ME 4012

Keli 2010
Helmut Mauell GmbH Reliability and Safety f the for th Energy E Supply S l Industry I d t

ME 4012 Process Control System for Steam Turbines: Structure, Control Strategies, Protection, Safety, Operation, Application Examples, Similarities to Gas Turbine Control
Detlef Baran KELI 10: Process Control System ME 4012 04. May 2010 1

ME 4012

E.ON Power Plant Heyden Turbine Control System 920 MW Unit data:
P Power: 920 MW Live steam: T = 544C P = 210 bar Intermed. Super Steam: T = 544C P = 46 bar Construction: 1987 Operating hours: 110,000 h Start-ups: 1850

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

ME 4012

Turbine Overview Compact Drive

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

ME 4012

Hard Ware Structure of the Turbine Control ME 4012

Binary y input i t KPA-HD / MD Binary output Analog input Analog output CPU Binary input Binary output Analog input Analog output CPU Binary input Binary output Analog inp t input Analog output CPU Binary input y Binary output Analog input Analog output CPU

Master
Turbine e contr. Channel A CPU Pulse input Binary output Analog output Analog input Turbine protection (2oo3) Option Turbine protection (2oo3) Option Turbine co ontr. Channel B Analog input Analog output Binary output Pulse input CPU
1 . .8 1 . .8 1. . 9

A1 B1
1 .. 9 1 .. 8 1 . 8 1 2

2oo3 working current turbine protection


1 2 3

CPT-HP / IP

2oo3 NC current turbine protection

Turbine shaft

CPT-LPT T

A2 B2

SSV

CV

Diagnosis and documentation

Slave
Turbine protection (2oo3) Option 3

Operator control Alarm reports ME-VIEW


Kraftwerks-Status Kraftwerks Status Aschefrderung Speisewasserregelung bersicht Block Ascherezirkulation berhitzer Luft/Rauchgas Fernwrmeauskopplung Kalkfrderung Gasfeuerung Eigenbedarf Kohlefrderung Monitoranwahl: Archiv Fr 08.Jul 94

Serial interface

e.g. Modbus 3964R External systems

CPT-LPT

Option

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

ME 4012

Structure of the Turbine Controller Master/ Slave


T Housing T Shaft
(typical)

Turbine temperature control

Turbine controller B Turbine controllr A Power control

Pmin
Prepress. controller Lim.press.contr. (Opening ( p g setpoint) p ) min Speed control Speed controller
Pmin

Power controller

n1 (n2) n2 (n3)

Acceleration meter dn dt

IS limit pressure controller

HP/IP coordinator

HP valve position controller

IP valve position controller

LPT

P LS

T
IS
n1 n2 n3

Condensator

HP

IP

LP

LP

920MW

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

ME 4012

Turbine Behavior During Start-up and Load Operation

Xw

Turbine controller features: - Cycle time < 4 ms typ. Speed Measurement (digital): - Accuracy: +/-2,0 mHz abs. - Resolution: R l ti 0 0,5 5 mHz H

F 1.4012.207 D06.97 VP1

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

ME 4012

Electronic Turbine Protection: 2oo3 Signal Acquisition (Overspeed)

+L1
Turbine shaft

+L2

Turbine contr. 1oo2 (Master)

Turbine contr. 1oo2 (Slave) +L3

Open-circuit turbine protect. Channel 1

Open-circuit turbine protect. Channel 2

Open-circuit turbine protect. Channel 3

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

ME 4012

Overspeed Protection: 2oo3 Signal Processing, SIL 3

Open-circuit Open circuit turbine protect. Channel 1 Closed-circuit turbine protect. Channels 1 - 3

