Page 1
Processes:
8.1
8.2 8.3
Page 2
Planning
4.2 Develop Project Management Plan 5.1 Collect Requirements 5.2 Define Scope 5.3 Create WBS 6.1 Define Activities 6.2 Sequence Activities 6.3 Estimate Activity Resources 6.4 Estimate Activity Durations 6.5 Develop Schedule 7.1 Estimate Costs 7.2 Determine Budget
Executing
4.3 Direct and Manage Project Execution 8.2 Perform Quality Assurance
Closing
4.6 Close Project or Phase
Page 3
Phase
Planning
Standards, Benchmarking, Cost Benefits Analysis, Flowcharts, Experiment Design Implement, Check the outputs of quality control measurements to verify if they meet the check overall quality standards overall Are the quality standards still appropriate? What lessons are learned to improve quality?
Execution
Overall performance evaluation (regular review), audits of quality activities, lessons learned identified Perform Quality Control Measure details, detail checking Measure (test) to see if the specific quality standards have been met.
Review compliance with quality standards, use of quality control tools (Pareto, Fishbone, Checklists, Control Charts)
2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 4
Perform Quality Control is primarily concerned with checking for correct work results (assuring that the quality requirements are met). Perform Quality Control takes place prior to Verify Scope!
Quality Assurance audits the quality requirements and the results from quality control measurements to ensure appropriate quality standards and operational definitions are used. It concerns with the over all quality of the project.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 5
Page 6
Outputs
Quality Management Plan Quality metrics Quality checklists Process improvement plan Project document updates
2.
3. 4. 5. 6. 7. 8.
Cost of quality
Control charts Benchmarking Design of Experiments Statistical sampling Flowcharting Proprietary quality management methodologies Additional quality planning tools
5.
6.
9.
Page 7
Page 8
Customer satisfaction
States the customers feelings about a product or service
Conformance to requirements
States the condition of the product or service in relation to the customers requirements
Managing quality effectively has a positive effect on morale, costs, risk and customer satisfaction.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 9
5. Balance the needs for quality with scope, cost, time, risk and satisfaction.
6. Develop a Quality Management Plan and add it to the Project Management Plan.
Page 10
Work should meet the project requirements and testing should be done whenever appropriate before submission to the project manager.
Senior management has the ultimate responsibility for quality in the organization as a whole.
Page 11
Quality must be planned into the project, not inspected in after the fact to make certain the product or service meets stakeholders expectations.
Reason: The cost of non-conformance (rework, scrap, inventory cost, warranty cost) is higher than cost of conformance
GOLD PLATING:
Giving the customer extras (e.g., extra functionality, higherquality components, and extra scope of work or better performance).
Gold plating adds no value to the project. Often, such additions are included based on the project team's impression of what the customer would like.
Page 12
Six Sigma = Six Sigma is a measurement-based strategy; no more than 3.4 defects per million.
Kaizen = Continuous improvement; improve quality of people first.
Page 13
NORMAL DISTRIBUTION:
A normal distribution is the most common probability density distribution chart that is in the shape of a bell curve and is used to measure variations.
Page 14
+ or 2 Sigma is equal to 95.46 + or 3 Sigma is equal to 99.73 + or 6 Sigma is equal to 99.99 3 sigma is the most common standard
Page 15
Page 16
Stakeholder register (described in 10 Project Communications Management) Cost performance baseline (described in 07 Project Cost Management) Schedule baseline (described in 06 Project Time Management)
Page 17
Page 18
Page 19
If the performing organization lacks a formal quality policy, or if the project involves multiple performing organizations (as with a joint venture), then the project management team will need to develop a quality policy for the project.
Regardless of the origin of the quality policy, the project management team is responsible for ensuring that the project stakeholders are fully aware of the quality policy.
Page 20
They apply the policy at the organizations operations level, i.e. projects, operations, maintenance, etc.
Page 21
The primary cost of meeting quality requirements is the expense associated with project quality management activities.
It is a widely accepted principle of the quality management discipline that the benefits must outweigh the costs.
