APTRANSCO SSR 2010-11

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

STANDARD SCHEDULE OF RATES

FOR EHT TRANSMISSION LINES AND SUBSTATIONS


FOR THE YEAR 2010 - 11
(With effect from the date of issue of T.O.O. Ms.No 449, dated. 21.01.2011.)

APTRANSCO SSR 2010-11

INDEX Page No 8 15

SI. No. 1 2 Preamble:

Description

ANNEXURE-I: 400kV Transmission Lines ANNEXURE-II: 220kV & 132kV Transmission Lines ANNEXURE-III 400kV, 220kV & 132kV Substations ANNEXURE-IV Illumination, Lighting, Fire Fighting, Airconditioning, D.G Set & 33kV Station Supply System in 400kV Substations. ANNEXURE-V: Power Transformers ANNEXURE-VI: Transportation, Handling charges Involved during erection of 400KV Transmission Lines ANNEXURE-VII: Handling charges of Equipments & Line Materials ANNEXURE-VIII: Transport of Protection and Control of Equipment and Line Materials.

17

22

32

40

48

49

55

APTRANSCO SSR 2010-11

PREAMBLE:
1. The Rates for the item of works (Line & Substations) involved under special conditions in the existing SSR 2010-11 are as follows: (I) Sl. No. 1. 2. 3. TRANSMISSION LINE WORKS: Description of work River Crossing with JC type towers % Over the basic labour rates 100% extra

2nd Circuit Stringing with 1st Circuit lives. 75% extra Works under shutdown: This is applicable under the following conditions only. i. Pre-programmed for interruption of line. ii.Pre-arranged replacement / rectification of line materials. 50% extra

4. 5.

Dismantling works

75% of Normal Rate.

Emergency Works such as break down 100% extra works. This will not be applicable for prearranged shutdown works. Stringing of railway crossings National and State High way crossings Tree cutting & Jungle Clearance SUBSTATIONS AND OTHER WORKS: Description of work Works under shutdown: This is applicable under the following conditions only. i. Pre-programmed for interruption of equipment. ii. Pre-Programmed replacement of bus in Substation. iii. Pre-arranged replacement / rectification of equipment 100% extra 25% extra 100% extra

6. 7. 8.

Sl. No. 1.

% Over the Basic labour rates 50% extra

2.

Dismantling works

75% of Normal Rate.

APTRANSCO SSR 2010-11

Sl. No. 3.

Description of work Emergency Works such as break down works. This will not be applicable for prearranged shutdown works. Idle trip (No load) rate of the lowbedded trailer for movement of Power Transformers.

% Over the Basic labour rates 100% extra

4.

50% of basic labour rate of loaded trip. Shortest distance from / to the place of availability of low bedded trailer shall be considered.

Note:- However if more than one special condition such as emergency, shutdown, 2nd circuit stringing with First circuit live and breakdown etc are applicable for a particular work item / situation, only one condition with maximum extra rate out of applicable special conditions can be allowed. Applying more than one special condition for any item is to be dispensed. 2 For EHT Transmission line works, Keeping scattered in nature, some extra provisions a. are provide and are as follows

b.

5% extra provision on the basic rates of APTRANSCO towards scattered area mobilization efforts in general areas Or 10% extra provision on the basic rates of APTRANSCO towards scattered area mobilization efforts in difficult areas. The concerned SE/TLC has to certify that entire line passes through difficult terrain / areas duly furnishing the justification. Note:- If 10% extra toward mobilization efforts in difficult areas is applicable for a work, then the 5% extra towards mobilization effort in general areas is not applicable.

Transmission line erection works, Uniform area allowance minimum of 25% on basic labour charges for the entire state as recommended by Board of Chief Engineers will be allowed against weighted average of area allowance mentioned in Schedule of rates except in Greater Municipal corporation limits. If the entire line is with in the Greater Municipal Corporation limits, area allowance shall be considered as mentioned in Common SSR 2010-11. This uniform area allowance is applicable only for the Transmission line erection works. However area allowance shall be considered as adopted from Common SSR 2010-11, for the works other than transmission line works.

10 3(a)

APTRANSCO SSR 2010-11

10% extra to the rate of earth flat (material) is allowed towards wastage, cleats and overlap etc., while preparing the estimate as the billing for this item is on Running Meters basis and after laying of earth mat.

3(b)

For stringing of conductor for small modification works, if the length of the line is less than 0.5 KM, 0.5KM is considered and if the length of the line is greater than 0.5 KM and less than 1 KM, 1KM is considered, in the preparation of estimate.

3(c)

For survey of small length of lines, if the length of line is less than 1KM, then 1KM is considered for survey of small length of lines in the preparation of estimate.

3(d)

The rates for tree cutting and jungle clearance may be followed as per Common SSR of Govt of Andhra Pradesh.

4. A)

AREA ALLOWANCES: CORPORATIONS & MUNICIPALITIES: a) (i) 25% extra over the rates on labour component of works is allowed in all Municipal Corporation Limits of Andhra Pradesh except Greater Hyderabad, Greater Visakhapatnam and Vijayawada municipal Corporations ( up to a belt of 12 Kms. from Municipal Corporation limits ) and other corporations as notified by the Government from time to time. 40% extra over the rates on labour component of works for Greater Hyderabad, Greater Visakhapatnam and Vijayawada Municipal Corporation (up to a belt of 12 Kms. from Municipal Corporation limits).

(ii)

b)

Allow 20% extra over basic rates on labour component of works in all District Headquarters and the remaining Municipal limits (up to a belt of 12 Kms. from Municipal limits). For works at Tirumala Hills in Chittoor District, 40% extra over the basic rates of labour component is allowed. For works at Horsely hills in Chittoor District, 30% extra over the basic rates of labour component is allowed. 20% extra over the basic rates of labour component for Tirupathi Municipal Corporation is allowed.

c)

d)

e)

11 B) JAIL COMPOUNDS:

APTRANSCO SSR 2010-11

15% extra is allowed over basic labour rates for the work in the Jail compounds. Only equivalent number of Man Mazdoor shall be provided in the Jail premises and no women Mazdoor are allowed inside.

C)

INDUSTRIAL AREA: 20% over basic rates on labour component works allowed for works situated within 10 Kms belt of Industrial area of, Jeedimetla, Lingampally, Ibrahimpatnam,Tandur in Ranga Reddy District, Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur District Garividi in Vijayanagaram District, Kothur in Mahabubnagar District, Patancheru, Ramachandrapur in Medak District, Bibinagar in Nalgonda District, Ramagundam and Godavarikhani in Karimnagar District, Renigunta in Chittoor District and Yerraguntla & Mangampet in Kadapa District, Manchiryal, Mandamarri, Bellampalli in Adilabad District, Sarpaka, Kothagudem, Paloncha, Manguguru, Singareni Collieries in Khammam District, Kamalapur, Bhoopalpally of Warangal District, Wadepally of Nalgonda District, Nagapally (Centenary Colony, Begumpet X roads),Takkelapally of Karimnagar District, Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District and Adoni, Dhone, Cement Nagar, Nandyal, Kurnool, Yemmiganur & Bethamcherla of Kurnool District ,Anakapally of Vishakhapatnam District.

D)

AGENCY / TRIBAL AREAS: a) 25% extra is allowed for the works located with in the interior Agency / Tribal limits, i.e. for the works located with in & upto16 KMs from any all weather route inside Agency / Tribal. 40% extra is allowed for the works located with in the interior Agency / Tribal limits, i.e. for the works located beyond 16 KMs from any all weather routes inside Agency / Tribal. The extra percentage under Agency / Tribal areas allowance may be allowed on the labour component and on the labour charges in the rates for conveyance of materials.

b)

E)

GHAT ROADS: For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5 times the existing length of the road for the purpose of leads only for conveyance of materials based on the certificate for the Ghat Road given by the Superintending Engineer concerned. Under compelling circumstances, the concerned Chief Engineer can adopt the equivalent length of road as 2 times of actual length.

12

APTRANSCO SSR 2010-11

Note: If more than one area allowance ( such as those ) for (1) Municipalities (2) Agency / Tribal areas (3) Industrial areas are applicable for a particular situation, only the maximum out of the allowable percentages is to be allowed. 14% on basic labour rates towards for contractors overheads and profit including labour importation is applicable only for Turnkey projects (New substations, Lines, 33kV features & Bay extension works) of more than 1 Crore and not applicable to O&M works and other than turnkey works. Contractors over heads and profit including Labour importation 14% is allowed on basic labour rates.

5.

The overhead charges include the following: Site accommodation, setting up plant, access road, water supply, electricity and general site arrangements. Office furniture, equipment and communications. Expenditure on: Corporate office of contractor. Site supervision. Documentation and as built drawings. Mobilization / de-mobilization of resources. Labour camps with minimum amenities and transportation to work sites. Light vehicles for site supervision including administrative and managerial requirements. Laboratory equipment and quality control including field and laboratory testing. Minor T&P and survey instruments and setting outworks, including verification of line, dimensions, trial pits and bore holes, where require. Watch and ward. Traffic management during construction Expenditure on safe guarding environment. Sundries Financing Expenditure. Sales / Turn over tax. Work Insurance / compensation. AutoCAD Tower /Structure drawings of required sets. AutoCAD shop drawings of Towers /Structures of required sets. AutoCAD Substation layout. Testing and commissioning of the equipment.

13

APTRANSCO SSR 2010-11

6.

The area allowances, COPs and Mobilization charges a re not applicable for O&M works and also on Fabrication charges and Galvanization Charges.

The area allowances & COPs are applicable where both electrical & civil works (labour) are involved and its value is more than Rs.20.00 lakhs. 7. Erection of Power Transformers and Oil filtration through Private Agency: The rates were communicated by Chief Engineer / Transmission, vide Letter No.CTO-121/F.PTRs erection works / D.No.104/08, dated.05.07.2008 and subsequent Amendment No. I, dt.15.07.2009 on rate contract basis for erection, dismantling, transportation and oil filtration of Power Transformers through private agency. Area Allowances, Special provisions and any others allowances are not applicable on the rates of rate contract. The rates mentioned under the rate contract include all taxes & duties, allowances and all extra provisions including Transport etc. excluding service tax.

In the case of the works of Handling, Erection and filtration of Power Transformers will be carried out by the department, in such cases, area allowances, special provisions and taxes and duties are not applicable 8. Civil Engineering Works in Transmission lines & Substations : For Civil items works of Transmission Lines and Substations the common SSR 2010-11 for engineering departments shall be followed in Toto. Some provisions made in T.O.O.CE (Civil) Ms No.148, dated.21.10.2009 are also applicable for civil works. 9. In respect of Cement and Steel rods the procedure indicated in Common SSR for all Engineering Departments shall be adopted for updating of estimates at the time of finalization of tenders.

14

APTRANSCO SSR 2010-11

10.

All statutory levies such as VAT (Works Contract Tax) @4% on 70%, Service Tax with Educational Cess @ 10.3%etc., cess for labour welfare @1% if any, shall have to be added in the estimate based on the prevailing notified rate.

11.

The S.S.R will come into force with immediate effect until further orders.