Open-circuit Open circuit turbine protect. Channel 2

Open-circuit Open circuit turbine protect. Channel 3

Quartz comparison

DW

DW

DW

Quartz comparison

DW

DW

DW

Quartz comparison

DW

DW

DW

RS

RS

RS

RS

RS

AS

AS

AS

AS

AS

RS

RS

AS

AS

AS

RS

&
t 0

& 2oo3 &

&
t 0

&

& 2oo3 &

&
t 0

&

& 2oo3 &

AS

Failsafe open-circuit protection DW module 1

Failsafe open-circuit protection DW module 2

Failsafe open-circuit protection DW module 3

Detlef Baran

KELI 10: Process Control System ME 4012

RS

&

04. May 2010

ME 4012

Protection-Pulse Distribution (2oo3 Electric), Protection Tripping


Failsafe open-circuit protection DW module d l 1 Failsafe open-circuit protection DW module 2 Failsafe open-circuit protection DW module 3

Turbine protection Manual trip 2oo3 LSN24

Test program Electric tripping device Electronic cutoff Solenoid valves (2oo3)
berwa achung berwa achung
# # # #

berwa achung

# #

EAM 15A

EAM 15A

EAM 15A

Power busbar 24V -

Solenoid valve activation (current controller)

Test

Test

Test

Test

ANS-MV SSV 1 Channel 1 MV

ANS-MV SSV 1 Channel 2 MV

ANS-MV RV 12 Channel 1 MV

ANS-MV RV 12 Channel 2 MV

CPT 1 SSV

CPT 12 RV

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

ME 4012

Turbine Protection (12 x Shut-off Valve SSV, 12 x Control Valve RV) Decentralized Hydraulic Tripping

Power busbar 24V -

Test program SSV and RV

Solenoid valve activation (currnt controller)

Test

Test

Test

Test

ANS-MV

ANS-MV

ANS-MV

ANS-MV

CPT 1 SSV
CPT 1 SSV CPT 1 RV

TS 1 SSV 1 Channel 1 MV

TS 2 SSV 1 Channel 2

CPT 1 RV

TS 1 RV 1 Channel 1 MV

TS 2 RV 1 Channel 2

MV

MV

CPT 12 SSV CPT 12 RV G SSV servomotor G RV servomotor

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

10

ME 4012

Design of a Compact Drive


(Complete Hydraulic System every Control Valve, Shut-off Valve)

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

11

ME 4012

Process Control System Signal Run and Cycle Times

SUB-NET Level B

60-140 ms master cycle

ME-DRP online

ME-VIEW

10 ms
SUB-NET SUB-NET coupler coupler

Time synchronization 1ms accuracy

B1
50 ms master cycle
Radio clock

SUB-NETSUB-NET coupler coupler


RAID 5

PD server
UVIEW UVIEW

SUB-NET Level A1

450 ms 70 ms incl. redundancy adjustment adjust e t


Subprocessor Hot standby

SUB-NET Level A2
Subprocessor Master

Subprocessor Active

Subprocessor Hot standby

Subprocessor Active

Redundancy changeover (bumpless) 2 ms

Subprocessor Slave

I/O bus

I/O bus

Passive expansion module 1

Passive expansion module 2

Passive expansion module 15

Passive expansion module 1

Passive expansion module 2

Passive expansion

Passive expansion module 1

Passive expansion module 2

Passive expansion module 15

Passive expansion module 1

Passive expansion module 2

Passive expansion module 15

1 ms module /mod. 15

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

0,5 s

12

ME 4012

Turbine Control 1150 MW (NPP)

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

13

ME 4012

Hydraulic Aggregates for the Turbine Hydraulic System

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

14

ME 4012

Hydraulic Aggregate and Reservoir

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

15

ME 4012

Turbine Driving Speed Measurement

A A4-m-59684-0001 20
1 ,5 TO 0 LE R AN CE

M8 x 25 EN 24017 8.4 DIN 93 DSF 1210 F SHV Fa. JAQUET A4-m-59651-0004

5 40

Detlef Baran

KELI 10: Process Control System ME 4012

35

04. May 2010

16

ME 4012

Turbine Speed Measurement Controller 1oo2, Protection 2oo3 / SIL3

Process interface digital speed measurement: Accuracy: 0,004 % = +/- 2 mHz at 50 Hz netw. Frequency Signal resolution: 0,5 mHz Signal scan cycle: 4 ms Measuring range: > 3 - 3600 U/min Long-term and temperature stability due to digital acquisition and processing
Channel 1 IE2FZ Channel 2 IE2FZ Channel 3 IE2FZ DW Channel 3 DW Channel 2 DW Channel 1 IE2 FZ Turbine speed measurement 1oo2 I/O-Bus Speed and power controller AE4012

