Escolar Documentos
Profissional Documentos
Cultura Documentos
14000
14100
14500
14900
Description
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Facilities
Scale300
Setup Scale
1360000
1362100
1382100
** Site Facilities **
Certification of Scale
Calibrate Scales
ea
ea
ea
ea
0.0000
1.0000
1.0000
0.00
1,030.00
5,150.00
0.00
1,030.00
5,150.00
SiteServices
Helicopter01
1400000
1416100
** Site Services **
Helicopter Service
Day
Day
0.0000
1.0000
0.00
5,562.00
0.00
5,562.00
Garbage100
Toilet120
Janitor100
1414100
1414210
1414300
Month
Month
Month
Month
Month
Month
1.0000
1.0000
1.0000
1,030.00
824.00
515.00
1,030.00
824.00
515.00
HaulHighboy011415100
HaulLowboy01 1415200
Load
Load
Load
Load
1.0000
1.0000
8,600.50
13,390.00
8,600.50
13,390.00
Security100
Medic 10
Medic 20
Medic 30
Medic 40
1419100
1419310
1419320
1419330
1419340
Month
Day
Day
Day
Day
Month
Day
Day
Day
Day
1.0000
1.0000
1.0000
1.0000
1.0000
1,030.00
499.55
602.55
679.80
1,987.90
1,030.00
499.55
602.55
679.80
1,987.90
Survey100
1510000
Month
Month
1.0000
20,600.00
20,600.00
QualityControl
QCPlan10
ISOPlan10
QVE10
Test510
Test520
HydroTest10
1600000
1611100
1611200
1631000
1644300
1644400
1651200
Month
Month
Day
Day
Day
m
Month
Month
Day
Day
Day
ft
0.0000
1.0000
1.0000
1.0000
1.0000
1.0000
3.2808
0.00
10,300.00
20,600.00
772.50
1,030.00
1,030.00
3.09
0.00
10,300.00
20,600.00
772.50
1,030.00
1,030.00
0.94
Inspect110
Inspect120
Inspect410
Inspect420
1621100
1622100
1624100
1624200
Month
Month
m
m
Month
Month
ft
ft
1.0000
1.0000
3.2808
3.2808
15,450.00
10,300.00
3.21
4.28
15,450.00
10,300.00
0.98
1.31
Testing
1640000
** Testing Services **
0.0000
0.00
0.00
Test100
1641100
1.3080
10.71
8.19
Cleaning Services
Hauling Services
Security Services
16000
Quality Control
16410
Sequence
Site Services
Survey Services
16400
Code
Site Facilities
15000
16200
Subcontract Description
Inspection Services
Testing Services
Concrete Testing
15/09/2007 5:37:14 PM
m3
cy
Page No 1 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
16430
Description
16440
Soil Testing
16500
16600
Monitoring Services
16900
17000
17200
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Test120
Test200
1641200
1642100
m3
t
cy
ton
1.3080
1.1023
10.71
3.11
8.19
2.82
Test310
Test320
1643100
1643200
t
t
ton
ton
1.1023
1.1023
0.32
0.11
0.29
0.10
Test410
1644100
m3
cy
1.3080
0.11
0.08
Test420
1644200
LS
LS
1.0000
1,071.20
1,071.20
Disinfect100
1651100
Disinfect Watermain
ft
3.2808
2.06
0.63
Monitor
Monitor100
Monitor200
Monitor300
Monitor400
Monitor500
1660000
1661000
1662000
1663000
1664000
1664040
** Monitoring Services **
Monitor Blast Vibrations
Monitor Slope Stability
Monitor Tunnel Excavations
Monitor Air Quality
Monitor Noise Levels
Day
Day
Day
ea
ea
Day
Day
Day
ea
ea
0.0000
1.0000
1.0000
1.0000
1.0000
1.0000
0.00
1,030.00
1,030.00
1,030.00
515.00
360.50
0.00
1,030.00
1,030.00
1,030.00
515.00
360.50
Environment10 1667110
Environment20 1667210
Hazardous10 1667310
Environmental Monitor
Environmental Mitigation Plan
Hazardous Waste Removal
Day
Day
t
Day
Day
ton
1.0000
1.0000
1.1023
1,030.00
1,030.00
154.50
1,030.00
1,030.00
140.16
Dive100
Dive200
1681100
1681200
ea
Day
ea
Day
1.0000
1.0000
927.00
2,008.50
927.00
2,008.50
Instrument110
Instrument120
Instrument130
Instrument140
1691010
1691020
1691030
1691040
ea
m
m
m
ea
ft
ft
ft
1.0000
3.2808
3.2808
3.2808
128.75
211.15
242.05
309.00
128.75
64.36
73.78
94.18
Catering10
1723000
Man-dayMan-day
1.0000
87.55
87.55
Camp10
1731000
Camp Rental 1
Person Person
1.0000
20,600.00
20,600.00
Incentive10
1741000
Week
1.0000
57.68
57.68
Environmental Controls
Diving Services
Instrumentation
Subsistence
Hourly Subsistence
17300
Camp
17400
Incentive
21000
Sequence
Aggregate Testing
Compaction Testing
16800
Code
Site Facilities
16440
16700
Subcontract Description
Week
Site Remediation
15/09/2007 5:37:14 PM
Page No 2 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
22100
31000
32000
32100
32300
32400
32500
Description
Subcontract Description
Code
Sequence
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Site Investigation
TestHoles100
CoreDrill110
BoreHole110
BoreHole120
2210010
2210020
2210030
2210040
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1,030.00
500.00
2,000.00
25,000.00
1,030.00
500.00
2,000.00
25,000.00
Concrete
Form110
Form120
Form130
Form140
3000000
3100010
3100020
3100030
3100040
m2
m2
m2
m2
sf
sf
sf
sf
0.0000
10.7639
10.7639
10.7639
10.7639
0.00
72.10
77.25
82.40
87.55
0.00
6.70
7.18
7.66
8.13
Reinforcing
Mesh110
3210000
3220010
** Reinforcing Steel **
Welded Wire Mesh
m2
sf
0.0000
10.7639
0.00
4.12
0.00
0.38
Rebar110
Rebar120
Rebar130
Rebar140
3210010
3210020
3210025
3210030
t
t
t
t
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
2,060.00
2,472.00
3,296.00
12,875.00
1,868.80
2,242.56
2,990.08
11,680.01
Stress10
Stress20
Stress30
Stress40
Strand10
PTB10
PTB20
3230010
3230020
3230030
3230040
3230050
3230060
3230070
m3
kg
m3
kg
kg
kg
kg
cy
lb
cy
lb
lb
lb
lb
1.3080
2.2046
1.3080
2.2046
2.2046
2.2046
2.2046
164.96
6.44
164.96
6.44
6.44
7.73
14.42
126.12
2.92
126.12
2.92
2.92
3.50
6.54
Coupler100
Coupler110
Coupler120
3230010
3230030
3230030
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
28.33
58.92
84.98
28.33
58.92
84.98
Filler10
Filler20
Filler30
3250010
3250020
3250030
m
m
m
ft
ft
ft
3.2808
3.2808
3.2808
9.27
12.36
18.54
2.83
3.77
5.65
Pour110
3300010
Pour Concrete
m3
cy
1.3080
30.90
23.62
Concrete Formwork
Concrete Reinforcing
Rebar
Stressing Systems
Rebar Accessories
Concrete Accessories
33000
Concrete Placing
33500
Concrete Finishing
15/09/2007 5:37:14 PM
Page No 3 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
34000
34100
34300
34310
34330
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Screed10
3350005
Trowel10
3350007
RubFinish10 3350010
Sandblast10 3350020
Bushhammer103350030
Harden10
3350040
Harden20
3350050
m2
m2
m2
m2
m2
m2
m2
Precast
3400000
** Precast Concrete **
CoreSlab10
CoreSlab20
TeeSlab10
ArchPanel10
PrecastCol10
3410010
3410020
3410030
3410040
3410050
m2
m2
m2
m2
m
PrecastBeam403432010
PrecastBeam423432020
PrecastBeam443432030
PrecastBeam103431010
PrecastBeam123431020
PrecastBeam143431030
PrecastBeam163431040
PrecastBeam183431050
PrecastBeam203431060
PrecastBeam223431070
PrecastBeam243431080
PrecastBeam263431090
PrecastBeam283431100
PrecastBeam303431110
PrecastBeam323431120
PrecastBeam343431130
PrecastBeam363431140
PrecastBeam383431150
PrecastBox10 3433010
PrecastBox20 3433020
sf
sf
sf
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
3.61
6.70
7.21
25.75
77.25
3.61
10.30
0.33
0.62
0.67
2.39
7.18
0.33
0.96
0.0000
0.00
0.00
sf
sf
sf
sf
ft
10.7639
10.7639
10.7639
10.7639
3.2808
113.30
128.75
144.20
288.40
669.50
10.53
11.96
13.40
26.79
204.06
m
m
m
ft
ft
ft
3.2808
3.2808
3.2808
566.50
147.29
113.30
172.67
44.89
34.53
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
294.58
117.83
70.70
471.33
147.29
117.83
589.16
147.29
117.83
589.16
235.66
117.83
648.08
176.75
117.83
89.79
35.92
21.55
143.66
44.89
35.92
179.58
44.89
35.92
179.58
71.83
35.92
197.53
53.87
35.92
m
m
ft
ft
3.2808
3.2808
589.16
706.99
179.58
215.49
Precast Concrete
Building Precast
Bridge Precast
Precast I-Beams
15/09/2007 5:37:14 PM
Page No 4 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
35000
36000
36100
36500
39000
39400
40000
42100
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
PrecastBox30
PrecastBox40
PrecastBox50
PrecastBox60
PrecastBox70
34350
Sequence
3433030
3433040
3433050
3433060
3433070
m
m
m
m
ea
ft
ft
ft
ft
ea
3.2808
3.2808
3.2808
3.2808
1.0000
176.75
176.75
88.37
88.37
589.16
53.87
53.87
26.94
26.94
589.16
PrecastPanel103435010
m2
sf
10.7639
412.41
38.31
Cementitious103510010
Cementitious113510020
m2
m2
sf
sf
10.7639
10.7639
20.00
90.00
1.86
8.36
Grout140
3610050
Curtain Grouting
m2
sf
10.7639
154.50
14.35
Grout050
Grout100
Grout105
Grout110
Grout120
Grout130
3610000
3610010
3610015
3610020
3610030
3610040
m
ea
m3
m3
m3
litre
ft
ea
cy
cy
cy
gal
3.2808
1.0000
1.3080
1.3080
1.3080
0.2642
169.95
618.00
14.42
2,472.00
5,150.00
0.62
51.80
618.00
11.02
1,889.98
3,937.46
2.34
Epoxy10
Epoxy20
Epoxy30
Epoxy40
3650010
3650020
3650030
3650040
m
m
m2
m3
ft
ft
sf
cy
3.2808
3.2808
10.7639
1.3080
51.50
82.40
360.50
13,390.00
15.70
25.12
33.49
10,237.39
Restoration
BlastClean10
BlastClean20
BlastClean30
BlastClean40
3910000
3910010
3910020
3910030
3910040
** Concrete Restoration **
Abrasive Blast Cleaning of Deck Concrete
Abrasive Blast Cleaning of Concrete
Abrasive Blast Cleaning of Reinforcing Steel
Abrasive Blast Cleaning of Concrete - Small Areas
m2
m2
m2
m2
sf
sf
sf
sf
0.0000
10.7639
10.7639
10.7639
10.7639
0.00
5.89
11.78
35.35
45.32
0.00
0.55
1.09
3.28
4.21
Restore110
Restore120
Restore130
3940010
3940020
3940030
m2
m2
m3
sf
sf
cy
10.7639
10.7639
1.3080
618.00
875.50
927.00
57.41
81.34
708.74
Masonry
4210000
** Masonry **
0.0000
0.00
0.00
Brick110
4210010
10.7639
139.05
12.92
Epoxy Grouting
Concrete Restoration
Masonry
Brick
15/09/2007 5:37:14 PM
m2
sf
Page No 5 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
42200
Description
44000
Stone
51230
Sequence