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

15 ANNEXURE I

APTRANSCO SSR 2010-11

SSR RATES FOR ERECTION OF 400KV TRANSMISSION LINES Sl. No. (1) 1 Description of Item Unit (3) kM SS Rate for 2010-11 (Rs.) (4) 2513.00

(2) Preliminary Survey with GPS survey, theodilite & total station, marking route on topo sheets represents actual field conditions. 2(a) Detailed Survey with GPS, total stations, Digital theodolite etc., along the approved alignments preparation of profiles, tower spotting, tower schedules and soil resistivity 2(b) Excavation of trail pit (1mt x 1 mt x 4mt) 3 Check Survey, peg marking the tower positions on ground, conforming to the approved Profile and tower schedules using GPS, Total stations, Digital theodolites etc. 4 Setting with stub for all types of towers with stub setting template which includes erection of stubs, fixing of jacks for supporting template, alignment and leveling excluding cost of excavation and concrete (excluding transportation charges). 5 Super structure erection of all type of towers including extensions except RC towers including fitting of step bolts, danger plates, number plates, phase plates, circuit plates, bird guards, anticlimbing devices etc., and tack welding of all bolts & nuts (upto bottom cross arm level) (excluding transportation charges). 6 Mounting of Insulators and stringing of double circuit with twin bundled ACSR Moose Power Conductor including laying, jointing, tensioning, sagging clamping and fixing spacers (excluding transportation charges). 6(a) Double Circuit Stringing 6(b) Single circuit Stringing 7 Mounting of Insulators and stringing of double circuit with Quadruple ACSR Moose Power Conductor including laying, jointing, tensioning, sagging clamping and fixing spacers (excluding transportation charges). 7(a) Double Circuit Stringing 7(b) Single circuit Stringing 8(a) Stringing of two (2) nos. 7/3.66 mm galvanized steel earthwire, including laying jointing, tensioning etc., with necessary accessories upto the pinnacle (excluding transportation charges).

kM

13056.00

No. kM

1979.00 4500.00

Set

10594.00

MT

5686.00

kM kM

226302.00 150868.00

kM kM kM

339454.00 226302.00 10633.00

16 Sl. No. (1) 8(b)

APTRANSCO SSR 2010-11

Description of Item

Unit

(2) (3) Stringing of one (1) no. 7/3.66 mm galvanized KM steel earthwire, including laying jointing, tensioning etc., with necessary accessories (excluding transportation charges). 9 (a) Stringing of two (2) nos. OPG Wire, including KM laying jointing, tensioning etc., with necessary (excluding transportation charges). 9(b) Stringing of one (1) no. OPG Wire, including KM laying jointing, tensioning etc., with necessary (excluding transportation charges). 10 Earthing of transmission towers: 10(i) Providing of Pipe type earthing including of cost Each of BH coke & salt but excluding cost of earthing set 10(ii) Counter poise earthing sets excluding cost of all Each materials (4sides of tower) location 10(iii) Counter poise earthing sets using Bentoinite and Each salt (4 sides of tower) location

SS Rate for 2010-11 (Rs.) (4) 7089.00

52348.00

34899.00

2913.00

2442.00 3664.00

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

17 ANNEXURE II

APTRANSCO SSR 2010-11

ERECTION OF 220kV & 132 kV TRANSMISSION LINES Sl. No. (1) 1 SS Rate for 2010-11 (Rs.) (4) 2737.00

Description of Item

Unit (3) kM

(2) Check Survey, peg marking the tower positions on ground, conforming to the approved Profile and tower schedules using GPS, Total stations, Digital theodolites etc. 2 Conducting reconnoitery and preliminary survey along bee line with three alternative routes and furnishing report for selecting the best proposal for approval, including cost & conveyance of all materials, hire charges of equipment, tools and plant, preparation of drawings and reports, labour charges, complete for finished item of work as per the directions of Engineer-in-charge at site. (a) With Theodolite (b) With GPS equipment ( As per Clause 4.9 of survey) (c) With total station equipment 3 Conducting detailed survey by taking the levels along the route to a corridor of 15 mtrs. width on either side of alignment, at every 20 mtrs. interval and wherever there is a steep increase/decrease in ground profile duly indicating the chainage between angle points, river crossings, railway crossing and major highway crossings and plotting the profiles and preparation of vicinity maps to the standard scales. The survey includes clearing of bushes, branches of tree, crops and shrubs wherever encountered for detailed survey for viewing, for fixing anchor towers and also taking levels etc. required for conducting detailed surveys. This work can be done with Theodolite or with GPS equipment (As per clause no.4.9 of survey) or with total station equipment. This work involves the following items. i) Tower schedules as per tower spotting requirements plotted on reproducible tracing of profile original with one extra copy shall be given. And ii) Identification of wind zones, collection of Hydraulic data of rivers / drains from competent authority.

RKM RKM RKM

2486.00 2486.00 2486.00

RKM

8536.00

18

APTRANSCO SSR 2010-11

Sl. No.

Description of Item

Unit

(1) (2) (3) iii) Taking earth resistivity at an interval of 1 Km by Loc electrical resisitivity method (4 point method) or by ERM method. iv) Preparing of PTCC questionnaire, topo sheets RKM extracts with marking of the proposed line. Soil resistivity report, tower sketch, station single line diagram etc. (30 copies/sets) v) Enumeration and numbering of trees, & marking Each on tree with white letters on yellow paint measuring girth and height of the trees and plotting in the profile. The trees enumerated shall be shown in profile on either side of centre line clearly, indicating name of tree, girth & height. Separate tree schedule should be submitted along with the profile for arriving tree compensation amount. vi Preparation of ground profiles for Railway Each crossing, River crossing and EHV power line crossing crossing separately wherever required. The above rates shall include cost and conveyance of all materials hire charges of equipment tools & plant, preparation of profile drawing, painting of trees, labour charges, preparation of report etc., complete for finished item of work as per instructions of Engineer-incharge. 4 Excavation of trial pits of standard dimensions of Each 1 mtr X 1 mtr. width upto 3 mtrs. depth at 1 KM interval or wherever there is abnormal change in topography and taking observation of soil strata for classification of foundation and position of existing ground water table/depth of water in the existing open wells if any and back filling the trial pits after vetting by Departmental officials.

SS Rate for 2010-11 (Rs.) (4) 621.00

621.00

12.50

1243.00

1024.00

19

APTRANSCO SSR 2010-11

Sl. No. (1) 5

Description of Item (2) Preparation of contour plan of special tower location / switch yard sites by taking levels at 10m X 10m grid interval (where ever the ground level variation are in substation or hilly areas 5 m x 5m grid may be adopted). Plotting the contours at each 1 Mtr. Intervals duly showing the boundaries of the site, existing structures/features, roads, natural drain and ponds. There alternative formation levels along with cutting and filling quantities of earth in a most economical way are to be prepared and submitted. The rates are inclusive of cost and conveyance of materials, labour charges, hire charges of equipment and tools & plants. Setting of stubs with stub-setting template : Erection of stubs, stub template, fixing of jacks for supporting template, allignment and levelling for exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of C.C., movement of template from one location to other location (A minimum lead of 1 KM is adopted). 132 KV P, R & S-Type Towers 220 KV A, B, C & D-Type Towers 132 KV Multi circuit Towers 220 KV Multi circuit Towers Erection of tower structures, including all types of extensions except JC type towers (stub template erection and dismantling are not to be included) (including 3 mtr., 6 mtr. , 9 mtr., & 12 mtr. extensions) Erection of all types of multi circuit tower structures, including all types of extensions except JC type towers (stub template erection and dismantling are not to be included) (including 3 mtr., 6 mtr. , 9 mtr., & 12 mtr. extensions) Erection of all types of 'JC' Type tower structures, including all types of extensions (stub template erection and dismantling are not to be included) (including '0' based, Extended and Truncated)

Unit (3) One Acre

SS Rate for 2010-11 (Rs.) (4) 2275.00

(a) (b) (c) (d) 7(a)

Loc. Loc. Loc. Loc. MT

4886.00 7119.00 6107.00 8899.00 3235.00

7(b)

MT

4530.00

7(c)

MT

5824.00

20

APTRANSCO SSR 2010-11

Sl. No. (1) 8

Description of Item (2) STRINGING OF POWER CONDUCTOR: Hoisting of tension insulators and Suspension insulators, paving out the conductor, rough sagging,Jointing, tensioning, clipping and fixing of preformed Armour rods and vibration dampers. measuring ground clearances wherever necessary.Which includes the works involved in the crossing of LT, 11kV & 33kV power lines viz dismantling and restringing of conductor 3 Nos. Zebra conductors 6 Nos. Zebra conductors 2 Nos. Panther conductors 3 Nos. Panther conductors 6 Nos. Panther conductors 2 Nos. Moose conductors 3 Nos. Moose conductors 6 Nos. Moose conductors 3 Nos. Bear conductors 6 Nos. Bear conductors 3 Nos. Dog conductors 6 Nos. Dog conductors Stringing of Earthwire: FIxing hardware, paving out earth wire, jointing, tensioning, stringing and clamping of 7/3.15 mm high tensile galvanised steel wire. Earthing of towers including cost of Excavation, Back-filling, including cost of 25 mm dia 2.5 mm thick, class 'C' G.I. pipe of 3 Mtrs length with 50X6 mm G.I. Flat 3 Mtrs long, Charcoal, Salt etc., and measuring tower footing resistance. Counterpoise earthing including clamping devices and terminal lugs, but excluding cost of steel wire. Half round welding of G.I.bolts and nuts of towers in the section between ground level & upto bottom X-arm level including all bolts connecting the bracings at the bottom X-arm level and painting the welded portion with one coat of zinc rich paint.

Unit (3)

SS Rate for 2010-11 (Rs.) (4)

(i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii) 9

RKM RKM RKM RKM RKM RKM RKM RKM RKM RKM RKM RKM RKM

27583.00 41372.00 14708.00 22063.00 34936.00 23290.00 34936.00 55161.00 27583.00 41372.00 16547.00 26202.00 4414.00

10

Nos.

2450.00

11

Rmts

24.90

12

Each

11.70

21 Sl. No. (1) 13

APTRANSCO SSR 2010-11

Description of Item (2) Replacement of Insulator disc at Cut points excluding transportation of material (220kV & 132kV) Replacement of Insulator disc at Suspension points excluding transportation of material (220kV & 132kV) Providing of Vibaration dampers (for 220kV & 132kV )

Unit (3) String

SS Rate for 2010-11 (Rs.) (4) 1398.00

14

String

827.00

15

Each

82.00

Note: -

While preparing the estimate, the transport component for the Transmission lines works shall be added depending on the respective lead and lifts and based on the rates communicated in prevailing Common SSR of all Engineering Departments for Initial Transport I.e., from TLC stores to Site Stores and Second transport i.e., from Site Stores to locations along the line (not for turnkey works).