Pulse pre-amplifier

Turbine overspeed protection 2oo3 SIL3

Reserve detector

Turbine shaft

Servodrive

E / H- Converter Servodrive

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

17

ME 4012
Generator protection

Steam Turbine Protection Concept Safety and Availability


Failsafe trip system 2 oo 3, SIL 3 Overspeed protection
+L1 # # +L2

Life trip system 2 oo 3 Electrical and mechanical trip criterions

Turbine controller (Master)


Channel 1 Life trip system
1

Turbine controller (Slave)


+L3

Channel 2 SUB-NET

Channel 3

Life trip signal tranfered as Failsafe trip signal # Criterion permutation

Quarz comparator

DW

DW

DW

Quarz comparator

DW

DW

DW

Quarz comparator

DW

DW

DW

Fuel control valve

LT FST

LT FST

LT FST

LT FST

LT FST

LT FST

LT FST

LT FST

& t0

Function group Turbine control 24V +L1 24V +L2 24V +L3 emergency stop (Turbine trip)

T.-protection latch >3 turns min-1

& 2 oo 3 &

& t0

&

& 2 oo 3 &

Turbine protection manual trip (2 oo 3) LSN24

Failsafe trip t p module DW-Modul 1

Failsafe trip p module DW-Modul 2

Failsafe p trip module DW-Modul 3

Test program hydraulic trip block

Fail-Safe 2 v 3 (EAM)

LT FST

Test program overspeed detector

&

Failsafe fuel protection system (2 oo 3)

Control oil Hydraulic trip block 1 oo 2


Seat valve
Pi

Seat valve

Turbine hydraulic system

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

18

ME 4012

Overspeed Protection Module (SIL 3)

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

19

ME 4012

Hydraulic Protection Module (SIL3)

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

20

ME 4012

Turbine Hydraulic System (Servo Drives, Hydraulic Protection Module)

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

21

ME 4012

Servo Drives for Turbines 1150 MW

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

22

ME 4012

Servo Drives for Turbines (1150 MW), Efficiency Tests

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

23

ME 4012

Pipeline Isometric Drawing 1

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

24

ME 4012

Pipeline Isometric Drawing 2

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

25

ME 4012

Modification of an Operating Stand 1

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

26

ME 4012

Modification of an Operating Stand 2

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

27

ME 4012

Power Plant Altbach/Deizisau, Unit 4

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

28

ME 4012

Gas Turbine Control System ME 4012: Power Plant Altbach Combined Cycle Unit 4
Steam power Injection
Boiler drum

200MW Steam turbine


Oil Gas Sek. - Prim. superheater Fire Area

Water pipes

Si Siemens GT V93.0 V93 0

Oil Gas
M

Feed water flow Burner

Compressor Turbine

Cooler Demineralize

50MW

Oil Gas

Co bust o Combustion chamber

Detlef Baran

KELI 10: Process Control System ME 4012

Flue gas

04. May 2010

29

ME 4012

Power, Speed and Temperature Control

Ramp function t generator Speed setpoint

Synchronizer y

Mode of operation

Frequency

Exhaust temperature

Setpoint deionized water injection

Setpoint generator speed

Power setpoint

Setpoint generation power

Temperatursollwert

Setpoint generation temperature

Deionized water injection (Oil > 25MW)

Turbine speed

Speed controller

Electrical power

Power controller

Exhaust temp.