Page 22
Cost of conformance to requirements (money spent to avoid failures) Prevention cost: Prevention means keeping defects out of the hands of customers. Prevention costs are the costs associated with satisfying customer requirements by producing a product without defects or within an acceptable defect range. Appraisal cost: Appraisal costs are the costs expended to examine the product or process and make certain the requirements are being met. Appraisal costs might include costs associated with aspects such as inspections and testing.
Cost of non-conformance (failure costs-money spent because of failures) Internal failure cost: These result when customer requirements are not satisfied while the product is still in the control of the organization. Internal failure costs might include corrective action, rework, scrapping, and downtime. External failure cost: These occur when the product has reached the customer who determines that the requirements have not been met. Costs associated with external failure costs might include inspections at the customer site, returns, and customer service costs. Costs of Conformance: Quality training, studies, surveys Costs of Non-Conformance: Rework, scrap, inventory costs, warranty costs
Page 23
Control charts are used most often in manufacturing settings where repetitive activities are easily monitored.
For example, the process that produces widgets by the case lot must meet certain specifications and fall within certain variances to be considered in control.
However, you arent limited to using control charts only in the manufacturing industry.
You can use them to monitor any output. You might consider using control charts to track and monitor project management processes. You could plot cost variances, schedule variances, frequency or number of scope changes, and so on, to help monitor variances in the project management process. As Plan Quality tools are used to establish the specification and control limits that the project must meet
Page 24
Page 25
Benchmarking example:
if your current printer can produce 8 pages per minute and youre considering a new printer that produces 14 pages per minute, the benchmark is 8 pages per minute.
Benchmarking is used for process and product improvement The other projects may be within the performing organization or outside of it, and may be within the same application area or in another.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 26
Page 27
Page 28
Matrix diagram
Include two, three, or four groups of information and show relationships between factors, causes, and objectives. Data in a matrix is organized in rows and columns
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 29
Page 30
Page 31
Page 32
Example:
Step 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Activity Document User Request for work Create an EARS ticket Document User Specifications Document Technical Impact/Requirements of change to other areas Document Issues & Risks Review Specifications and Impacts with Business Owner and get their signoff to proceed Document expected resource requirements from other groups Create Time Estimate (effort and duration) of effort for changes Gather Estimates from other required groups Done? (Y/N/NA)
Page 33
The process improvement plan is a subsidiary plan of the project management plan. Some of the elements you should consider when thinking about process improvement are:
the process boundaries, which describes the purpose for the process and its expected start and end dates; the process configuration so that you know what processes are performed when and how they interact; the process metrics; and any specific elements you want to target for improvement.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 34
Page 35
Page 36
Outputs
1. Organizational process assets updates
2. Change requests
1. Project management plan (Quality management plan & Process improvement plan) 2. Quality metrics
3. Process analysis
Page 37
Phase
Planning
Standards, Benchmarking, Cost Benefits Analysis, Flowcharts, Experiment Design Check the outputs of quality control measurements to verify if appropriate quality standards and operational definitions are used Implement, Are the quality standards still appropriate? check overall What lessons are learned to improve quality? Overall performance evaluation (regular review), audits of quality activities, lessons learned identified Measure (test) to see if the specific quality standards have been met. Review compliance with quality standards, use of quality control tools (Pareto, Fishbone, Checklists, Control Charts)
2009 Bob Xourafas, P.Eng, PMP, Proprietary
Executing
Page 38
NOTE:
The specified quality standards, methods and procedures are specified in the Quality Assurance Plan
The project team members, the project manager, and the stakeholders are responsible for the quality assurance of the project. It could be that a quality assurance department or organization is assigned to the project to oversee these processes. In that case, quality assurance might be provided to (rather than by) the project team.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
One of the techniques of process analysis includes performing root cause analysis (Remember to ask Why FIVE TIMES!), i.e. finding what is causing the quality problem. (I will discuss root cause analysis in the Risk Identification process in 11 Project Risk Management)
The result of this exercise will allow you to develop preventive actions for quality problems that are similar to the problem youre examining or that have the similar root causes.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 45
These arent new, but there is one new idea embedded in the change request output.
