Escolar Documentos
Profissional Documentos
Cultura Documentos
Re v
Date
Change Description
Original distribution
1.0 4-28-00
Table of Contents
1. OVERVIEW
1.1. Size Measurements
1
1
2. SYSTEM VERIFICATION TEST (SVT) TEST CASES 3. PROBLEM TRACKING REPORT (PTR) SUMMARY 4. OTHER METRICS
4.1. Dates 4.2. Software Builds 4.3. People & Time 4.4. Beta Test results / summary
1 1 2
2 2 2 2
5. GENERAL COMMENTS
1. Overview
This Test Report concerns the SVT Phase of testing for 9000 Version 7.0 Advanced Color Module, and includes testing performed for Color Management, even though Color Management was not released with 9000 Ver. 7.0.
#PTRs Total Opened: 87 #PTRs Closed: 86 #PTRs Still Open: #8897 (a firmware problem involving noise detected at the Card Registration sensor), of severity P3. 10. The major open issue remaining at the time of release was Color Management. This feature is no longer tied to the Advanced Color Module release, but must nevertheless be tested and is still on-going at the time of this report.
4. Other Metrics
4.1. Dates
1 . 2 . DATE DESCRIPTION Date testing Started: this is the first day of Entrance Testing Date Testing Ended: this is the last day of Regression Testing. PLANNED 9-22-99 11-2-99 ACTUAL 1-10-00 3-15-00
4.2.
1. 2. 3.
Software Builds
VERSION First Build done Last Build done # Builds done during testing period DATE DONE
No attempt was made to add together the test hours for all 4 test personnel. This information may be available to management via time card data.
5. General Comments
1. One very big hindrance to this testing effort was that, on the Friday before SVT was to start, the new Print On Image Generation Error was successfully built. This feature was not included in any of the currently-existing test cases, and hence caused a complete overhaul of the associated test cases (mainly all the error test cases) and associated requirements and test case matrices. Under no circumstances should extensive new features (or perhaps features of any kind) be introduced at the very end of DVT. 2. The color system I tested on, Continuation 2, also contained an UltraGraphix module in it that, as it turned out, never did get used for testing. Having that module there caused some holdups: - Everytime we initialized, the UltraGraphics ribbon would advance, so that several times we could not continue testing until the ribbon were replaced (since it had run out, even though never used). - Many times cards would stick at the entrance to the UG Module due to the rollers getting dirty. On the plus side, the project was tracked very well, and there seemed to be sufficient time for testing.
3.