SAUDI TECHNOLOGISTS CONSULTING ENGINEERS

PREQUALIFICATION DOCUMENT

Power and Water Projects

Mineral Processing Plants

Oil and Gas Plants

Infrastructure Projects

Petrochemical Plants

Aviation Projects

MESSAGE
Engineering Trends and Latest Technology of Modern Projects with specialists Engineers, is the need of the hour in the Engineering Design and Project Management System. In this advancing competent and Technological Era, we are confronted with new challenge in every project, and to meet this, we exercise all our efforts for value added engineering design and project management services. We believe in the international partnership joint ventures affiliates to widen our expertise.

KHALED A. MUKAHAL
MANAGING DIRECTOR FOUNDER OF SATECH

Its our privilege to introduce experienced SATECH Managed by a strong diversified team of highly engineering professionals. Our personnel have in-depth design and project management knowledge of projects. We believe in long term commitments and good business relations, which we achieved by our mission at every stage of Design and Project Management.

AHMED K. MUKAHAL
GENERALMANAGER SATECH

INFORMATION

Mr. Khaled A. Makahal

Managing Director General Manager

Mr. Ahmed K. Mukahal

CONTACT PERSONS

Mr. S. V. RAMESHA Engineering and Design Manager Mr. MUHAMMAD AFZAL Head of Transmission Lines and U/G Cable Systems Mr. V. ARUL NOBLE Head of S/S, Protection and Controls Mr. JAVED FAROOQ Projects Manager and Marketing

Address
Saad Bin Abdul Aziz Street, Cross Road # 2 (Near Old Shola Market /Al-Rahmaniyah Mall) P.O. 31759, Al-Khobar 31952 Tel. +966 (3) 899 7629 / 93 1251 / 893 4188 Fax +966 (3) 893 2065 Web Site: www.satech.com.sa

SATECH H.Q.

Email: info@satech.com.sa

Registrations Engineering License No. 486 Chamber of Commerce Membership No. 10311

TABLE OF CONTENTS
Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Description History of Company Vision and Mission of Company Scope of Services Range of Activities Organization Structure Manpower Resources Engineers by Discipline and CADD Operators Major Project Completed / On-Going SATECH Office Location Map SATECH Accomplished Projects Photos Certificates Company Registration INTERNATIONAL AFFILIATES NESPAK DMF LAHAMAYER LAHAMAYER POET CONSULTING - RIYADH KSA - ABU DHABI, UAE - GERMANY - INDIA - INDIA Page No. 1 2 3 4 5 6 7 8 18

History of Company

Saudi Technologists Consulting Engineers (SATECH) was established in 1976 as an Engineering Consulting Organization, licensed in Saudi Arabia. SATECH is operating under license issued by the Ministry of Commerce. SATECH holds Membership of the Chamber of Commerce and Industry, Eastern Province. The organization is manned by nearly Three Hundred and Twenty Four (324) professional engineers and technical staff who have expertise in their respective disciplines and vast experience in Planning, Design and Construction Management. SATECH provides sound professional engineering services in wide variety of disciplines from conceptual engineering to Structural engineering, design of electrical power generation, transmission and distribution systems. The company also offers services of monitoring execution project, development of technical specifications, and management of construction sites. SATECHs in house capabilities are enhanced many folds by an out of Kingdom supports from many Consultancy Offices in India, Abu Dhabi, Germany, etc. SATECH is a dynamic organization and has extensive experience in Power Distribution Network and industrial Projects. At present, SATECH serves as Project Management on behalf of S.E.C (Saudi Electricity Company), Chamber of Commerce and also as A/E for Design and Engineering of Power System for Royal Commission Jubail. SATECHs Human Resource Division remains ever vigilant to enhance its Manpower strength and expertise by inducting into the organization Competent Engineers and Staff in Kingdom of Saudi Arabia and Abroad.

VISION
To Be The Most Successful, Respected, and Singled Out Engineering Consultants for both Clients and Employees. To achieve and sustain recognition as the market leader in engineering design and project Management Company in the Kingdom of Saudi Arabia, GCC, Iraq and North African (MENA) countries. Our goal: We should be known for High Engineering standards with most economical services. Value Added Engineering is the Motto of Our Company.

MISSION
To Provide Result-Oriented Consultancy Services to Our Clients by Offering Value Added and Cost-Effective Services to Improve Our clients' Performance. Our mission is, to provide both design and Project Management Services with most cost effective methods to our client keeping high standards of Engineering. To develop local and international man-power with team motivation. Maintain a professional environment and good relation with the employees, clients, vendors, & government agencies. We develop our professional team by training locally and abroad, & by updating the team with all high-tech softwares. We maintain excellent customer relation by greater understanding of Projects. We deliver Project Design to our customers with high Standards of Engineering, keeping Quality and safety of the Project with utmost important.

SCOPE OF SERVICES
The various natures of the projects executed by SATECH are depicted in the following block diagram. Broadly speaking the services offered by SATECH may be classified into the following major categories: a. FEED and Detail Engineering b. Construction Supervision c. CAD & Geographical Information System

PROJECT FEASIBILITY STUDY Civil /Structural Engineering Designs Tender Document Development

Mechanical Engineering Design Saudi Technologists Consulting Engineers SATECH

Bid Evaluation

Electrical and Telecom. Engineering Design

Risk Management

Instrumentation Engineering Design

Tender Negotiation

MONITORING AND PROJECTS, EXECUTION

RANGE OF ACTIVITIES
We provide complete Engineering Design, Project Management services, and High Technical Professional Manpower For:

1. Power Plants, Substations, and Overhead Transmission Lines

2. Sewage and Diesel Plants, Pump Stations, and Pipeline network. 3. Control buildings RIB (Remote Instrumentation Buildings)

4. Data Center Buildings and Communication Networks 5. Analyzers, Shelters and Laboratory Buildings

6. Utilities for: OIL AND GAS PETROCHEMICAL MINERAL PLANTS

7. Infrastructure Projects: AIR PORTS SEA PORTS HOTELS ROADS AND BRIDGES HOSPITALS COMMUNITY AND INDUSTRIAL AREA DEVELOPMENTS

MANPOWER RESOURCES
SATECH has at the moment a total of Three Hundred and Twenty Four (324 Nos.) employees. Its manpower resources represent technical, engineering, and administrative and support staff belonging to a wide range of nationalities. As such, its member staff has inherently developed the ability and competence of working in an international environment. Many Engineers possess Master of Engineering or Higher Degree. Most of the engineers have long professional experience in their respective disciplines while some engineers have also obtained professional training abroad. Their expertise covers a wide range of engineering disciplines, which include the following major areas: - Feasibility studies a. b. c. d. Risk Assessment Hazop / Hazards Value Engineering Gate Review

Project management Planning and designing Costing and scheduling Material management Quality assurance and control Construction management Financial analysis and management Progress monitoring and material management

SATECH has an adequate administrative and marketing setup, which remains vigilant to enhance its manpower strength and expertise by inducting into the organization competent engineers and other staff. It also has sound technical support staff working as Computer Specialists, CADD Operators, Architects and Surveyors. With the competence and dedication of its employees, SATECH has been able to successfully execute a number of prestigious projects offered by Clients like SEC-ERB, ARAMCO, Ministry of Defense, Electricity Corporation Riyadh, Petrokemya, etc. The details of projects executed by SATECH are given in another Section. SATECH has also been providing engineers and technical personnel for the Engineering Services and Construction supervision to Clients like SEC ERB, SABIC group of Companies, etc.

