Você está na página 1de 1

From

Sent

Morel
Friday

Brian
April

16 2010
Cocales

505 PM
Brett

To Cc
Subject

Jesse Hafle

Gagliano

Mark

WaIz

Gregory

RE

Cement Procedure
.jpg

Attachments

imageflol

Answers

below

in

red

From
Sent

Jesse Friday

Gagliano
April

16

2010

439 PM
Brett

To Cc

Morel Brian Hafle Mark Cocales

WaIz Gregory

Subject

RE

Cement

Procedure

Below are the answers cement


to

to

some When

of your questions

fro

the

procedure

Spacer
behind could

behind the

we pump
contact

foam job

in

SOBM
and
the

environment we

usually

pump
the

small

cement

prevent

between the cement


is

SOBM SOBM
mud
behind
for

destabilizes but
in

foamed

cause nitrogen

breakout as

There

plug
is

between
specific

cement and

the
if

case that we
feel this

of spacer system which might pump around

volume

the plug

we
it

put spacer
to

buffer

There

no

reason

pumping

20 bbls
the

can cut
with

back
about

10

to

15 bbls

Arent we

pumping you an

non foamed answer once

cement

you foamed

too

much volume
Brett
is

we

job

bbls

talking

Carl

affect

on tools

We

will

give

he determines

the effect

Pumping of Base Oil and Adding WeIlLife them on the Procedure page will added Rate
of

734
the

had these

steps

on

the

Job Recommendation

page

but

did

not capture

steps cement

cement

will

drop

the

rate

of mixing

to

bpm
is

to

simplify

the

procedure

10

bbls

ahead
it

of plug bbls then

the drop

line

volume

on

the Horizon

about

3-4

bbls

10

bbls

is

too

much and was

mistake

will

change

to

dart

Cement
be much
with the

behind

helpwith

volume

mud 10

be 3-4 bbls of cement in the lines that will be behind the plug This volume would not itwould be contaminated of volume would getto 18300 plugs Bythe time thatsmall In order for the cement to help you with the drilling of the plugs then have to would Larger you pump No cement behind 20 bbls behind This volume would cause issues with FasDrill or logging necessary
top plug there
will drilling

outthe

if

the darts

Compressibility compressibility
will

You have

written half

half

shoe track
to

bbls

Does

that

mean
in

that to

16
just

bbls plus want


to

shoe track
sure

see plug bump ordo you want

you want to pump calculated plus pump calculated plus half shoe track
Compressibility

change MiSwaco

but

make

understand

who

to

capture

it

the

procedure

14

bbls

1/2

shoe track volume

bbls and
await

will

start

making

changes

to

the procedure

your

comments

to

finalize

Brian have
off this

regards

to

the other e-mail

regarding
test

lab test

submitted

another

lab

test

with

an

additional
it

gal of retarder

to

see

what pump time that gives us The them put the test back on again to

review the chart didnt look right so Im having morning and when verify pump time Below is the compressive strength chart forthe current test with GPHS of retarder Im having them run the test out to 45 hours is have not received currently at 4150 any foamed all cement at strengths yet The JPT is currently 405 pumping bpm and we currently have 530 pump compressive

came

It

time

which

gives

us

122 cushion Thanks

will

forward

the

results

of

test

with additional

retarder

once

get

it

Let

me

know

if

you have

nay questions

Sounds

good send them once

you available

EXHIBIT

fl
41

33
HAL_00 10815

WIT_________________

Business

Confidential