m2
1 m2

B.1
B.2
B.3
B.4
B.5
B.6
B.7
B.8
B.9
B.10
B.11

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

767,703.50
906,326.33
971,476.33
1,023,528.00
1,033,456.78
11,419.50
60,122.00
70,397.50
164,292.50
64,792.50
63,963.00

1 m2
1 m2
1 m2
1 m2
2
1m
2
1m
1m'
1 m'
1 m'
1 m2
1m'
1 m'
1 m'
1 m2
1 m2
1 m2
1 m2
1 m2
1m'
1 m'

PA.1
PA.2
PA.3
PA.4
PA.5
PA.6
PA.7
PA.8
PA.9
PA.10
PA.11
PA.12
PA.13
PA.14
PA.15
PA.16
PA.17
PA.18
PA.19
PA.20

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

63,050.00
70,900.00
77,750.00
63,050.00
30,050.00
34,300.00
102,654.00
97,621.80
60,871.80
82,586.00
85,600.40
121,675.00
44,715.50
56,915.00
57,560.00
46,380.00
71,980.00
67,230.00
22,848.00
112,275.00

1 m2
1 m2
1 m2
1 m2

LL.1
LL.2
LL.3
LL.4

Rp
Rp. Rp
Rp. Rp
Rp. Rp

28,387.00
82,845.00
86,105.00
88,865.00

Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

Rp.

Rp
469,175.00
Rp
469,175.00
Rp
79,730.00
Rp
127,730.00
Rp
41,105.00
Rp
133,190.00
Rp 11,816,620.00
Rp 18,380,870.00
Rp 7,416,620.00
Rp 7,602,780.00
Rp 12,791,900.00
Rp
739,480.00
Rp
712,180.00
Rp 1,070,230.00
Rp
472,180.00
Rp
779,480.00
Rp
701,517.50
Rp
695,935.00
Rp
367,561.00
Rp
583,201.00
Rp
592,100.00
Rp
812,600.00
Rp
390,510.00
Rp
523,810.00
Rp
174,757.50
Rp
144,007.50
Rp
185,644.00
Rp
187,677.50
Rp
117,595.00
Rp
122,035.00
Rp
40,985.00

KETERANGAN

URAIAN PEKERJAAN

NO

SATUAN

KODE
ANALISA

HARGA SATUAN
PEKERJAAN

1 m2

LL.5

Rp

41,869.60

bh
bh
bh
bh
bh
bh
bh

S.1
S.1.b
S.2
S.3
S.4
S.5
S.6

Rp
Rp
Rp
Rp
Rp
Rp
Rp

693,155.00
1,649,805.00
346,953.00
563,943.00
538,203.00
403,500.00
15,950.00

1
2
3
4
5
6
7
8
9
10
11
XII
1
2
3
4
5
6
7
8
9
10
11
XIII

Pasang gypsum board


PEKERJAAN SANITASI
Memasang Closet Duduk
Memasang Closet Duduk / Mono Block INA
Memasang Closet Jongkok Porcelen
Memasang Urinoir
Memasang Wastafel
Memasang Bak Cuci Piring Stainlees
Memasang floor drain
PEKERJAAN BESI DAN ALUMINIUM
Pasang Rangka Atap Baja
Pasang Pintu Lipat Besi
Pasang Roling Door tebal 5 mm
Pasang Roling Door tebal 8 mm
Pasang Kusen Alumunium
Pasang Pintu Aluminium
Pasang Jendela Nako + Tralis
Pasang Talang Datar / Jurai Seng BJLS 28
Pasang Talang Miring Seng BJLS 28
Baut angkur
Pasang Talang Gantung 15 cm
PEKERJAAN KUNCI DAN KACA
Pasang Kunci Tanam Biasa
Pasang Kunci Tanam Kamar Mandi
Pasang Engsel Pintu
Pasang Engsel Jendela Kupu-Kupu
Pasang Engsel Angin
Pasang Kait Angin
Pasang Door Closer
Pasang Kunci Sloot
Pasang Rel Pintu Dorong
Pasang Kaca tb. 3 mm
Pasang Kaca tb. 5 mm
PEKERJAAN PENUTUP LANTAI DAN DINDING

kg
1 m2
1 m2
1 m2
1 m1
1 m2
1 m2
1 m2
1 m2
1 kg
1 m1

BS.1
Rp
BS.2
Rp
BS.3
Rp
BS.4
Rp
BS.5
Rp
BS.6
Rp
BS.7
Rp
BS.8
Rp
BS.9
Rp
BS.10 Rp. Rp
BS.11 Rp. Rp

