Você está na página 1de 14

L d + '

Date: 27.05.2010 Madhucon projects Limited Madhucon House 1129lA Road No.36, Hi-Tech City Road Jubilee Hills Hyderabad - 500 033 Andhra Pradesh, India Kind Attn: Mr. Lakshmana Rao Dear Sir,

SUB: Firefighting system for our 2x135 MW coal based thermal Power plant at Tamminapatnam village, 'NelloreDist. Andhrapradesh. REF: Your enquiry mail dt: 18-01-2010 Our clarification mail dt: 02-02-2010 Your reply to our clarification mail dt: 02-04-2010 Your mail for MOM dt: 30.04.10 Our Tech offer dt: 11.05.10 Our Commercial offer dt: 14.05.10 Your MOM for meeting held on 24h May mail dt: 25.05.10

With reference to the above, please find attached our revised offer for your kind consideration and our offer is based on the MOM held on 24thmay 2010. 1. 2. 3. 4. Commercial terms and conditions Observation Exclusions Price summary

We look forward to address any queried clarifications that you may have and will be pleased to be part of any technical discussion. Thanking you and assuring you of our co-operation for all times to come, We remain, Thanking you, Yours faithfully For AGNICE FIRE PROTECTION LTD.,

AGM Marketing.

AGNICE FIRE PROTECTIUN LTD.

H.NO. 10-3-2/l5 Sripuri Colony East Marredpally Secunderabad 500 026 A.P. T :t9140 4202 4448, E : t9140 4202 4448 E-mail: hyderebed@agnice.net Web :www.agnlcefireprotection.com

CLIENT: MIS. b & i d h ~ p F &

&.

Rcf: E-TN CHN-20 10-005lR2

Date: 27.05.20 I 0 Page I of I

PROJECT: FIRE FIGHTING SYSTEM FOR 2 X 105 MW COAL I3ASED TCIERMAL POWER PLANT, NELLORE, AP.

OBSERVATIONS
1. We have quoted hydrant syslcm, Extinguishers & spray inaiii on unit ralc colitract basis as per the
BOQ provided along with the enquiry.

2. We have considered I-Ieavygrade MS construction conform to ERW pipc to IS: 12391IS: 3589 3. We have considered CI Non rising spindle Sluice valve as per IS: 14846 for size 50 - 300 mm
4. We have considered CI NRV as per IS: 5312.

5. We have not considered GI conduits for laying cable inside the building since the cable considered is annoured.
6. For cable gallery, we have designed number of zones based on pump capacity of 273 cum. Hr.

7. We have considered two runs of LHS for coal conveyors, one at the centreinost top along the length of the conveyor belt and another one at the centremost top along the return conveyor. 8. We have considered two numbers of IRD for conveyor less than 30 m. 9. In MVWS system for coal conveyors, we have considered two rows of sprayers along the conveyor, one at the centremost top along the length of the coilveyor belt and another one at side of the return belt conveyor. 10. We have considered polyethylene material for foam concentrate tank.

Note: Any changes in the above points will have cost implications.

EXCLUSIONS

* : * : *
* : *

Pump house equipments Foundation and Grouting for all equipments. Hume pipes for road and rail crossing of all underground pipes. Pad plates in the LDOlHFO tank for supporting of spray pipes.

* :

* : All pipe sleeves wherever required for crossing of walls. * : *


Supply of fire station equipments, fire mobile tenders.

* : All Civil works as per MOM dt:24th May 2010


* : *

Valve pit & dewatering Passive fire protection

* :

CUENT: MIS.

C-0

RcT: E-TN CHN-20 10-005-R2


'

AGNICE

PROJKT: FIRE Pl(.il-ITINCI SYSTEM FOR 2 X 135 MW COAL RASED THERMAL POWER PLANT, NCLLORE, AP.

Ddc: 27.05.20 10
~age I of 2

COMMERCIAL TERMS AND CONDITIONS


I. Our Scope

Our Scope is Design, Enginering, Supply, Erection, Testing and Commissioning of items for the systems as mentioned in the Price summary

2. Price basis

F.O.R. Destination Included 2% Payable to our vendor is included in our Supply price on EllE2 sale in transit basis. Customer to issue form "C" for all supply transaction.

