Definitions Transmittal Form Shop Drawing Submittals Sample Submittals Miscellaneous Submittals Point of Delivery Saudi Aramco's Review Comments on Shop Drawing and Sample Submittals Released for Construction Drawings Purchase of Material
REV. NO.
DISCIPLINE ENGINEER
PART 1 - GENERAL 1.01 A. Definitions Shop Drawings: The term "shop drawings" includes the shop drawings and shop drawing information such as descriptive literature, product data, illustrations, schedules, performance and test data, and similar information furnished by the Contractor to explain in detail specific portions of the Work as required by the various sections of these specifications. Samples: The term "samples" includes a representative item, a representative part of an item, or a mock-up, which is a representative assembly of items as required by the various sections of these specifications. Miscellaneous Submittals are non-administrative submittals directly related to the Work including warranties, guarantees, survey data and reports, quality testing and commissioning reports, and other similar information and materials as required by the various sections of these specifications, not defined as shop drawings or samples. Transmittal Form A transmittal form shall be provided with each submittal. The Contractor shall prepare a draft of the required transmittal form and submit to Saudi Aramco for
DWG. TYPE PLANT NO. INDEX DRAWING NO.
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
B.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
C.
Date:
1.02 A.
Section 01340
SHT. NO. REV. NO.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
15-Sep-07
JOB/EWO#
1 OF 6
00
ENGG
CERT
PMT
B.
DESCRIPTION
The Contractor shall provide certification on the form, stating that the information submitted complies with the requirements of the Contract Documents and shall provide comparison table depicting the Materials Specifications and Project Specifications requirements. Shop Drawing Submittals General: 1. The Contractor shall be responsible for the prompt and timely submittal of all shop and working drawings so that there shall be no delay to the Work due to the absence of such drawings. Within 15 calendar days of receipt of Notice to Proceed, submit a schedule of shop drawing submittals to Saudi Aramco for acceptance. The schedule shall include the required Saudi Aramco review periods and shall indicate shop drawing submittals in the order of priority which reflects the logical sequence of construction activities and the Contract schedule. The Contractor shall update and resubmit the schedule to Saudi Aramco as required by any schedule changes. Shop drawings shall be submitted for all items as required by the various sections of these Specifications and all crossing utilities. Shop drawing acceptance shall be obtained prior to execution of the work detailed on such submittal. Any work done prior to such acceptance shall be at Contractor's risk. If a shop drawing shows any deviation from the Contract requirements, the Contractor shall make specific mention of the deviations in his letter of transmittal.
1.03 A.
DATE JOB/EWO
REV. NO.
DISCIPLINE ENGINEER
3.
PROJECT ENGINEER
____________ DATE
4.
CERTIFIED _ __________
DATE: ________
5.
CONSTRUCTION AGENCY
________________ DATE:
6.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
B.
Shop Drawing Submittal Sheet: 1. The Contractor shall use the "Contractor Drawing Submittal Sheet" form furnished by Saudi Aramco for all shop drawing submittals. The Contractor shall maintain a file of all submittal sheets at the work site. The file will be subject to Saudi Aramco review and shall be provided to Saudi Aramco at the time of project closeout.
Date:
2.
C.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
15-Sep-07
JOB/EWO#
2 OF 6
00
ENGG
CERT
PMT
2.
REV. NO.
DATE JOB/EWO
DESCRIPTION
DISCIPLINE ENGINEER
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
4.
CONSTRUCTION AGENCY
________________ DATE:
5.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
6.
Date:
7.
D.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
15-Sep-07
JOB/EWO#
3 OF 6
00
DESCRIPTION
ENGG
CERT
PMT
1.04 A.
Sample Submittals Samples and sample sets shall be submitted marked, tagged, or otherwise properly identified with the name of the Contractor, the manufacturer's name and country of origin and the date, and shall be accompanied by a letter of transmittal (in quadruplicate), together with the specification section number for identification of each item. Each tag or sticker shall have clear space for the stamps of the Contractor and Saudi Aramco. For submission containing two or more samples, Form "List of Submitted Materials" shall be used listing all samples of origin. 1. Where requested, or in case a considerable range of color, graining, texture or other characteristics may be anticipated in finished products, a number of samples of the specified materials shall be furnished to indicate the full range of such characteristics which will be present in the finished products and shall be considered one sample set; any such products delivered or erected without submittal and acceptance of full range samples shall be subject to rejection. Provide full sets of optional samples where Saudi Aramco selection is required. Prepare samples to match Saudi Aramco's sample where so indicated.