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Brick120
4210020
m2
sf
10.7639
144.20
13.40
Block100
Block110
Block120
Block130
4220010
4220020
4220030
4220040
m2
m2
m2
m2
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
72.10
87.55
123.60
15.45
6.70
8.13
11.48
1.44
GlassUnit10
4270010
m2
sf
10.7639
515.00
47.85
Stone100
Stone110
Stone125
Stone120
Stone130
Stone140
4400010
4400020
4400025
4400030
4400040
4400050
Rough Limestone
Rough Fieldstone
Cut Sandstone
Cut Limestone
Cut Marble
Cut Granite
m2
m2
m2
m2
m2
m2
sf
sf
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
180.25
334.75
360.50
412.00
721.00
875.50
16.75
31.10
33.49
38.28
66.98
81.34
Steel
SteelFab110
SteelFab120
SteelFab130
SteelFab140
SteelFab150
SteelFab160
5000000
5001010
5001020
5001030
5001040
5001050
5001060
** Steel **
Supply Detail Fabricate Extra Heavy Steel (>125 kg)
Supply Detail Fabricate Heavy Steel (65-125 kg)
Supply Detail Fabricate Medium Steel (25-65 kg)
Supply Detail Fabricate Light Steel (<25 kg)
Supply Detail Fabricate Steel Stairs
Supply Detail Fabricate Steel Ladders & Misc Metal
t
t
t
t
t
t
ton
ton
ton
ton
ton
ton
0.0000
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
0.00
2,575.00
3,090.00
3,811.00
6,695.00
7,107.00
10,506.00
0.00
2,336.02
2,803.23
3,457.28
6,073.60
6,447.36
9,530.89
Steel100
Steel110
5121910
5121920
t
t
ton
ton
1.1023
1.1023
2,575.00
2,678.00
2,336.00
2,429.44
Steel310
Steel320
Steel330
Steel350
5123010
5123020
5123030
5123050
t
t
t
t
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
11.78
176.75
471.33
2,592.30
10.69
160.34
427.58
2,351.70
MetalDeck110 5300010
m2
sf
10.7639
30.90
2.87
MetalFrame10 5400010
MetalFrame20 5400020
MetalFrame30 5400030
m2
m2
m2
sf
sf
sf
10.7639
10.7639
10.7639
11.33
14.94
25.75
1.05
1.39
2.39
Block
Glass Units
51200
51219
Code
Site Facilities
42700
50000
Subcontract Description
Steel Fabrication
Structural Steel
Building Structural Steel
53000
Metal Deck
54000
Metal Framing
15/09/2007 5:37:14 PM
Page No 6 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
54500
55000
55200
55210
55220
58000
58200
60000
61100
61600
Description
Subcontract Description
Code
Sequence
Site Facilities
Supply Detail & Fab Steel Bldgs
MetalBldg110 5450010
MetalBldg120 5450020
MetalBldg130 5450030
MetalBldg140 5450040
MetalBldg150 5450050
MetalBldg160 5450060
Metal Fabrications
MiscMetal110 5510010
MetalStair10 5510020
MetalStair20 5510030
MetalLadder10 5510040
MetalLadder20 5510050
Metal Railings
Bridge Railings
Railing
5521000
Railing110
5521010
Railing120
5521020
Railing130
5521030
Railing140
5521040
Railing150
5521060
Building Rail
Railing210
5522010
Railing220
5522020
Expansion Control
Bearings
Bearing110
5820010
Bearing120
5820020
Bearing130
5820030
Bearing140
5820040
Rough Carpentry
Wood Framing
Framing
6110000
Frame105
6110105
Frame110
6110110
Sheathing
Frame100
6110100
Frame120
6110120
15/09/2007 5:37:14 PM
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
m3
m3
m3
m3
m3
m3
cy
cy
cy
cy
cy
cy
1.3080
1.3080
1.3080
1.3080
1.3080
1.3080
30.90
36.05
46.35
206.00
283.25
412.00
23.62
27.56
35.44
157.50
216.56
315.00
Miscellaneous Metal
Metal Stairs per Riser
Metal Landings
Metal Ladders (Open)
Metal Ladders (with Safety loops)
kg
ea
m2
m
m
lb
ea
sf
ft
ft
2.2046
1.0000
10.7639
3.2808
3.2808
2.36
133.90
721.00
103.00
180.25
1.07
133.90
66.98
31.39
54.94
** Steel Railing **
Install - Rail 3-1/2" (88.9mm) OD x 3.175mm Wall Structural T m
Pedestrian Hand Railing
m
Supply & Install - Rail 3-1/2" (88.9mm) OD x 3.175mm Wall St m
Pedestrian Railing 52" (1300mm high)
m
Aluminum Railing
m
ft
ft
ft
ft
ft
0.0000
3.2808
3.2808
3.2808
3.2808
3.2808
0.00
23.57
100.16
117.83
265.12
589.16
0.00
7.18
30.53
35.92
80.81
179.58
ft
ft
3.2808
3.2808
66.95
175.10
20.41
53.37
ea
ea
sf
ea
1.0000
1.0000
10.7639
1.0000
353.50
353.50
1,413.98
5,891.60
353.50
353.50
131.36
5,891.60
** Wood Framing **
Floor Framing
Wood Framing
m2
m2
sf
sf
0.0000
10.7639
10.7639
0.00
23.57
35.35
0.00
2.19
3.28
Plywood Sheathing
Plywood Paneling
m2
m2
sf
sf
10.7639
10.7639
20.60
58.92
1.91
5.47
m
m
Page No 7 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
13000
62000
Site Facilities
Finish Carpentry
71000
Waterproofing
71100
Dampproofing
71200
Building Waterproofing
71300
71500
72000
72500
73000
Subcontract Description
Code
Sequence
Metric
Unit
Frame50
6110050
Wood Paneling
Waterproof
7110000
** Waterproofing **
Damp110
7110010
Damproofing
m2
Protection Board
Membrane Waterproofing (Polyethelene)
Fluid Applied Waterproofing
Membrane Waterproofing (Rubber)
Waterproofing - Building Complete
Waterproof110 7120010
Waterproof120 7120020
Waterproof130 7120030
Waterproof140 7120040
Waterproof160 7120060
Bridge Deck Waterproofing
Waterproof210 7130010
Waterproof220 7130020
Waterproof230 7130030
Dampproofing
Damp110
7110010
Insulation
Insulate110
7200010
Insulate120
7200020
Insulate130
7200030
Insulate140
7200040
Insulate150
7200050
Insulate160
7200060
Insulate170
7200070
Insulate180
7200080
Insulate190
7200090
Fire Resistant Coatings
FireCoat110 7250010
FireCoat120 7250020
Shingles
Shingle110
7200030
Shingle110
7300010
Shingle120
7300020
Shingle130
7300030
Siding110
7400030
Siding120
7400040
15/09/2007 5:37:14 PM
Description
m2
Imperial Conversion
Unit
Factor
sf
Metric Rate
Imperial Rate
10.7639
88.37
8.21
0.0000
0.00
0.00
sf
10.7639
5.89
0.55
m2
m2
m2
m2
m2
sf
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
10.7639
8.24
20.60
25.75
36.05
35.35
0.77
1.91
2.39
3.35
3.28
sf
sf
ft
10.7639
10.7639
3.2808
17.67
117.83
11.78
1.64
10.95
3.59
Damproofing
m2
sf
10.7639
5.89
0.55
m3
m2
m2
m2
m2
m2
m2
m2
m2
cy
sf
sf
sf
sf
sf
sf
sf
sf
1.3080
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
77.25
16.48
21.63
17.51
28.33
10.30
16.48
24.72
32.96
59.06
1.53
2.01
1.63
2.63
0.96
1.53
2.30
3.06
m2
m2
sf
sf
10.7639
10.7639
14.42
17.51
1.34
1.63
Asphalt Shingles
Asphalt Shingles
Cedar Shingles
Slate Shingles
Baked Enamel Steel Siding
Baked Enamel Auminum Siding
m2
m2
m2
m2
m2
m2
sf
sf
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
11.78
15.45
51.50
118.45
87.55
103.00
1.09
1.44
4.78
11.00
8.13
9.57
Page No 8 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
75000
75100
75400
76000
76100
76200
79000
80000
81000
82000
83000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Fascia110
Fascia120
Sandwich110
Sandwick120
7400050
7400060
7400070
7400080
m2
m2
m2
m2
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
113.30
118.45
123.60
139.05
10.53
11.00
11.48
12.92
Roof110
Roof120
Roof130
Roof140
Roof150
7500010
7500020
7500030
7500040
7500050
m2
m2
kg
t
m2
sf
sf
lb
ton
sf
10.7639
10.7639
2.2046
1.1023
10.7639
3.61
3.09
0.88
82.40
51.50
0.33
0.29
0.40
74.75
4.78
Roof160
Roof170
7500060
7500070
m2
m2
sf
sf
10.7639
10.7639
30.90
33.99
2.87
3.16
m2
sf
10.7639
412.00
38.28
m2
sf
10.7639
66.95
6.22
ft
ft
ft
ft
ft
0.0000
3.2808
3.2808
3.2808
3.2808
3.2808
0.00
7.93
5.67
4.53
11.33
5.67
0.00
2.42
1.73
1.38
3.45
1.73
0.0000
0.00
0.00
Membrane Roofing
Built Up Roofing
15/09/2007 5:37:14 PM
** Joint Sealing **
Rout & Fill Cracks or Joints in Concrete Pavement
m
Sawcutting & Sealing Joints in Concrete Pavement
m
Resealing of Joints & Sealing or Resealing of Cracks in Concr m
Sawcut and Seal Asphalt
m
Sawcutting & Sealing Joints in Asphalt Pavement
m
** Doors & Windows **
Steel Door & Frame
Aluminum Door & Frame
ea
ea
ea
ea
1.0000
1.0000
463.50
1,030.00
463.50
1,030.00
ea
ea
1.0000
360.50
360.50
sf
sf
sf
ea
10.7639
10.7639
10.7639
1.0000
206.00
309.00
412.00
25,500.00
19.14
28.71
38.28
25,500.00
Page No 9 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
84000
85000
Description
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
ServiceBayDoo8300050
ea
1.0000
25,500.00
25,500.00
Storefront110
Storefront120
Storefront130
Storefront140
Storefront150
8400010
8400020
8400030
8400040
8400050
m2
m2
ea
ea
ea
sf
sf
ea
ea
ea
10.7639
10.7639
1.0000
1.0000
1.0000
113.30
144.20
8,240.00
12,360.00
51,500.00
10.53
13.40
8,240.00
12,360.00
51,500.00
Window110
Window120
Window130
8500010
8500020
8500030
m2
m2
m2
sf
sf
sf
10.7639
10.7639
10.7639
123.60
154.50
175.10
11.48
14.35
16.27
Skylight10
8600010
Skylights
m2
sf
10.7639
772.50
71.77
Hardware110
Hardware120
Hardware130
Hardware140
Hardware150
Hardware160
8710010
8710020
8710030
8710040
8710050
8710060
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
15.45
49.44
51.50
180.25
206.00
309.00
15.45
49.44
51.50
180.25
206.00
309.00
Glazing110
Glazing120
Glazing130
Glazing140
8800010
8800020
8800030
8800040
Sheet Glass
Float Glass
Insulated Glass
Wired Glass
m2
m2
m2
m2
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
87.55
180.25
247.20
283.25
8.13
16.75
22.97
26.31
CurtainWall1108900010
CurtainWall1208900020
CurtainWall1508900050
CurtainWall1608900060
m2
m2
m2
m2
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
324.45
412.00
515.00
1,030.00
30.14
38.28
47.85
95.69
Finishing
9000000
** Interior Finish **
0.0000
0.00
0.00
Wall10
9100010
m2
sf
10.7639
11.78
1.09
Furring110
Lath110
Plaster110
9200010
9210010
9210030
m
m2
m2
ft
sf
sf
3.2808
10.7639
10.7639
4.12
15.45
30.90
1.26
1.44
2.87
Windows
87000