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

22 ANNEXURE III

APTRANSCO SSR 2010-11

ERECTION OF 400kV, 220kV & 132 kV SUBSTATIONS Sl. No. (1) SS Rate for 2010-11 (Rs.) (4) 25312.00

Description of Item (2) 1 Hoisting of insulators & hardware, paving conductor and stringing of 400kV main bus for three phases with quadruple moose conductor to a tension of 1000kgs for single moose conductor, bus section length is 54mtrs. 2 Hoisting of insulators & hardware, paving conductor and stringing of 400kV Jack bus for three phases with twin moose conductor to a tension of 1000kgs for single moose conductor, bus section length is 60mtrs. 3 Hoisting of Insulators and hardware, stretching the conductor and stringing of 220 kV bus comprising of three phases with Quadraple Moose conductor to a tension of 900kgs for single moose conductor.( The maximum length or up to a length of bus section of 40m) 4 Hoisting of Insulators and hardware, stretching the conductor and stringing of 220 kV bus comprising of three phases with single Zebra/Moose conductor to a tension of 900kgs.( The maximum length or up to a length of bus section of 40m) 5 Hoisting of Insulators and hardware, stretching the conductor and stringing of 220 kV bus comprising of three phases with Twin Zebra/Moose conductor to a tension of 1800kgs, including fixing of spacer clamps( The maximum length or up to a length of bus section of 40m). 6 Hoisting of Insulators and hardware, stretching the conductor and stringing of 132 kV bus comprising of three phases with Single Zebra/Moose conductor to a tension of 900kgs.( The maximum length or up to a length of bus section of 45m). 7 Hoisting of Insulators and hardware, stretching the conductor and stringing of 132 kV bus comprising of three phases with Twin Zebra/Moose conductor to a tension of 1800kgs including fixing of spacer clamps.( The maximum length or up to a length of bus section of 45m).

Unit (3) Bus Section

Bus Section

12838.00

Bus Section

14705.00

Bus Section

3677.00

Bus Section

7356.00

Bus Section

3677.00

Bus Section

7356.00

23

APTRANSCO SSR 2010-11

Sl. No. (1) 8

Description of Item

Unit

10

11

12 13 14

15

16

17

(2) (3) Hoisting of Insulators and hardware, stretching Bus the conductor and stringing of 33 kV bus Section comprising of three phases with Single Zebra/Moose conductor to a tension of 450kgs.( The maximum length or up to a length of bus section of 20m). Hoisting of Insulators and hardware, stretching Bus the conductor and stringing of 33 kV bus Section comprising of three phases with Twin Zebra/Moose conductor to a tension of 900kgs including fixing of spacer clamps.( The maximum length or up to a length of bus section of 20m). Hoisting of Insulators and hardware, stretching Bus the conductor and stringing of 132 kV bus Section comprising of two phases with Single Zebra/Moose conductor to a tension of 900kgs.( The maximum length or up to a length of bus section of 45m). Erection of 7/3.66 G.S. Earth wire from top of RM Peak tower and LMs to ground and connecting to untreated earth pits including cutting,clamping and fixing of all hardware like Pad type compression clamp, cleat type clamp and T clamp etc (for 400kV). Fixing of spacers for Twin Moose conductor Each Fixing of spacers for Quadruple Moose Each conductor Fixing of Hardware,stretching the ground wire Each and stringing of earth wire to a tension of 450kgs from pinacle to pinnacle. Fixing of Hardware,stretching the ground wire RM and stringing of earth wire to a tension of 450kgs from pinacle to ground. Connecting equipment to equipment through 4" Meter IPS Al tube including cutting, bending, welding, testing, clamping etc., for each meter including both side connections. Connection of equipment to bus and or another Each equipment with single zebra/Moose/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

SS Rate for 2010-11 (Rs.) (4) 2758.00

4599.00

2451.00

37.50

72.80 109.20 550.00

37.50

163.00

193.00

24 Sl. No.

APTRANSCO SSR 2010-11

Description of Item

Unit (3) Each

(1) (2) 18 Connection of equipment to bus and or another equipment with Twin zebra/Moose/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 19 (i) Laying of earth mat including excavation & backfilling, welding, connecting to all equipment, structures, Junction boxes, and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting to cast iron pipes as per approved drawings with the following sizes:(for 400kV) M.S. Rod 40 mm dia. 19(ii) Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.,.(for 400kV) (a) M.S./ G.S. Flat 75 x 12 mm (b) M.S./ G.S. Flat 50 x 8 mm ( Above ground) (c) Un-Treated Earth pits including installation of 40 mm dia rod electrode, disconnecting links, and all required materials and RCC collar/ chambers with bricks, cement mortar 1:4 and completion of related civil works as specified for LMs, LAs, Carrier couplings and CVTs. (Cost of RCC Collar included) 20 Laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats /GI Flats.(for 220kV & 132kV) including fabrication. (a) 100x16mm MS Flat / GI Flat. (b) 50x 8mm MS Flat / GI Flat. (c ) 75x 8mm MS Flat / GI Flat. (d ) For laying of earth flat in hard rock in substation / bays extension, an additonal amount of Rs.45/per RM to the basic labour rate of SSR will be allowed as there is no provision in the rate of laying of earth flat for remvoal of hard rocks.

SS Rate for 2010-11 (Rs.) (4) 299.00

RM

97.80

RM RM Each

85.30 36.40 1369.00

RM RM RM

56.90 44.80 51.00

25

APTRANSCO SSR 2010-11

Sl. No.

Description of Item

Unit (3) Each

(1) (2) 21 Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete. 22(I) Laying including termination and providing suitable ferrules & lugs etc of armoured Control cables of size 2 core, 2.5 Sq.mm to 27 core, 2.5 Sq. mm including cost of Cable Glands, lugs, ferrules (for 400kV) (a) 2 to 12 core (b) 14 to 19 core (c) 27 core 22(II) Laying including termination and providing suitable ferrules & lugs, Jointing kits etc of armoured Power cables of the following size including cost of cable glands, lugs, ferrules etc complete.(for 400kV) (a) upto 50 sq.mm (b) above 50 sq.mm to 300 sq.mm (c) above 300 sq.mm to 700 sq.mm 23 Buried Cable Trench - Excavation for cable trench providing 100mm thick sand layer before and after laying the cable & Providing 4" thick brick cover over sand, refilling, consolidation and levelling of surplus earth including the cost and conveyance of all materials, route markers, labour charges etc. complete for finished item of work (for 400kV). (a) Size : 300 x 300 mm (b) Size : 300 x 600 mm (c) Size : 1500 x 800 mm 24 Erection of Galvanised Cable trays with 2mm thick perforated CRCA Sheet. Size : 200 and 600 mm (for 400kV)

SS Rate for 2010-11 (Rs.) (4) 8892.00

RM RM RM

33.00 37.50 44.40

RM RM RM

57.00 73.00 92.00

RM RM RM RM

159.00 159.00 423.00 37.50

26

APTRANSCO SSR 2010-11

Sl. No.

Description of Item

Unit (3) RM RM

(1) (2) 25 Laying and termination of HF cables for PLCC system (for 400kV) 26 Laying of Telephone cable of Different sizes in cable trench/ PVC Conduit pipe in wall (for 400kV) 27 Laying of underground OFAC (Optical Fibre Approach cable of 12 fibre capacity) through 40 mm dia PLPE HDPE pipe (Laying of pipe included) (for 400kV) 28 Laying of control cables of all sizes (from 2 core. 2.5 / 4.0sqmm to 12 core, 2.5/4.0sqmm , both copper and alluminium in cable trenches including cost of suitable metalic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct (for 220kV & 132kV). 29 Laying of power cables (for 220kV & 132kV). :a upto 50 sqmm b above 50 sqmm 30 Cable terminations to the switchgear, Marshalling boxes / Panel terminal blocks/control & relay panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV & 132kV). (i) 2.5 sqmm Copper with copper lugs each core at both ends. (ii) 4.0 sqmm Aluminium with Aluminium lugs each core at both ends. (iii) Up to 50 sqmm Power Cable with lugs each core at both ends. (iv) Above 50 sqmm Power Cable with lugs each core at both ends. 31 Instalation of lighting fixtures on switch yard structures including cabling and connections, labour charges etc., including 40mm dia G.I bent pipe of 0.75m length with suitable clamps for fixing to structures in complete shape (excluding cost of lighting fixtures)

SS Rate for 2010-11 (Rs.) (4) 10.20 4.50

RM

18.20

RM

7.40

RM RM

8.40 11.60

Nos. Nos. Nos. Nos. Each

23.00 24.50 44.70 83.20 736.00

27 Sl. No.

APTRANSCO SSR 2010-11

Description of Item

Unit (3)

(1) (2) 32 Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from Dept. stores to the site). Note :- In 400kV Substations only, 25% extra charges for Testing and Commissioning of switchgear equipment where ever applicable). a(i) 420 KV SF6 Circuit breaker with support structure & marshalling boxes a(ii) 220 kV Circuit breakers with support structure & marshalling boxes including Ploe to Pole cable wiring and terminations. a(iii) 132 kV Circuit breakers with support structure & marshalling boxes including Ploe to Pole cable wiring and terminations. a(iv) 33 kV Circuit breakers including Ploe to Pole cable wiring and terminations. b(i) 420 KV Single phase current transformers with secondary terminal box b(ii) 220 kV Current Tranformers. b(iii) 132 kV Current Tranformers. b(iv) 33 kV Current Tranformers. c(i) 220 kV Potential Transfomers. c(ii) 132 kV Potential transformers. c(iii) 33 kV Potential transformers. d(i) 390 KV Lightning Arrestors d(ii) 220 kV Lightning Arrestors. d(iii) 132 kV Lightning Arrestors. d(iv) 33 kV Lightning Arrestors. e(i) 420kV Single phase Capacitive Voltage transformers with secondary terminal box ( with / without carrier coupling device) e(ii) 220 kV Capacitve Voltage Transformers. e(iii) 132 kV Capacitve Voltage Transformers. f(i) 400 KV Isolators, 3 pole Horizontal centre break With Single earth switch including solid core insulators. f(ii) 400 KV Isolators, 3 pole Horizontal centre break With Double earth switches including solid core insulators. f(iii) 220 KV Isolators, 3 pole Horizontal Double break With Double earth switches including solid core insulators.

SS Rate for 2010-11 (Rs.) (4)

Set Each

15378.00 12871.00

Each

9195.00

Each Each Each Each Each Each Each Each Each Each Each Each Each

2850.00 4383.00 3127.00 2023.00 736.00 3127.00 2023.00 736.00 4228.00 2023.00 955.00 406.00 4383.00

Each Each Set

2942.00 2023.00 8904.00

Set

10685.00

Set

5958.00

28

APTRANSCO SSR 2010-11

Sl. No.