During this process, the recommended corrective actions, whether they are a result of a quality audit or process analysis, should be acted upon immediately. Example: Lets say youre manufacturing parts for one of the deliverables of your project. Obviously, the moment you discover that the parts are not correct, youd correct the process by calibrating the machine perhaps, or by using different raw materials, to make certain the parts are produced accurately.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 46
Page 47
Phase
Planning
Standards, Benchmarking, Cost Benefits Analysis, Flowcharts, Experiment Design Check the outputs of quality control measurements to verify if they meet the overall quality standards Implement, Are the quality standards still appropriate? check What lessons are learned to improve overall quality?
Executing
Overall performance evaluation (regular review), audits of quality activities, lessons learned identified Perform Quality Control Measure details, detail checking Measure (test) to see if the specific quality standards have been met.
Review compliance with quality standards, use of quality control tools (Pareto, Fishbone, Checklists, Control Charts)
2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 48
Outputs
Quality control measurements Validated changes Validated deliverables Organizational process asset updates (checklists, lessons learned) Change requests Project management plan updates Project document updates
2. 3. 4. 5. 6. 7.
Page 49
Perform Quality Assurance is concerned with assuring that the project is using the correct and most efficient processes to meet the project requirements. Perform Quality Control is concerned with the accuracy of the project results. Involves monitoring specific project results to determine:
if they comply with relevant quality standards, and identifying ways to eliminate causes of unsatisfactory results Focuses on the correctness of work.
Project results include: product results, such as deliverables, and project management results, such as cost and schedule performance
Page 50
Page 51
Page 52
Page 53
Effect
Causes
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 54
10 8 6 4 2 0 0
Mean
Page 55
Page 56
Mean
Specification Limits
Page 57
Out of Control (Think of "out of control" as a lack of consistency and predictability in a process)
The process or product is out of statistical control under of either of two circumstances. 1. A data point falls outside either the upper or lower control limit 2. Non-random data points that are within the upper and lower control limits such as the rule of seven.
Page 58
Defects
16 23 30
13 20 27
13 20 27
10 17 24
15 22
Jan
Feb
Mar
Apr
May
Page 59
Pareto charts are displayed as histograms that rank-order the most important factors such as delays, costs, defects, or other factors by their frequency over time. The histograms show the types of problems (anomalies) and their frequency. His theory is that you get the most benefit if you spend the majority of your time fixing the most important problems.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 60
Run Chart
Page 61
Variances that are always present in the process: The process itself will have inherent variability that is perhaps caused by human mistakes, machine variations or malfunctions, the environment, and so on, which are known as variances always present in the process. These variances generally exist across all applications of the process.
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 62
Flowcharting
Already discussed
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 63
The closer the points resemble a diagonal line, the closer the two variables are related
100 80 60 40 20 0 0
PMGT- 401: Project Management Fundamentals 08 Project Quality Management
6
Page 64
Page 65
Take too long Cost too much Be too destructive When we believe there are not many defects
Page 66
Attribute: Are specific characteristics for which a product is designed and tested (built); i.e., the measurement (cm, mm, m, Kg, etc.) that will tell if the sample is acceptable (the result either conforms or does not conform)
PMGT- 401: Project Management Fundamentals 08 Project Quality Management 2009 Bob Xourafas, P.Eng, PMP, Proprietary
Page 67
It always costs less to prevent problems in the first place than it does to fix problems built into the product after the fact.
Rework, labor costs, material costs, and potential loss of customers are all factors to consider when weighing prevention costs versus the cost of rework. Philip Crosby developed the theory of Zero Defects, which deals with prevention costs. Loosely translated, Zero Defects means doing it right the first time.
Page 68
Change requests
Change requests could recommend corrective and preventive actions. Remember that processes that are in control should not be adjusted. Processes out of control might require adjusting, but this should occur only as a result of a management decision.
Page 69
Project management plan updates as the result of the Project Quality Management processes, the plan must be updated accordingly.
Page 70
Improve Quality Quality Assurance Recommend Corrective Actions Request Changes Update Quality Standards Update Project Management Plan Integrated Change Control Do work following the new plan
Quality Planning
Do Work
Quality Control
Page 71
Page 72