Hardware
90000
Sequence
Storefronts
Skylights
89000
Code
Site Facilities
86000
88000
Subcontract Description
Glazing
Curtainwall
Interior Finishing
91000
92000
Wall Finish
15/09/2007 5:37:14 PM
Page No 10 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
93000
Description
95000
Ceilings
99000
99500
100000
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Plaster120
Drywall110
Wall30
9210040
9210050
9260010
m2
m2
m2
sf
sf
sf
10.7639
10.7639
10.7639
82.40
15.45
42.42
7.66
1.44
3.94
Tile110
Tile120
Tile130
Tile140
Tile150
9300010
9300020
9300030
9300040
9300050
m2
m2
m2
m2
m
sf
sf
sf
sf
ft
10.7639
10.7639
10.7639
10.7639
3.2808
92.70
103.00
133.90
515.00
36.05
8.61
9.57
12.44
47.85
10.99
Terrazzo10
9400010
Terrazzo
m2
sf
10.7639
206.00
19.14
Ceiling110
Ceiling120
9500010
9500020
m2
m2
sf
sf
10.7639
10.7639
30.90
72.10
2.87
6.70
WoodFloor110 9550010
WoodFloor120 9550020
WoodFloor130 9550030
m2
m2
m2
sf
sf
sf
10.7639
10.7639
10.7639
77.25
123.60
133.90
7.18
11.48
12.44
ResilientFloor1 9650010
ResilientFloor1 9650020
ResilientFloor1 9650030
ResilientFloor1 9650040
Carpet110
9680010
Carpet120
9680020
Carpet130
9680030
m2
m2
m2
m2
m2
m2
m2
sf
sf
sf
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
25.75
41.20
46.35
82.40
30.90
46.35
61.80
2.39
3.83
4.31
7.66
2.87
4.31
5.74
Paint110
Paint120
9900010
9900020
m2
m2
sf
sf
10.7639
10.7639
8.24
10.30
0.77
0.96
WallCover10
9950010
Wall Covering
m2
sf
10.7639
22.66
2.11
Special110
Special120
Special130
Special140
Special150
Special160
10110010
10130010
10145010
10150010
10260010
10270010
Chaulkboards
Tackboards
Aluminum Trim
Toilet Compartments
Wall & Corner Guards
Access Flooring
m2
m2
m
ea
m
m2
sf
sf
ft
ea
ft
sf
10.7639
10.7639
3.2808
1.0000
3.2808
10.7639
92.70
77.25
10.30
721.00
103.00
257.50
8.61
7.18
3.14
721.00
31.39
23.92
Tile
Terrazzo
96000
Code
Site Facilities
94000
95500
Subcontract Description
Wood Flooring
Flooring
Painting
Wall Covering
Specialties
15/09/2007 5:37:14 PM
Page No 11 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
110000
140000
200000
210000
211100
211300
211900
212000
213000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Special170
Special180
Special190
Special200
10350010
10505010
10615010
10652010
Flagpoles
Lockers
Demountable Drywall Partitions
Folding Partitions
ea
ea
m2
m2
ea
ea
sf
sf
1.0000
1.0000
10.7639
10.7639
2,060.00
206.00
257.50
772.50
2,060.00
206.00
23.92
71.77
Load110
Load120
11160010
11160020
Dock Levellers
Protective Bumpers
ea
ea
ea
ea
1.0000
1.0000
6,180.00
133.90
6,180.00
133.90
Elevator110
Escalator110
Walkway110
14210010
14310010
14320010
ea
ea
m
ea
ea
ft
1.0000
1.0000
3.2808
386,250.00
180,250.00
10,300.00
386,250.00
180,250.00
3,139.44
Mechanical
Mech10
20000000
20000010
** Mechancial **
Sub Mechancial
LS
LS
LS
LS
1.0000
1.0000
0.00
0.00
0.00
0.00
PipeSteel110
PipeSteel120
PipeSteel130
PipeSteel140
PipeSteel150
PipeSteel160
21110010
21110020
21110030
21110040
21110050
21110050
m
m
m
m
m
m
ft
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
82.40
139.05
211.15
185.40
283.25
592.25
25.12
42.38
64.36
56.51
86.33
180.52
CopperPipe11021130010
CopperPipe12021130020
CopperPipe13021130030
m
m
m
ft
ft
ft
3.2808
3.2808
3.2808
41.20
56.65
118.45
12.56
17.27
36.10
CastIronPipe1121190010
CastIronPipe1221190020
CastIronPipe1321190030
m
m
m
ft
ft
ft
3.2808
3.2808
3.2808
103.00
293.55
463.50
31.39
89.47
141.27
Valve110
Valve120
Valve130
Valve140
Valve150
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1.0000
51.50
82.40
164.80
515.00
1,442.00
51.50
82.40
164.80
515.00
1,442.00
ft
3.2808
18.54
5.65
Equip. Installations
Conveying Systems
Mechanical
Mechanical Piping
Steel Pipe
Copper Pipe
Iron Pipe
Valves
21210010
21210020
21210030
21210040
21210050
Pipe Insulation
InsulatePipe11 21310010
15/09/2007 5:37:14 PM
Page No 12 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
230000
235200
260000
261000
263000
311000
311200
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
InsulatePipe12 21310020
InsulatePipe13 21310030
InsulatePipe14 21310040
InsulatePipe15 21310050
m
m
m
m
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
22.66
27.81
39.14
51.50
6.91
8.48
11.93
15.70
Boiler110
Boiler120
Boiler130
Boiler140
23520010
23520020
23520030
23520040
97 kw (10hsp) Boiler
193 kw (20hsp) Boiler
774 kw (80hsp) Boiler
1210 kw (125hsp) Boiler
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
17,510.00
20,600.00
41,200.00
51,500.00
17,510.00
20,600.00
41,200.00
51,500.00
Electrical
26000000
** Building Electrical **
LS
LS
1.0000
0.00
0.00
Conduit110
Conduit120
Conduit130
Conduit140
Conduit150
ElecFitting110
ElecFitting120
ElecFitting130
ElecFitting140
ElecFitting150
Conductor110
Conductor120
Conductor130
Conductor140
26100010
26100020
26100030
26100040
26100050
26100060
26100070
26100080
26100090
26100100
26100110
26100120
26100130
26100140
m
m
m
m
m
m
m
m
m
m
m
m
m
m
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
15.45
25.75
51.50
139.05
180.25
10.30
51.50
103.00
206.00
309.00
5.15
15.45
30.90
51.50
4.71
7.85
15.70
42.38
54.94
3.14
15.70
31.39
62.79
94.18
1.57
4.71
9.42
15.70
Transformer11026100150
Transformer12026100160
Transformer13026100170
30 kva Transformer
300 kva Transformer
750 kva Transformer
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
3,090.00
17,510.00
51,500.00
3,090.00
17,510.00
51,500.00
ClearGrub1
Clear10
Clear20
Grub10
Grub20
ha
ea
ha
ea
acre
ea
acre
ea
0.0000
2.4710
1.0000
2.4710
1.0000
0.00
14,139.84
589.16
7,069.92
235.66
0.00
5,722.21
589.16
2,861.11
235.66
HVACs
Boilers
Electrical
Electrical Wiring
Electrical Equipment
Site Preparation
Clearing & Grubbing
15/09/2007 5:37:14 PM
31120000
31120010
31120020
31120030
31120040
Page No 13 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
312000
312200
312300
312500
312700
312000
312100
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
ClearGrub10
311500
Sequence
31120050
ha
acre
2.4710
17,674.80
7,152.77
Hazardous110 31152010
ton
1.1023
150.00
136.08
Excavation
Dumpfee10
Haul10
31220000
31220010
31230050
** Earthwork **
Disposal Fee
Haul Offsite (1 hr round trip)
m3
m3
cy
cy
0.0000
1.3080
1.3080
0.00
3.40
0.00
0.00
2.60
0.00
Grade10
Grade20
31220010
31220020
Grade Sub-base
Grade Site
m2
m2
sf
sf
10.7639
10.7639
1.08
1.18
0.10
0.11
Excavate05
Excavate10
Excavate20
Excavate40
31230025
31230030
31230035
31230040
Stripping
Bulk Excavation
Structural Excavation
Tenching Including Backfill
m3
m3
m3
m
cy
cy
cy
ft
1.3080
1.3080
1.3080
3.2808
0.00
3.53
10.30
17.51
0.00
2.70
7.87
5.34
Erosion110
Erosion120
Erosion130
Erosion140
31250010
31250020
31250030
31250040
m2
m2
m2
m3
sf
sf
sf
cy
10.7639
10.7639
10.7639
1.3080
2.27
2.36
77.25
231.75
0.21
0.22
7.18
177.19
StructuralExc1031270020
Backfill10
31270030
Backfill20
31270040
Backfill30
31270050
Footing Excavation
Native Backfill
Granular Backfill
Crushed Backfill
m3
m3
m3
m3
cy
cy
cy
cy
1.3080
1.3080
1.3080
1.3080
10.30
10.30
27.81
41.20
7.87
7.87
21.26
31.50
Remove95
Demolish10
30210100
30250010
ea
m3
ea
cy
1.0000
1.3080
3,965.50
10.60
3,965.50
8.11
Removals
SiteRemoval
Remove10
Remove20
Remove30
Remove40
Remove50
Remove60
Remove70
30210000
30210000
30210010
30210020
30210030
30210040
30210050
30210060
30210070
** Removals **
** Site Removals **
Removal of Fence
Removal of Chainlink Fence
Removal of Delineator Posts
Removal of Cable Guide Rail
Removal of Anchor Blocks
Removal of Steel Beam Guide Rail
Removal of Steel Box Beam Barrier
ft
ft
ea
ft
ea
ft
ft
0.0000
0.0000
3.2808
3.2808
1.0000
3.2808
1.0000
3.2808
3.2808
0.00
0.00
3.54
9.43
5.89
5.89
176.75
17.67
29.46
0.00
0.00
1.08
2.87
5.89
1.80
176.75
5.39
8.98
Environmental
Earthwork
Grading
Excavation
Erosion Control
Structural Excavation
Removals
Site Removals
15/09/2007 5:37:14 PM
m
m
ea
m
ea
m
m
Page No 14 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
312210
312220
312230
312280
312400
312700
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Remove80
Remove90
312200
Sequence
30210080
30210090
ea
m
ea
ft
1.0000
3.2808
1,767.48
47.13
1,767.48
14.37
** Pavement Removals **
Mobilization for Asphalt Removal
ea
ea
0.0000
1.0000
0.00
1,699.50
0.00
1,699.50
m2
sf
10.7639
0.47
0.04
m2
m2
sf
sf
10.7639
10.7639
3.54
2.27
0.33
0.21
m
m
m
m2
m2
m2
t
m2
m2
t
ft
ft
ft
sf
sf
sf
ton
sf
sf
ton
3.2808
3.2808
3.2808
10.7639
10.7639
10.7639
1.1023
10.7639
10.7639
1.1023
1.13
1.13
7.93
5.89
2.04
2.36
2.36
2.83
5.67
7.07
0.35
0.35
2.42
0.55
0.19
0.22
2.14
0.26
0.53
6.41
m2
m2
t
sf
sf
ton
10.7639
10.7639
1.1023
4.00
6.00
4.00
0.37
0.56
3.63
** Structure Removals **
Scarifying Concrete Deck
Scarify Bridge Deck
Bridge Demolition
m2
m2
LS
sf
sf
LS
0.0000
10.7639
10.7639
1.0000
0.00
4.53
28.33
58,916.00
0.00
0.42
2.63
58,916.00
m
m
m
m
m
m
ft
ft
ft
ft
ft
ft
0.0000
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
0.00
1.18
1.54
1.85
2.47
2.78
3.09
0.00
0.36
0.47
0.56
0.75
0.85
0.94
Pavement Removals
PavementRem 30221000
Remove100 30221010
Full Depth Asphalt Removal
Remove110 30221010
Pulverize Asphalt
Pulverize10
30222010
Pulverize20
30222020
Grind Asphalt
Grind100
30223010
Grind110
30223020
Grind120
30223030
Grind200
30223040
Grind210