Description of Item

Unit (3) Each Each Each Each Each Each Each Each Set Each Each Each Each

(1) (2) f(iv) 220 kV Isolators with earth swtich including solid core insulators. f(v) 132 kV Isolators with earth swtich including solid core insulators. f(vi) 220 kV Isolators without earth swtich including solid core insulators. f(vii) 132 kV Isolators without earth swtich including solid core insulators. f(viii) 33 kV Isolators including solid core insulators. g(i) 400 KV Line Traps with pedestal stand g(ii) 220 kV Wave traps g(iii) 132 kV Wave traps h(i) 400 KV Bus post insulators h(ii) 220 kV Bus Post Type Insulators. h(iii) 132 kV Bus Post Type Insulators. h(iv) 33 kV Bus Post Type Insulators. 33 33 kV /400 V Station Transformer and HG fuse set including all necessary connections on HV & LV side including cost of lugs (But excluding cost of transformer and HG fuse set) 34 Erection of Control / Relay panels, LTAC panels, announciation panels etc.,in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts (for 220kV & 132kV ) 35 Erection of 220 V, 200 Ah/ 80 Ah battery in complete shape fit for charging (for 220kV & 132kV ). 36 Erection of 220 V, 200 Ah / 80Ah battery charger (for 220kV & 132kV ). 37 Erection of PLCC battery set (Lead acid Battery) in complete shape fit for charging. 38 Erection of PLCC battery set (Maintenance free) in complete shape fit for charging (for 220kV & 132kV ). 39 Erection of PLCC battery charger) in complete shape fit for charging (for 220kV & 132kV ). 40 Erection of Line Matching Unit 41 Erection of Capacitor Bank including series reactor of 7.5 MVA Capacity

SS Rate for 2010-11 (Rs.) (4) 4965.00 3677.00 4599.00 3309.00 1195.00 2841.00 1379.00 955.00 4228.00 261.00 196.00 132.00 4599.00

Each

1286.00

Set

6953.00

Set Set Set

2506.00 3721.00 2291.00

Set Each Each

1146.00 267.00 3298.00

29 Sl. No.

APTRANSCO SSR 2010-11

Description of Item

Unit (3)

(1) (2) 42 Erection of PLCC Equipment, site handling, providing base channel, supports in complete shape (for 400kv sub stations) (a) PLCC Panel (b) EPAX-Decolam Table (c) Battery charger cum DC DB( incl.Testing&comm) (d) 48 V, 400 AH Battery ( incl.Testing&Comm.) 43 Erection of Marshalling kiosk 44 Erection of Marshalling boxes 45 Erection of Lighting pillar box in switchyard on foundation laid (Excluding pillar box). (for 220kV & 132kV ) 46 Fabrication of Main and Auxiliary structures, stub setting templates, foundation bolts, 'U' bolts etc,.using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, M.S.rounds, excluding cost of Mild Steel and transport charges to substation site. 47 Galvanization of Main and Auxiliary structures, stub setting templates, foundation bolts, 'U' bolts etc,.using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, M.S.rounds, excluding cost of zinc and transport charges to substation site.(Cost of zinc should be followed as per IEEMA rates.).The average quantity of Zinc required for all angles of tower parts is 60 Kgs. 48 Setting of stubs with with stub setting template for sub-station structure:Erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubsetting template, dismantling of template after completion of initial curing of CC (a) 220kV Towers (b) 132kV Towers (c ) 33kV Towers & CPL's 49 Erection of the main and auxiliary structures etc., using bolts and nuts. 50 Fixing of 90lb rail poles over the transformer plinths. 51 Fixing of 105lb rail poles over the transformer plinths. 52 Erection of 33kV HG Fuse set

SS Rate for 2010-11 (Rs.) (4)

Each Each Each Each Each Each Each

3412.00 832.00 5019.00 5019.00 550.00 267.00 736.00

MT

6526.00

MT

3822.00

Each Each Each MT RM RM Each

2579.00 1851.00 463.00 1839.00 366.00 428.00 444.00

30 Sl. No.

APTRANSCO SSR 2010-11

Description of Item

Unit (3)

(1) (2) 53 Painting of towers with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of towers and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. (a) First coat of 1st Grade Aluminium Paint duly scratching and cleaning of towers including labour charges, cost of paint, brushes etc. (b) Labour charges for painting including scratching and cleaning of towers of 1st coat of Aluminium with out cost of paint & brushes. (c ) (*) Second coat of 1st Grade Aluminium Paint duly scratching and cleaning of towers including labour charges, cost of paint, brushes, etc,. (d) (*) Labour charges for painting including scratching and cleaning of towers of 2nd coat of Aluminium with out cost of paint & brushes. (*) Note:-The requirement of 2nd coat is to be justified by the concerned Divisional Engineer /Executive Engineer before execution of thIS work 54 Painting of towers single coat of red oxide paint of 1st Grade, including scratching and cleaning of towers. (a) One coat of 1st Grade Red Oxide Paint including labour charges for scratching and cleaning of towers including cost of paint, brushes etc,. (b) Labour charges for painting of towers including scratching and cleaning of towers without cost of paint & brushes.

SS Rate for 2010-11 (Rs.) (4)

MT

2618.00

MT

734.00

MT

1532.00

MT

416.00

MT

1640.00

MT

910.00

31 Sl. No. (1) 55

APTRANSCO SSR 2010-11

Description of Item (2) Preparation of contour plan of special tower location / switch yard sites by taking levels at 10m X 10m grid interval (where ever the ground level variation are in substation or hilly areas 5 m x 5m grid may be adopted). Plotting the contours at each 1 Mtr. Intervals duly showing the boundaries of the site, existing structures/features, roads, natural drain and ponds. There alternative formation levels along with cutting and filling quantities of earth in a most economical way are to be prepared and submitted. The rates are inclusive of cost and conveyance of materials, labour charges, hire charges of equipment and tools & plants.

Unit (3) One Acre

SS Rate for 2010-11 (Rs.) (4) 2275.00

Note: 1. The rates for item No, 32 to 42 the transport charges are extra from departmental stores to site as per Common standard schedule of Board of Engineers. While preparing the estimates, the transport component for the Substation works shall be added depending on the respective lead and lifts and based on the rates communicated in ' Common SSR (Latest) ' i.e. from departmental stores to substation site (not applicable for turnkey projects).

2.

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

32

APTRANSCO SSR 2010-11

ANNEXURE IV ERECTION OF ILLUMINATION, LIGHTING, FIRE FIGHTING, AIRCONDITIONING, D.G Set & 33kV STATION SUPPLY SYSTESM IN 400kV SUBSTATIONS
Sl. No. (1) A Description of Item Unit SS Rate for 2010-11 (Rs.) (4)

(i) (ii) (iii) 3

4(i)

4(ii)

(2) Erection of indoor and out door illumination for 400/220 KV Substation, Control House, Auxiliary Buildings, 33 KV Switch yard, street lighting, erection and commissioning of following items as per the approved design and drawings, including indoor/ out door Junction Boxes, Conduits, Lighting wires, lugs, ferules etc for complete finished item of work. Fixing Buzzer anchor make or equivalent approved make with ISI mark with necessary bell and switches etc. Providing and fixing concealed in roof and walls with PVC Conduit piping of ISI standards with necessary GI wire of suitable wire of suitable guage to draw wires at later date including cost of junction Box etc. cost of conveyance of all materials etc complete for fnished item of work for Guest House, store building, pump house building & security room as approved and directed by the Engineer-in-charge at site. 32 mm dia - 2mm thick 25 mm dia - 2 mm thick 12 mm dia - 1.5mm thick Modular for Main distribution board with 1 No. 63A, TPMCB for I/C and 2 Nos. 32A SPMCB & 6 Nos. SPMCB with neutral link for O/G complete make Havells or MDS or equivalent. Fixtures for 36W lamps BJLM-236 type, Fixtures for 36W lamps BJSM-236 type , Fixtures for 36W lmaps BJIV-236 type, Fixtures for energy saving tube light 2x36W. Fixtures for 9W CFL Lamp, Fixtures for GLS DBD-10type, Fixtures for 2x18 W CFL Lamp, Fixtures for 1x36W CFL Lamp

(3)

Each

180.00

RM RM RM Each

72.00 63.00 42.00 1312.00

Each

359.00

Each

180.00

33 Sl. No. (1) B Description of Item

APTRANSCO SSR 2010-11

Unit

1 (i) (ii) 2 3 4 5 6 7 8 9 10 11 12 13 14

(2) Erection, testing and commissioning of outdoor and street Lighting Fixtures including fixing of conduit, Junction boxes, wiring and terminations complete etc.(excluding cost of concrete) Lighting Masts / Poles as per drawing enclosed in including concreting in full shape. Type A1 Type E1 All types of Lighting Panels Junction Box with MCB and Terminal Blocks (Bolt Type) 415V 63A Power Recepticle outdoor 5/15 A, 240 V sockets with swtich board Decorative type switch Boards Telephone Junction Boxes Telephone Jacks for Telephones Ceiling Fans with Electronic regulators Flood lighting fixtures for 400W sodium Vapour lamp Street lighting fixtures for 150 W sodium Vapour lamp Street lighting fixtures for 250 W sodium Vapour lamp Industrial high bay lighting fixures for 250 W HVSP lamp Lighting fixtures for 125 HP MV lamp post lantherns

(3)

SS Rate for 2010-11 (Rs.) (4)

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

3688.00 1970.00 1266.00 251.00 502.00 33.00 72.00 63.00 23.00 127.00 235.00 235.00 283.00 283.00 176.00

34 Sl. No. (1) C 1 Description of Item

APTRANSCO SSR 2010-11

Unit

4 5 6 7(a)

7(b) 7(c) 7(d) 8 (a) (b) (c) (d) (e) (f)

(2) Erection, testing and commissioing of Fire Fighting, Detection and Alarm System : Erection of Horizontal centrifugal Electric Driven Hydrant/HVW Spray pump of capacity 410M3/hr, total dynamic head of 88MWC with all accessories & fittings and Electric Induction Motor Squirrel cage type for the above with all accessories & fittings. Erection of Horizontal centrifugal Diesel Engine Driven Hydrant/HVW spray pump of capacity 410M3/hr and total dynamic head of 88MWC with all accessories and fittings. Diesel Engine, multi cylinder type, four stroke cycle with mechanical airless injection cold starting type for the above with all accessories and fittings and a set of Batteries and battery chargers and fuel tank having capacity to hold fuel oil for six hours of full load run. Erection of Horizontal centrifugal Electric Driven jockey pump of capacity 10.8 m3/hr and Total dynamic head of 88MWC with all accessories and fittings along with Electric Motor for the above with all accessories and fittings. Air vessels with vent valves etc. as per system requirement. Sump pumps 10 Cum/ Hr. MWC with motor starter and all accessories Basket strainer 300 NB Control panel equipped with all accessories for motor drives of Fire water pumps and 2 Nos. jockey pumps for two sources of supply. Panel for 2 nos. Battery chargers & Diesel Engine driven fire water pumps. Annunciation panel at fire water pump house. Annunciation panel in Control Room. Hydrant and HVWS system Accessories. Single headed Hydrants Landing valves Hose cabinets. Hoses of 15.0m length with coupling Hoses of 7.5m length with coupling Branch pipe with Nozzels.

