CONSUMER HANDBOOK
BLANK
Table of Contents
About Us ............................................................................................................................ 4 Company Profile..................................................................................................................... 4 Our Network .......................................................................................................................... 4 Our Mission and Vision .......................................................................................................... 4 Basic Awareness ................................................................................................................. 5 How does electricity reach your home? ............................................................................ 5 What is power crisis? ......................................................................................................... 5 How does BESCOM work during power failure? ............................................................... 5 Our Services ....................................................................................................................... 6 Getting a New Connection..................................................................................................... 6 Changing the Name (Transfer of an Installation) .................................................................. 6 Rebate to Consumers............................................................................................................. 6 Rebate on installing solar water heaters ........................................................................... 6 Rebate for institutions involved in social welfare ............................................................. 6 Disconnecting and Reconnecting Power Supply.................................................................... 6 Reconnection charges........................................................................................................ 7 Changing Sanctioned Load..................................................................................................... 7 Mode of Payment .................................................................................................................. 7 Energy Conservation and Safety Issues ................................................................................. 8 Energy saving awareness ................................................................................................... 8 Tips on energy conservation .............................................................................................. 9 Safety is our concern........................................................................................................10 Customer Care Initiatives.....................................................................................................10 24 X 7 Customer Care Helpline ........................................................................................10 SMSbased complaint management system ...................................................................11 Interactive website ..........................................................................................................11 Customer Interaction Meeting (CIM) ..............................................................................11 Complaint register system (Soujanya Counters) .............................................................11 Facebook ..........................................................................................................................12 Consumer Grievance Redressal Forum ............................................................................. 12 Complaint to Consumer Grievance Redressal Forum (CGRF)..............................................12 Appeal to Ombudsman..................................................................................................... 12 Frequently Asked Questions (FAQs).................................................................................. 13
About Us
Company Profile
In 1999, the Government of Karnataka introduced Reforms in the Karnataka Power Sector by enacting the Karnataka Reforms Act. As the first step, the erstwhile Karnataka Electricity Board, which was responsible for power transmission and distribution within the State of Karnataka was corporatized as Karnataka Power Transmission Corporation Limited (KPTCL) with effect from 1.8.1999. Subsequently, the transmission and distribution functions of KPTCL were separated. KPTCL remained as a transmission Company. Distribution of power was entrusted to four regional distribution companies with effect from 1.6.2002 -- namely, BESCOM, HESCOM, MESCOM and GESCOM. One more distribution company by name CESC was formed in Mysore with effect from 1.4.2005 by bifurcating the jurisdiction of MESCOM.
Our Network
BESCOM was created as part of a reform process that took effect on 01.06.2002. BESCOM was assigned with distribution of power in the districts of Bangalore Urban/Rural, Kolar, Tumkur, Ramanagar, Chikkaballapura, Chitradurga and Davanagere.
Basic Awareness
How does electricity reach your home?
1.
speeds high enough to produce electricity in a generator. The blades can be rotated by water, stream or wind.
2. High-voltage Switchyard: The
electricity flows through metal conductor to a switchyard where a Transformer steps up voltage for transmission.
Transmission Lines: Transmission Lines efficiently carry high-voltage electricity over
3.
Power reaches you from substations through a line or a cable. At your end, power supply is fed through cut-outs or fuses installed in your house or in a building near your meter. Power failure occurs most commonly due to blown fuses or damaged cables. The fuse blows due to short circuit or equipment overloading. Further, there may be problems with the line or cable between the substation and distribution lines. These problems normally occur due to storms, fallen trees or branches, bird interference, insulator failures, etc.
How does BESCOM work during power failure?
When the field staff members get information about faulty lines or receive a consumer complaint regarding power supply interruption, they first find and isolate the faulty area in the feeder. Then, they restore power supply to the rest of the feeder. The isolated feeder is then rectified by earthing both sides of the faulty line and taking safety precautions for the lineman to attend the fault safely. Once the fault is rectified, the entire feeder is charged and power supply is normalized.