ENGINEERS BY DISCIPLINE AND CADD OPERATORS

Sl. No. ENGINEERS 1. 2. 3 4. 5. 6.

DISCIPLINE

TOTAL

ELECTRICAL ENGINEERS Civil/ STRUCTURAL ENGINEERS ARCHITECTURAL ENGINEERS MECHANICAL ENGINEERS TELECOMMUNICATION ENGINEERS INSTRUMENTATION ENGINEERS

148 62 6 23 14 8

CADD DESIGNERS 7 8 9 10 11 12 CIVIL ARCHITECTURAL MECHANICAL ELECTRICAL INSTRUMENTATION AND CONTROL TECHNICAL SUPPORT TOTAL 10 11 8 15 3 16 324

MAJOR PROJECTS COMPLETED/ ON GOING


Sl.No. Name of Project Date of Award Date of Completion Value of Work Performed (SR) Client(s)/Location

1. 2.

3. 4. 5.

6. 7. 8.

9. 10. 11.

12.

13.

Detail Design (Safety Improvement for Uth. GOSPS 7,8 & 11) Five Miscellaneous Jobs - Inter connection pipelines of Riyadh Oil Refinery Pipelines, Upgrading of Hydrocarbon facilities, Blast Proof control room design. Detail Design (Khuff Gas test wells, re-design platform structures for well U-590) Survey & Drafting (Update of Instrument and piping diagram for Refinery Plant 32, 34, 35) Detail Design (Final design Uthmaniyah Power Distribution for Cathodic Protection on Phase 2) Engineering Design (Cathodic Protection for Wells & Flowlines) Detail Design (Uth. SSD Fencing at GOSP- 1, 2, 6, 7 &8) Engineering and drafting (Engineering and Drafting Services for Project Design Services S. A D) Detail Design (Retrofit D. C. Rotary D. C. Exciters with static exciter plt. 110) Engineering Design (Qassim Refinery) Engineering Study (General site review. Update Dha. North, Dha. Clinic & Abqaiq region, Abqaiq Clinic and Qurayyah) Engineering & Drafting (Testing Services for 6GHZ Digital Communication Backbone System for the Eastern Province) Design and Supervision of

Jan. '82

Mar. 84

SR 332,761

Uthmaniyah ARAMCO Riyadh Oil Refinery c/o. Mace Saudi Arabia Ltd. Mr. Luke F. DeBock Rastanura ARAMCO Rastanura ARAMCO Uthmaniyah ARAMCO MAPLE (UK) Uthmaniyah ARAMCO Abqaiq/Uth./Yan bu - ARAMCO Abqaiq ARAMCO SABCO (BECHTEL) Dhahran / Abqaiq - ARAMCO

Mar. '82

Aug. 84

SR 1,000,000

Apr. '82 Aug. '82 Aug. '82 Oct. 82 Oct. '82 Oct. '82 Nov. '82 Jan. '83 Jan. '83

Jan. 84 Mar. 84

SR 296,545 SR 181,713

Feb. 84

SR 1,764,646 SR 14,000,000 SR 2,049,137 SR 966,000

Jun. 85 Apr. 84 Dec. 84

Jul. 84 Apr. 84 Jun. 84

SR 256,315 SR 138,494 SR 430,928

Feb. '83 Feb.

Jun. 84 Aug. 84

SR 190,316 SR 478,174

Dhahran ARAMCO Rastanura -

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

14.

Abandon old pump house # 2 & replace substation # 19 Engineering Design (Installation Temporary Buildings Qassim Refinery Drafting (Excess flow check valves and piping modifications for Uth. Gas Plant 34 C ) Construction Supervision (Offshore Structural Engineering) Detail Design Drafting (Console Design for Dhahran Main Gate Operations) Detail Design (GEC N15, Preparation of Radio Network Configuration) Detail Design ( Reroute 8 flow line from AD well to GOSP-1) Drafting & Engineering services (Khuff Gas Development wells J. O. 54368) Drafting & Engineering Services (Uth. Gas Plant C. P. Protection) Design & Drafting (Khuff Gas Test wells As Built drawings Shedgum 196 & Shedgum 212) Cathodic Protection for Wells and Flowlines Detail Design (GEC N11, Console design Dhahran Fire Station) Detail Design (Uth.maniyah Gas Plant SSD Fence Project design of main gate installation cct. Checkout) Design (Ar Rabiyah Housing Program) Detail Design (Cathodic Protection PA 2 WP 115 and H2S monitoring system)

'83

ARAMCO

Mar. '83 Mar. '83 Apr. '83 Apr. '83 Apr. '83 Apr. '83 May '83 May. '83 May. '83 May. '83 Aug. '83 Aug. '83 Sep. '83 Sep. '83

Aug. 84

SR 360,000

Al Yami Est.

15. 16. 17. 18. 19. 20. 21. 22.

Jan. 84 Jun. 83 Dec. 84 Dec. 84 Mar. 84 Oct. 85 Dec. 84

SR 89,700 SR 1,109,707 SR 68,393 SR 169,773 SR 109,240 SR 1,204,566 SR 84,870

Uthmaniyah ARAMCO King Wilkinson (UK) Dhahran ARAMCO Dhahran ARAMCO Abqaiq ARAMCO Uthmaniyah ARAMCO Uthmaniyah ARAMCO Shedgum ARAMCO ARAMCO MAPLE Saudi Arabia Ltd. Dhahran ARAMCO Uthmaniyah ARAMCO Dhahran ARAMCO Uthmaniyah ARAMCO

Apr. 84

SR 112,391 SR 14,000,000 SR 84,985

23. 24. 25.

Jun. '85 May 84

Mar. 84 May 85 May 84

SR 70,268 SR 2,507,784 SR 96,704

26. 27.

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

28. 29.

30. 31.

32. 33. 34. 35.

Detail Design (Shedgum Gas Sep. Plant SSD Fencing) '83 Drafting & Engineering services (Instrument / drafting services Oct. '83 to S. P. O. E. D. Safaniyah Prod. Detail Design (Reconfiguration of Dhahran 2 way radio Oct. '83 channel) Engineering Design (Mechanical Structural and Pipe Nov. work for new Hexane Plant) '83 Yanbu Design & Construction Nov. Supervision of Higher Alpha '83 Oilfins Factory (HAO Project) Project proposal & Final Design Nov. (General Engineering Services '83 for SAI / PPD A & YPP /PDS) Engineering & Design (Petroline Nov. Engineering Library update ) '83 Architectural & Engineering Design & Supervision (General Dec. Engineering Services for ER '83 2780 Ar Rabiyah executive Housing Program) Design of Khuff Gas Wellhead Air Reserve Vessel Jan. '84 Conceptual & Detail Design Khuff Gas Flowline U 623 to Jan. '84 U GOSP 10 Engineering Support for Jan. '84 B1-3221 Engineering Design & Drafting Feb. Al Mutawa Commercial '84 Center SIHAT, K. S. A Engineering Design & Drafting (Administration Building for the Feb. R. A. S. F at the king Khaled '84 Airbase Khamis Musshayt Design & Construction Feb. Supervision of Higher Alpha '84 Olifins Factory (HAO Project) Khuff Gas Well U 616 to U Feb.