(3)

SS Rate for 2010-11 (Rs.) (4)

Each

45449.00

Each

48281.00

Each

4310.00

Each Each Each Each

3739.00 3307.00 1436.00 2874.00

Each Each Each Each Each Each Each Each Each

2874.00 1095.00 1095.00 502.00 502.00 548.00 50.00 50.00 50.00

35 Sl. No. (1) 9 Description of Item

APTRANSCO SSR 2010-11

Unit

(2) Mild steel black pipes and Galvanized Mild steel pipes with wrapping & coating for below ground and painting for above ground including cost of wrapping & coating material and paint required & excavation, back filling & all civil works etc., & testing complete. a(i) 300 NB (below ground) a(ii) 300 NB (above ground) b(i) 250 NB (below ground) b(ii) 250 NB (above ground) c(i) 200 NB (below ground) c(ii) 200 NB (above ground) d(i) 150 NB (below ground) d(ii) 150 NB (above ground) e(i) 100 NB (below ground) e(ii) 100 NB (above ground) f(i) 80 NB (below ground) f(ii) 80 NB (above ground) g) 50 NB h) 25 NB i) 15 NB 10(a) Set of GI Piping beyond deluge valves for transformer including detection piping and pipe supports including all accessories. 10(b) Erection of Hume pipe as per specification 11 VALVES (a) 300 NB Gate (b) 250 NB Gate (c) 250 NB Check (d) 200 NB Gate (e) 150 NB Gate (f) 100 NB Gate (g) 80 NB Gate (h) 80 NB Check (i) 25 NB Gate (j) 50 NB Gate (k) 50 NB Check (l) 15 NB (m) Float operated valve 100 NB 12 INSTRUMENTS (a) Float operated level guage (b) Level Switch (c) Pressure Guage (d) Pressure Switch (e) Differential Pressure Guage

(3)

SS Rate for 2010-11 (Rs.) (4)

RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM per Set

1436.00 958.00 1175.00 741.00 912.00 696.00 719.00 587.00 456.00 371.00 348.00 240.00 232.00 139.00 99.00 163674.00

RM Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

456.00 1436.00 1220.00 1220.00 958.00 912.00 649.00 433.00 433.00 159.00 348.00 348.00 96.00 912.00 787.00 787.00 456.00 958.00 696.00

36 Sl. No. Description of Item

APTRANSCO SSR 2010-11

Unit

(1) (2) 13(a) Deluge valve with motor gounge, pr. switch, pr.guage, solenoid valve to drain - size 150 NB 13(b) Local control panel for Deluge valve 13(c) Strainer Y type, 150 NB 13(d) Quartzoid bulb detectors 13(e) HVW spray nozzles 14 Detection & Alarm System (a) Ionisation smoke detector (b) Photoelectric smoke detector (c) Heat detector (d) Response indicator (e) Manual call point (f) Fire detection & Alarm panel 15 Portable Fire Extinguishers (a) Dry chemical powder type Fire extinguishers with all accessories. (i) 10 kgs. Capacity (ii) 25 kgs. Capacity (trolley mounted) (iii) 50 kgs. Capacity (trolley mounted) (iv) 150 kgs. Capacity (trolley mounted) (b) CO2 type portable Fire extinguishers (i) 45 kgs. Capacity (trolley mounted) (ii) 22.5 kgs. Capacity (trolley mounted) (iii) 9 kgs. Capacity (trolley mounted) (iv) 2 kgs. Capacity (Portable ) (c) 9 iltres capacity Mechanical foam type fire extinghuishers (d) Sand / water Buckets 9 litres capacity D Air Conditioning System 1 Erection, testing and commissioing of Split AC 2 Ton with all suitable accessories 2 Erection of Air Conditioning AC distribution panel 3 Providing Under Deck Insulation for the Roof exposed to sunlight with 50 mm thick TF quality expanded poly styrene including GI washers and wire for fixing. 4 Erection of Ventilation fans i) 600 mm Sweep ii) 450 mm Sweeep iii) 300 mm Sweep

(3) set Each Each Each Each Each Each Each Each Each Each

SS Rate for 2010-11 (Rs.) (4) 4310.00 1220.00 958.00 77.00 77.00 348.00 348.00 348.00 348.00 348.00 348.00

Each Each Each Each Each Each Each Each Each Each Each Each Sq. ft.

35.00 69.00 93.00 199.00 72.00 72.00 34.00 27.00 36.00 47.00 3412.00 2874.00 31.00

Each Each Each

764.00 764.00 764.00

37 Sl. No. (1) E Description of Item

APTRANSCO SSR 2010-11

Unit

F 1 (a) (b) (c) (d) (e) (f) (g)

2 (a)

(b)

(c)

(d)

(2) Erection, testing and commissioing of 250 KVA DG Set complete including AMF Panel, auxilaries etc. Erection, testing and commissioing of 33kV Station Supply System 33kV/440 V Substation : 33kV/433 V, 630KVA Station supply transformer 33 kV Isolator with terminal connectors and support insulators 33 kV HG Fuse set 33 kV Lightning Arrestor 150 x 75 mm M.S Channels & Struc. Steel HT Trivector Meter Box Hoisting of Insulators & Hardware, stringing / formation of the 33 kV Bus comprising of 3 phases with DOG Conductor and all equipmnet to equipment, euipment to bus interconnections, jumpering, fixing of clamps & connectors etc. required for the entire 33kV/440 V station supply switchyard of 400/220 KV Substation complete as directed by site engineer. 33 kV Line : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,fixing of danger boards, back filling with earth and stones properly ramming including transport of materials from road side to location excluding concreting and including excavation. Assembly and erection of D.P.Structure as per specification which includes fixing of top channels and cross bracings, transport of all materials from road side to the location, earthing, back filling with earth ramming etc excluding concreting and including excavation. Mass concretingof supports erected with CC (1:4:6) using 40 mm, HBG metal including the cost of metal, sand, cement and curing etc. Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming etc excluding concreting and including excavation.

(3) Set

SS Rate for 2010-11 (Rs.) (4) 50905.00

Each Set Each Each MT Each LS

4360.00 1551.00 872.00 679.00 1839.00 548.00 10037.00

Set

1163.00

Set

1862.00

Cum

3506.00

Set

233.00

38

APTRANSCO SSR 2010-11

Sl. No.

Description of Item

Unit

(1) (2) (3) (e) Paving out conductor, providing temporary stays, km tensioning, sagging correctly, fixing strain points, transferring to pin points binding, fixing of Insulators, guys and jumpering etc., including transport of material from road side to location. ( 3 phases) G Erection of Control and Relay Panels Receipt from site stores, Transport to control room, handling, Erection, Testing and commissionig of all Control, Relay, Protection and other Panels/ Equipment, with complete accessories, equipment etc., as specified. (i) 400 KV Feeders/ Tie/ 315 MVA Tranformer Each Control/ Relay/ Protection Panels. (ii) 220 KV Feeders/ Bus coupler/ Transfer Bus / 315 Each MVA Tranformer Control/ Relay/ Protection Panels. (iii) Common equipment Panels for 400/220kV. Each (iv) 400kV Bus bar Protection Set (v) 220KV Bus bar Protection Set (vi) All other equipment of SMS and Time Each synchronising equipment. (vii) 400KV AC Bay Kiosk Each (viii) 220KV AC Bay Kiosk Each (ix) Complete Substation Automation system for 400/220KV Substation including hard ware and software for remote control station along with associated equipments and kiosks in full shape as per specification. (a) Installation, Testing and commissioning of Set Networking Panel, OWS1, OWS2, EWS Remote work station. BCUs, LIUs, Ethernet Switches, Splicing of OFC. (b) Installation, Testing and commissioning of all Set necessary softwares compatible to IEC: 61850 for making the SAS operation in full shape including remote SCADA complete as directed by site engineer. (c) Extension works of Installation, Testing and per Bay commissioning of BCU, LIU, Ethernet Switch, Splicing of OFC to the existing SAS System.

SS Rate for 2010-11 (Rs.) (4) 8531.00

24005.00 22863.00

19729.00 30986.00 40004.00 91813.00 23243.00 17433.00

150000.00

50000.00

20000.00

39

APTRANSCO SSR 2010-11

Sl. No.

Description of Item

Unit

(1) (2) (3) (d) Extension works of Installation, Testing and per Bay commissioning of all necessary softwares compatible to IEC: 61850, adding new SLD for the new bay in the existing substation and configuring all necessary signals and data base for making the SAS operation in full shape including Remote SCADA as directed by site engineer. H 220 V DC Battery & Battery Chargers and AC, DC Distribution Boards 1 Receipt from site stores, Transport to control room, handling Erection, Testing and commissionig of Battery & Battery chargers with complete accessories, equipment etc., as specified. (a) 220V, 400AH Capacity Sealed Maintanace free Set VRLA Type 1 No Battery Banks along with all other required accessories. (b) 40/100A Folat - Cum- Boost Charger (1 No.) Set 2 Receipt from site stores, Transport to control room, handling, Erection, Testing and commissionig of A.C.& D.C. Distribution Boards with complete accessories, equipment etc., as specified. (a) 415V AC Main Board ( Sub- Boards- I & II ) as Each per the Specification & Drawing. (b) 415V AC Distribution Board ( Sub- Boards- I & II) Each as per the Specification & Drawing. (c) 415V AC Lighting Board ( Sub- Boards- I & II ) & Each Emergency Lighting Board as per the Specification & Drawing. (d) 220V DC Distribution Board ( Sub- Boards- I & II) Each as per the Specification & Drawing.

SS Rate for 2010-11 (Rs.) (4) 50000.00

8437.00

5019.00

68242.00 113739.00 28572.00

17235.00

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

40

APTRANSCO SSR 2010-11

ANNEXURE V
RATES FOR HANDLING & ERECTION OF POWER TRANSFORMERS Sl. Description of Item Unit SS Rate for No. 2010-11 (Rs.) (1) (2) (3) (4) A) HANDLING AS JOB WORK BY DEPARTMENT 1 Loading/Unloading of T&P such as wooden sleepers, winch jacks, packing pieces etc., required for handling the power transformers. a Up to 31.5 MVA transformers, one load of Load 722.00 wooden sleepers and another load of T&P such as chain pulley block and rail poles etc (Maximum two loads) b For above 31.5 MVA and up to 100 MVA Load 722.00 transformers, two loads of wooden sleepers and another load of T&P such as chain pulley block, winch and rail poles etc (Maximum three loads) c For the above 100 MVA and up to 160 MVA Load 722.00 transformers, three loads of wooden sleepers and another load of T&P such as winch machine and rail poles etc (Maximum Four loads) 2 Loading/Unloading of fragile material such as a) LV bushing / Neutral bushing for 132 kV Each 96.00 transformer b) 132kV Bushings Box 388.00 c) 220kV Bushings Box 483.00 NOTE : If crane used ,Crane charges can be claimed as per actuals and labour charges will be reduced to 40% 3 Loading/Unloading of accessories of transformer Load 1193.00 including raidator, pipe line, FCC & RTCC panels, conservatory tank, turrets LA set frames and oil barrels 'A' frame and header etc., (For 50MVA and above 50 MVA PTRs without oil barrels) 4 Dragging of power transformer main tank duly arranging wooden sleeper platform providing packing pieces, jacking up the transformer, insertion of wooden sleeper, rail poles arrangement of pullies, steel ropes positioning of winch and anchoring of wrinch. a Transformers upto 16 MVA capacity Up to 10 Mtrs. LS 1899.00 Over and above 10 Mtrs. RM 190.00

41 Sl. No. (1) Description of Item

APTRANSCO SSR 2010-11

Unit

(2) b Transformers above 16MVA and upto 31.5 MVA capacity Up to 10 Mtrs. Over and above 10 Mtrs. c Transformers above 31.5MVA and upto 50 MVA capacity Up to 10 Mtrs. Over and above 10 Mtrs. d Transformers above 50MVA and upto 100 MVA capacity Up to 10 Mtrs. Over and above 10 Mtrs. e Transformers above 100MVA and upto 160 MVA capacity Up to 10 Mtrs. Over and above 10 Mtrs. 5 Turning the transformer through 90 degrees including making arrangements as above. a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity 6 Turning the transformer through 180 degrees including making arrangements as above. a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity 7(a) Anchoring of transformer including excavation of trench of 4 x 1x0. 5 mtrs for anchoring and burying 2 Nos. sleepers in it and removing the same after work is completed. 7(b) Movement of 10 MT winch for anchoring.

