ENGINEERING GUIDE

ECA / EUSA

EG 15-1-1.1
Page 1 of 2 Rev. 1 June 1999

Fired Heater Sample Connections


(This practice is appropriate for attachment to Inquiry or Purchase Document)

Changes shown by

1.1

This Engineering Guide provides the preferred design for the installation of sample and draft gauge connections for fired heaters. FIGURE 1 TYPICAL THREADED SAMPLE OR DRAFT GAUGE CONNECTION (DETAIL SHOWN FOR DRAFT GAUGE CONNECTION)
Clearance for Probe Removal

1/4" See Note (1) 304 or 316 Stainless Steel Elbow, 1/2 inch FNPT x 1/2 inch Tubing 1/2 inch NPT Male Tubing Connector 1/2 inch Stainless Steel Tubing to Grade See Note (7) 2 inch - 3000 lb Carbon Steel Coupling 2 inch x 1/4 inch Bushing, (Carbon Steel), Drilled for 1/2 inch Pipe UNLINED CONSTRUCTION 6" 1/4" 1/2 inch Schedule 40, 304 Stainless Steel

Clearance for Probe Removal

1/4" See Note (1) 304 or 316 Stainless Steel Elbow, 1/2 inch FNPT x 1/2 inch Tubing 1/2 inch NPT Male Tubing Connector 1/2 inch Stainless Steel Tubing to Grade See Note (7) 2 inch - 3000 lb Carbon Steel Coupling 2 inch x 1/4 inch Bushing, (Carbon Steel), Drilled for 1/2 inch Pipe LINED CONSTRUCTION 1" Minimum 1/4"

5" 10" Maximum

1/2 inch Schedule 40, 304 Stainless Steel 2 inch Schedule 40, 304 Stainless Steel

Notes: (1) Use E309 electrodes. (2) Connection shall be located to avoid interference with fired heater tubes and tube movement due to expansion. (3) For additions to existing fired heaters, fill void between NPS 2 pipe and refractory with 80 lb. insulating castable, or ceramic fiber insulation and a retainer. (4) High temperature thread lubricant shall be used for all threaded joints. (5) Connections must be located so as to be accessible from a ladder or permanent platform. (6) Appropriate gaskets shall be used on all flanged connections. (7) See EG 3-6-1.4, Figure 10 for continuation of sample line.
EG150101-1F1

ECA / EUSA Regional Engineering Guide

EG 15-1-1.1
Page 2 of 2 Rev. 1 June 1999

ENGINEERING GUIDE Fired Heater Sample Connections


(This practice is appropriate for attachment to Inquiry or Purchase Document)

ECA / EUSA

FIGURE 2 TYPICAL FLANGED SAMPLE OR DRAFT GAUGE CONNECTION

Clearance for Probe Removal 5" Minimum 1 inch x 1/4 inch Bushing Drilled for 1/2 inch Pipe 304 or 316 Stainless Steel Elbow, 1/2 inch FNPT x 1/2 inch Tubing 1/2 inch NPT Male Tubing Connector 1/2 inch Stainless Steel Tubing to Grade See Note (7) of Figure 1. Matching ASME Raised Face Blind Flange. Drill and Tap for 1 inch NPT. ASME Raised Face Slip on Flange 1/4" 3/8" 1/2 inch Schedule 40, 304 Stainless Steel

6"

UNLINED CONSTRUCTION

Clearance for Probe Removal 5" Minimum 1 inch x 1/4 inch Bushing Drilled for 1/2 inch Pipe 304 or 316 Stainless Steel Elbow, 1/2 inch FNPT x 1/2 inch Tubing 1/2 inch NPT Male Tubing Connector 1/2 inch Stainless Steel Tubing to Grade See Note (7) of Figure 1. Matching ASME Raised Face Blind Flange. Drill and Tap for 1 inch NPT. ASME Raised Face Slip on Flange 1/4" 3/8" 6"

Pack with Ceramic Fiber Insulation

1/2 inch Schedule 40, 304 Stainless Steel Schedule 40, 304 Stainless Steel

LINED CONSTRUCTION Note: See Figure 1 for notes.


EG150101-1F2

5/89 6/94 6/99

Revision Memo Revision 3 - EXES 15-1-1D Revision 0 - Original Issue of Engineering Guide Revision 1 Added Par. 1.1 to cover scope of Engineering Guide. Updated reference to ASME for raised face flanges in Figure 2. Exxon Chemical Americas, Exxon Company, USA, 1994, 1999

ECA / EUSA Regional Engineering Guide