Mar. 84 Jan. 84

SR 64,521 SR 93,880

Shedgum ARAMCO Safaniyah ARAMCO Dhahran ARAMCO Pits Burgh Des Moines (PDM) Saudi Arabia Saudi Petrochemical (Kemya) Yanbu - ARAMCO Yanbu Plants Library Dhahran ARAMCO Uthmaniyah ARAMCO Dhahran ARAMCO Uthmaniyah ARAMCO Villa Construction & Supervision Ballast - Nedam Saudi Petrochemical (Kemya) Uthmaniyah -

May 84

SR 69,173

May 85

SR 250,000

Jul. 85 Mar. 85 Oct. 85

SR 830,001 SR 310,684 SR 1,029,020

Jun. 85

SR 2,394,808

36. 37. 38. 39. 40.

Aug. 85 Aug. 85 Oct. 85 Aug. 85

SR 134,566 SR 162,993 SR 673,212 SR 105,000

Jul. 85

SR 168,000

41. 42.

Dec. 85 Sep. 85

SR 105,000 SR 359,425

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

43.

44. 45. 46.

GOSP 11 Project Proposal Engineering & Drafting Services (Utilization of Swimming pool water for Fire Fighting at E/W Pipeline pump stations No. 3,6 & 10) Engineering and Detail Design (Reroute of 36 / 24 Fuel Gas Line 1800 ft. Yanbu) Uthmaniyah Gas Plant Drafting Support Engineering & Drafting Services Design Modification and Upgrading to Switchrack 20 MR 1 NGL Product Exchange Area

'84 Feb. '84 Feb. '84 Mar. '84 Mar. '84 Apr. 85 SR 99,038

ARAMCO PDS UNIT, YANBU ARAMCO Yanbu - ARAMCO Uthmaniyah ARAMCO PDS UNIT, YANBU ARAMCO

May 85 Dec. 85

SR 224,334 SR 165,600

May 85

SR 85,506

47.

48. 49.

50.

51. 52.

53.

54.

Engineering & Drafting (Documentation Services for Mar. Disaster Control center '84 communication System ) Area & Skid Lighting for Shedgum & Uthmaniyah Khuff Apr. '84 Gas wells Retrofit Rotary D. C. Exciters with Static Exciters-EWO-57554 May. PIT 110 Contract No. '84 SO177/716-530/11 1180 Retrofit Rotary D. C. Exciters with static Exciters May. EWO- 57554 Plt 11 Rev # 2 '84 Dated 12/11/94 Contract No. 15854/00 Engineering Design (2 Wash Aug. Oil Line 2-1-/2 from PEM-REF 84 to Yanpet.) Engineering & Drafting (Testing Services for 6GHZ Digital Aug. Communications System and 85 Record Updating ) Detail Design (GEC N12 Combining & Interfacing Aug. remote Controllers to ARAMCO 84 VHF / UHF Base Station) Conceptual & Detail Design Oct. 85 (ARAMCO Aviation Center

Feb. 85

SR 134,651

Dhahran ARAMCO Uthmaniyah ARAMCO ARAMCO, Abqaiq Mr. M. G. Brown ARAMCO, Abqaiq Mr. M. G. Brown Dhahran ARAMCO Dhahran ARAMCO Dhahran ARAMCO Dhahran ARAMCO

Sep. 85

SR 120,758

Jan. '85

SR 256,315

Jan. '85

SR 256,315.50

Apr. 85

SR 184,147

Apr. 86

SR 184,147

Apr. 85 May 86

SR 91,347 SR 730,136

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

55. 56. 57. 58. 59. 60.

61. 62.

Facilities EPIA) Engineering Work Orders Nov. Contract No. 15854/00 84 Reroute of 36" Fuel Gas Line Dec. Yanbu, JO-29156 '84 ARAMCO Aviation Center Mar. Facilities at KFIA '85 Contract No. 15854/00 Khuff Gas Wellhead Air Reserve Apr. '85 Vessel BI 8107 Khuff Gas Well U - 616 to UGOSP-11 Project Proposal, Apr. '85 BI-8157 Engineering Support for BI3221 May. (All Uthmaniyah GOSPS) '85 SO-362/713660/094 Contract No. SO-362/713-660/094 Engineering Support for Uthm. May. GOSPs B1-3221 85 Khuff Gas Wellhead Air Reserve Vessel: BI-8107 Jun. '85 Jun. '85 Jul. '85 Jul. '85 Aug. '85 Aug. '85 Sep. '85

Mar. 85 May. '85 Nov. '85 Jan. '86 Sep. '86

SR 310,684 SR 224,334 SR 1,150,556 SR 196,468 SR 359,425

ARAMCO H.M. Al-Yahya ARAMCO R. Crosby ARAMCO A. M. Al - Aqeel ARAMCO M. A. Mullen ARAMCO K. W. Richardson ARAMCO, Dhahran ARAMCO T.M. Simpson ARAMCO M. A. Mullen ARAMCO P. Collela ARAMCO J. F. Yamzon ARAMCO A. Q. Regino PDM Saudi Arabia Mr. G. Heywood ARAMCO J. F. Yamzon Saudi Fisheries Company, Dammam. Mr. S. H. Mid ARAMCO J. F. Yamzon ARAMCO

Oct. '86

SR 673,212

Mar. 86

SR 673,212

Sep. '85

SR 144,194 SR 165,600 SR 162,993 SR 120,758

63. 64. 65. 66. 67. 68.

Uthmn Gas Plant Drafting Support Khuff Gas Flowline U - 623 to U - GOST - 10 Area and Skid Lighting for Shedgum and Uthmn. Khuff Gas Wells. Hexene Purification Project Electrical, Instrumentation Design Khuff Gas Flowline U - 606 to U-GOSP - 11 Saudi Fisheries Fish Depot Processing Plant (Haskoning) Service Order 002-SATECH

Dec. '85 Oct. 85 Oct. '85 Dec. '85 Dec. '85 Oct. '86

SR 135,750 SR 784,873 SR 575,000

69. 70.

Khuff Gas Flowline U - 623 to U Sep. - GOSP - 10, BI - 8150 JO '85 54512 Ar Rabiyah Executive Housing Jan. '86

Mar. '86 Sep. '87

SR 694,051

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

71.

72.

Project - ER 2780 - Details Design Contract No. SD380/713-320/05 R2 Khuff Gas Flowline U-616 to GOSP-11, BI-80574 Rev. # 5 Dec '86 Contract No. SO-381/713620/170R5 Higher Alphs Olifins Facilities (HAO Project) Contract No. 5CEN-6102 Jan. '86 Khuff Gas Flowlines, U-623 to U-GOSLP-10, BI -8150; JO - Jan. '86 54512 Khuff Gas Flowline U-616 to UGOSP - 11, BI - 8159, JO - Jan. '86 81575 Ar-Rabiyah Executive Housing Jan. Project, ER-2780 Design & 86 Supervision Detail Design of Khuff Gas Flow Line U-616 to GOSP-11 BI-8157 Contract No. SD-381/713620/170R5 Jan. '86

SR 930,994

Mr. G. White

Apr. '88

SR 536,289

ARAMCO, Abqaiq Al Jubail Petrochemical Company (Kemya) Mr. G. M. Staudt ARAMCO A. R. Al-Dahhan ARAMCO A. I. Al - Worthan ARAMCO G.J. White ARAMCO Mr. A. I. Al Worthan Abqaiq

May '87

SR 162,300

73. 74. 75. 76.

Mar. '87 Apr. 87 Sep. 87

SR 588,136

SR 536,289 SR 930,994

Aug. '87

SR 536,289

77.

78. 79. 80.

81.