Our Services
Getting a New Connection
A consumer who wants to get a new connection has to first submit the following documents: Duly filled-in application form Proof of ownership or occupation of premises along with voters ID card, PAN card or ration card
After the consumer submits these documents, a Field Officer will inspect the site for the proposed connection. Once the documents are verified, the Field Officer prepares an estimate and a Licensed Electrical Contractor (LEC) provides the wiring diagram. The wiring diagram shows how the wiring will be done at the premises. Once the wiring is successfully completed, the Field Officer inspects the location for a final time before approving the power supply connection.
Formal letter of request for Change of Name Copy of the Sale Agreement NOC from the builder, owner or society Sale deed and tax payment receipts Copy of last paid power supply bill Indemnity Bond
Rebate to Consumers
Rebate on installing solar water heaters
BESCOM has made it mandatory to install solar water heating systems in order to get a new connection. New connections are not provided unless and until solar water heaters are installed by the applicant. Additionally, a rebate of up to Rs 50/- per month is given to consumers who have installed solar water heaters.
Rebate for institutions involved in social welfare
A rebate is given for installations registered in the name of a house, school or hotel meant for the handicapped, aged, destitute and orphans or rehabilitation centres run by charitable institutions.
sticker in person to the occupant consumer or after pasting the sticker on the gate/door in case the premises is locked. If the consumer produces clear proof of payment, the installation will not be disconnected. Reconnection charges The following reconnection charges are levied in case of disconnection. These charges are included in the monthly bill of the consumer. The reconnection charges are listed in the following table:
Installation Type
Single phase domestic installations under tariff schedule LT1 & LT2 (a) Three phase domestic installations under tariff schedule LT2 (a) & single Phase commercial power installations All LT installations with three phase other than LT2 (a) All HT and EHT installations
Charges
Rs. 20/- Per installation Rs. 50/- Per installation Rs. 100/- Per installation Rs. 500/- Per installation
Mode of Payment
BESCOM provides various options for its Consumers to make their bill payments.
Any Time Payment (ATP)
BESCOM has around 90 ATP kiosks across Bangalore Urban and Rural and a few district headquarters that directly collect cash and Cheques from Consumers via touch screen facility.
Any Where Payment (AWP)
With the AWP mode, Consumers can pay their bills at any BESCOM counter and not necessarily in the counter of area to which they belong.
Electronic Clearance System (ECS) through banks
ECS is an electronic mode of payment to transfer funds from one bank account to another. BESCOM supports ECS with IDBI bank, Corp bank, ICICI bank, Axis bank and Citi Union bank.
Online Payment:
7
l l l l l l
Web porta al Bill desk Bangalore One outlets Bill junction Easy bill outlets Pay world (Suvidha)
Consume ers can pay their electric city bills in any of the cash counters at the Sub-division usin ng cash, che eque or dem mand draft pa ayments.
B Bangalore On ne
It is a go overnment in nitiative base ed on the o one-stop sho op concept. Consumers can get the eir electricity y bill details, as well as can c pay bills s, in any of th he Bangalor re One cente ers across th he city using g cash, cheq que, Demand d Draft or Cr redit Card.
Easy Bill
Consume ers can pay their electric city bills thro ough Easy Bill counters u using cash payments. p
BESCOM M has been n working to owards spre eading awa areness on energy sav vings throug gh various channels. c So ome of them are listed below.
Flash mobs:
COM has cap pitalized on th he rising popu ularity of Flas sh Mobs to sp pread awaren ness on energ gy BESC savin ngs.
D Dollu Kunitha a:
BESC COM organiz zes Dollu Kun nitha, a folk fo orm of art in Karnataka, to o attract the attention a of th he public and to spre ead awarenes ss on energy s savings. V Veeragase da ances
Veer ragase is a vigorous dance e form native to Karnataka a. These dances are organized to attra act the attention a of the e public and spread s aware eness on energy savings.
