Escolar Documentos
Profissional Documentos
Cultura Documentos
Plant| Environmental
Solar Boost
Questionnaire on solar energy and
its integration in your steam plant
Are you interested in a discussion on improvement opportunities, which allows the generation of renewable power in a fossil fired power plant? ALSTOM Power Service offers sophisticated solutions for your specific requirements from its broadly based product portfolio. Please answer the following short questions and contact us.
Unit name Unit operator Unit size and quantity, Location Plant age Plant expecting life time Brief descriptions
Boiler Type and manufacturer: Turbine Type and manufacturer: Generator Type and Manufacturer: Fuel: e.g. 3 x 457MW
MW
General Information Are you interested in a new environmental solution to produce green electricity? Is there the necessity to invest in environmental or climate protecting optimization measures due to legal restraints or to public drives? Are you already informed about the different solar thermal energy technologies? What is the average load factor for the units? - Net Capacity Factor (NCF, in MWhproduced/(MWinstalled*8760 h) - Annual operating hours Would an increase of output at constant coal consumption be of value? Would a decrease of coal consumption at a constant power output be of value? Can a heat balance diagram be made available? (Please attach it!)
No No No
% h/a No No No
www.service.power.alstom.com
ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
THERMAL POWER
9DESER00021
Location Have you available space near the power plant? If yes: - Total surface available? - Distance between the available area and the power plant (nearest point)? - Can a site plan or a sketch of the site plan be made available? (Please attach it!) Pre-heating train Pre-heaters type and manufacturer Please list the different temperatures and mass flows at inlet and outlet of each pre-heater (if not displayed in the heat balance diagram). Condensate Mass Flow (for the full load case and the average load case) Temperatures of the different high pressure pre-heaters - HP1 - HP2 - HP3 - HP4 Feed water Mass Flow (for the full load case and the average load case) Is the plant capable for continuous operation with top heaters out of service? Other miscellaneous comments if applicable;
Yes
No m m
Yes
No
kg/s Yes No