Detail Design of Khuff Gas Well Uthmaniyah -627 to Jan. Uthmaniyah Kuff Gas Mainifold 86 BI-8157 Contract No. SD382/713-620/169 R1 BI-8157, JO-81576 Khuff Gas Well U-626, to Uthmn. Khuff Jan. '86 Manifold. Provide Drafting / Training Assistance within Contractor's Jan. '86 Office Relocation of Aviation Facilities at King Fahd International Jan. Airport BI-3240 '86 Contract No. SD384/713320/001 Uthmaiyah Gas Plant Drafting Jan. Contract No. SD-386/21386

Aug. 86

SR 586,175

ARAMCO Mr. W. Al Ghalayini ARAMCO W. Al - Ghalayini ARAMCO ARAMCO Mr. J.C. White Dhahran ARAMCO Mr. L.G. Gall P.

Aug. '86 Jul. '86

SR 586,175 SR 120,000

June. '86

SR 49,153

Oct. 86

SR 96,075

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

82.

83.

84.

85.

86. 87. 88. 89.

700/40 1984 Maintain Potential Flowlines BI-8150/JO-54517 Jan. Contract No. SO-391-713'86 660/103 Removal of redundant instrumentation, Modification Jan. 3 '86 NGL - EWD 140 Contract No. SO-387/713-630/Y27 1984 Maintain Potential Flowlines BI-8150/JO54515 Jan. '86 Contract No. SO-388/713660/106R1 1984 Maintain Potential Flowlines BI-8150/JO-54520 Jan. '86 Contract NO. SO 391/713660/104R1 Design for Frantel National Hotel Najran Five Star Hotel Feb '86 Design / Drafting Support for Completion of As Built, ArRabiyah, Phase I Piping Hexane Mar. 86 Mar '86

Apr. '86

SR 28,728

Collela ARAMCO Uthmaniyah MR. M. I. Al Multhem ARAMCO Yanbu Mr. R. K. Naylor ARAMCO Uthmaniyah Mr. M. I. Al Mulhea ARAMCO Uthmaniyah Mr. M. I. Al Mulhem Al Robaya Establishment, Mr. K. R. Mathew ARAMCO J.A. Belvo PDM Saudi Arabia Mr. G. Heywood ARAMCO Uthmaniyah Mr. M. I. Al Mulhem ARAMCO Udhailiyah Mr. I. M. Simpson Al Jubail Petrochemical Company (KEMYA) Mr. I. Katab Engg. Dept. ARAMCO Yanbu

Mar. '86

SR 11,550

Jun. '86

SR 39,822

Jun. '86

SR 28,718

Mar '86 Nov. 86 Sep '86

SR 415,000 SR 49,336 SR 230,058

90.

91.

Reconnect Uthmaniyah-217 and 219 To Uthmaniyah GOSPMar. 11 JO-54591 Contract No. SO'86 393/713-610/107R2 Engineering Support for Uthmaniyah 60SPs Construction Apr. '86 Contract No. SO-394/713610/108 Field Engineering Support Kemya Contract No. 5CEN 6102 Apr. '86

Oct. '86

SR 48,994

Jul. '86

SR 47,518

Oct. '86

SR 225,817

92.

EWD # 161 - Platform for Firewater Jockey Pump Contract No. SO-395/713630/Y33R1

May. '86

Jul. '86

SR 3100

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

93. 94. 95. 96.

Abandon Old Pump House - 2 and replace Sub - Station - 19, 131 - 8146 PRI.4 Abandon Old Pumphouse - 2 Pumps and Replace Substation - 19, BI-8146, PRI, - 41 Abandon Old Pumphouse 2 Pumps and Replace S/S 19, BI- 8146, PRI, - 41

May. '86 May. '86 May. 86

May. '87 Aug. '86 Aug. 86

SR 135,147 SR 82,696 SR 82,696

ARAMCO R. I. Cimioco ARAMCO I. K. Al Binali ARAMCO I.K. Al-Binali Saudi ARAMCO (PPD/MPPD) Abqaiq SCECO, Dammam Mr. J. D. McNab Jeddah Oil Refinery Company (JORC) Mr. A. Saber ARAMCO Yanbu Mr. D.A. Mehar Uthmaniyah Gas Plant ARAMCO Mr. P. Colella ARAMCO Dahran Mr. G.J. White ARAMCO J.A. Belvo Best Foods Saudi Arabia Limited (CPC) Mr. S. McCall Arabian Electrical Industries Limited

97.

98.

Detail Design of Andr-303 Trunkline to Andr-GOSP-1 and Sept. Fire water System Extension at '86 Andr-GOSP-2 Contract #540/713-200/141 Engineering Services for SCECO East/Central 380kV Oct. '86 Interconnection. Contract No. 80870/01 Update JORC As Built Drawings P & Ids and Piping Layout Oct. '86 Project No. 225 EWD # 170 Yanbu & Yanbu Petromine Refinery # 1 Oct. East/West Pipeline Mofifications 86 Platforms Conract No.SO406/713-200/Y47 Engineering Assistance and Nov. Drafting Coordination Contract 86 No. SO-409/213-700/47 Design/Drafting support for As Built Drawings Ar Rabyah, Nov. Phase-I Rev. # 1 dated 86 09/03/87 Contract No. So408/713-400/00 Design/Drafting support for Nov. Completion of As-Built Ar86 Rabiyah Phase I. Foodstuffs Production Facilities at Royal Commission for Dec '86 BINZAGR Yanbu. Design & Supervision Engineering Services contract Dec. No. C-3120 86

Nov. 90

SR 633,000

Apr. 87

SR 222,000

Sep '87

SR 1,994,000

99.

Nov. 86

SR 5,846.40

100. 101.

Dec. 86

SR 24,964.80

Mar. 87

SR 61,418

102. 103.

Mar. 87

SR 49,336 SR 900,000

May '87

104.

Jun. 88

SR 150,000

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

105.

106.

107. 108.

Field Engineeing Support Kemya Revision # 1 Dated 21/04/86 Contract No. SO-AFSS-5003R-O Khuff Gs Well Shedgum 238 to Shedgum SOSP 2, Rev. # 3 Dated 28/10/87 Contract No. SO-415/713-200/022 R3 Khuff Gas SH-238 to SH-GOSP2 EWD # 162 Cot Fire Water Jockey Pumps Modifications Contract No.SO-416713200/Y59 Digitization of Juaymah Gas Plant PandIDs Phase II Desing and supervision of Wadi Leban / Swedi Pipelines and Pumping Stations Detail design of trunkline and associated well tie-in to Abq.GOSP-3 Detail design of BI-8167 Trunkline/ Testline of U-663 and Flowlines to Tie-in (07) wells to U-GOSP-11 Off shore platforms and pipelines, maintain potential

Jan. 87 Jan. 87 Jan. 87 Jan. 87 Feb '87

Sep. 87

SR 249,787

Al-Jubail petrochemical Co. (Kemya) Mr. G.M. Staudt ARAMCO Uthmaniyah Mr. P. Collele ARAMCO A.R. Al-Dahhan ARAMCO Yanbu Mr. D. A. Meher Saudi ARAMCO Abqaiq MACE S,A, Ltd. / M.O.A., Riyadh Saudi ARAMCO Abqaiq

Feb. 88 Mar. 87 Mar. 87

SR 623,392 SR 623,373 SR 30,004

109. 110.

May 90

SR 260,000

Feb 87

Oct 89

SR 650,000

111.