Temperature controller

Flow controller Deionized water

Coordinator Valve position controller

> 25MW asynchronous balanced mode

Oil-ESV

Oil-CV

Gas-CV

Gas-ESV F
M

P n

Compressor

Turbine T

Deionized water- CV

50MW

Detlef Baran

KELI 10: Process Control System ME 4012

Master

ocessing redunda ancy) Slave (full interface and pro

04. May 2010

30

ME 4012
100% 60%

Power, Speed, Temperature and Fuel Control


Start up setpoint diagram

15% 0
T C

300C Synchronisation

396C

Ramp function generator Speed setpoint

Synchronizer

Setpoint generator speed g p

Speed controller Oil flow Turbine speed EHCposition Fuel Flow controller Oil CV Oil-CV position Valve position controller EHC-position controller

Operational mode Power setpoint

Frequency

Setpoint control power

Power controller

Coordinator (bumpless switch)

Setpoint generation amount of fuel

EHCposition Flow controller Valve position controller Gas-CVposition Gas flow EHC-position controller

Exhaust temperature Temperature setpoint

Electrical power

Setpoint control temperature

Temperature controller

Shares plate Gas / Oil and automatic fuel switching, Base: Energy content / heat balance

Exhaust temperature Deionized water flow Fuel Electrical power Valve position controller Deionized water CV-position

Deionized water injection for NOx reduction in oil operation

Setpoint generation deionized water

Flow controller

Power adjuster dj t

Mode of operation

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

31

ME 4012
Master CPU Turbine e Governor Channel A

Turbine Controller (1oo2), Turbine Protection (2oo3, SIL3)


Diagnostics and Documentation
Alarms, SOE, Protocol

Operator station

Analog output

ME-DRP

ME-VIEW

AE4012 A

Binary output
Analog input

LAN
SUB-NET

Pulse input Life trip system Channel 1 Life trip system

Channel 2
Pulse input

Pulse pre-amplifier and decoupling

Turbin ne Governor Channel B

1 3

Analog output Binary output

Over speed protection p (2 oo3) SIL 3

AE4012

GT
2 oo3 Servodrive E/H-Converter Servodrive

Analog g input
Oil-ESV l-CV

CPU Slave
Servodrive E/H-Converter Servodrive

Time critical realtime funktions CPU-Functional Area 1 < 4 ms Speed control setpoint Speed controller Acceleration Measurement Fuel valve position controller

Life trip system

Channel 3

3
Gas-ESV Gas-CV

AE4012

Realtime funktions CPU Functional Area 2 CPU-Functional < 10ms Funktion group controls Power control setpoint Power controller Frequency influence Flue gas temp. controller Fuel controller Combustion controller Deionized water injection Anti surge control Turbine protection 2 oo 3

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

32

ME 4012

Gas Turbine Behavior During Start-up and Load Operation

Xw

Turbine controller features: - Cycle time < 4 ms typ. Speed Measurement (digital): - Accuracy: +/ +/-2 2,0 0 mHz abs abs. - Resolution: 0,5 mHz

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

33

ME 4012

Turbine Speed Measurement for Control and Fail-Safe Overspeed Protection (SIL 3)

Pulse pre-amplifier

Turbine overspeed protection 2oo3

Channel 1

IE2FZ

2v3 Turbine shaft Channel 2


IE2FZ

&

Channel 3

IE2FZ

DW Channel 1 DW Channel 2 DW Channel 3 IE2 FZ Turbine speed measurement 1oo2

Shut-off valve SSV

R Reserve sensor

Digital speed measurement: Accuracy : 0.004 % = +/- 2mHz at 50 Hz line frequency Signal resolution : 0.5 mHz Signal scan cycle : 4 msec. Measuring range : > 3 up to 3,600 U/min Long-term and temp. stability through digital acquisition and processing

I/O bus

Detlef Baran

KELI 10: Process Control System ME 4012

SUB-N NET

Speed and power controller, valve position controller

04. May 2010

34

ME 4012
Generator protection

Protection of the Gas Turbine: Overview Machine Protection


Life trip system 2 oo 3 Electrical and mechanical trip criterions Failsafe trip system 2 oo 3, SIL 3 Overspeed protection
+L1 # # +L2

Turbine controller (Master)


Channel 1 Life trip system
1

Turbine controller (Slave)