3. Excise Duty
4. Sales Tax

5. Service tax

10.3% extra on Erection, Testing and commissioning.

6. Validity 7. Force Majure


:

Our offer is valid 30 days from the date hereof. Either party shall be considered in default under this order for force Major conditions, which are limited to act of war, invasions, acts of foreign enemies, hostilities, acts of god, embargo of civil or military authorities, riots, civil commotion, fire

,floods, Tsunami, earthquakes, epidemics,


quarantine restrictions, and/or directives of any central, State government orland Municipal authority or agencies thereof.

CLIENT: MIS. MADHUCON PROJECTS LIMITED PROJECT: FIRE FIGHTING SYSTEM FOR 2 X 135 NIW COAL BASED THERMAL POWER PLANT, NELLORE, AP.

BOQ

Ref: E-TN CHN-2010405/R2 Date: 27.05.2010

SI.No

Description

Unit

Cable Gallery QTY

Coal ConvyQTY

LDO-

MEDIUM VELOCITY WATER SPRAY

N o s

Nos 11

l
43 2
22

.
39

Nos

Nos
Nos

CLIENT: MIS. MADHUCON PROJECTS LIMITED PROJECT: FIRE FIGHTINGSYSTEM FOR


2 X 135 MW COAL BASED THERMAL

BOQ

Ref: E-TN CHN-2010405IR2 Date: 27.05.201 0

POWER PLANT, NELLORE, AP.

CLIENT: NVS. MADHUCON PROJECTS LIMITED PROJECT: FlRE FIGHTING SYSTEM FOR 2 X 135 MW COAL BASED THERMAL POWER PLANT, NELLORE, AP.

BOQ

Ref-.E-TN CHN-2010-0051R2 Date: 27.05.201 0

AGNICE FlRE PROTECTION LTD CHENNAl

CLIENT: MIS. MADHUCON PROJECTS LIMITED PROJECT: FlRE FIGHTING SYSTEM FOR 2 X 135 MW COAL BASED THERMAL POWER PLANT, NELLORE, AP.

BOQ

Ref: E-TN CHN-201M05IR2 Date: 27.05.201 0

AGNICE FlRE PROTECTION LTD CHENNAI

CLIENT: MIS. MADHUCON PROJECTS LIMITED PROJECT: FlRE FIGHTING SYSTEM FOR 2 X 135 MW COAL BASED THERMAL POWER PLANT, NELLORE, AP.

BOQ

Ref: E-TN CHN-201M)05/R2 Date: 27.05.201 0

AGNICE FlRE PR

CLIENT: ME. MADHUCON PRO.IECTS LIMITED PROJECT: FlRE FIGHTING SYSTEM FOR 2 X 135 MW COAL BASED THERMAL POWER PLANT. NELLORE, AP.

BOQ

Ref: E-TN CHN-201M)05/R2 Date: 27.05.201 0

AGNICE FlRE PROTECTION LTD CHENNAI

CLIENT: WS. MADHUCON PROJECTS LIMITED PROJECT: FiRE FIGHTING SYSTEM F O F Z 2 X 135 MW COAL BASED THERMAL WWER PLANT, NELLORE. AP

Ref: E-TM CHN-2010-0051R2 Date: 27.05.2010

CLIENT: MS. MADHUCON PROJECTS LIMITED PROJECT: FIRE FIGHTING SYSTEM FOR 2 X 135 MW COAL BASED THERMAL POWER PLANT, NELLORE, AP.

BILL OF QUANTITY

Ref: E--rN CHN-2010-005-R2 Date: 27.05.2010

Description

17
18
19

CELLARS PC WITH PRINTER RESPONSE INDICATOR GI CONDUITS


-

M Nos Nos

3428 1 104 1

20

Lot

AGNICE FIRE PROTECTION LTD CHENNAl

CLIENT: MIS. MADHUCON PROJECTS LIMITED BOQ PROJECT: FIRE FIGHTING SYSTEM FOR (OPTIONAL) 2 X 135 MW COAL BASED THERMAL POWER PLANT, NELLORE, AP.

Ref E-TN CHN-2010-005lR2 Date: 27.05.2010

150 DIA 100DIA STRUCTURAL STEEL SLIPPORTS FLOWSWITCH

Nos
Nos

12 5 1 17

b
6
>

Lot Nos

Você também pode gostar