Mar. '87

Nov. 90

SR 633,000

112.

Mar. '87 Mar. '87

Sep. 90

SR 789,000

Saudi ARAMCO Abqaiq Saudi ARAMCO Rastanura Saudi ARAMCO Abqaiq National Industrial Gas Co. Dahran ARAMCO Abqaiq Mr. A. I. Al Worthan ARAMCO A.I. Al Worthan

113. 114.

May. '90

SR 233,000

Detail design of trunklines between AD-GOSP-6 and U- Apr. '87 GOSP-8 Supervision of Construction for N.I.C. Co. May. 87

Aug. 90

SR 688,000

115. 116.

Dec. 90

SR 300,000

Khuff Gas Well U-628 to Uthmaniyah Manifold Rev. # 1 Dated 20/10/87 Contract No. May.87 SO-435/713-200/036R1 Khuff Gas Well U-628 to May.87

Mar. 88

SR 258,240

117.

Dec. 88

SR 451,096

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

Uthmaniyah Manifold. 118. Shedgum Khuff Gas Flowline Loops and Manifold Extension BI-8160 Revision # Dated 20/10/87 REV # 2 Contract No. SO-436/713-200/037R2 BI-8160 / JOB-81605/6/7/8 Shedgum Khuff Gas Manifold Expansion and Flowline Loops. Design of Flowlines for Abqaiq and Uthmaniyah Wells Design of water injection header and Laterals for Andr284, 291 and 293 Detail design of Transmission Line and Testline of SDGM-268 and Wells to SDGM-GOSP-5 Detail design of Tieing-in Andr249 and 252 to U-WIPS-2 Detail design of Trunkline/ Testlines and 7 Flowlines to SDGM-GOSP-3 Engineering Services Provide Engineering and Design related services to YPR

Jun. '87 Jun. '87 Jun. 87 July. '87 Aug. '87 Aug. '87 Sep. '87 Sep. 87 Sep. '87

Apr. '87

SR 587,924

ARAMCO, Abqaiq Mr. S. M. Al Aradi ARAMCO S. M. Al - Aradi ARAMCO Abqaiq Saudi ARAMCO Abqaiq Saudi ARAMCO Shedgum Saudi ARAMCO Abqaiq Saudi ARAMCO Abqaiq Al-Kawther Industries Ltd. Mr. Sahl S. Hefzi Yanbu Petrominy Refinery Y.P.R Mr. Saleh A. Al Zaid Saudi ARAMCO Dhahran Saudi ARAMCO Ainder Saudi ARAMCO Abqaiq ARAMCO J. F. Nelson

119. 120. 121.

Aug. '88 Jun. 90 Jun. 90

SR 672,337 SR 364,000 SR 385,000

122.

Nov. 90

SR 629,000

123. 124.

Oct. 90

SR 355,000

Oct. 90

SR 770,000

125. 126.

Mar. 88

SR 150,000 SR 250,000

Dec. '88

127. 128.

Detail design of Fire Protection Oct. '87 and Detection System Design of Tie-in Water Supply Wells Andr-892, 893, 894 to Oct. '87 North Andr Header Update existing drawings Nov. '87 BI-3104 Instrument Loop Dec. Diagram for E/W Pipeline Area '87 III

Nov. 90

SR 314,000

Nov. 90 Nov. 90 Jul. '88

SR 360,000 SR 308,000 SR 216,359 .

129. 130.

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

131. 132.

OSI Program, Zuluf Offshore Jan. '88 GOSP - 4, Plant G-52. Detail design of Heavy Equipment Fac. / Fuel Proj. Drainage EWO-295-1 & EWO 306 E, P, F.E. BI-8160 Flowline Loop on Khuff Gas Well Shedgum 233 to Shedgum Manifold. Feb. '88 Mar. '88

Apr. '88

SR 95,034

ARAMCO S. Al - Rowaili Saudi ARAMCO Yanbu

Oct. '90

SR 141,000

133. 134. 135.

Dec. '88 Feb. 91

SR 116,528

ARAMCO S. M. Al - Aradi Saudi ARAMCO Yanbu ARAMCO S. M. Al - Aradi ARAMCO A.R. Al - Dahhan ARAMCO M.A. Meher ARAMCO K.D. Slattery

Design of Facility / Community Apr. '88 Maintenance Shop Modification Replacement of Deepwell Anodes at COT Yanbu, EWO Apr. '88 241 BI-8159 Khuff Gas Well SH Apr. '88 238 Tie - In to SH - GOSP2 EWO 253 Yanbu NGL Onshore/Offshore Drawings May'88 Update. Contract No. 19125/01 BI-8160 Flowline Qatif Wells 21 & 43 Injections. Contract No. 19125/01 Jun. '88

SR 296,000 SR 116,528 SR 136,135 SR 581,805

Dec. '88 Dec. '88 Dec. '88

136. 137.

138. 139.

Aug. '88

SR 228,256

Design & Supervison Services for the Fisheris Processing Centers in Riyadh & Jeddah Jan. '89 with the association of HASKONING (Holland) BI-8167 Design of Trunkline for F/L Sh-32, 224 & 225 Tie-in SH-GOSP-1. E, P, F.E.Contract #530/713-200/128 Drafting of As-Built drawings for Various Projects General Engineering and Design Services supervision and Drafting Design & Management Supervision of Replace/ Repair QJ-3 Pipeline Mar. '89 Mar. '89 Mar 89

Mar. '91

SR 2,500,000

Saudi Fisheries Co.

140.

Aug. 90

SR 284,000

Saudi ARAMCO (PPD/MPPD) Abqaiq Saudi ARAMCO Abqaiq SAMAREC Jeddah Saudi ARAMCO Dhahran

141. 142. 143.

Aug. 90 Feb 92

SR 120,000 SR 650,000

Jul. '89

Jan. 91

SR 767,000

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

144.

Al-Qahtani Pipe Coating Terminal Yanbu Design & Supervision Design & Supervision Services for Al-Aujan Beverage Plant in IInd Industrical City - Dammam

Jun. '90 Jun. '90

Mar. '91

SR 900,000

Al-Qahtani Co. Saudi Danish Company Mr. Thorsen Mr. Abdul Rehman Al-Dabal - Dammam

145.

Dec. '91

SR 800,000

146.

147.

Residence Complex for Mr. July Abdul Rehman Dabal at 92 Mazroueye, Dammam A Conceptual and detail Design & Supervision of Multistorey Dispensery including Emergency facilities, X-Ray Apr. 93 Dept, Laboratories Dept, 14 Specialised Clinics and a complete floor for Administrattion Design & Construction Supervision of WALLS ICE CREAM FACTORY in Dammam 2nd Industrical City Jun. '93

Dec 92

SR 90,000

Aug. 93

SR 1,100,000

AL- FARABY Dispensary.

148.

Jan. '95

SR 1,500,000

BINZAGR WALLS ICE CREAM

149.

Design & Supervision of Pitmoss Plant in 2ND Industrial Jan. '94 City Labor camp in Jubail Industrial City, Design Services Construction Management of Combined Mussalah and Dammam Facilities at Dhahran Main Storehouse Construction Supervision Combined Mussalah and Dammam Facilities at Juaymah, KSA Detail design of 230/34.5kV Substation No.1 of SABAYEK Ferro Alloys Project May 94

Jun. '95

SR 1,000,000

AL-OMARY Plant MesSRs Assad Saeed Co. Al-Guhaidan Est. / Saudi ARAMCO, Dhahran, KSA Al-Guhaidan Est. / Saudi ARAMCO, Juaymah, KSA MAPHAR Jubail MAPHAR Jubail

150. 151.