(3)

SS Rate for 2010-11 (Rs.) (4)

LS RM

3469.00 347.00

LS RM

4049.00 405.00

LS RM

5004.00 500.00

LS RM

6437.00 644.00

Each Each Each Each Each

1701.00 2133.00 2652.00 3035.00 3793.00

Each Each Each Each Each 1 Job

2948.00 3544.00 4177.00 4641.00 5569.00 722.00

1 Job

653.00

42 Sl. No. (1) Description of Item

APTRANSCO SSR 2010-11

Unit

(2) 8 Lifting/Lowering the transformer main tank to the required height of one sleeper using jacks and wooden sleepers packing pieces for loading onto /from the truck. a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity 9 Pulling the transformer from platform to the truck for loading/ from truck to the platform for unloading a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity 10 Fixing of transformer wheels to main tank including alignment of transformer etc., vice versa. a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity 11 Arranging gas cutter equipment at site including operator and helper to remove anchoring of transformer main tank on truck for loading and unloading (including cost of gas)

(3)

SS Rate for 2010-11 (Rs.) (4)

Each Each Each Each Each

2063.00 3181.00 3960.00 5279.00 6754.00

Each Each Each Each Each

1735.00 3035.00 3373.00 4217.00 5701.00

Job Job Job Job Job Job

802.00 947.00 1379.00 1787.00 2648.00 1315.00

43 Sl. No. Description of Item

APTRANSCO SSR 2010-11

Unit

(1) (2) 12 Removal of steel rope and turn buckles of transformer main tank on truck. (a) Up to 100MVA Capacity (b) above 100MVA and up to 160MVA Capacity 13 Tieing the transformer main tank on to the truck with steel rope and turn buckles (a) Up to 100MVA Capacity (b) above 100MVA and up to 160MVA Capacity 14 Assisting for lifting of overhead live lines, while transporting of transformers by truck. (a) Up to 100MVA Capacity (b) above 100MVA and up to 160MVA Capacity B) ERECTION OF POWER TRANSFORMERS AS JOB WORK BY DEPARTMENT 1 Opening of crates and keep ready for erection of accessories of transformers a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity 2 Shifting, loading dragging of accessories of transformers like radiator, conservator tank, pipe line, fans, headers, DM box, FCC and oil barrels etc., from place of storage to work spot and vice versa of transformers.(For 50MVA and above 50 MVA PTRs without oil barrels) a Transformers upto 31.5 MVA capacity b Transformers above 31.5MVA and upto 100 MVA capacity c Transformers above 100MVA and upto 160 MVA capacity d Transportation of oil barrels from unloading place to the filter machine in the substation.

(3)

SS Rate for 2010-11 (Rs.) (4)

Job Job

362.00 541.00

Job Job

465.00 696.00

Job Job

1018.00 2036.00

Job Job Job Job Job

1134.00 1418.00 1897.00 2277.00 3035.00

Job Job Job Job

1701.00 2268.00 3116.00 1696.00

44 Sl. No. (1) Description of Item

APTRANSCO SSR 2010-11

Unit

(2) 3 Erection of Radiators to the transformers including headers a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity 4 Erection of main conservator tank. a Transformers upto 16 MVA capacity b Transformers above 16MVA and upto 31.5 MVA capacity c Transformers above 31.5MVA and upto 50 MVA capacity d Transformers above 50MVA and upto 100 MVA capacity e Transformers above 100MVA and upto 160 MVA capacity f Pronal bag testing and commissioning g Hiring of compressor h Dry Nitrogen Cylinder (In case, Dry Nitrogen Cylinder is used for commissioning of Air cell instead of Air compressor), excluding transportation cost. 5 Erection of transformer bushing a 33 kV Neutral and teritary bushings b(I) 132 kV bushings up to 100MVA. b(ii) 132 kV bushings for above 100MVA and up to 160MVA c(I) 220 kV bushings up to 100MVA c(ii) 220 kV bushings for above 100MVA and up to 160MVA d(I) 220kV 3 Nos. erection of turrets up to 100MVA d(ii) 220kV 3 Nos. erection of turrets for above 100MVA and up to 160MVA e(I) 132kV 3 Nos. erection of turrets up to 100MVA e(ii) 132kV 3 Nos. erection of turrets for above 100MVA and up to 160MVA

(3)

SS Rate for 2010-11 (Rs.) (4)

Job Job Job Job Job

1262.00 2022.00 2513.00 3080.00 4199.00

Each Each Each Each Each Each Each Each

1138.00 1266.00 1856.00 2891.00 3722.00 1252.00 876.00 1000.00

Each Each Each Each Each Job Job Job Job

248.00 462.00 578.00 693.00 860.00 993.00 1303.00 466.00 683.00

45 Sl. No. (1) Description of Item

APTRANSCO SSR 2010-11

Unit

(2) 6 Erection of air blowers (cooling fans) including frames and control cubical etc., (for each transformer) 7 Erection of LA frames (HV & LV side) 8(a) I).Erection of driving mechanism box, bevel gear of OLTC for below 100MVA.. ii).Erection of driving mechanism box, bevel gear of OLTC 100MVA and above 100MVA. 8(b) ii).Erection of OLTC conservator tank with stand for up to 100MVA. ii).Erection of OLTC conservator tank with stand for above 100MVA and upto 160MVA. 9 Erection of pipe line. a Transformers upto 31.5 MVA capacity b Transformers above 31.5MVA and upto 50 MVA capacity c Transformers above 50MVA and upto 100 MVA capacity d Transformers above 100MVA and upto 160 MVA capacity 10 I).Erection of Thermometer, pressure Relief valve and vent pipe etc., ii)Erection of Thermometer, pressure Relief valve and vent pipe etc.,100MVA and above PTRs. 11 Erection of detachable OLTC including connecting internal jumper with OLTC tank. a Transformers upto 31.5 MVA capacity b Transformers above 31.5MVA and upto 100 MVA capacity c Transformers above 100MVA and upto 160 MVA capacity 12 I).Erection of separate, cooler bay including 'A' frame header pipes and bends of transformers up to 100 PTRs MVA capacity. ii).Erection of separate, cooler bay including 'A' frame header pipes and bends of transformers above 100 MVA and up to 160MVA PTRs capacity.

(3) Job

SS Rate for 2010-11 (Rs.) (4) 1876.00

Each Each Each Each Each

589.00 589.00 1178.00 760.00 1138.00

Each Each Each Each Each Each

398.00 595.00 1008.00 1261.00 398.00 595.00

Each Each Each Bay

1956.00 2948.00 3287.00 4217.00

Bay

4641.00

46 Sl. No. Description of Item

APTRANSCO SSR 2010-11

Unit

(1) (2) 13 Removal of old worn out gaskets and replacement with new gaskets including cutting, pasting of gasket with all accessories including cost of adhesives. a Transformers upto 16 MVA capacity b Transformers 31.5MVA and 50 MVA capacity c Transformers 100 MVA and upto 160 MVA capacity 14 Erection of supporting insulators and earth flat for HV & LV Neutrals / Tertiary. C OIL FILTERATION OF TRANSFORMERS AS JOB WORK BY DEPARTMENT 1 Loading / Unloading of 2KL Oil filter. 2 Laying of L.T.Cable from AC Supply point to filter connecting Pipes etc, from filter to transformer and back to filter and Vice-versa. 3 Loading / unloading of full transformer oil barrels. 4 Loading / unloading of oil drums. 5 Oil topping for transformer through oil filter: 5.1 Transformer already filled with oil a Transformers upto 31.5 MVA capacity b Transformers above 31.5MVA and upto 50 MVA capacity when the transformer is received with transformer oil 5.2 Transformers above 50MVA upto 160 MVA capacity When the transformer is received empty with Nitrozen 6 Assisting labour for filtering of oil during the period of filteration for a Transformers upto 31.5 MVA capacity b Transformers above 31.5 MVA and upto 100 MVA capacity c Transformers above 100 MVA and upto 160 MVA capacity 7(I) Dismantling of control cables of power transformer for arranging, pulling of transformer maintank out of plinth for failed transformer or improvement of transformercapacity. (ii) Laying of control cables for the transformers which are received with non completion of wiring on the transformer and complete wiring of the transformer on the tank.F.C.C,D.M box etc., (for old repaired transformers).

(3)

SS Rate for 2010-11 (Rs.) (4)

Job Job Job Job

1631.00 2535.00 3262.00 398.00

Job Job

1393.00 673.00

Barrel Barrel

31.00 5.20

Each Each

535.00 1178.00

Barrel

16.30

Each Each Each Job

2543.00 3561.00 5087.00 470.00

Job

1252.00

47 Sl. No. (1) Description of Item

APTRANSCO SSR 2010-11

Unit

(2) 8 Shifting of filter machine in switch yard from existing place to near transformer or to the convient place manually (where movement of tractor trailer is not possible). 9 Labour charges for arrangement for vaccum filling for the power transformer for prescribed time duration for 50MVA and above PTRs which are received at site with nitrogen gas filled. (a) Below 100MVA PTRs (b) Above 100MVA PTRs. 10 Loading / Unloading of 5 KL Storage tanker. 11 Hire charges for a private tractor for transport of 6 KL of oil filter is (a) Up to 50KM ( to and fro) (b) Beyond 50KM (to and fro) 12 Complete wiring up of the transformer indicating systems cooler control fans and motor driving mechanism of OLTC panel providing suitable ferrules and lugs. a) 16/31.5 MVA Transformer b) 50 MVA Transformer c) 100 MVA Transformer d) 160 MVA Transformer D) ERECTION OF POWER TRANSFORMERS AND OIL FILTERATION THROUGH PRIVATE AGENCY Please refer Lr.No.CTO-121/F-PTRs erection works /D.No.104/08, dt.05.07.2008 of Chief Engineer / Transmission and subsequent amendments.

(3) RM

SS Rate for 2010-11 (Rs.) (4) 58.50

Job Job Job

1876.00 3755.00 621.00

LS KM

1725.00 26.00

LS LS LS LS

11031.00 14341.00 15905.00 15905.00

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

48

APTRANSCO SSR 2010-11

ANNEXURE VI TRANSPORTATION, HANDLING CHARGES INVOLVED DURING ERECTION OF 400KV TRANSMISSION LINES
Sl. No. (1) 1 Description of Item Unit SS Rate for 2010-11 (Rs.) (4) 546.00 431.00 11797.00

2 3

(2) Total cost for transportaion and handling Charges for Setting of Stub with Stub setting template Erection of Tower : Total cost for transportation and handling Charges Double Circuit Stringing with Twin Moose : Transportation and and handling charges for line materials Single Circuit Stringing with Twin Moose : : Transportation and handling charges for line materials. Double Circuit Stringing with Quadruple Moose : Transportation and and handling charges for line materials Single Circuit Stringing with Quadruple Moose : : Transportation and handling charges for line materials. OPG wire & earthwire: Transportation and handling charges for OPGW/earthing materials for 1 kM for D/C stringing. OPG wire & earthwire: Transportation and handling charges for OPGW/earthing materials for 1 kM for S/C stringing.