19,500.00
482,800.00
457,800.00
489,300.00
119,472.50
470,260.00
75,909.00
156,868.00
156,430.50
31,551.00
43,622.00

bh
bh
bh
set
set
bh
bh
bh
bh
1 m2
1 m2

KK.1
KK.2
KK.3
KK.4
KK.5
KK.6
KK.7
KK.8
KK.9
KK.10
KK.11

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

136,150.00
83,325.00
28,187.50
21,150.00
27,000.00
14,887.50
249,625.00
20,250.00
310,550.00
80,387.50
91,387.50

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1
XIV
1
2
3
4
5

Pasang Lantai Ubin PC Abu-Abu 20x20


Pasang Lantai Ubin PC Granito (batu granit) uk. 40x40
Pasang Lantai Keramik uk. 40x40 Putih
Pasang Lantai Keramik uk. 40x40 Warna
Pasang Lantai Keramik uk. 40x40 Warna Pola
Pasang Lantai Keramik 20x20
Pasang Lantai Keramik 30x30 Warna
Pasang Lantai Keramik 30x30 Putih
Pasang Lantai Keramik 30x30 Warna Pola
Pasang Dinding Keramik 10x20
Pasang Dinding Keramik 20x20
Pasang Batu Tempel Muntilan
Pasang lantai batu merah 1:3:10
Pasang tegel plint 20 x 20 cm
Pasang lantai tegel abu-abu ukuran 30 x 30
Pasang lantai tegel warna ukuran 30 x 30
Pasang lantai tegel wafel warna khusus 30 x 30
Pasang blok paving ukuran tebal 6 cm K.125
Pasang blok paving ukuran tebal 8 cm K.125
Pasang lantai tegel 20 x 20 kembang
Pasang lantai tegel 20 x 20 warna
Pasang Paving tbl 6 cm dengan paving mutu K 200
Pasang Paving tbl 8 cm dengan paving mutu K 300
Pasang Paving warna tbl. 6 cm K.125
Pasang Paving warna tbl. 8 cm K.125
Perekat portland 1 : 2
Pasang lantai batu lempeng
Pasang saluran U-20cm
Pasang saluran U-30cm
PEKERJAAN PENGECATAN
Mengecat kayu 3 kali
Mengecat kayu 2 kali
Mengecat trotoir 3 kali
Mengecat trotoir ulang
Mengecat besi 3 kali

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
2
1m
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
2
1m
1 m2
1 m3
1 m2
1 m'
1 m'

L.1
L.2
L.3
L.4
L.5
L.6
L.7
L.8
L.9
L.10
L.11
L.12
L.13
L.14
L.15
L.16
L.17
L.18
L.19
L.20
L.21
L.22
L.23
L.24
L.25
L.26
L.27
L.28
L.29

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

70,762.70
247,328.90
93,777.90
108,761.90
114,368.90
103,679.70
97,170.00
89,810.60
98,032.50
147,133.40
145,872.40
394,167.10
60,336.80
35,172.50
59,591.00
82,415.00
82,415.00
68,050.00
69,750.00
92,915.00
92,915.00
93,750.00
123,250.00
80,550.00
87,550.00
1,081,647.80
106,066.48
165,903.19
173,403.19

1 m2
1 m2
1 m2
1 m2
1 m2

C.1
Rp. Rp
C.1.b
Rp
C.2
Rp. Rp
C.2.b
Rp
C.3
Rp. Rp

22,839.20
14,220.10
20,799.70
9,979.85
22,427.20

5
X
1
2
3
4
5
6
7
XI

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

KETERANGAN

NO

6
7
8
1
10
11
12

URAIAN PEKERJAAN

Mengecat tembok dg mowilex utk dalam ruangan


Mengecat tembok dg mowilex utk luar ruangan
Mengecat tembok ulang dg mowilex
Mengecat tembok dg Decolit
Mengecat tembok dg decolit (ulang)
Mengecat pohon anyoman
Mengetir 2 kali

SATUAN

1 m2
1 m2
1 m2
2
1m
2
1m
2
1m
2
1m

KODE
ANALISA

C.4
C.5
C.5.b
C.6
C.7
C.8
C.9

HARGA SATUAN
PEKERJAAN

Rp. Rp
Rp. Rp
Rp
Rp. Rp
Rp. Rp
Rp. Rp
Rp. Rp

20,787.50
37,560.00
18,780.00
16,040.00
8,020.00
10,437.50
14,580.00

KETERANGAN