Aug 94

SR 80,000

Oct. '94

Apr. 95

SR 240,000

152. 153.

Oct. '94

Apr. 95

SR 40,000

Apr. '95

Jan. 96

SR 150,000

154.

Detail design of 34.5/4.16kV Substation of SABAYEK Ferro Apr. '95 Alloys Project

Oct. 95

SR 80,000

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

155.

156. 157.

158.

159. 160. 161.

Detail design of Product Handling No.1 Substation, 460V Apr. '95 of SABAYEK Ferro Alloys Project Mr. Al- Fozan Villa at Cornishe June Al- Khobar 95 Installation supervision of Electrical Power Points for Jul 95 SAMS and Stand-by Equipments Dhahran. Installation of 69 kV U/G Cable & Associated Pilot Cable and Non-Metallic Fiber Optic Cable between Ibn-Khaldoun BSP, Aug Dammam BSP, Dammam P/P & '95 other Grid Stations In Dammam Area, Contract No. 82335/00 Mr. Misbah AL- Dajani Villa at Sept Dana, Dhahran 95 Food Court at Khobar Cornishe between Burger King and Dec 95 McDonald 230kV (D/C) O/H Tranmission Lines (Third Line,)Qatif BSP to Ras Tanura Refinery Substation Jan 96 # 80 Design and Engineering: 115kV Wood H-Frame T/L: Power Supply to Saudi Apr. 96 ARAMCO E/W Pump Station # 2 SCECO East Contract No.82655/00 General Apr 96 Engineering Services Design and Engineering: Upgrading of 115 kV (DC) T/L from Berri P/P to Jubail Area May 96 Substation, SCECO-EAST, Contract No-82361/00 Yanpet Infrastructure Expansion Project 115kV May 96 Feeder to Yanpet.

Sep. 95 Sept 95 Dec 96

SR 60,000 SR 80,000. SR 138,000..

MAPHAR Jubail Mr. AL Fozan Cornishe Khobar. Al-Guhaidan Est. / Saudi ARAMCO, Dhahran

May 97

SR 120,000.

Al-Ojaimi Co./ SCECO-EAST Dammam

Feb 96 May 96

SR 40,000. SR 140,000.

Mar 96

SR 650,000

Mr. Misbah Dajani,DanaDhahran H.H.Prince Faisal Bin Fahad AlSaud Saudi Services for Electro Mechanic work Co. Ltd. (SSEM) SCECO East SCECO-East / AlHaider Co. for Trad. & Cont.

162.

Sep. 97

SR 220,000

163. 164.

Apr 2000

SR 594,864

SCECO East Al-Haider Co. for Trading & Contracting / SCECO-EAST SSEM/Royal Commission Yanbu KSA

Aug. 98

SR 375,000

165.

Oct 96

SR 550,000

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

166. 167. 168.

169.

King Abdul Aziz University Telephone Exchange network of more than 20,000 lines Warehouse and Office building at SNAS area Khobar Design and Engineering: 230 kV (D/C) O/H Transmission Lines (Third Line), Qatif BSP to Ras Tanura Refinery Substation # 80 Contract #82629/00 Design and Engineering: 69kV U/G Cables Replacement; Qatif BSP to Safwa Lines 1 & 2

July 1996 Sept 96 Sep. '96

Dec, 2000 Nov 96

SR 16,200,000 SR 30,000.

King Abdul Aziz Univeristy Mr.Marwan Dardas.


Saudi Services for Electro Mechanic Works Co. Ltd. (SSEM) / SCECOEAST,Qatif/
Rastanura

Aug. 98

SR 320,000

Nov. '96

May 97 Mar 97 Mar 97 Jan98

SR 190,000 SR 60,000. SR 180,000 SR 90,000. SR 6,600,000

Al-Nafjan Contracting Est./ SCECO-East Qatif / Safwa Al khodary Co. Al-Nafjan Contracting Est./SCECO East Mrs Abdulah Khodary Khobar. SCECO-East

170. 171. 172. 173.

174.

175. 176.

177.

Residential biulding in Rakah Jan 97 area Khobar 69kV U/G Cables Replacement;Qatif BSP to Jan 97 Safwa Lines 1 & 2. AL Khodary family Villa ,at May 97 Green Belt in Khobar Construction Management for New Ghazlan Power Plant Integration and Reinforcement Jul. 97 of 230 kV System in Northern Area.Contract No.82800/00 Construction Management for Power Supply to Saudi ARAMCOs New Hawiyah Gas Jul Plant. Contract No. 82992/00 1997 King Fahd University Telephone Sep, Exchange network of more 1997 than 14,000 lines Site Preparation for Hawiyah Gas Plant,115kV O/H T/L, Oct. '97 SCECO-East Contract # 44202/00 Development of Scope of Work for O & M of Kharkhair Power Oct. '97 Plant Project and Distribution Network. Phase-I Design of Yanpet Infrastructure Expansion Project Jan. '98 115kV Feeder to Yanpet

Dec. 2000

Dec 2000 Oct, 2000

SR 6000,000 SR 9,300,000

SCECO East King Fahd University Ahmed Al-Binali & Sons Co.Hawiyah / SCECO-East SCECO-East Kharkhair SSEM / Royal Commission, Yanbu, K.S.A.

Dec. 97

SR 135,000

Mar. 98

SR 270,000

178.

Jan. 99

SR 265,000

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

179. 180.

Chamber of Commerce Jan, 98 Development of Scope of Work for O& M of Kharkhair Power Mar 98 Plant Project and Distribution Network; Phase-II Construction Management for Power Supply to Saudi ARAMCOs New Hawiyah Gas Oct. '98 Plant. Contract No. 82992/00 Drafting Services May 99 General Engineering Services Jun 99 Jan. 2002 SR 216,500 Dec, 1998 210,000 SR 540,000

Chamber of Commerce Saudi Electricity Company EOA

Feb 2001

181.

Apr. 2001 Dec, 99

SR 2,995,000 SR 72,000

Saudi Electricity Company EOA Arabian Thermal Air Industries (ATAI) Al-Jubail Petrochemical Company (Kemya) Raymond Saudi Arabia Limited/ SCECO-ERB Royal Commission, Jubail Saudi Electricity Company EOA Royal Commission Jubail Royal Commission Jubail SSEM SCECO ERB King Fahd University

182. 183.

184.

Improvement of Sea Water Inlet and other Facilities at Qurayyah Power Plant SCECOOct. '99 East Contract # 83770/00 Design and Engineering of Power System Royal Commission for Jubail Quality Monitoring and Inspection Services for SCECOEast Contract No. 83320/00 Design and Engineering : 115/134.5 Kv 45 BC S/S in Jubail Industrial City for Royal Commission Design and Enginering 2x115Kv Underground power cables + F.O cable from Jubail Southwest S/S 45 BC S/S Engineering & Design Services of 69kV U/G and Fiber Optic Cable Installation in Dammam Area King Fahd University , Ethernet based Enterprise network upgrade, totaling to 10,000 points with interanet /internet services Dec. '99 Dec. '99 Feb. 2000 Feb.20 00 Apr 2000

Sep. 2000

SR 345,000

185. 186. 187.

Oct. 2005 Jul. 2005 Jun. 2002

SR 7,222,830

SR 4,649,222 SR 500,000

188.