30223050
Grind220
30223060
Grind230
30223070
Grind240
30223080
Grind250
30223090
Grind260
30223100
Mill Concrete Pavement
MillConcrete11 30228100
MillConcrete12 30228200
MillConcrete13 30228300
Structural Concrete Removals
StructureRemo 30240000
Scarify
30240010
ScarifyDeck
30240020
Demolish20
30240050
Cutting & Coring
CoreDrill
30270000
Saw10
30271010
Saw20
30271020
Saw30
30271030
Saw40
30271040
Saw50
30271050
Saw60
30271060
15/09/2007 5:37:14 PM
Page No 15 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
312100
313900
314000
314100
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Saw70
Saw80
Saw90
Cut10
Cut20
Core10
Core20
Core30
30271070
30271080
30271085
30271090
30271100
30272010
30272020
30272030
m
m
Load
ea
m
ea
ea
ea
ft
ft
Load
ea
ft
ea
ea
ea
3.2808
3.2808
1.0000
1.0000
3.2808
1.0000
1.0000
1.0000
3.41
3.71
347.60
5.89
28.33
57.27
101.97
1.59
1.04
1.13
347.60
5.89
8.63
57.27
101.97
1.59
Dewater
WellPoints05
WellPoints10
Wick10
31210000
31210005
31210010
31210020
** Dewatering **
Well Point Dewatering-first montrh
Well Point Dewatering-subsequent months
Supply & Install Wick Drains
Month
Month
m
Month
Month
ft
0.0000
1.0000
1.0000
3.2808
0.00
82,400.00
47,132.80
2.83
0.00
82,400.00
47,132.80
0.86
Rock
DrillBlast60
DrillBlast70
DrillBlast80
DrillBlast100
DrillBlast110
DrillBlast115
DrillBlast120
DrillBlast130
DrillBlast140
DrillBlast150
DrillBlast160
DrillBlast170
DrillBlast175
DrillBlast180
DrillBlast185
Haul-Rock
31390000
31390010
31390015
31390020
31390030
31390040
31390045
31390050
31390060
31390070
31390080
31390090
31390100
31390110
31390120
31390130
31390140
** Rock Excavation **
Drill Rock Face Softrock (900mm c-c)
Drill Rock Face (750mm c-c)
Drill Rock Face (600mm c-c)
Drill Blast Quarry Rock (Limestone)
Drill Blast Quarry Rock (Silica)
Drill Blast Soft Rock
Drill Blast Mass Rock
Drill Blast Grade Rock
Drill Blast Channel Rock
Drill Blast Sliver Rock
Drill Blast Road Rock
Drill Blast Ditch Rock
Drill Blast Trench Rock
Drill Blast Structural Rock
Drill Blast Electrical Rock
Haul Rockfill
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m
m3
m3
m3
t
sf
sf
sf
cy
cy
cy
cy
cy
cy
cy
cy
ft
cy
cy
cy
ton
0.0000
10.7639
10.7639
10.7639
1.3080
1.3080
1.3080
1.3080
1.3080
1.3080
1.3080
1.3080
3.2808
1.3080
1.3080
1.3080
1.1023
0.00
10.00
30.00
40.00
1.47
2.65
3.60
4.53
10.02
11.33
22.66
33.99
47.13
88.37
117.83
117.83
2.83
0.00
0.93
2.79
3.72
1.13
2.03
2.75
3.47
7.66
8.66
17.32
25.99
14.37
67.57
90.09
90.09
2.57
Shoring
31410000
** Shoring **
0.0000
0.00
0.00
Shotcrete10
Shore10
Shore20
Shore30
31410005
31410010
31410020
31410030
Sub Shotcrete
Shotcrete & Soil Nails
Soldier Piles & Lagging
Sheetpile Shoring
1.3080
10.7639
10.7639
10.7639
396.55
235.66
294.58
324.04
303.18
21.89
27.37
30.10
Dewatering
Rock Excavation
Shoring
Shore Excavations
15/09/2007 5:37:14 PM
m3
m2
m2
m2
cy
sf
sf
sf
Page No 16 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
13000
314200
Site Facilities
Soil Anchors
316000
316400
316500
Subcontract Description
Code
Sequence
Description
Metric
Unit
Anchor10
31420010
Piling
31640000
** Piling **
Piles10
Piles20
31640010
31640020
Pipe Piles
H-Piles
m
m
Auger510
31650010
Auger512
Auger513
Auger514
Auger515
31651010
31651020
31651030
31651040
Auger522
Auger524
Auger526
Auger528
Caissons
Imperial Conversion
Unit
Factor
ft
Metric Rate
Imperial Rate
3.2808
117.83
35.92
0.0000
0.00
0.00
ft
ft
3.2808
3.2808
141.40
164.80
43.10
50.23
ea
ea
1.0000
17,674.80
17,674.80
m
m
m
ea
ft
ft
ft
ea
3.2808
3.2808
3.2808
1.0000
235.66
0.00
1,060.49
6,598.59
71.83
0.00
323.24
6,598.59
31652010
31652020
31652030
31652040
m
m
m
m
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
706.99
793.10
849.75
906.40
215.49
241.74
259.00
276.27
31660000
** Caissons **
0.0000
0.00
0.00
31661010
31661020
31661030
31661040
31661050
31661060
31661070
31661080
m
m
m
m
m
m
m
m
ft
ft
ft
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
1,246.30
1,413.98
1,531.82
1,649.65
1,885.31
2,356.64
2,719.20
3,172.40
379.87
430.98
466.90
502.81
574.64
718.30
828.81
966.95
31662010
31662020
31662030
31662040
31662050
31662060
31662070
ft
ft
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
0.00
2,120.98
2,238.81
2,356.64
2,592.30
3,059.10
3,512.30
0.00
646.47
682.39
718.30
790.13
932.41
1,070.55
Drive Piles
Bore Holes
316600
Caissons
15/09/2007 5:37:14 PM
Page No 17 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
13000
317000
317700
Site Facilities
Tunneling & Boring
Bore & Jack
321100
321110
Aggregate Base
Process Aggregate
Subcontract Description
Code
JackBore10
321120
321130
321200
321200
Sequence
31770010
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
ft
3.2808
1,133.00
345.34
ProcessAggreg32111000
Screen10
32111010
Screen20
32111020
Crush10
32111030
Crush20
32111040
** Process Aggregates **
Screen Granular
Screen Granular
Crushed Granular
Crush Rap
t
t
t
t
ton
ton
ton
ton
0.0000
1.1023
1.1023
1.1023
1.1023
0.00
0.59
0.57
1.98
3.40
0.00
0.53
0.51
1.80
3.08
Gran20
Gran30
Gran50
Gran60
32112010
32112020
32112030
32112040
t
t
t
t
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
3.54
3.54
4.71
7.07
3.21
3.21
4.28
6.41
Gran10
32113010
Granular Base
ton
1.1023
11.79
10.69
Asphalt
32121100
** Asphalt **
0.0000
0.00
0.00
Asphalt110
Asphalt120
Asphalt130
Asphalt140
Asphalt150
HL1
HL1-M
HL2
HL3
HL4
HL4-M
HL8
32121110
32121120
32121130
32121140
32121150
32121410
32121420
32121430
32121440
32121450
32121460
32121470
t
t
t
t
t
t
t
t
t
t
t
t
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
58.92
67.98
53.02
58.92
50.99
73.65
62.32
79.31
56.65
50.99
50.99
50.99
53.45
61.67
48.10
53.45
46.25
66.81
56.53
71.95
51.39
46.25
46.25
46.25
Superpave10 32121210
Superpave20 32121220
Superpave30 32121230
t
t
t
ton
ton
ton
1.1023
1.1023
1.1023
67.98
62.32
67.98
61.67
56.53
61.67
SMA100
ton
1.1023
73.65
66.81
Haul Aggregate
Place Aggregates
Asphalt Paving
Asphalt Paving
15/09/2007 5:37:14 PM
32121310
Page No 18 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
321210
Description
Subcontract Description
Code
Sequence
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Asphalt Paving
Asphalt110
Asphalt120
Asphalt130
Asphalt140
Asphalt150
HL1
HL1-M
HL2
HL3
HL4
HL4-M
HL8
32121110
32121120
32121130
32121140
32121150
32121410
32121420
32121430
32121440
32121450
32121460
32121470
t
t
t
t
t
t
t
t
t
t
t
t
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
58.92
67.98
53.02
58.92
50.99
73.65
62.32
79.31
56.65
50.99
50.99
50.99
53.45
61.67
48.10
53.45
46.25
66.81
56.53
71.95
51.39
46.25
46.25
46.25
Superpave10 32121210
Superpave20 32121220
Superpave30 32121230
t
t
t
ton
ton
ton
1.1023
1.1023
1.1023
67.98
62.32
67.98
61.67
56.53
61.67
SMA100
32121310
ton
1.1023
73.65
66.81
HaulAC10
HaulAC20
32123010
32123020
ea
t
ea
ton
1.0000
1.1023
1,302.95
39.66
1,302.95
35.97
TempAsphalt1032124010
TempAsphalt2032124020
TempAsphalt3032124030
TempAsphalt4032124040
m2
t
t
t
sf
ton
ton
ton
10.7639
1.1023
1.1023
1.1023
14.73
76.59
76.59
90.64
1.37
69.48
69.48
82.23
Rap110
Rap120
Rap130
t
t
t
ton
ton
ton
1.1023
1.1023
1.1023
1.77
2.36
2.95
1.60
2.14
2.67
AsphaltHand1032126010
AsphaltHand2032126020
AsphaltHand3032126030
AsphaltHand4032126040
t
t
t
m2
ton
ton
ton
sf
1.1023
1.1023
1.1023
10.7639
88.37
88.37
88.37
181.28
80.17
80.17
80.17
16.84
TackCoat
** Tack Coat **
0.0000
0.00
0.00
321240
321250
321260
321260
Temporary Asphalt
Rap Processing
32125010
32125020
32125030
Asphalt Handwork
Tack Coating
15/09/2007 5:37:14 PM
32127000
Page No 19 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
Subcontract Description
Code
Sequence
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
13000
Site Facilities
321261 Tack Coat per m2
TackCoat10
32127010
Tack Coat
m2
sf
10.7639
0.29
0.03
TackCoat20
PrimeCoat30
32127020
32127030
Tack Coat
Prime Coat
litre
litre
gal
gal
0.2642
0.2642
0.65
0.77
2.45
2.90
AsphaltSpillway32128010
AsphaltSpillway32128020
Asphalt Spillways
Asphalt Gutter Outlets
m
ea
ft
ea
3.2808
1.0000
17.67
28.33
5.39
28.33
AsphaltSeal10 32129010
AsphaltSeal20 32129020
m2
m2
sf
sf
10.7639
10.7639
2.36
1.18
0.22
0.11
Asphalt
32121100
** Asphalt **
0.0000
0.00
0.00
Asphalt110
Asphalt120
Asphalt130
Asphalt140
Asphalt150
HL1
HL1-M
HL2
HL3
HL4
HL4-M
HL8
32121110
32121120
32121130
32121140
32121150
32121410
32121420
32121430
32121440
32121450
32121460
32121470
t
t
t
t
t
t
t
t
t
t
t
t
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
58.92
67.98
53.02
58.92
50.99
73.65
62.32
79.31
56.65
50.99
50.99
50.99
53.45
61.67
48.10
53.45
46.25
66.81
56.53
71.95
51.39
46.25
46.25
46.25
Superpave10 32121210
Superpave20 32121220
Superpave30 32121230
t
t
t
ton
ton
ton
1.1023
1.1023
1.1023
67.98
62.32
67.98
61.67
56.53
61.67
SMA100
32121310
ton
1.1023
73.65
66.81
Asphalt110
Asphalt120
Asphalt130
Asphalt140
Asphalt150
32121110
32121120
32121130
32121140
32121150
t
t
t
t
t
ton
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
1.1023
58.92
67.98
53.02
58.92
50.99
53.45
61.67
48.10
53.45
46.25
321270
321280
321210
321200
Asphalt Spillways
Asphalt Sealing
Asphalt Paving
Asphalt Paving
Asphalt Paving
15/09/2007 5:37:14 PM