(3) Each Set Per MT Per KM

Per KM

6297.00

Per KM

23595.00

Per KM

12595.00

Per KM

359.00

Per KM

367.00

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

49

APTRANSCO SSR 2010-11

ANNEXURE VII (I). Loading / Unloading of materials from departmental / Private vehicles in to the stores yard and stacking and vice-versa
Sl. No. (1) I 2 (I) (ii) (iii) Description of Item (2) Cement All othe materials Steel Tower parts RS Joists and rail poles and MS Sheets pf various sizes. 3 Cable / Conductor drums (for loading / un loading ) a Panther ACSR b Zebra ACSR c Moose ACSR d Moose ACSR (Huge Drums of 1.75KM and above) e Earth wire f Control cables up to 6 Core g Control cables above 6 Core h 3 1/2 Core LTAC cable drum (up to 500 meters). i 3 1/2 Core LTAC cable drum (above 500 meters). 4 Other materials received in cases. (i) Case weighing not more than 100kgs. (ii) Case weighing from101kgs to 500kgs. (iii) Case containg fragile items and weighing more than 501kgs and up to 1MT (iv) for LTAC panel v(a) 70KN Normal disc insulator v(b) 120KN Normal disc insulator v(c) 160KN Normal disc insulator Unit (3) MT MT MT MT SS Rate for 2010-11 (Rs.) Loading Un loading (4) (5) 66.00 77.00 131.00 150.00 131.00 131.00 150.00 131.00

Each Drum Each Drum Each Drum Each Drum Each Drum Each Drum Each Drum Each Drum Each Drum Each case Each case Each case Each Each Each Each

164.00 230.00 230.00 26200 98.00 98.00 131.00 132.00 165.00

164.00 230.00 230.00 262.00 98.00 98.00 131.00 132.00 165.00

87.00 164.00 328.00 219.00 1.00 1.25 1.50

87.00 164.00 262.00 219.00 1.00 1.25 1.50

50

APTRANSCO SSR 2010-11

Sl. No. (1) vi(a) vi(b) vi(c) (vii)

Description of Item

Unit (3) Each Each Each

(2) 70KN Anti-fog disc insulator 120KN Anti-fog disc insulator 160KN Anti-fog disc insulator Loading / Un loading and stacking charges for 70KN /120KN SRC insulators. (a) 132kV (b) 220kV

SS Rate for 2010-11 (Rs.) Loading Un loading (4) (5) 1.25 1.25 1.50 1.50 2.00 2.00

(viii) Loading / Un loading and stacking charges for 120KN /160KN SRC insulators for 400kV . 5 Cases containing Control & Relay Panels (a) 33kV (b) 132kV and 220kV 6 Cases containing CTs, PTs, CVTs (i) 11kV to 33kV Rating (ii) Above 33kV and up to 132kV (iii) 220kV Rating 7 Cases containing LAs (i) 33kV (ii) 132kV (iii) 220kV 8 Loading / Un-Loading of 1 33kV Breaker 2 132kV CB 3 220kV SF6 CB 4 Station Transformer (100KVA) 5 Station Transformer (250KVA) 6 132kV Wave Trap 7 220kV Wave Trap 8 220V 80AH Battery (Conventional)

Each string Each string Each string

2.00 2.00 3.00

2.00 2.00 3.00

Each Each Each case Each case Each case Each case Each case Each case Each set Each set Each set Each set Each set Each Each Set

219.00 273.00 66.00 328.00 492.00

219.00 273.00 66.00 328.00 492.00

15.00 164.00 219.00

15.00 164.00 219.00

656.00 1311.00 1639.00 273.00 328.00 87.00 328.00 546.00

656.00 1311.00 1639.00 273.00 328.00 87.00 328.00 546.00

51

APTRANSCO SSR 2010-11

Sl. No. (1) 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Description of Item (2) 220V 80AH Battery (VRLA) 220V 200AH Battery 220V 400AH Battery 48V PLCC battery 150 AH 48V PLCC battery 250 AH 48V Battery Charger 10A 48V Battery Charger 35/50A 48V Battery Charger 100A 220V Battert Charger with DC distribution Board DCDB for battery Charger. 132kV Hardware single 132 KV Hardware double 220 kV Hardware single 220 KV Hardware double 220 KV Isolators, without insulators including machanism box 220kV Solid core insulators 132 KV Isolators (without soild core insulators) 132kV Solid core insulators 33 KV Isolators (without soild core insulators) 33kV Solid core insulators Vibration dampers, mid span compression joints, repair sleeves, clamps & connectors etc Capacitor Banks 5 MVAR Neutral C.T. Scrap items like MS Scrap, GI Scrap, Ferrous Scrap etc,. Scrap items like Conductor scrap, Earth wire Scrap, etc,. Single channel PLCC Panel Twin Channel PLCC Panel Phase to Phase couplings units (LMU) Bolts & Nuts weighing 50 Kgs bags including springs washers, flat washers. 3 1/2 Core LTAC Cable bits (loose) by measuring and load / unload

Unit (3) Set Set Set Set Set Set Set Set Set Each Set Set Set Set Set Each Each Each Each Each 100 Nos

SS Rate for 2010-11 (Rs.) Loading Un loading (4) (5) 383.00 383.00 600.00 600.00 874.00 874.00 219.00 191.00 328.00 273.00 219.00 219.00 273.00 273.00 383.00 383.00 328.00 328.00 109.00 7.70 8.00 10.90 11.50 328.00 44.00 246.00 27.00 109.00 3.00 109.00 109.00 7.70 8.00 10.90 11.50 328.00 44.00 246.00 27.00 109.00 3.00 109.00

30 a b 31 32 33 34 35 36 37

Set Each Per MT Per MT Each Each Set Each bag Mts

874.00 60.00 164.00 219.00 164.00 219.00 109.00 5.00 0.55

874.00 60.00 164.00 219.00 164.00 219.00 109.00 5.00 0.45

52

APTRANSCO SSR 2010-11

Sl. No.

Description of Item

Unit (3) Mts Mts Per MT Per MT Ea ch Each Each Each Each Barrel Barrel

(1) (2) 38 Cable bits (loose) up to 6 Core by measuring and load / un load 39 Cable bits (loose) above 6 Core by measuring and load / un load 40 Copper Scrap 41 Battery Scrap 42 43 44 45 46 47 48 Capacitor units Scrap 33kV Breaker Limb 132kV Breaker Limb 220kV Breaker Limb Tyres scrap of all sizes Empty oi drums Full oil drums

SS Rate for 2010-11 (Rs.) Loading Un loading (4) (5) 0.50 0.50 0.75 131.00 137.00 5.00 120.00 273.00 393.00 13.10 4.60 27.30 0.75 131.00 137.00 3.00 120.00 273.00 393.00 6.60 4.60 27.30

Note - If loading / Un loading is done with Crane, 1/3 rd Charges are to be paid towards labour charges and remaining amount is towards crane hire charges. For example: Loading charges of 100KVA Station Transformer is Rs.273.00. If it is loaded through crane. 1/3rd of loading charges i.e 91.00 is to be paid towards labour charges and remaining amount of Rs.182.00 is towards crane hire charges.

(II). Loading and Un loading and counting at Stores for check measuring and Stock Verification Purpose.
Sl. No. (1) Description of Item Unit SS Rate for 2010-11 (Rs.) (4) 55.00 219.00

(2) 1 Tower parts counting on part wise and restocking at stores yard ( for stock verification purpose) 2 Labour charges for weighing and restocking of GI Tower Parts or Bolts & Nuts, Washers (for stock verification purpose) 3 Labour charges for loading and unloading of ACSR, AAA Conductor & Earth wire bits for weighiment (for stock verification purpose). 4 Counting and Restocking of Hardware (Iron parts, Al jumper cones, Al Tensition cones, PA rods, Arcing horns, Al grippers etc) (for stock verification purpose)

(3) Per MT Per MT

Per MT

219.00

Each set

3.30

53

APTRANSCO SSR 2010-11

Sl. No. (1) 5

Description of Item

Unit

6 7

8 9 (a) (b) (c) 10

(2) Counting and Restocking of 220kV & 132kV Line accessories like Dampers, MSC Joints, Repair sleeves, PA rods, D- Shackles Links, Earthing sets, Hangers, Counter Poise Earthing Clamps etc (for stock verification purpose) Counting and restocking of insulators of various capacities (for stock verification purpose) Loading of Assorted tower parts from different places by observing part wise and loading in to lorry at stores For Opening and Repacking of Packing of Panels for check measuring purpose For Opening and Repacking of Packing of Breakers for check measuring purpose 220 kV 132 kV 33 kV For Opening and Repacking of Packing of Fragile Materials, and Small Packages like wooden, Cartoon Boxes etc., for check measuring purposes.

(3) Each set

SS Rate for 2010-11 (Rs.) (4) 1.10

Each Per MT

1.10 164.00

Each

33.00

Each Each Each Each

109.00 77.00 33.00 16.40

(III). Crane Hire charges:(for departmental works at the premises)


Sl. No. Description of Item Unit SS Rate for 2010-11 (Rs.) (4) 1742.00 791.00 2716.00 905.00 4188.00 1472.00

(1) (2) a) For 2 to 8 Tonne Capacity crane i.For Ist hour ii.For every hour or part thereof after Ist hour b) For 8 to 20 Tonne Capacity crane i.For Ist hour ii.For every hour or part thereof after Ist hour c) For above 20 Tonne Capacity crane i.For Ist hour ii.For every hour or part thereof after Ist hour

(3) Hour Hour Hour Hour Hour Hour

54

APTRANSCO SSR 2010-11

(IV). Sparing of Departmental vehicle to the contractor:


Sl. No. (1) 1 Description of Item Unit SS Rate for 2010-11 (Rs.) (4) 2102.00

(2) (3) Sparing of Departmental vehicle(Lorry) to the Per day contractor is under emergency only. When departmental lorry is engaged to the Contractor on a particular day an amount of Rs2102/- per Plus day or part there of should be recovered for a additional total KM run up to 100KM on that day plus for KM every additional KM at Rs.17.50 per KM Which ever is higher. The run to be worked out taking initial reading at starting point and closing reading after returing the same starting point duly completing the transport work.

17.50

Note:1. When the departmental lorry is used for transport of fragile and costly
equipment, they have to be insured by the contractor in first place before transport and the same will be claimed in the respective work bill.

2. If the crane is given on hire to other than APTRANSCO works, the rate is a minimum of Rs18984/-(Rs.791/-per hr X 24Hrs) + (Fuel cost & lubricants) per day or part there of and the time is to be reckoned from the time of leaving department premises till reaching back.

Sd/- B.UMAKAR RAO) DIRECTOR (PROJECTS)

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.

