ASSIGNMENT -2

SUBMITTED BY: Phani Kumar. N COURSE-PROJECT MANAGEMENT

Draw up a Feasibility report for this report. In wind projects, A unit saved is two units produced. The loss minimized is the profit earned. Optimized operation of the existing asset is increase in RRI. Before the said project was incepted, our 100MW wind power project was connected to 4 different Distribution substations through 25 to 30 KM network. Due to long distance evacuation lines, the line losses (I2R losses) were high. The grid shutdown / down times were also high as the substations were of rural substations. If these losses are restricted then the total project will become profitable. Hence the feasibility of Substation Construction is very high Include benefits of the projects to the organizations. The organizations would be benefitted in many ways. Some of the direct benefits are as follow:1. The evacuation lines can be connected to our own substation, hence the less line losses 2. As the substation is connected to EHV transmission line, the grid availability will be more 3. Less line losses and high grid availability translates to high generation from the same capacity of the project 4. Power quality of the EHV network will be higher than the distribution system, hence the electrical operation cost is reduced 5. Optimum operation of the wind farm is possible 6. Satisfactions of Stake holders. Mention how the project full fills the needs & requirements of the organization. Every company has a vision and strategy to achieve that. The main vision of the company is to satisfy the customers with innovative approach towards work. Stack holders are a part of customer as they are also depending upon company profits. If the yield out of the existing assets is increased with the small addition to investments, surely the profits boosts up. This will definitely full fills the organizational needs. Mention the cost associated with the Project. At the beginning of the project the cost would be more, as the project would come to closure the cost would reduce & revenue would start. Factors of Cost are:1. Land Cost 2. Government Formalities regarding approval of project & land.

3. 4. 5. 6. 7.

Assessment of land by geographical survey. Equipment Cost Transportation or shipment cost Erection Manpower Cost Miscellaneous cost.

Lastly, recommend whether the project should be sanctioned or not. Yes, it would lead to profit the company. So it is recommended to continue the project.

Você também pode gostar