Page No 20 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Metric
Unit
Description
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
HL1
HL1-M
HL2
HL3
HL4
HL4-M
HL8
32121410
32121420
32121430
32121440
32121450
32121460
32121470
t
t
t
t
t
t
t
ton
ton
ton
ton
ton
ton
ton
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
1.1023
73.65
62.32
79.31
56.65
50.99
50.99
50.99
66.81
56.53
71.95
51.39
46.25
46.25
46.25
Superpave10 32121210
Superpave20 32121220
Superpave30 32121230
t
t
t
ton
ton
ton
1.1023
1.1023
1.1023
67.98
62.32
67.98
61.67
56.53
61.67
SMA100
32121310
ton
1.1023
73.65
66.81
HaulAC10
HaulAC20
32123010
32123020
ea
t
ea
ton
1.0000
1.1023
1,302.95
39.66
1,302.95
35.97
TempAsphalt1032124010
TempAsphalt2032124020
TempAsphalt3032124030
TempAsphalt4032124040
m2
t
t
t
sf
ton
ton
ton
10.7639
1.1023
1.1023
1.1023
14.73
76.59
76.59
90.64
1.37
69.48
69.48
82.23
Rap110
Rap120
Rap130
t
t
t
ton
ton
ton
1.1023
1.1023
1.1023
1.77
2.36
2.95
1.60
2.14
2.67
AsphaltHand1032126010
AsphaltHand2032126020
AsphaltHand3032126030
AsphaltHand4032126040
t
t
t
m2
ton
ton
ton
sf
1.1023
1.1023
1.1023
10.7639
88.37
88.37
88.37
181.28
80.17
80.17
80.17
16.84
TackCoat
32127000
** Tack Coat **
0.0000
0.00
0.00
TackCoat10
32127010
Tack Coat
m2
sf
10.7639
0.29
0.03
TackCoat20
PrimeCoat30
32127020
32127030
Tack Coat
Prime Coat
litre
litre
gal
gal
0.2642
0.2642
0.65
0.77
2.45
2.90
321240
321250
321260
321260
Temporary Asphalt
Rap Processing
32125010
32125020
32125030
Asphalt Handwork
Tack Coating
321270
Asphalt Spillways
15/09/2007 5:37:14 PM
Page No 21 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
321280
321300
321310
321320
321400
321600
321610
Description
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
AsphaltSpillway32128010
AsphaltSpillway32128020
Asphalt Spillways
Asphalt Gutter Outlets
m
ea
ft
ea
3.2808
1.0000
17.67
28.33
5.39
28.33
AsphaltSeal10 32129010
AsphaltSeal20 32129020
m2
m2
sf
sf
10.7639
10.7639
2.36
1.18
0.22
0.11
ConcretePaving32131000
** Concrete Paving **
0.0000
0.00
0.00
ConcretePave132131010
ConcretePave132131020
ConcretePave132131030
ConcretePave132131040
m2
m2
m2
m2
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
69.52
101.97
271.92
906.40
6.46
9.47
25.26
84.21
ConcretePave232132010
ConcretePave232132020
m3
m3
cy
cy
1.3080
1.3080
88.37
114.30
67.57
87.39
Paver110
Paver120
32140010
32140020
m2
m2
sf
sf
10.7639
10.7639
58.92
100.16
5.47
9.30
Curb
Curb110
Curb120
Curb130
Curb140
Curb150
32161000
32161010
32161020
32161030
32161040
32161050
m
m
m
m
ea
ft
ft
ft
ft
ea
0.0000
3.2808
3.2808
3.2808
3.2808
1.0000
0.00
47.13
47.13
53.02
70.70
441.87
0.00
14.37
14.37
16.16
21.55
441.87
AsphaltCurb21 32162010
Asphalt Curb
ft
3.2808
11.78
3.59
Sidewalk
Sidewalk110
Sidewalk120
Sidewalk130
Sidewalk140
32164000
32164010
32164020
32164030
32164040
** Sidewalk **
Asphalt Sidewalk
Concrete Sidewalk
Concrete Slab Type Raised Median
Coloured Concrete Apron Strip
m2
m2
m2
m2
sf
sf
sf
sf
0.0000
10.7639
10.7639
10.7639
10.7639
0.00
5.89
41.24
41.24
141.40
0.00
0.55
3.83
3.83
13.14
32171000
** Pavement Markings **
0.0000
0.00
0.00
32171010
3.2808
5.10
1.55
Asphalt Sealing
Concrete Paving
Concrete Paving per m2
Unit Pavers
Asphalt Curb
321640
Sidewalks
321710
Code
Site Facilities
321620
321700
Subcontract Description
Pavement Marking
Striping
Durable Pavement Markings
Durable10
15/09/2007 5:37:14 PM
ft
Page No 22 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
321720
321730
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Durable20
32171020
ea
ea
1.0000
206.21
206.21
Paintline10
Paintline20
32172010
32172020
m
ea
ft
ea
3.2808
1.0000
1.18
147.29
0.36
147.29
Rumble Strip
ft
3.2808
1.18
0.36
m
m
m
ft
ft
ft
3.2808
3.2808
3.2808
3.24
3.12
14.16
0.99
0.95
4.32
ft
3.2808
13.60
4.14
ea
ea
1.0000
58.92
58.92
m
m
ea
m
ea
ft
ft
ea
ft
ea
3.2808
3.2808
1.0000
3.2808
1.0000
1.13
9.06
11.78
18.85
147.29
0.35
2.76
11.78
5.75
147.29
m2
sf
10.7639
4.71
0.44
0.0000
0.00
0.00
Rumble Strips
Rumble10
32173010
Obliterate Pavement Markings
Obliterate10 32174010
Obliterate20 32174020
Obliterate30 32174030
321750
Recessed Pavement Markings
Inlaid10
32175010
321760
Raised Pavement Markers
Raised10
32176010
321770
Temporary Pavement Markings
TempLine100 32177010
TempLine110 32177020
TempLine120 32177030
TempLine130 32177040
TempLine140 32177050
321780
Pavement Marking-Runways
RunwalLine10 32178010
323100
Fences & Gates
Fence
32311100
323110
Chainlink Fence
323111 Fence
ChanlinkFence 32311110
ChanlinkFence 32311130
ChanlinkFence 32311140
ChanlinkFence 32311160
ChanlinkFence 32311220
ChanlinkFence 32311250
ChanlinkFence 32311370
ChanlinkFence 32311380
323112 Gates
Gates
32311210
Fence34
32311220
Fence36
32311230
321740
15/09/2007 5:37:14 PM
** Fence **
ft
ft
ft
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
51.50
56.65
61.80
72.10
47.13
58.92
58.92
70.70
15.70
17.27
18.84
21.98
14.37
17.96
17.96
21.55
ea
ea
ea
1.0000
1.0000
1.0000
339.90
235.66
471.33
339.90
235.66
471.33
ea
ea
ea
Page No 23 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Fence38
Fence40
Fence42
32311240
32311250
32311260
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
706.99
942.66
1,413.98
706.99
942.66
1,413.98
Gates
Fence34
Fence36
Fence38
Fence40
Fence42
32311210
32311220
32311230
32311240
32311250
32311260
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
339.90
235.66
471.33
706.99
942.66
1,413.98
339.90
235.66
471.33
706.99
942.66
1,413.98
HighwayFence 32311190
ft
3.2808
17.67
5.39
Ornamental51032315010
ft
3.2808
147.29
44.89
32316010
32316020
Wooden Fence
Wooden Privacy Fence 5ft (1.5 m)
m
m
ft
ft
3.2808
3.2808
88.37
198.28
26.94
60.43
32317010
32317020
32317030
32317040
32317050
m2
m2
m
m
ea
sf
sf
ft
ft
ea
10.7639
10.7639
3.2808
3.2808
1.0000
11.78
11.78
17.00
90.64
176.75
1.09
1.09
5.18
27.63
176.75
32321000
** Earthwall ""
0.0000
0.00
0.00
32321010
32321020
32321030
32321040
m2
m2
m2
m2
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
154.50
589.16
668.47
526.85
14.35
54.73
62.10
48.95
32322010
m2
sf
10.7639
353.50
32.84
32323020
ea
ea
1.0000
147.29
147.29
32351000
32351010
** Noise Barrier **
Noise Barrier Wall
m2
sf
0.0000
10.7639
0.00
294.58
0.00
27.37
357710 Gates
323120
Highway Fence
323150
Ornamental Fence
323160
Wood Fence
323170
323200
323210
323220
323230
323500
323510
WoodFence10
WoodFence20
Fence Screens & Accessories
Fence710
Fence720
Fence730
Fence740
Fence750
Earth Walls
Earthwall
MSE Walls
MSE100
MSE130
MSE120
MSE110
Bin Walls
BinWall10
Durisol Walls
Durisol10
Screening Devices
Noise Barriers
NoiseBarrier
Noise110
15/09/2007 5:37:14 PM
Page No 24 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
328000
329000
Description
331110
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Noise115
Noise120
Noise125
Noise130
Noise135
Noise140
Noise145
Noise150
Noise155
Noise160
Noise165
32351020
32351030
32351040
32351050
32351060
32351070
32351080
32351090
32351100
32351110
32351120
ft
ea
ft
ft
ft
ft
ft
ft
ft
ft
ft
3.2808
1.0000
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
471.33
471.33
530.24
807.15
854.28
930.87
1,013.36
1,172.43
1,260.80
1,413.98
1,472.90
143.66
471.33
161.62
246.02
260.39
283.73
308.87
357.36
384.29
430.98
448.94
Sprinkler
Sprinkler10
32800000
32800010
** Sprinklers **
Sprinkler System Complete
ft
0.0000
3.2808
0.00
117.83
0.00
35.92
Landscaping
32910000
** Landscaping **
0.0000
0.00
0.00
Topsoil110
32910010
m3
cy
1.3080
26.78
20.47
Land40
Land50
Seed110
32920010
32920020
32920030
m2
m2
m2
sf
sf
sf
10.7639
10.7639
10.7639
3.24
4.12
0.41
0.30
0.38
0.04
Topsoil105
Seed120
ShrubBed
Plant110
Shrub110
Tree120
Tree125
Tree130
Tree135
Tree140
32910005
32920035
32930010
32930020
32930050
32930060
32930065
32930070
32930075
32930080
m3
m2
m2
ea
ea
ea
ea
ea
ea
ea
cy
sf
sf
ea
ea
ea
ea
ea
ea
ea
1.3080
10.7639
10.7639
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
8.24
0.57
22.66
11.33
41.20
206.00
515.00
471.33
875.50
566.50
6.30
0.05
2.11
11.33
41.20
206.00
515.00
471.33
875.50
566.50
Riparian10
32950010
Riparian Planting
m2
sf
10.7639
5.67
0.53
WaterSewer
33110000
0.0000
0.00
0.00
Landscaping
329200
331100
Sequence
Sprinkler System
Topsoil
329500
Code
Site Facilities
329100
329300
Subcontract Description
Riparian Planting
Watermain
Watermain Pipe
15/09/2007 5:37:14 PM
Page No 25 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
331130
332000
332100
333000
333100
334000
334200
334400
334600
334900
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
WM100
WM200
WM300
WM450
WM600
33110010
33110020
33110030
33110040
33110050
m
m
m
m
m
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
195.70
272.95
412.00
669.50
1,004.25
59.65
83.20
125.58
204.06
306.10
WM12
WM20
WM25
CurbStop20
CurbStop25
33110060
33110070
33110080
33110090
33110100
m
m
m
ea
ea
ft
ft
ft
ea
ea
3.2808
3.2808
3.2808
1.0000
1.0000
180.25
195.70
211.15
319.30
360.50
54.94
59.65
64.36
319.30
360.50
Steam100
Steam200
Steam300
33210110
33210120
33210130
m
m
m
ft
ft
ft
3.2808
3.2808
3.2808
1,030.00
1,596.50
2,678.00
313.94
486.61
816.25
CCTVSewer10 33113010
CleanSewer10 33300020
m
m
ft
ft
3.2808
3.2808
33.99
56.65
10.36
17.27
San10
33300010