55 ANNEXURE -VIII

APTRANSCO SSR 2010-11

TRANSPORT OF PROTECTION AND CONTROL EQUIPMENT & LINE MATERIALS The following are the minimum materials / equipment, for each load One Load=9.0MT 1 CTs, PTs, & CVTs: a). 220kV 2 Nos. b).132kV 3 Nos. c).33kV 12 Nos. NOTE: For transport of 220kV CTs, PTs &CVTs extra provison of Rs.197/- may be added for each load towards labour for clearing the obstructions like electrically and telephone lines as the equipment are very tall. 2 SF6 Circuit Breakers: a). 220kV 1/2 sets b).132kV 2/3 sets c).33kV 1 No. 3 Isolators with or without Earth switch including post type insulators: a). 220kV 1 set in 2 Loads. b).132kV 1 No. c).33kV 8 Nos. 4 Lighting Arrestors: a). 220kV 6 Nos. b).132kV 6 Nos. c).33kV 24 Nos. 5 Control & Relay panels: 6 Nos. 6 ACSR Conductor and Earth wire drums: a)ACSR moose 3Nos. b)ACSR Zebra 4Nos. c)ACSR Panther 6Nos. d)Earth wire 8Nos. e)CABLE DRUMS 10Nos. 7 Solid Core Insulators (a) 70 KN - 1000 Nos. (b) 120KN - 800 Nos. Silicon Rubber 8 Insulators (a) 70 KN - 275 Nos. (b) 120KN - 228 Nos. 9 Wave Traps a). 220kV 6 Nos. b).132kV 16 Nos.

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED APTRANSCO - Standard Schedule of Rates for the year 2010-11 Communicated - Regarding.
_____________________________________________________________________ T.O.O. No. CE (Construction-2)/ Ms.No.449 dt. 21 .01.2011 Read the following:Ref:- i). T.O.O.No. Dir/(Tr. &G.O) Ms.No.156, dt.08.10.2004. ii). T.O.O.No.CE (Construction)/Ms.No.228, dt.31.10.2006. iii). Circular Lr.No.CPT 310/SE/PM-II/DE-3/D.No.43/2008, dt.11.06.2008. iv).T.O.O.Ms.CE (Construction) Ms.No.191, dt.31.10.2008. v). T.O.O.CE (Civil) Ms No.148, dt.21.10.2009. vi).T.O.O.No.CE (Construction)/Ms.No.234, dt.31.10.2006. *** The standard schedule of Rate for the year 2010-11 approved by Transmission Corporation of Andhra Pradesh Limited in respect of item of works pertaining to EHV Transmission lines and Substations are communicated herewith for adoption in preparation of estimates. For all Civil item of works of EHV Transmission lines & substations, the rates that are approved in the common SSR2010-11 for all engineering departments of Govt of A.P and the provisions made in the T.O.O.No.148, dated.21.10.2009 of APTRANSCO shall be adopted as already approved and communicated vide ref 5th cited. The Standard Schedule of Rates for 2010-11 will come into force from date of issue of T.O.O. Encl: As above. (By order and in the name of APTRANSCO)

Sd/- B.UMAKAR RAO DIRECTOR (PROJECTS) To, The Chief Engineer/ Construction -2/VS/Hyderabad. The Chief Engineer/ Construction -1/VS/Hyderabad. The Chief Engineer/ LIS/VS/Hyderabad. The Chief Engineer/ Construction/400kV /VS/Hyderabad. (Contd )

The Chief Engineer/ Transmission /VS/Hyderabad. The Chief Engineer /Civil/VS/Hyderabad. The Chief Engineer /Zone/Metro/Hyderabad. The Chief Engineer/Zone/Rural/Hyderabad. The Chief Engineer/Zone/Kadapa. The Chief Engineer/Zone/Vijayawada. The Chief Engineer/Zone/Vishakapatnam. The Chief Engineer/Zone/Warangal. The Superintending Engineer/TLC/Metro/Hyderabad. The Superintending Engineer/TLC/Rural/Hyderabad. The Superintending Engineer/TLC/Warangal. The Superintending Engineer/TLC/Vijayawada. The Superintending Engineer/TLC/Visakhapatnam. The Superintending Engineer/TLC/Karimnagar` The Superintending Engineer/TLC/Kadapa. The Superintending Engineer/TLC/LIS/Kurnool. The Superintending Engineer/TL&SS/ Metro Circle / Hyderabad The Superintending Engineer/TL&SS/ Hyderabad Circle / Hyderabad. The Superintending Engineer/TL&SS/ Mahaboob Nagar. The Superintending Engineer/TL&SS/ Nalgonda The Superintending Engineer/400 KV / Mamidipally The Superintending Engineer/TL&SS/ Warangal The Superintending Engineer/TL&SS/ Karimnagar The Superintending Engineer/TL&SS/ Nizamabad The Superintending Engineer/TL&SS/ Vijayawada The Superintending Engineer/TL&SS/ Nellore The Superintending Engineer/TL&SS/ Rajahmundry The Superintending Engineer/TL&SS/ Vizag The Superintending Engineer/TL&SS/ Kadapa The Superintending Engineer/TL&SS/ Kurnool The Superintending Engineer/Civil /TLC/Hyderabad The Superintending Engineer/Civil/TLC/Warangal The Superintending Engineer/Civil/TLC/Vijayawada. The Superintending Engineer /Civil/TLC/Kadapa. The Superintending Engineer /Civil/TLC/Visakhapatnam The Executive Engineer/TLC/RMS/Hyderabad. The Executive Engineer/TLC/Mahaboob Nagar. The Executive Engineer/TLC/Nalgonda. The Executive Engineer/TLC/Erragadda. The Executive Engineer/TLC/Sanga Reddy. The Divisional Engineer/ MRT / EHT / TLC / Hyderabad The Executive Engineer/TLC/Warangal. (Contd..3)

The Executive Engineer/TLC/Karimnagar. The Executive Engineer/TLC/Nizamabad. The Executive Engineer/TLC/Vijayawada. The Executive Engineer/TLC/Gunadala. The Executive Engineer/TLC/Guntur. The Executive Engineer/TLC/Nellore. The Executive Engineer /TLC/Ongole. The Executive Engineer/TLC/Thirupathi. The Executive Engineer/TLC/Rajahmundry. The Executive Engineer/TLC/Vizag. The Executive Engineer/TLC/Kurnool The Executive Engineer/TLC/LIS/Division-I/Kurnool. The Executive Engineer/TLC/LIS/Division-2/Kurnool. The Executive Engineer/TLC/Kadapa. The Divisional Engineer /TLC/TRE/Kadapa The Divisional Engineer/TL&SS / Chandrayangutta The Divisional Engineer/TL&SS / Moulali The Divisional Engineer/TL&SS / Erragadda The Divisional Engineer/ MRT / Metro Circle / Hyderabad The Divisional Engineer/ MRT / Hyderabad Circle / Hyderabad The Divisional Engineer/TL&SS / Mahaboobnagar The Divisional Engineer/TL&SS / Yeddumailaram The Divisional Engineer/TL&SS / Miryalaguda The Divisional Engineer/TL&SS / Nagarjunasagar The Divisional Engineer/ O&M / 400 KV / Mamidipally The Divisional Engineer/ TL&SS / Warangal The Divisional Engineer/ TL&SS / MRT / Warangal The Divisional Engineer/ TL&SS / Budidampadu The Divisional Engineer/ TL&SS / Karimnagar The Divisional Engineer/ TL&SS / Ramagundam The Divisional Engineer/ MRT / Nizamabad The Divisional Engineer/ TL&SS / Nirmal The Divisional Engineer/ TL&SS / Dichpally The Divisional Engineer/ MRT / TLC / Warangal The Divisional Engineer/ MRT / EHT / TLC / Vijayawada The Divisional Engineer/ MRT / EHT / TLC / Nellore The Divisional Engineer/ TL&SS / Vijayawada The Divisional Engineer/ TL&SS / Guntur The Divisional Engineer/ MRT / TL&SS / Vijayawada The Divisional Engineer/ MRT / TL&SS / Nellore The Divisional Engineer/ TL&SS / Nellore The Divisional Engineer/ TL&SS / Ongole The Divisional Engineer/ TL&SS / Bommur The Divisional Engineer/ TL&SS / Nidadavole The Divisional Engineer/ HVDC / TL&SS Circle / Rajahmundry The Divisional Engineer/ MRT / EHT / Rajahmundry (Contd..4)

The Divisional Engineer/ TL&SS / Gazuwaka The Divisional Engineer/ TL&SS / Garividi The Divisional Engineer/ MRT / TL&SS / Vizag The Divisional Engineer/ TL&SS / Kadapa The Divisional Engineer/ TL&SS / Yerraguntla The Divisional Engineer/ TL&SS / Tirupathi The Divisional Engineer/ EHT / MRT / Kadapa The Divisional Engineer/ MRT / TL&SS / Kurnool The Divisional Engineer/ MRT / TL&SS / Ananthapur The Divisional Engineer/ Windfarms / Ananthapur The Divisional Engineer/ TL&SS / Kurnool The Divisional Engineer/ TL&SS / Ananthapur The Divisional Engineer/ O&M / 400 KV / Kurnool The Divisional Engineer/ O&M / 400 KV Lines / Srisailam

The Executive Engineer/Civil/TLC/Mint Compound/Hyderabad. The Executive Engineer/Civil/TLC/Rajahmundry. The Executive Engineer/Civil/TLC/Kadapa. The Divisional Engineer/Quality Control/ Vidyut Soudha / Hyderabad Superintending Engineer/Construction /PM-I /VS/Hyd. Superintending Engineer/Construction /PM-II/VS/Hyd. Superintending Engineer/PM-I/400 KV /VS/Hyderabad. Superintending Engineer/PM-II/400 KV /VS/Hyderabad. Superintending Engineer/LIS /VS/Hyderabad. Superintending Engineer/O&M/Lines/VS/Hyderabad. Superintending Engineer/O&M/Substations/VS/Hyderabad. Divisional Engineer-1/Construction-1/VS/Hyderabad. Divisional Engineer-2/Construction-1/VS/Hyderabad. Divisional Engineer-3/Construction-1/VS/Hyderabad. Divisional Engineer-4/Construction-1/VS/Hyderabad. Divisional Engineer-1/Construction-2/VS/Hyderabad. Divisional Engineer-2/Construction-2/VS/Hyderabad. Divisional Engineer-3/Construction-2/VS/Hyderabad. Divisional Engineer-1/LIS/VS/Hyderabad. Divisional Engineer-2/LIS/VS/Hyderabad. Divisional Engineer/Design/Construction/VS/Hyderabad.

PS to Chairperson Managing Director/APTransco/VS/Hyd. PS to Joint Managing Director/ Comml. IPC, RA & IT/APTransco/VS/Hyderabad. PS to Joint Managing Director/ V&S/ APTransco/VS/Hyderabad. (Contd

5)

6 Divisional Engineer / Tech to Addl. Joint Managing Director/HRD& Distribution/ APTransco/ VS/Hyderabad. Divisional Engineer/Tech to Director /Projects/ APTransco/VS/Hyderabad. Divisional Engineer/Tech to Director /Transmission/ APTransco/VS/Hyderabad. Divisional Engineer/Tech to Director /Grid Operation/ APTransco/VS/Hyderabad. Divisional Engineer/Tech to Director /Finance & Revenue/ APTransco/VS/Hyderabad. The FA & CCA (A,E &R)/APTransco/VS/Hyderabad.

//

FORWARDED BY ORDER //

DIVISIONAL ENGINEER 3 /PM-II O/o.Chief Engineer (Construction-2) Vidyut Soudha, Hyderabad.