Jun. 2002

SR 160,000

189.

Apr 2001

SR 230,000

190.

Apr, 2000

Sep, 2001

SR 4,055,000

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

191.

192. 193.

194.

195.

196. 197.

Construction Management and Project Monitoring of Diesel Power Plant and Overhead Distribution Network at Kharkhair Area. Contract No. 83419/00 Design and Engineering Services SEC-ERB contract No. 83330 Drafting Services of Civil/ Structural works for Restoration of Piers at King Abdul Aziz Navy Base, Jubail Engineering & Desing Services of 132kV O/H T/L and Fibre Optice system in Riyadh Muzahimiyah and Qassim Construction Management of S/S & T/L Projects for Power Supply of HARDAD and FARAS /SHEDGUM Expansion Projects Design and Engineerng : D/C 69 KV OH T/L from Dhahran Central S/S to Al-Maha S/S Design and Engineering : D/C 115 Kv OH Transmission line from Mahasen BSP to SANG S/S

Jul 2000 20, Jul 2000 Aug 2000

Jan 2002

SR 3,410,272

SCECO East

July, 2001

SR 3,836,964

SCECO East Al Rabiah in Association with COWI consulting Engineers Al-Sharif KEC / SEC-ERB

Oct 2000

SR 55,800

Aug 2000

March 2001

SR 137,000

Dec 2000 Jan.20 01

Nov 2003 Oct. 2002

SR 5,160,000 SR 80,000

SCECO East Al-Yami

Jun.20 01

Mar. 2002

SR 160,000

Al-Ertifaa

198.

199. 200. 201. 202.

Design 3 and Engineering: reinforcement of power distribution network, Jubail industrial City . Mr. Naif Al-khodary Villa at Bahrain causeway area ,Khobar Residencial Building at Lexus showroom area in Khobar

Oct. 2001 Jul.200 2 Jan.20 03

July, 2002 Oct,2002 Mar 2003 July 2003 March, 2004

SR 450,000 SR 60,000. SR 50,000 SR 50,000. SR 230,000

Royal Commission Jubail Mr. Naif Alkhodary Khobar. Mr.Naif Alkhodary Khobar Mr.Mohd Al-Assaf Doha Dhahran. SCECO East, SSEM

Mr. Mohammad Al-Assaf Mar.20 Rsidential Villa at Doha 03 ,Dhahran Saudi S Services for Electro March mechanic works Co. 69 Kv U/G 2003 T/L & F.O Cable installation

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

203.

204. 205. 206. 207.

208. 209. 210.

211. 212. 213. 214. 215.

Supervision work for the roofing reconstruction of the May processing area more than 2003 2500m in the Dammam Plant. Mr.Sami Al-Khodary Villa at Aug.20 Green Belt- Khobar 03 El-Mandeb , Engineeering & Sep, Design Services for new Street 2003 Lights Instrumentation & Control 2003 Design Services National contracting Co. (NCC) Design and Engineering works Oct, of 69 Kv & Fiber optic U/G 2003 cables & taleemi S/S SEC-ERB Contract No. 83723/00 Al-Ertifa , Engineering and May Design Services 2003 Design and Engineering July Services for Construction of 2004 new 115/13.8Kv S/S 16BD Engineering and design services for New St. Lighting Sep, for Jyaumah & Dammam SEC2003 Erb Contract No. 83844/00 Design of 115 KV overhead Jan, Transmission lines Sec-ERB 2004 contracto No. 83426/00 Saudi German , Engineering Jan, and Design Services 2004 Warehouse Building annex Feb attached to an existing Ware 2004 house SNAS Area ,Khobar C.C.C. Engineering and Design 2004 services Engineering & Design Services for construction of BCIC Feb, Plant-2 2004 Increased Power Supply for Plant expanstion Contract No. 83400/00 Design and Engineering Services Contract No. 10442066/00 Gen. Engineering Services March, 2004 Jan, 2005 29 Jan, 2005

Sept 2003 Nov 2003 Dec, 2003 July, 2006

SR 80,000. SR 50,000 SR 31,000 SR 190,635

Saudi Fisheries Co- Dammam Mr.Sami AlKhodari Khobar El-Mandeb Co. Sofcon Co.

Feb, 2003

SR 155,000

NCC/SEC-EOA

Oct 2003 May, 2005

SR 34,750 SR 1,534,446

Al-Ertifa Co. Saud Consult/RC El-Mandeb/ SECEOA SCECO East Saudi German Co. Mr.Marwan Dardas C.C.C. Co. BCIC Co. MK Cables SCECO East SCECO East

Dec, 2003 June, 2004 March, 2004 Apr 2004 July 2004 May, 26 2004 May 2004 Jan, 2007 July, 2009

SR 131,000

SR 1350 SR 25,000 SR 30,000. SR 20,000 SR 95,000 SR 16,650 SR 253,312 SR 206,800

216. 217. 218.

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

219. 220.

Al-Ojaimi Services of Draft Man Engineering Design And Consulting Services For Power Supply To SAUDI ARAMCO Khursaniyah Producing and Gas Facilities. Contract No:83400/00 Engineering Design And Consulting Services For 380 KV Double Curcuit OH T/L from AL-Fadhili Substation to Shamlul Switching S/S.380KV Double Circuit OH T/L Shamlul Switching Station To Sudair S/S SECEOA Cont No:30531005/00 & Cont No:30531076/00 Supervision work for the expansion of the processing area of the Plant in Dammam. Design & Engineering of 380kV OHTL for Al-Fadhili S/S to Shamlul Switching Station + From Shamlul switching Station to Sudair S/S Design & Engineering for O/H Lines Distribution NetworkKhurais SEC-COA # 10531123/00 Installation of OH Line for Circuit S/S 8600, 8 Construction Management of 380 kV D/C OHTL Fadhili Shamlul-Sudair SEC-Contract 30531676/00 & 30531065/00 Design and Engineering for Power & Telecom Network. RC Contract No. 068-T08 E.S.Generation SEC-EOA Contract No: 30522122/00 Enhancement of Telecommunication systems supporting energy Transmission Network

Jan,20 05 Jan, 2005

Feb, 2005

SR 15,019

Al-Ojaimi Co. Saudi Elecrticity Company Eastern Operating Area.

June, 2005

SR 253,312

221.

June, 2005

July, 2006

Saudi Elecrticity SR 7,000,000 Company Eastern Operating Area.

222. 223.

July 2005 July 2005 Feb 2006 Feb, 2006 Jan 2006 Nov 2005 June 2006 May 2006

Dec, 2005

SR 70,000.

Saudi Fisheries Co Dammam.