Sanitary Sewers
ft
3.2808
147.29
44.89
Culvert110
Culvert120
Culvert130
Culvert140
Culvert200
33420010
33420020
33420030
33420040
33420050
m
m
m
m
m
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
154.50
180.25
206.00
412.00
824.00
47.09
54.94
62.79
125.58
251.16
Storm300
Storm450
Storm600
Storm750
Storm900
33440030
33440045
33440060
33440070
33440090
m
m
m
m
m
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
242.05
303.85
412.00
576.80
757.05
73.78
92.61
125.58
175.81
230.75
Subdrain100
Subdrain200
33460110
33460120
m
m
ft
ft
3.2808
3.2808
30.90
43.26
9.42
13.19
Water Services
Steam Distribution
Steam Pipe Buried
Sanitary Sewer
Storm Sewers
Subdrains
Drainage Structures
15/09/2007 5:37:14 PM
Page No 26 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
13000
Site Facilities
335000
335100
Pipeline
Station Piping
Subcontract Description
Code
Manhole100
Sequence
33490010
StationPiping 33511000
335110 Station Piping Fabrication
StationPipeFab33511010
StationPipeFab33511020
StationPipeFab33511030
335120 Station Steel Fabrication
StationSteelFa 33512010
StationSteelFa 33512020
StationSteelFa 33512030
335130 Station Haul Fabrication
StationHaul10 33513010
StationHaul20 33513020
StationHaul30 33513030
335140 Station Shop Coating
StationCoating 33514010
StationCoating233514020
StationCoating333514030
335160 Station Pile Driving
StationPiling10 33515010
StationPiling20 33515020
StationPiling30 33515030
335200
Directional Drilling
DirectionalDrill 33520000
DirectionalDrill433520010
335300
CRC
CRCGang10 33530010
CRCGang20 33530020
335400
Welding School
WeldSchool10 33540010
DitchBreaker1033550010
337000
Electrical Sitework
SiteElectrical 33710000
337100
Transmission & Distribution
Distribution100 33710010
Distribution200 33710020
15/09/2007 5:37:14 PM
Description
Manholes
Metric
Unit
ea
Imperial Conversion
Unit
Factor
ea
** Station Piping **
Metric Rate
Imperial Rate
1.0000
2,945.80
2,945.80
0.0000
0.00
0.00
LS
LS
LS
LS
LS
LS
1.0000
1.0000
1.0000
103,000.00
123,600.00
133,900.00
103,000.00
123,600.00
133,900.00
LS
LS
LS
LS
LS
LS
1.0000
1.0000
1.0000
41,200.00
51,500.00
61,800.00
41,200.00
51,500.00
61,800.00
LS
LS
LS
LS
LS
LS
1.0000
1.0000
1.0000
82,400.00
92,700.00
103,000.00
82,400.00
92,700.00
103,000.00
LS
LS
LS
LS
LS
LS
1.0000
1.0000
1.0000
10,300.00
20,600.00
30,900.00
10,300.00
20,600.00
30,900.00
Station Piling 1
Station Piling 2
Station Piling 3
LS
LS
LS
LS
LS
LS
1.0000
1.0000
1.0000
103,000.00
128,750.00
154,500.00
103,000.00
128,750.00
154,500.00
** Directional Drilling **
Directional Drilling 42" (1067mm)
ft
0.0000
3.2808
0.00
3,347.50
0.00
1,020.32
m
m
ft
ft
3.2808
3.2808
2.68
2.68
0.82
0.82
Welding School
Ditch Breaker Sub
m
m3
ft
CY
3.2808
1.3080
4.74
195.70
1.44
149.62
0.0000
0.00
0.00
1.0000
1.0000
31,157.50
28,325.00
31,157.50
28,325.00
** Site Electrical **
Distribution Assemblies
Modification of Power Supply Equipment
ea
LS
ea
LS
Page No 27 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Distribution300 33710030
Distribution400 33710040
ea
LS
1.0000
1.0000
0.00
23,793.00
0.00
23,793.00
33720000
33721010
33721020
33721030
33721040
33721050
33721060
** Buried Ducts **
Flexible Ducts
Flexible Ducts (Temporary)
Rigid Ducts, Direct Buried
Rigid Ducts, Direct Buried (Temporary)
Rigid Ducts by Subsurface Installation
Rigid Ducts, Steel Encased by Subsurface Installation
m
m
m
m
m
m
ft
ft
ft
ft
ft
ft
0.0000
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
0.00
22.66
29.46
33.99
33.99
113.30
339.90
0.00
6.91
8.98
10.36
10.36
34.53
103.60
33722010
ft
3.2808
169.95
51.80
33723010
ft
3.2808
84.98
25.90
33724010
33724020
m
m
ft
ft
3.2808
3.2808
67.98
283.25
20.72
86.33
33725010
LS
LS
1.0000
33,990.00
33,990.00
33726010
Innerducts
ft
3.2808
7.93
2.42
33730000
33730010
33730020
33730030
33730030
33730040
** Underground Structures **
Electrical Chamber Drains
Adjusting & Rebuilding Electrical Chambers
Electrical Handholes (Temporary)
Electrical Maintenance Holes
Electrical Handholes
m
ea
ea
ea
ea
ft
ea
ea
ea
ea
0.0000
3.2808
1.0000
1.0000
1.0000
1.0000
0.00
226.60
906.40
1,133.00
2,832.50
1,133.00
0.00
69.07
906.40
1,133.00
2,832.50
1,133.00
33741000
** Poles **
0.0000
0.00
0.00
33741010
33741030
ea
ea
ea
ea
1.0000
1.0000
1,133.00
11,330.00
1,133.00
11,330.00
33742010
33742020
33742030
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
339.90
623.15
0.00
339.90
623.15
0.00
337200
Ductbanks
337210 Direct Bury Ductbanks
337220
337230
337240
337250
337260
337300
337400
337410
337420
BuriedDucts
Duct100
Duct110
Duct120
Duct130
Duct140
Duct150
Concrete Encased Ductbanks
Duct200
Embedded Work in Structures
Duct300
Surface Mounted Ducts
Duct410
Duct420
Suspend Ducts
Duct700
Inner Ducts
Innerduct10
Underground Structures
Handhole
Handhole110
Handhole111
Handhole121
Handhole130
Handhole122
Utility Poles
Poles
Pole Foundations
PoleFdn10
PoleFdn20
Wood Poles
WoodPole10
WoodPole20
WoodPole30
15/09/2007 5:37:14 PM
Page No 28 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
13000
Site Facilities
337430 Concrete Poles
ConcretePole1 33743020
ea
ea
1.0000
1,416.25
1,416.25
SteelPole10
SteelPole20
SteelPole30
SteelPole40
33744010
33744020
33744030
33744040
Frangible Bases
Steel Poles, Base Mounted
Sectional Steel Poles, Direct Buried in Earth
Sectional Steel Poles, Base Mounted
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
396.55
1,246.30
1,416.25
2,379.30
396.55
1,246.30
1,416.25
2,379.30
HighMast10
33745010
ea
ea
1.0000
45,320.00
45,320.00
PoleBracket10 33746010
PoleBracket20 33746020
PoleBracket30 33746030
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
453.20
453.20
481.53
453.20
453.20
481.53
GuyAnchor10 33747010
GuyAnchor20 33747020
ea
ea
ea
ea
1.0000
1.0000
226.60
396.55
226.60
396.55
Lights
33751000
** Lights **
0.0000
0.00
0.00
Luminaire111
Luminaire112
Luminaire113
Luminaire114
Luminaire115
Luminaire116
Luminaire117
Luminaire118
33751010
33751020
33751030
33751040
33751050
33751060
33751070
33751080
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
56.65
96.31
566.50
566.50
793.10
793.10
1,246.30
2,832.50
56.65
96.31
566.50
566.50
793.10
793.10
1,246.30
2,832.50
Flasher120
Flasher122
Flasher124
Flasher126
33752010
33752020
33752030
33752040
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
339.90
339.90
849.75
934.73
339.90
339.90
849.75
934.73
Cable
Cable100
Cable110
Cable120
33761000
33761100
33761110
33761120
** Cable **
Coaxial Cables, in Ducts
Extra Low Voltage Cables, in Ducts
Low Voltage Cables, in Ducts (Temporary)
m
m
m
ft
ft
ft
0.0000
3.2808
3.2808
3.2808
0.00
2.27
2.27
2.83
0.00
0.69
0.69
0.86
337500
Site Lighting
337510 Luminaires
337520 Flashers
337600
Cables & Loop Detectors
337610 Low Voltage Cables
15/09/2007 5:37:14 PM
Page No 29 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Cable130
Cable140
Cable150
Cable160
Cable170
Cable180
Cable190
Cable200
Cable210
Cable220
Cable230
Cable240
Cable250
33761130
33761140
33761150
33761160
33761170
33761180
33761190
33761200
33761210
33761220
33761230
33761240
33761250
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.2808
3.40
3.40
5.10
5.67
6.23
6.80
7.93
9.35
22.66
23.79
24.93
28.33
28.33
1.04
1.04
1.55
1.73
1.90
2.07
2.42
2.85
6.91
7.25
7.60
8.63
8.63
Loop150
Loop
Loop100
Loop110
Loop120
Loop130
Loop140
Loop160
33761150
33762000
33762100
33762110
33762120
33762130
33762140
33762160
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
0.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1,133.00
0.00
135.96
368.23
736.45
849.75
906.40
1,869.45
1,133.00
0.00
135.96
368.23
736.45
849.75
906.40
1,869.45
Controllers
33771000
** Controllers **
0.0000
0.00
0.00
Controller10
33771040
ea
ea
1.0000
3,399.00
3,399.00
Traffic100
Traffic110
Traffic120
Traffic130
Traffic140
33772010
33772020
33772030
33772040
33772050
ea
ea
LS
LS
ea
1.0000
1.0000
1.0000
1.0000
1.0000
538.18
1,416.25
11,330.00
45,320.00
0.00
538.18
1,416.25
11,330.00
45,320.00
0.00
Cabinet10
Cabinet20
Cabinet30
Cabinet40
Cabinet50
33773010
33773020
33773030
33773040
33773050
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1.0000
3,399.00
7,364.50
7,364.50
7,364.50
7,364.50
3,399.00
7,364.50
7,364.50
7,364.50
7,364.50
337700
337710 Controllers
337720 Traffic Control
337730 Cabinets
15/09/2007 5:37:14 PM
ea
ea
ea
ea
ea
Page No 30 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
13000
Site Facilities
337740 Signal Heads
Signals
Signal100
Signal110
Signal120
Signal130
Signal140
Signal150
Signal160
33774000
33774010
33774020
33774030
33774040
33774050
33774060
33774070
** Signals **
Pedestrian Pushbuttons
Pedestrian Type Signal Heads (Temporary)
Pedestrian Type Signal Heads
Highway Type Signal Heads (Temporary)
Highway Type Signal Heads
Special Type Signal Heads (Temporary)
Special Type Signal Heads
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
0.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
0.00
113.30
481.53
481.53
764.78
764.78
934.73
934.73
0.00
113.30
481.53
481.53
764.78
764.78
934.73
934.73
33775010
33775020
33775030
33775040
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
481.53
1,416.25
3,399.00
3,399.00
481.53
