Escolar Documentos
Profissional Documentos
Cultura Documentos
Specification
Scope
This specification covers the flooring system for Car Parking specifically designed for Basement and Ramp areas.
General
1. The area where treatment system needs to be installed shall be made free from all other activities that could disrupt the installation of the system. 2. All the products specified in this document shall be installed strictly in accordance with the manufacturers written instructions and by a specialist applicator approved by the manufacturer. 3. All products in the system shall be manufactured Pidilite Industries Ltd., shall meet the key performance properties listed below against each. Should the applicator or contractor prefer to use alternative equivalent product(s), the Applicators shall provide proof of compliance to the specified key performance properties. 4. The applicator shall ensure that all products in the system are received in good condition without damage and stored as per manufacturers instructions.
Advantages of Dr.Fixit Pidilite Flooring system No additional dead load Savings in slab / columns / foundation design Fast and clean installation Excellent protection to RCC Wide range of colors available Good durability / easy recoating Good cost / performance ratio
Treatment to joints
All other stable joints (saw cut joints / dummy joints / construction joints) are to be filled up prior to lay the screed as per the designed thickness using Dr.Fixit Epoxy flooring screed.
System
Dr.Fixit Pidipoxy MI EP( Primer)- 1st coat + Dr.Fixit Pidipoxy MI EP(Primer) 2nd coat + Fine Quartz (Broadcast) + Dr.Fixit Pidipoxy EC SF (2 coats)
Application Methodology
Primer (1st coat)
Prime the surface with a neat binder Dr.Fixit Pidipoxy MI EP Primer (Moisture Insensitive Epoxy Primer) containing Comp. A & Comp B mixed thoroughly with a mechanical mixer to get a homogeneous consistency mix. After application of primer, wait for minimum 30-60 minutes for the primer to become tacky.
Primer (2nd coat) & Broadcast quartz
Prime the surface with a neat binder Dr.Fixit Pidipoxy MI EP Primer (Moisture Insensitive Epoxy Primer) containing Comp. A & Comp B mixed thoroughly with a mechanical mixer to get a homogeneous consistency mix. After application of primer, immediately broadcast sand evenly on the freshly laid scratch coat. Allow it to dry completely. Sealer coat with Dr.Fixit Pidipoxy EC SF Mixing
Transfer part A in a suitable clean container, add part B to it and stir with a low speed electrical drill withattached paddle stirrer at 250 300 rpm for 3 - 5 minutes to a homogeneous & uniform colour mix. Application Apply the mix material by brush or roller on to the primed surface. Intercoat application time is 8 to 10 hours. If earlier coat has cured for longer duration, roughen the surface by sanding & then subsequent second coat should be applied. Finished coating should be protected and allowed to cure for 7 days.
Highly abrasion resistant Coloured Waterproof Slip resistant Moisture insensitive during application
Concrete Slab
5. Bill of Quantities
Sl. No. 1
Description Surface Preparation Prepare the dry concrete surface using proper grinding equipment to remove any loose material, contaminations and laitance to provide a sound, fine gripping surface. Clean the entire floor area using a powerful industrial vacuum cleaner. Primer 1st coat Providing and applying 2 part epoxy resin based primer Dr.Fixit Pidipoxy MI EP on the prepared concrete substrate. Primer 2nd coat Providing and applying 2 part epoxy resin based primer Dr.Fixit Pidipoxy MI EP on the prepared concrete substrate, immediately broadcast quartz on the applied primer. Allow it to dry completely. Application of Sealer coat Dr.Fixit EC SF Providing and applying solvent free epoxy coating with Dr.Fixit Pidipoxy EC SF in 2 coats having Specific gravity 1.35 +/- 0.02 g/cc, Hardness, Shore D is 84 as per ASTM D 2240, Tensile strength is 15N/mm2 @7 days N/mm2 ASTM C 307, Compressive Strength is 85 N/mm2 @7 days AST M C 579, Flexural Strength is 35N/mm2 7 days N/mm2 ASTM C 580, Elongation is 16%, also the it is resistant to many chemicals. All in complete as per the manufacturers specifications and directions of the engineer in charge.
Unit
Unit Price
Quanti ty
Amount
Sq. m
4.