REV. NO.
DATE JOB/EWO
DISCIPLINE ENGINEER
PROJECT ENGINEER
____________ DATE
2.
CERTIFIED _ __________
DATE: ________
3. B.
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
Samples of materials which are generally furnished in containers bearing the manufacturer's descriptive labels and printed application instructions shall, if not submitted in the standard containers, be supplied with such labels and application instructions. Maintain the returned final set of samples at the work site in suitable condition and available for quality control comparisons by Saudi Aramco. Miscellaneous Submittals Inspection and Test Reports: Submit six (6) copies each where required by technical specifications. Guarantees and Warranties: Furnish three (3) executed copies.
Section 01340
C.
1.05
Date:
A.
B.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
15-Sep-07
JOB/EWO#
4 OF 6
00
PMT
C.
Survey Data: Furnish three (3) copies of survey data required by quantitative records of actual work, damage and settlement surveys, surveys of adjacent construction, and similar data. Point of Delivery Deliver all shop drawings, samples, and miscellaneous submittals to Saudi Aramco Representative. Saudi Aramco's Review Comments on Shop Drawing and Sample Submittals Saudi Aramco's action with regard to shop drawings and catalog cuts are as hereinafter specified. 1. Approved. a. Work may proceed. No changes or additions to the document are required. The acceptance of shop drawings and samples is general, and shall not be construed as: (1) Permitting any departure from the Contract requirements. Relieving the Contractor of the responsibility for any errors or omissions, including details, dimensions, and materials. Permitting any departures from details furnished by Saudi Aramco.
ENGG
CERT
1.06 A.
DESCRIPTION
1.07 A.
DATE JOB/EWO
b.
REV. NO.
DISCIPLINE ENGINEER
(2)
PROJECT ENGINEER
____________ DATE
(3)
CERTIFIED _ __________
DATE: ________
2.
Revise and Resubmit: This comment requires correction and resubmittal of the shop drawing or sample for approval prior to release of the drawing for construction. Although the content of the submittal is in basic accord with the drawings and specifications, technical or physical changes in the material or product are necessary to make it acceptable to or usable on the project. The document shall be corrected and resubmitted.
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
3.
Approved as Noted: Content is in basic accord with the drawings and specifications. Technical or physical changes in the material or product are necessary to make it acceptable to or usable on the project. The document shall be corrected and resubmitted. The qualifications pertaining to "Work May Proceed" apply. Disapproved - Work May Not Proceed: Document content is not acceptable as it is not in conformance with the drawings and specifications. The document must be corrected and resubmitted.
Section 01340
Date:
4.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
15-Sep-07
JOB/EWO#
5 OF 6
00
ENGG
CERT
PMT
1.08
DESCRIPTION
Released for Construction Drawings Following the technical review of the shop drawings, the Contractor shall make the appropriate and applicable drawing corrections. Subsequently a "Released for Construction" sticker is affixed, duly signed by Saudi Aramco. The Contractor shall follow the current Saudi Aramco Procedure "Control of Construction Documents" regarding submittal and acceptance of drawings. After receiving signed "Released for Construction sticker on each drawing, the Contractor shall maintain the (1) set of "Released For Construction" drawings at the site office plus provide a minimum of 1 set of each print to Saudi Aramco and additional sets for the Contractor's field operations as required. Purchase of Material No material or equipment shall be purchased or fabricated for the Contract until the required shop and working drawings have been submitted as hereinabove provided and reviewed and approved by the Saudi Aramco Representative for conformance to the Contract requirements. All such materials and equipment and the work involved in their installation or incorporation into the Work shall then be as shown in and represented by the said drawings.
A.
B.
C.
DATE JOB/EWO
REV. NO.
1.09 A.
DISCIPLINE ENGINEER
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
- END OF SECTION -
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
Date:
Section 01340
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
15-Sep-07
JOB/EWO#
6 OF 6
00