Escolar Documentos
Profissional Documentos
Cultura Documentos
Unit
Quantity
Material unit
Cost
I. GENERAL REQUIREMENTS
A. Mobilization / Demolition/Clean-up
B.Permits & Licenses
1. Building Permit
2. Cert. of Occupancy (including requirements thereof)
3. Other Related Permits
C. Temporary Facilities & Utilities
1. Warehouse, Quarters (off-site housing)
lot
lot
lot
lot
lot
lot
cu.m.
cu.m.
sq.m.
cu.m.
cu.m.
sq.m.
25.14
100
7.1
17
850
56.54
cu.m.
kgs.
sq.m.
5.31
160.7
3850
45
cu.m.
kgs.
sq.m.
8.89
1048.79
128.04
3850
45
275
cu.m.
kgs.
sq.m.
5.29
1635.47
3650
45
cu.m.
kgs.
sq.m.
2.86
243.27
3650
45
cu.m.
8.46
3650
Rebars
Formworks
6. Suspended Slabs
Concrete 3000 Psi
Rebars
Formworks
7. Stairs
Stringer 2" x 12"
Tread & Landing 2" x 10"
Sub-Total Structural Works
kgs.
sq.m.
2167.51
117
45
275
cu.m.
kgs.
sq.m.
9.58
3573.03
83.5
3650
45
275
lin m.
lin.m
16
31.2
sq.m.
sq.m.
335.76
86.32
B.Finishing Works
FLOOR FINISHES - all areas specified in BOQ:
1. 100 x 200 laminated Wood
2. 600 x 600 Homogenous Tiles
3. 400 x 400 Vitrified Ceramic Tiles
4. 5 Pebbles Wash out
5. 300 x 300 Glaze Ceramic Tiles
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
875
675
650
159.22
111.06
450
sq.m.
sq.m.
sq.m.
44.74
60.23
180
450
C. Plastering Works
1. Plain Cement Plaster
sq.m.
844.16
90
D. Ceiling Works
1. Rubbed concrete ceiling
2. Hardiflex moisturized ceiling
3. Hardiflex ceiling paint finish
4. Spandrel Panel
sq.m.
sq.m.
sq.m.
sq.m.
42.05
8.22
46.27
90
700
650
7
10
8
5500
750
650
E. Finishing Hardwares
1. Door Locksets (Yale locksets)
a. Main door lockset
b. Bedroom Locksets
c. Toilet and Baths
sets
sets
sets
sets
sets
sets
130
sq.m.
sq.m.
40.65
10.53
450
650
A. Doors
D-1 PVC Panel with louver (.60 x 2.10 m.)
D-2 Wood panel door with wood frame (.85 x 2.10 m.)
D-3 Wood panel door with wood frame (.75 x 2.10 m.)
D-4 Wood panel door with wood frame (.60 x 2.10 m.)
D-5 Clear Glass with aluminum Frame (0.6 x 2.10 m.)
pc.
pc.
pc.
pc.
PC.
4
6
12
1
2
8500
8000
SD-1 Wood panel door with wood frame (0.7 x 2.10 m.)
SD-2 Wood panel door with wood frame (0.90 x 2.10 m.)
SD-3 Sliding Door with aluminum frame (0.92 x 2.10 m.)
SD-4 Sliding Door with aluminum frame (0.7 x 2.10 m.)
SD-5 Sliding Door with aluminum frame (1.76 x 2.10 m.)
SD-6 Sliding Door with aluminum frame (1.42 x 2.10 m.)
pc.
pc.
pc.
pc.
pc.
pc.
1
1
1
2
2
2
sq.m.
2.28
3500
sq.m.
2.76
3500
sq.m.
1.8
3500
sq.m.
0.57
3500
l.m.
l.m.
l.m.
ls
sq.m.
52.8
550
25.33
650
H. Metal Works
1. 50 mm stainless steel rail
I. Cabinet Works
J. Modular Kitchen System
K. Stair System
L. Waterproofing Works
Sub-Total Architectural Works
IV. Plumbing Works and Fixtures
V. Electrical Works and Finishings
ls
ls
3850
Labor Cost
Amount
2514
100
2514
5028
6035
961.18
50
50
355
850
6390
1811.18
13229.18
20443.5
7231.5
330
4.5
1752.3
723.15
34226.5
47195.55
35211
330
4.5
225
2933.7
37160.2
4719.555 51915.105
28809
64020
19308.5
73596.15
330
4.5
1745.7
21054.2
7359.615 80955.765
10439
10947.15
330
4.5
943.8
11382.8
1094.715 12041.865
30879
330
2791.8
22195.8
7954.65
33670.8
97537.95
32175
0
34967
160786.35
22962.5
4.5
225
9753.795 107291.75
26325
58500
330
4.5
225
3161.4
38128.4
16078.635 176864.99
18787.5
41750
764886.32
293790
58266
140
140
47006.4
12084.8
340796.4
70350.8
411147.2
0
0
100
49977
0
120
13327.2
63304.2
63304.2
8053.2
27103.5
100
120
4474
7227.6
12527.2
34331.1
46858.3
75974.4
0
120
101299.2
177273.6
3784.5
5754
30075.5
120
150
150
5046
1233
6940.5
8830.5
6987
37016
38500
7500
5200
1500
150
150
10500
1500
1200
49000
9000
6400
50
0
64400
18292.5
6844.5
75
150
3048.75
1579.5
21341.25
8424
34000
48000
2550
2400
10200
14400
44200
62400
7980
7980
9660
9660
6300
6300
1995
1995
29040
250
13200
42240
16464.5
150
3799.5
20264