1,416.25
3,399.00
3,399.00
33782000
33782010
33782020
33782030
33782040
** Grounding **
Ground Wires
Ground Wires (Temporary)
Ground Electrodes
Ground Electrodes (Temporary)
m
m
ea
ea
ft
ft
ea
ea
0.0000
3.2808
3.2808
1.0000
1.0000
0.00
2.27
2.27
90.64
113.30
0.00
0.69
0.69
90.64
113.30
33790000
33790010
33790020
33790030
33790040
33790050
33790060
33790070
33790080
33790090
** Video **
Outdoor Pan / Tilt Units (Temporary)
Outdoor Pan / Tilt Units
Closed Circuit Television Maintenance Sites
Fibre Optic Modems (Temporary)
Fibre Optic Modems
Outdoor Closed Circuit Television Cameras (Temporary)
Outdoor Closed Circuit Television Cameras
Video Transmitters and Receivers (Temporary)
Video Transmitters and Receivers
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
0.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
0.00
934.73
934.73
1,416.25
2,379.30
2,379.30
7,024.60
7,024.60
7,024.60
9,630.50
0.00
934.73
934.73
1,416.25
2,379.30
2,379.30
7,024.60
7,024.60
7,024.60
9,630.50
34110000
34110010
34110020
** Rail **
Haul Rail Ballast
Railway Flagman
t
Hour
ton
Hour
0.0000
1.1023
1.0000
0.00
8.25
70.70
0.00
7.48
70.70
34411100
** Signs **
0.0000
0.00
0.00
337800
337900
341100
344100
344110
Pad100
Pad110
Pad120
Pad130
Cathodic Protection & Grounding
Grounding
Ground100
Ground110
Ground120
Ground130
CCTV Cameras
Video
Video110
Video120
Video130
Video140
Video150
Video160
Video170
Video180
Video190
Railway Work
Rail
Rail110
Rail120
Traffic Signs/Control
Traffic Control Signs
Signs
15/09/2007 5:37:14 PM
Page No 31 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
13000
Site Facilities
344111 Post Mounted Signs
Sign120
Sign150
Sign110
Sign140
Sign130
34411110
34411120
34411130
34411150
34411160
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1.0000
84.98
368.23
56.65
198.28
169.95
84.98
368.23
56.65
198.28
169.95
ea
ea
ea
ea
1.0000
1.0000
2,266.00
3,399.00
2,266.00
3,399.00
** Detours **
Truck Mounted Attenator
Sub Two-Man Traffic Control Crew
Pay Duty Police c/w Car
Hour
Hour
Hour
Hour
Hour
Hour
0.0000
1.0000
1.0000
1.0000
0.00
88.37
96.31
96.31
0.00
88.37
96.31
96.31
** Barrier **
Temporary Concrete Barrier
Concrete Barrier - Type "A"
Temporary Concrete Barrier - Relocation
Tall Wall Barrier - Type "E"
Asymmetric Tall Wall Barrier - Type "E2"
m
m
m
m
m
ft
ft
ft
ft
ft
0.0000
3.2808
3.2808
3.2808
3.2808
3.2808
0.00
76.59
117.83
17.67
206.21
353.50
0.00
23.34
35.92
5.39
62.85
107.75
** Guiderail **
Single Rail Steel Beam Guide Rail
Single Rail Steel Beam Guide Rail c/w Channel
Steel Box Beam Median Barrier
Double Rail Steel Beam Guide Rail
Transition Rail Adjustment
Temporary Transition Rails
Temporary Transition Rails - Left-in-Place
m
m
m
m
ea
ea
ea
ft
ft
ft
ft
ea
ea
ea
0.0000
3.2808
3.2808
3.2808
3.2808
1.0000
1.0000
1.0000
0.00
82.48
106.05
176.75
294.58
2,651.22
2,651.22
3,240.38
0.00
25.14
32.32
53.87
89.79
2,651.22
2,651.22
3,240.38
m
m
ft
ft
3.2808
3.2808
11.33
16.50
3.45
5.03
** Attenuating Devices **
Anchor Blocks
Eccentric Loader
ea
ea
ea
ea
0.0000
1.0000
1.0000
0.00
648.08
2,945.80
0.00
648.08
2,945.80
344120
347100
347110
347120
347140
347150
SignStructure1 34411210
SignStructure2 34411220
Temporary Traffic Controls
Detour
34412000
Traffic210
34412010
Traffic220
34412020
Police100
34412030
Barriers & Guiderail
Concrete Barrier
Barrier
34711010
Barrier110
34711010
Barrier120
34711020
Barrier130
34711030
Barrier140
34711040
Barrier150
34711050
Metal Post Beam Guide Rail
Guiderail
34712000
Guiderail210 34712010
Guiderail220 34712020
Guiderail230 34712030
Guiderail240 34712040
Guiderail250 34712050
Guiderail260 34712060
Guiderail270 34712070
Post & Cable Guiderail
AdjustCGR
34714010
CableRail10 34714020
Impact Attenuating Devices
Attenuator
34715000
Attenuator710 34715010
Attenuator715 34715020
15/09/2007 5:37:14 PM
Page No 32 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
347160
357600
357700
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Attenuator720
Attenuator725
Attenuator730
Attenuator735
Attenuator740
Attenuator745
Attenuator750
Attenuator755
Attenuator760
Attenuator765
Attenuator770
Attenuator775
34715030
34715040
34715050
34715060
34715070
34715080
34715090
34715100
34715110
34715120
34715130
34715140
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
4,713.28
5,302.44
5,891.60
5,891.60
14,139.84
16,496.48
17,674.80
22,977.24
7,069.92
11,783.20
23,566.40
53,024.40
4,713.28
5,302.44
5,891.60
5,891.60
14,139.84
16,496.48
17,674.80
22,977.24
7,069.92
11,783.20
23,566.40
53,024.40
Reflector
Reflector10
GuidePost10
GuidePost20
GuidePost30
34716000
34716010
34716020
34716030
34716040
** Refectors **
Retro Reflectors
Delineator Posts
Temporary Flexible Guide Posts - Relocation
Temporary Flexible Guide Posts
ea
ea
ea
ea
ea
ea
ea
ea
0.0000
1.0000
1.0000
1.0000
1.0000
0.00
2.36
58.92
117.83
324.04
0.00
2.36
58.92
117.83
324.04
Hydro110
Penstock110
35700000
35760000
** Hydro Work **
** Penstocks **
0.0000
0.0000
0.00
0.00
0.00
0.00
Gates110
35770000
** Hydro Gates **
0.0000
0.00
0.00
Gates1100
Gates1110
Gates1115
Gates1130
Gates1135
Gates1140
Gates1145
Gates1150
Gates1155
Gates1160
35771100
35771110
35771115
35771130
35771135
35771140
35771145
35771150
35771155
35771160
lb
sf
sf
sf
sf
sf
sf
sf
sf
sf
2.2046
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
13.80
4,000.00
7,000.00
11,500.00
18,000.00
19,000.00
21,000.00
21,500.00
22,000.00
38,500.00
6.26
371.61
650.32
1,068.39
1,672.25
1,765.16
1,950.96
1,997.42
2,043.87
3,576.77
Guides1210
Gates1215
35771210
35771215
ft
sf
3.2808
10.7639
900.00
1,200.00
274.32
111.48
Penstocks
Hydro Gates
323112
Gates
357711 Gate Structure
15/09/2007 5:37:14 PM
m
m2
Page No 33 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Gates1220
Gates1225
35771220
35771225
sf
sf
10.7639
10.7639
2,100.00
2,400.00
195.10
222.97
Gates1100
Gates1110
Gates1115
Gates1130
Gates1135
Gates1140
Gates1145
Gates1150
Gates1155
Gates1160
35771100
35771110
35771115
35771130
35771135
35771140
35771145
35771150
35771155
35771160
lb
sf
sf
sf
sf
sf
sf
sf
sf
sf
2.2046
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
13.80
4,000.00
7,000.00
11,500.00
18,000.00
19,000.00
21,000.00
21,500.00
22,000.00
38,500.00
6.26
371.61
650.32
1,068.39
1,672.25
1,765.16
1,950.96
1,997.42
2,043.87
3,576.77
Guides1210
Gates1215
Gates1220
Gates1225
35771210
35771215
35771220
35771225
ft
sf
sf
sf
3.2808
10.7639
10.7639
10.7639
900.00
1,200.00
2,100.00
2,400.00
274.32
111.48
195.10
222.97
Gates1100
Gates1110
Gates1115
Gates1130
Gates1135
Gates1140
Gates1145
Gates1150
Gates1155
Gates1160
35771100
35771110
35771115
35771130
35771135
35771140
35771145
35771150
35771155
35771160
lb
sf
sf
sf
sf
sf
sf
sf
sf
sf
2.2046
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
13.80
4,000.00
7,000.00
11,500.00
18,000.00
19,000.00
21,000.00
21,500.00
22,000.00
38,500.00
6.26
371.61
650.32
1,068.39
1,672.25
1,765.16
1,950.96
1,997.42
2,043.87
3,576.77
Guides1210
Gates1215
Gates1220
Gates1225
35771210
35771215
35771220
35771225
ft
sf
sf
sf
3.2808
10.7639
10.7639
10.7639
900.00
1,200.00
2,100.00
2,400.00
274.32
111.48
195.10
222.97
Gates1100
Gates1110
35771100
35771110
lb
sf
2.2046
10.7639
13.80
4,000.00
6.26
371.61
357710
Gates
357711 Gate Structure
15/09/2007 5:37:14 PM
kg
m2
Page No 34 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Gates1115
Gates1130
Gates1135
Gates1140
Gates1145
Gates1150
Gates1155
Gates1160
35771115
35771130
35771135
35771140
35771145
35771150
35771155
35771160
sf
sf
sf
sf
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
7,000.00
11,500.00
18,000.00
19,000.00
21,000.00
21,500.00
22,000.00
38,500.00
650.32
1,068.39
1,672.25
1,765.16
1,950.96
1,997.42
2,043.87
3,576.77
Guides1210
Gates1215
Gates1220
Gates1225
35771210
35771215
35771220
35771225
ft
sf
sf
sf
3.2808
10.7639
10.7639
10.7639
900.00
1,200.00
2,100.00
2,400.00
274.32
111.48
195.10
222.97
Stoplog2100
Stoplog2110
Stoplog2115
Stoplog2120
Stoplog2130
Stoplog2135
Stoplog2140
Stoplog2145
35772100
35772110
35772115
35772120
35772130
35772135
35772140
35772145
lb
sf
sf
sf
sf
sf
sf
sf
2.2046
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
11.55
3,900.00
4,500.00
5,100.00
6,600.00
7,400.00
8,500.00
9,000.00
5.24
362.32
418.06
473.81
613.16
687.48
789.68
836.13
Stoplog2210
Stoplog2215
Stoplog2220
Stoplog2225
Stoplog2230
Stoplog2235
Stoplog2240
Stoplog2245
35772210
35772215
35772220
35772225
35772230
35772235
35772240
35772245
sf
sf
sf
sf
sf
sf
sf
Set
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
1.0000
470.00
890.00
940.00
960.00
1,200.00
1,380.00
1,975.00
63,000.00
43.66
82.68
87.33
89.19
111.48
128.21
183.48
63,000.00
Stoplog2100
Stoplog2110
Stoplog2115
Stoplog2120
Stoplog2130
35772100
35772110
35772115
35772120
35772130
lb
sf
sf
sf
sf
2.2046
10.7639
10.7639
10.7639
10.7639
11.55
3,900.00
4,500.00
5,100.00
6,600.00
5.24
362.32
418.06
473.81
613.16
357720
Stoplogs
357711 Gate Structure
15/09/2007 5:37:14 PM
Page No 35 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Stoplog2135
Stoplog2140
Stoplog2145
35772135
35772140
35772145
sf
sf
sf
10.7639
10.7639
10.7639
7,400.00
8,500.00
9,000.00
687.48
789.68
