BSEs Pilot Plant Has Been Directly Producing 5400 C High Pressure Steam from Concentrated Sunlight for Over Two Years
2
October, 2010:
Backlog of 2.6 GW of signed, approved Power Purchase Agreements with
4
PG&E and Southern California Edison Pilot plant operational for two years with its performance certified by multiple IEs Over US$300 million of corporate equity from world-class investors Solar-2-Steam plant under construction for Enhanced Oil Recovery operations Bechtel Power broken ground at Ivanpah, the worlds largest solar power project (392MW) - fully permitted with transmission access approved Term sheet signed by US Government to provide US$1.4 billion Ivanpah debt NRG Energy signed LOI to provide US$300 million of Ivanpah project equity Alstom power invested US$50 million and became strategic partner
Great Technology
Financial Strength
Technical Credibility
Success
Heat Exchanger
1000m 750m
450m
250m
The BrightSource Team Built 354MW SEGS Plants in 80s and 90s - Still Running Today
9
10
Solar Thermal Chevron EOR Demo Plant (Construction Began May, 2009)
11
Key Demonstration Accomplishments Worlds highest temperature and pressure solar thermal steam production known to be achieved
13
Ivanpah 2 133MW
Establishing market credibility: Signed MOU for 500MW before Series A financing closed
Site selection: Analyzed DNI and transmission and identified over 4GW of good sites within six months of beginning operations Raising project debt for second-generation technology: Submitted preliminary request for 100% loan guarantee to US Department of Energy in December, 2006 Key elements of successful project development in US:
Transmission: Transmission access requests submitted 1Q 2007 Permitting is critical and takes time: Utilized low-impact design with minimal site disturbance and dry cooling, submitted permit and site right-of-way requests in July, 2007 Need creditworthy customer commitments: Signed 900MW of Power Purchase Agreements with Pacific Gas & Electric in February, 2008
Must
demonstrate technology: Dedicated pilot plant in June, 2008, fully operational in October, 2008, extensively vetted by customers, investors, and the US DOE.
Capital intensive business requires financial depth and patient investors: Multiple rounds of funding from world-class investors based on solid achievement Big backlog required to fuel growth: Increased total backlog of signed and approved PPAs in the US to 2.6GW by mid-2009 worlds largest CSP backlog World-class EPC contractor for Ivanpah: Select Bechtel Power Strategic investor/operator for Ivanpah: Signed LOI with NRB Energy International growth fueled with partnerships: Signed strategic partnership agreement with Alstom Power for selected countries.
15
The US Government signed term sheet to provide 100% of Ivanpahs project debt US$1.4 billion. NRG Energy, one of USs largest power generators signed LOI to invest US$300 million to be Ivanpahs majority owner and operator. Alstom Power, one of the worlds largest manufacturers of power generation equipment, and a major EPC contractor, has invested US$55 million in BSE and is partnering in selected countries.
16
N 1 hydro
2005
Stabilize Needed emissions path 550 ppm 450ppm +30C +20C max
17
Heat Exchanger
18
Conclusions
Alstom & BrightSource offering fully integrated turnkey solar thermal plants
19