Dec, 2006

SR 650,000

SSEM/SEC-EOA

224 225 226

Mar, 2007 Feb, 2008

SR 1,452,000 SR 100,000

Saud Consult/Aramco Al-Haider

Jan, 2008 In Progress June2009

SR 7,868,000

SEC-EOA

227 228 229

SR 6,819,543 SR 32,887,233 SR 145,000

RC Jubail SEC-EOA

May, 2007

Al-Fanar

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

230 231

232 233 234

235

236 237 238 239 240 241 242

243 244

115/13.8 kV Substation 16 BD and related works - Jubail SEC-EOA # 30631079/00 Construction of 380 kV Doubel Circuit OHTL Works Associated with the integration of Phase-I of Qurayyah -2 P/P Design & Engineering Services For Private Villa Desing & Engineering Services For Private Villa Engineering and Design Serivces for Temporary Support Structures Required for FCCU Sea Water Scrubber Project Construction Management for Power Supply Project to Saudi Aramco E/W Pump Station Contract No. 30633080/00 132 kV OHTL Modification in Jizan Area, SEC-SOA Contract No. 40631138/00 Developments of Bid Documents Contract No. 30782040/00 Project Management Services of Company Projects Contract No. 30731051/00 Site Supervision for DTA Project for 2008 at SOA Contract No. 40731109/00 Engineering & Design Services SEC-EOA Cont No. 30731116/00 Desing & Engineering Services For Malila Factory Asharqia Chambers Design & Supervision Services for Invstment Building in Royal Comission Of Jubail Cont # OPD -JP-070001 Design & Engineering Services For Workshop + Labor Camp Engineering support Services Contract No. 30832120/00

Aug 2006 Aug 2006 Sep 2006 Dec 2006 Jan 2007 Mar 03 2007 Mar, 2007 Mar 28 2007 July 2007 Feb 03 2008 Feb, 2008 Feb 2008 Mar 31 2008 June 2008 Aug 2008

Aug, 2008

SR 335,000

Saud Consult

Aug, 2008

SR 319,000

N.C.C. Ibrahim Alraya, Al-Khobar Mohammad Hifzi Khobar ABA Corp

Feb 2007 Apr 2007 Sep, 2008

SR 25,000 SR 25,000 SR 168,327

Nov, 2008 In Progress Mar, 2009 In Progress In Progress In Progress Dec 2009 In Progress Dec 2009 In Progress

Saudi Elecrticity SR 2,033,200 Company Eastern Operating Area. SR 100,000 SR 12,116,185 SR 29,498,980 SR 18,494,400 SR 250,000 SR 25,000 Al-Haider Saudi Elecrticity Company EOA Saudi Elecrticity Company EOA Saudi Elecrticity Company EOA Al-Haider Ditra Company Dammam Asharqia Chamber of Commerce Jubail Jar Company Dammam Saudi Elecrticity Company EOA

SR 2,522,800

SR 500,000 SR 86,486,120

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

245 246 247

248

249

250

Construction Management for Dec, 16 SEC Central Region Contract 2008 No. 10831076/00 General Engineering Services Dec, 24 (DED) Contract No. 2008 30842153/00 Engineering Design of 72,000m2 Housing Compound for 300 people, Mosque, Jan. Cafeteria, Central Kitchen & 2009 gardens. Maintenance Hangar for Cranes. Power Supply to SWCC Pump Station from SEC 230/115 kV Apr, S/S Jubail Southeast Cont # 2009 EPWTS 115 Kv Power Supply to Jubail 2, 115/34.5 kV Secondary May, Industries S/S 4, Cont. # 0712009 C13 Design & Supervision Services for Fire Fighting Plant in 2nd Jun. Industrial City Dammam 2009 Design of 132 kV OHTL between S/S No. 8780 & 8782 in wadi al-Dawaser SEC-COA Cont. # 10331229/00 Construction of Dhahran South 380/115/13.8 kV BSP (PhaseI), SEC-EOA Cont. # 30731170/00 Design Engineering Services For Ware House Design Engineering Services For Mosque Desing & Engineering Services For Office Building Consturction Management SEC- (COA) Contract No. 10931134/00 Consturction Management SEC-COA (Princes Nura University) Contract No. 10933164/00 July, 2009 July, 2009 Dec 2009 Jan 2010 Feb 2010 Feb. 2010 Jun. 2010

In Progress In Progrerss

SR 18,999,800 SR 113,193,600

Saudi Elecrticity Company EOA Saudi Elecrticity Company EOA

Jun. 2009

SR 600,000

Ejar Cranes, Dubai

In Progress In Progress

SR 341,400

S.S.E.M.

SR 176,000

S.S.E.M. H.H. Prince Faisal Bin Fahad AlFaisal Al-Saud N.C.C

Jan. 2011

SR 1,500,000

251

In Progress In Progress Mar 2010 Dec 2010 Dec 2010 In Progress In Progress

SR 260,000

252

SR 1,000,000

S.S.E.M. Gulf Guide Company Dammam Port Ibrahim Alraya Al-Khobar Modern Printing Press Dammam Saudi Electricity Company EOA Saudi Electricity Company EOA

253 254 255 256 257

SR 30,000 SR 40,000 SR 50,000 SR 14,637,800 SR 16,226,000

Sl.No.

Name of Project

Date of Award

Date of Completion

Value of Work Performed (SR)

Client(s)/Location

258

259

Design and Engineering Services for Construction of Shumaisi S/S 8151, Souht Olaya S/S 8156, Manfoha S/S 8134 & 2nd Industrial City S/S 8174 Contract No.10931062/00 SWL-Safe Working Load Limit For Gantries And Other Steel Structures General Engineering Services (TSD) Contract No. 31062064/00 Engineering & Design Services For Ware House and Office Building Design & Supervision Services for the Investment Building of Modern Printing Press in the 2nd Industrial City - Dammam Contract # 31031112/00 Construction Management For 132kV S/S Works For Qurayyat Generation And Qurayyat Tabarjal 380kV OHTL Contract # 21033109/00 Consultant Site Supervision Services for Customer for Fund Projects WOA Design & Engineering SEC-COA Contract # 11031157/00 Qassim-4 BSP Construction of Najran University 380/132/13.8kV BSP Al-Najran Design & Engineering SEC-COA Power Factor Correction in Hail, Contract # 11031168/00 PTS # 11 CM01 Design & Engineering Services for SBW Parking AreaT emporary Support Structure Construction Management services for Qurayyah IPP Integration 380/230kV

Jun. 2010

In Progress

SR 1,100,000

Al-Toukhi Company for Industry Trading & Contracting, Riyadh M.K Cable Management (Saudi Arabia) LTD Saudi Electricity Company EOA Al Quraishi Company Dammam Modern Printing Press Al-Khobar

Nov. 2010 Nov. 2010 Dec 2010 Jan. 2011

06 Weeks In Progress In Progress In Progress

SR 24,000

260 261 262

SR 971,830 SR 50,000

SR 1,500,000

263

Mar. 2011

In Progress

SR 13,756,700

Saudi Electricity Company EOA

264

Nov. 2011 Aug. 2011 Aug. 2011 Dec. 2011 Dec. 2011 2012

In Progress In Progress In Progress In Progress In Progress In Progress

SR 16,176,000 SR 1,452,000 SR 1,409,150

Saudi Electricity Company WOA Saudi Electricity Company COA/SSEM Saudi Electricity Company SOA/ABB Saudi Electricity Company COA/ISCOSA SAMREF Rawabi Specilized Contracting Co. SAMSUNG/HAJR ELECTRICITY PRODUCTION CO. Al-Khobar,

265 266 267

SR 970,000

268 269

SR 20,000

SR 1,900,000

17

SATECH ACCOMPLISHED PROJECTS

SEC -SHOAIBA POWER PLANT

SEC 115KV HAFAR AL-BATIN SUBSTATION TRANSFORMER

SEC- 115 kV QAISUMAH POWER PLANT SUBSTATION

SEC- INDOOR HAFAR AL-BATIN SUBSTATION

CABLES AND GAS PIPELINE PROJECT

JUBAIL - ROYAL COMMISSION JUBAIL PIPELINE PROJECT

SABIC-PETRO CHEMICAL

132kV SUBSTATION IN RIYADH

SATECH INTERNATIONAL AFFILIATES