836.13
Stoplog2210
Stoplog2215
Stoplog2220
Stoplog2225
Stoplog2230
Stoplog2235
Stoplog2240
Stoplog2245
35772210
35772215
35772220
35772225
35772230
35772235
35772240
35772245
sf
sf
sf
sf
sf
sf
sf
Set
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
10.7639
1.0000
470.00
890.00
940.00
960.00
1,200.00
1,380.00
1,975.00
63,000.00
43.66
82.68
87.33
89.19
111.48
128.21
183.48
63,000.00
TrashRack311035773110
TrashRack311535773115
TrashRack312035773120
TrashRack312535773125
357732 Trashrack Embedded Parts
Trashrack3210 35773210
Trashrack3220 35773220
357733 Trashrack Accessories
Trashrack3310 35773310
Trashrack3320 35773320
357800
Hydro Hoisting Equipment
Hoist110
35780000
357810
Hydro Overhead Cranes
PHCrane1010 35781010
PHCrane1015 35781015
PHCrane1020 35781020
PHCrane1025 35781025
PHCrane1030 35781030
357820
Service Elevators
PHElevator201 35782010
PHElevator202 35782020
357830
Gate Hoists
GateHoist3010 35783010
GateHoist3015 35783015
Trash Racks
m2
Fine Trash Racks 6ea-(5m wide x approx 16m high)
m2
Trash Racks 8.6 m x 23.5 m head 41 m 70000kg/set 346kg/m2m2
Trash Racks 10.6 m x 23.5 m head 41 m 88000kg/set 371kg/mm2
sf
sf
sf
sf
10.7639
10.7639
10.7639
10.7639
2,200.00
3,500.00
5,050.00
5,400.00
204.39
325.16
469.16
501.68
sf
sf
10.7639
10.7639
500.00
520.00
46.45
48.31
ea
ea
1.0000
1.0000
10,800.00
305,000.00
10,800.00
305,000.00
0.0000
0.00
0.00
357730
Trashracks
357731 Trashrack Structure
15/09/2007 5:37:14 PM
** Hydro Hoists **
Overhead Crane (5 Tonne for Service & Assembly Area)
Powerhouse Crane 95/15 ton for 38.5 MW Francis Turbines
Powerhouse Crane 200 ton for 70 MW Francis Turbines
Powerhouse Crane 300 ton for 166 MW kaplan Turbines
Powerhouse Crane 350 ton for 187 MW kaplan Turbines
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
71,500.00
71,500.00
1.0000
870,000.00
870,000.00
1.0000 1,870,000.00 1,870,000.00
1.0000 3,100,000.00 3,100,000.00
1.0000 3,360,000.00 3,360,000.00
ea
ea
1.0000
1.0000
410,000.00
435,000.00
410,000.00
435,000.00
Draftube Crane
Spillway Hoists - 10 ea Hoist Support Structure & Frame
ea
ea
1.0000
1.0000
168,000.00
254,000.00
168,000.00
254,000.00
ea
ea
Page No 36 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
GateHoist3020 35783020
GateHoist3025 35783025
357900
Description
ea
ea
1.0000
1.0000
420,000.00
560,000.00
420,000.00
560,000.00
0.0000
0.00
0.00
BOP100
35790000
Balance of Plant Mechanical
BOPlant1010 35791010
BOPlant1015 35791015
BOPlant1020 35791020
BOPlant1025 35791030
357920
Balance of Plant Electrical
BOPlant2010 35792010
BOPlant2015 35792015
BOPlant2020 35792020
BOPlant2025 35792025
400000
Process Equipment
430000
Gas & Liquid Handling Equipment
434000 Gas Liquid Storage Equipment
Sphere1110 43411110
Sphere1120 43411120
Sphere1140 43411140
Sphere1150 43411150
ConeRoof2110 43412110
ConeRoof2120 43412120
ConeRoof2130 43412130
ConeRoof2140 43412140
ConeRoof2150 43412150
ConeRoof2160 43412160
FloatRoof2210 43412210
FloatRoof2220 43412220
FloatRoof2230 43412230
FloatRoof2240 43412240
FloatRoof2250 43412250
483000
Hydro Water to Wire Equipment
483100
Water to Wire - complete
W2W100
48300000
W2W110
48310010
W2W120
48310020
W2W130
48310030
** Balance of Plant **
357910
15/09/2007 5:37:14 PM
MW
MW
MW
MW
1.0000
1.0000
1.0000
1.0000
15,000.00
27,000.00
28,000.00
32,000.00
15,000.00
27,000.00
28,000.00
32,000.00
MW
MW
MW
MW
1.0000
1.0000
1.0000
1.0000
15,000.00
18,000.00
21,000.00
23,500.00
15,000.00
18,000.00
21,000.00
23,500.00
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
1.0000
85,000.00
85,000.00
1.0000
250,000.00
250,000.00
1.0000
425,000.00
425,000.00
1.0000
570,000.00
570,000.00
1.0000
75,000.00
75,000.00
1.0000
120,000.00
120,000.00
1.0000
350,000.00
350,000.00
1.0000
450,000.00
450,000.00
1.0000
850,000.00
850,000.00
1.0000 1,300,000.00 1,300,000.00
1.0000
350,000.00
350,000.00
1.0000
500,000.00
500,000.00
1.0000
650,000.00
650,000.00
1.0000 1,200,000.00 1,200,000.00
1.0000 1,800,000.00 1,800,000.00
MW
MW
MW
0.0000
1.0000
1.0000
1.0000
0.00
375,000.00
380,000.00
420,000.00
0.00
375,000.00
380,000.00
420,000.00
Page No 37 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
483200
483300
483400
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
W2W140
W2W150
W2W160
W2W170
W2W175
W2W180
W2W190
48310040
48310050
48310060
48310070
48310075
48310080
48310090
MW
MW
MW
MW
MW
MW
MW
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
500,000.00
609,000.00
1,009,000.00
1,083,000.00
1,287,000.00
1,338,203.00
2,100,000.00
500,000.00
609,000.00
1,009,000.00
1,083,000.00
1,287,000.00
1,338,203.00
2,100,000.00
Turbine100
Turbine120
Turbine130
Turbine140
Turbine150
Turbine150
Turbine170
48320000
48320020
48320030
48320040
48320050
48320060
48320070
** Turbines **
Turbines for 3 ea 187 MW Kaplan
Turbines & Governors for 2 ea 70 MW Francis
Turbines for 3 ea 38.5 MW Vertical Francis
Turbines for 9 ea 136 MW Fixed Blade Propeller
Turbines for 3 ea 166 MW Kaplan
Turbines & Governors for 7 ea 6 MW Saxo
MW
MW
MW
MW
MW
MW
MW
MW
MW
MW
MW
MW
0.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
0.00
160,000.00
165,000.00
170,000.00
175,000.00
210,000.00
570,000.00
0.00
160,000.00
165,000.00
170,000.00
175,000.00
210,000.00
570,000.00
Governor100
Governor110
Governor120
Governor130
Governor140
48330000
48330010
48330015
48330020
48330025
** Governors **
Governors for 3 ea 187 MW Kaplan Units
Governors for 9 ea 136 MW Fixed Blade Propeller Units
Governors for 3 ea 166 MW Kaplan Units
Governors for 3 ea 38.5 MW Vertical Francis
MW
MW
MW
MW
MW
MW
MW
MW
0.0000
1.0000
1.0000
1.0000
1.0000
0.00
13,000.00
14,500.00
15,000.00
22,250.00
0.00
13,000.00
14,500.00
15,000.00
22,250.00
0.0000
0.00
0.00
Turbines
Governors
** Generators **
Generator110
Generator120
Generator130
Generator140
Generator150
Generator160
MW
MW
MW
MW
MW
MW
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
125,000.00
130,000.00
135,000.00
140,000.00
150,000.00
450,000.00
125,000.00
130,000.00
135,000.00
140,000.00
150,000.00
450,000.00
MW
MW
MW
MW
MW
MW
1.0000
1.0000
1.0000
6,000.00
7,000.00
8,200.00
6,000.00
7,000.00
8,200.00
MW
MW
MW
1.0000
1.0000
1.0000
5,000.00
12,000.00
13,600.00
5,000.00
12,000.00
13,600.00
483410 Generators
48341010
48341020
48341030
48341040
48341050
48341060
15/09/2007 5:37:14 PM
Page No 38 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
483500
483600
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
GeneratorCont 48343040
MW
MW
1.0000
35,000.00
35,000.00
Exciter100
Exciter120
** Exciters **
Exciters for 3 ea 38.5 MW Vertical Francis
MW
MW
0.0000
1.0000
0.00
104,000.00
0.00
104,000.00
0.0000
0.00
0.00
Exciters
48350010
48350020
Transformers
Transformer11048350000
483610 Main Power Transformers
Transformer11048361010
Transformer12048361020
Transformer13048361030
Transformer14048361040
Transformer15048361050
Substation160 48361060
483620 Station Service Transformers
Transformer20 48362010
Transformer20248362020
483700
Switchgear
Switchgear110 48360000
483721 Switchyard Equipment
Switchyard110 48372110
Switchyard120 48372120
483722 Batteries & Charger System
Switchgear170 48372210
483724 High Voltage Cable to Switchyard
Switchgear410 48372410
Switchgear410 48372420
483725 Breakers
Switchgear180 48372510
483800
Supervision & Commissioning
Commission11 48380010
600000
Engineering
Engineering
60000000
Investigate100 60000010
Investigate200 60000020
Investigate300 60000030
Investigate400 60000040
Design100
60000050
Design300
60000060
15/09/2007 5:37:14 PM
** Transformers **
Transformers for 2 ea 70 MW Francis Units
MW
Main Power Transformers (157.5 MVA) for 9 ea 136 MW FixedMW
Main Power Transformer (185 MVA) for 3 ea 166 MW Kaplan MW
Main Power Transformer (210 MVA) for 3 ea 187 MW Kaplan MW
Transformers for 7 ea 6 MW Saxo Units
MW
Substation Complete for 3 ea 38.5 MW Vertical Francis
MW
MW
MW
MW
MW
MW
MW
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
19,000.00
31,000.00
44,000.00
45,000.00
60,000.00
131,300.00
19,000.00
31,000.00
44,000.00
45,000.00
60,000.00
131,300.00
MW
MW
1.0000
1.0000
2,500.00
15,000.00
2,500.00
15,000.00
0.0000
0.00
0.00
** Switchgear **
Switchyard Equipment for 2 ea 70 MW Francis Units
Outdoor Apparatus for 7 ea 6 MW Saxo Units
MW
MW
MW
MW
1.0000
1.0000
11,500.00
28,000.00
11,500.00
28,000.00
MW
MW
1.0000
925.00
925.00
MW
MW
1.0000
1.0000
1,525.00
44,000.00
1,525.00
44,000.00
MW
MW
1.0000
50,000.00
50,000.00
MW
MW
1.0000
150,000.00
150,000.00
** Engineering **
Geotechnical Investigation
Environmental Studies
Hydrology Study
Initial Site Survey
Preliminary Design (Proposal Phase)
Detailed Design (Design Phase)
%
%
%
%
%
%
%
%
%
%
%
%
0.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
0.00
0.52
0.52
0.26
0.52
0.62
5.15
0.00
0.52
0.52
0.26
0.52
0.62
5.15
Page No 39 of 40
Subcontract Rates
2007-09-15 IPEL Master Resource File ($Cdn)
Subcontract Category
Sequence
13000
Description
Subcontract Description
Code
Sequence
Description
Metric
Unit
Imperial Conversion
Unit
Factor
Metric Rate
Imperial Rate
Site Facilities
Design200
Design400
15/09/2007 5:37:14 PM
60000070
60000080
%
%
%
%
1.0000
1.0000
1.03
2.06
1.03
2.06
Page No 40 of 40