+L3

Channel 2 SUB-NET

Channel 3

Life trip signal tranfered as Failsafe trip signal # Criterion permutation

Quarz comparator

DW

DW

DW

Quarz comparator

DW

DW

DW

Quarz comparator

DW

DW

DW

Fuel control valve

LT FST

LT FST

LT FST

LT FST

LT FST

LT FST

LT FST

& t0

Function group Turbine control 24V +L1 24V +L2 24V +L3 emergency stop (Turbine trip)

T.-protection latch >3 turns min-1

& 2 oo 3 &

& t0

&

Turbine protection manual trip (2 oo 3) LSN24

Failsafe trip module DW-Modul 1

Failsafe trip odu e module DW-Modul 2

Failsafe trip module DW-Modul 3

Test program hydraulic trip block

Fail-Safe 2 v 3 (EAM)

LT FST LT FST

Test program overspeed detector

& 2 oo 3 &

&

Failsafe fuel protection system (2 oo 3)

Control oil Hydraulic trip block 1 oo 2


Seat S t valve
Pi

Seat S t valve

Turbine hydraulic system

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

35

ME 4012
Life trip system 2 oo 3 Turbine controller 1v2

Gas Turbine Protection: Overview Fuel Trip System


Overspeed protection 2 oo 3 (SIL 3)

Turbine shaft

Hydraulic trip block 1 oo 2 Fail-Safe shut off valve

Control oil

2oo3 F il S f fuel Fail-Safe f l trip t i (SIL3)

> 60% Load asynchronous M balanced operating low NOx Fuel Burner M < 60% Load diffusion operating M Fuel CV

Seat valve

ESV 1

ESV 2

Pilot flame Ignitor Pilot light


Propane gas 2. Shut-off valve 1. Shut-off valve

Combustion chamber
Detlef Baran KELI 10: Process Control System ME 4012

Venting system

04. May 2010

36

ME 4012

2. Solution: Automation Unit AE 4012 and Location Involvement


PD-Switch 1 PD-Switch 2

SUB-NET Level B

SUB-NET Coupler

SUB-NET Coupler

Automation unit AE 4012

UVIEW

Automation unit AE 4012

UVIEW

SUB-NET Coupler

SUB-NET Coupler

Automation unit AE 4012

SUB-NET Level A TC 1 TP 1
Multifunctionsprocessor

TC 2 TP 2

Multifunctionsprocessor

TP 3

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

Multifunctionsprocessor

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

BinaryInput/ Output

AnalogInput/ Output

marshalling rack

marshalling rack

marshalling rack

Auxiliary cabinet bi t
Flame / burner surveillance Shaft vibration measurement Coupling relays ~

Fail-Safe S t System
Fail-Safe logic

Power adjuster dj t
Stepping control drives

Turbine protection

Stepping control drives

Burner protection ~

Stepping control drives ~

Gas turbine Turbine controller, Turbine protection Turbine, burner, flue gas flap

Steam generator auxiliary power

Hardware signal exchanges: - Control steam generators - Daily oil tank - Operating load distribution - start-up device / alternator excitation

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

37

ME 4012
Control Room Unit4 GT-A

Operator System ME-VIEW and Location Involvement


Control Room HKW 2 Relay Room HKW 2

ME-VIEW Client

ME-VIEW Client

ME-VIEW Client

Balance protocol

ME-AIS

ME-DRP Client

ME-DRP Server / Client

VIEW-LAN VIEW-Switch 1 VIEW-Switch 2 Documentation VGB standard R 170 C On-line features: -- Diagnosis -- Configuration -- Simulation

EnBW Management system PI-System

Router

Gateway PC PD-Switch 1

RAID 5

RAID 5

DRPSwitch (Rail)

PD-Switch 2

Distributed coupling ME4012

Distributed coupling ME4012

DRP-LAN

Detlef Baran

KELI 10: Process Control System ME 4012

04. May 2010

38

ME 4012

KELI 2010
Helmut Mauell GmbH Reliability and Safety f the for th Energy E Supply S l Industry I d t

Thank very much for your attention. For more information click here www.mauell.com