JOB SAFETY ANALYSIS

JOB DESCRIPTION : ULTRASONIC TEST FOR CORROSION MONITORING PRESSURE VESSEL AREA/TAG NO/EQUIPMENT DESCRIPTION : PERTAMINA EP - CEPU REFERENCES : PERTAMINA EP - HSE

PT. RADIANT UTAMA INTERINSCO Tbk. SIGNATURE OF SUPERVISOR

DATE OF ISSUE : March. 17. 2011 REVIEWED BY : LAST REVIEWED DATE :

SAFETY EQUIPMENT (PPE) REQUIRED TO DO THIS JOB : Hand gloves, safety shoes, safety hats, masker, safety harness, ear plugs.

Sequence of Basic Job Steps


1. Prepare work permit, materials, tools and equipments to be used for the job.

Machine/Equipment /Tool Involved in each step


Wire brush Hand gloves Masker Ear Plugs Safety harness

Potential Accidents or Hazards


Wire brush failure causing hand injury. Slip or fall Wire brush failure causing hand injury. Slip or fall

Recommendations to Eliminate or Reduce Potential Hazards


Safety Meeting before starting the job. The PPE must be used when do the job. Wash after handling, and before eating, drinking or smoking. Unusual fire and explosion hazards. Dont expose to extreme heat. Be careful when used wire brush and equipment. The PPE c/w safety harness & work vest shall be used when do the job. Make sure the pipe was clean as minimum preparation. Wash after handling, and before eating, drinking or smoking. Unusual fire and explosion hazards. Dont expose to extreme heat. Make sure safety harness in safe installation/position The PPE must be used when do the job. Be careful when conduct the job. Make sure the materials save in the correct place. Wash after handling, and before eating, drinking or smoking. Unusual fire and explosion hazards. Dont expose to extreme heat. Put in Garbage in the correct place. The PPE must be used when do the job. Be careful when do the job. Make sure the materials save in the correct place. Wash after handling, and before eating, drinking or smoking. Unusual fire and explosion hazards. Dont expose to extreme heat. Put in garbage in the correct place Make sure all equipments stored in the correct place. Wash after handling, and before eating,

2. Minimum surface pressure vessel preparation

Wire brush Hand glove Masker Ear Plugs Safety harness

3. Phase I for conduct thickness measurement

Wire brush Hand glove Masker Ear Plugs Safety harness Thickness meter (UT equip.)

Wire brush failure causing hand injury. Slip or fall

4. Phase II for install marks area of inspection

Wire brush Hand glove Masker Ear Plugs Safety harness

Wire brush failure causing hand injury. Slip or fall

5. Phase III for storage equipments

Thickness meter (UT equip.)

drinking or smoking. Put in garbage in the correct place.

This sheet is to record that Personnel noted below have been made aware of the nature of the task to be carried out; any potential hazards associated with the completion of this task and any additional work activities which could impact on safe completion of this task. It can be used as an aid by work leader. Are you satisfied that: You have seen, briefed and understood all Work Permits, Work Procedure, and Job Safety Analysis? You understand your responsibilities for both the work activity and safe working practices? You have the correct tools and equipment for the job? You know how to access and exit the work site safely, the nearest emergency telephone or fire alarm point is? You are aware what action to take in an emergency? You have all the necessary and specified personnel protective equipment? You have received MSDS advice on any materials or substances you may come in contact with? You have considered the work environment? You understand how you will control waste? You have considered conflicting activities? You are PTW trained and competent to carry out the task?