System
Dr.Fixit Pidipoxy MI EP( Primer) + Dr.Fixit PidiPU Wearing Layer + Fine Quartz (Broadcast) + Dr.Fixit Pidipi TC (Sealer coat PU Top coat)
Application Methodology
Primer
Prime the surface with a neat binder Dr.Fixit Pidipoxy EP Primer, containing Comp. A & Comp B mixed thoroughly with a mechanical mixer to get a homogeneous consistency mix. After application of primer, wait for minimum 30-60 minutes for the primer to become tacky. Wearing layer and Broadcast quartz Mix Part A & Part B in their individual containers to uniform consistency & appearance. Transfer Part A & Part B into a clean & dry mixing vessel. Mix together using a slow speed (400 rpm) drill with a spiral mixing head to a homogeneous & uniform mix. Start addition of Part C, filler component gradually under continuous mixing by increasing speed of the drill to a homogeneous & even mix. Mix the material for atleast 5 minutes to a uniform colour shade. Pour the mixed material on to the primed or crack bridging layer applied floor surface & spread at required coverage rate to get the desired DFT by trowel. Move spiked roller over the coated surface to remove entrapped air. After overnight curing / 16 hrs curing of Dr. Fixit PIDIPU WL coating apply one or two coats Dr. Fixit PIDIPU Top Coat Immediately broadcast sand evenly on the freshly laid scratch coat. Allow it to dry completely.
Note: Broadcasting of quartz is completely depended upon the texture / roughness required at site which shall be decided after the site trials. Sealer coat with Dr.Fixit PidiPU TC Remove the excess quartz particles from the surface. Seal the broadcasted surface with sealercoat Dr.Fixit Pidipu TC Application of Top Coat Dr.Fixit PidiPU TC Mixing Mix Part A & Part B in their individual containers to uniform consistency & appearance. Transfer Part B, Hardener component to Part A, base component container completely. Mix together using a slow speed (150 200 rpm) drill with a paddle or cowl disc mixing head to a homogeneous & uniform mix. Scrape the sides & bottom of the mixing container during mixing. Sieve the mixed material through fine muslin or bolting nylon cloth.
Application
Pour the mixed & sieved material at required coverage rate to get the desired DFT by using best quality paint brush or spray or roller. Apply second coat at right angle to the first coat. Allow it to cure for minimum 16 hours for foot traffic & 48 hours for capable of bearing loads.
2. Ramps
Requirements for ramps High abrasion resistance Coloured Waterproof High impact resistance High slip resistance
Concrete Slab
Sl. No. 1
Description Surface Preparation Prepare the dry concrete surface using proper grinding equipment to remove any loose material, contaminations and laitance to provide a sound, fine gripping surface. Clean the entire floor area using a powerful industrial vacuum cleaner. Primer Providing and applying 2 part epoxy resin based primer Dr.Fixit Pidipoxy MI EP on the prepared concrete substrate. Installation of Dr.Fixit PidiPU WL Wearing Layer Providing and applying 3 component polyurethane wear and protective layer having solid weight of 99%, Hardness Shore D 60 as per ASTM D 2240, Tensile strength at break >15 as per ASTM D 412, Elongation at break >50 as per ASTM D412,Tear strength is >40N/mm2 as per ASTM D 624, Abrasion (Taber) mgm/1000 cycles is <10 as per ASTM D 4060, Slip resistance >90 as per BS 797602:2002, Bond strength >1.5 N/mm2. All in complete as per the manufacturers specifications and directions of the engineer in charge. Installation of Dr.Fiit PidiPU TC Top coat Providing and applying Dr.Fixit PidiPU TC - 2 component Polyurethane UV resistant Protective coating having Hardness Pendulum S >60, Tensile strength at break >2N/mm2 as per ASTM D 412, Elongation at Break >100% as per ASTM D 412,Abrasion (Taber), mg / 1000 cycles <50 as per ASTM D 1044. All in complete as per the manufacturers specifications and directions of the engineer in charge.
Unit
Quanti ty
Amount
Sq. m
4.
Bill of Quantities
6. 3. Coving & Skirting Requirements of coving Aesthetics Part of a cardeck system Finishing edge of epoxy
Bill of Quantities
Sl. No. 1
Description Providing and laying coving all along the columns and floor-wall junctions by using Quartz with Dr.Fixit Pidipoxy EP Primer and using a sealer coat with Dr.Fixit Pidipoxy EC SF at 75mmx375mm size. (size can be varied depending upon the requirement) Providing and laying skirting all along the walls by using Quartz with Dr.Fixit Pidipoxy EP Primer and using a sealer coat with Dr.Fixit Pidipoxy EC SF at ht of upto 50mm (size can be varied depending upon the requirement)
Unit
Unit Price
Quantity
Amount
RM
RM
Bill of Quantities Sl. No. 1 Description Providing and laying markings all along flooring system as per the requirement using Dr.Fixit Pidipoxy with 100mm width Unit Unit Price Quantity Amount
Rm
Terms & Conditions 1 The above mentioned rates are inclusive of ED @ 12.36%, 2% CST against C-form and frieght charges for material. 2 The cost of application is included. 3 The VAT and Service charges for application will be charged extra.