Street plays
et plays are a form of th heatrical perfo ormance and d presentation in public spaces s witho out Stree targe eting any spec cific paying audience. a BES SCOM condu ucts street pla ays to spread awareness on o energ gy savings.
H Hoardings
BESC COM has cr reated and set s up hoardi ings all acro oss the city a and the distr ricts to sprea ad awar reness about energy savings.
BESC COM has set t up bus shelt ter advertisem ments across the city to sp pread awaren ness on energ gy savin ngs.
C stickers Car
BESC COM is takin ng advantage of this rising g trend and ha as introduced d attractive ca ar stickers with mess sages relevan nt to energy savings s to ens sure that the public p is awar re of this issu ue.
R Radio jingles
Radio jingles are short tunes conveying a message. BE ESCOM is us sing radio jin ngles to sprea ad awar reness on ene ergy savings. Tips on energy e conse ervation
Switch S off ligh hts and elec ctrical applian nces when not n in use Make M maxim mum use of f sunlight; it t is free. Avoid A use o of artificial
lig ghting during g day time
Keep K bulbs and a tube lights clean to get g brighter light Use U low watta age lamps fo or corridors and other le ess important areas Do D not unnec cessarily ope en refrigerato or doors Avoid A the use e of decorative and conc cealed lightin ng Use U air conditioning and climate cont trol equipme ent sparingly y Turn T off all bu ut security lig ghts when th he building is s not occupied Use U solar water heaters Use U right size e wiring. Do not use wire es with many y joints or loose joints Use U energy-e efficient irrig gation pump sets accord ding to requ uirements an nd save up to t
25% on electricity wing table lists energy savings s on u using CFL The follow
Compact C Lamp L
11 1 4 1.32 1 units/month
Fluore escent
Donts
Always use approved quality wires and cables that are ISI marked Use insulated cutting pliers and screwdrivers while handling electric wires and equipment Cover any bare portions of electrical connections with insulation tape Always ensure that plug sockets are not within the reach of children Always ensure that matching plugs and sockets are used to avoid loose contact and consequent heating and melting Always use graded fuse or rated MCCB Use three-pin plugs and sockets only and ensure that the third point (Ground) is earthed Switch off lights and electrical appliances when not in use
Do not dump garbage below power lines Do not fly kites near power lines Do not operate electrical switches and equipment with wet hands Do not park vehicles near transformer centers, ring main units, etc. Do not try to remove or chop trees fallen on electrical lines Do not touch snapped wires Do not cut trees or branches near overhead electric lines Do not climb electric poles Do not use guy wires tied to poles for drying clothes Do not tie banners or publicity material on electricity poles Do not touch the fencing around transformers Do not try to tie animals to electric poles or guy wires Do not energize fences
BESCOM has enriched its 24x7 Customer Care Helpline using the latest technology and software applications, along with an in-built automatic call transfer system. Consumers can call the Customer Care Helpline on 080 2287 3333, which has 25 concurrent lines.
10
At present there are 120 Customer Support Executives,12 Team Leaders, 4 Team Managers are working at Customer Service Cell(CSC). There are also shift Junior/Assistant Engineers along with Supporting staff working in CSC to help BESCOM Consumers
All complaints registe ered through h the 24x7 C Customer Ca are Helpline are provide ed with docke et numbers. Consumer rs can track k the status of their com mplaint eithe er through th he helpline o or t BESCOM M website. through the For trans sfer and sp peedy redre essal of com mplaints, BE ESCOM ha as introduce ed a wireles ss communication syste em, so that complaints c c can be conv veyed to the concerned circles faste er. This in tu urn facilitates s faster reso olution of issues.
SMS-based complain nt manageme ent system
Consume ers can send d text messa ages to 9243 3150000 to register r complain nts. The form mat for the te ext message e is as follow ws: BESCOM M < Sub-division code> <Nature of complaint> c Example: BESCOM N2 No Powe er Supply sin nce 10:10 PM sumer receives an Once the message is received, the cons edgment me essage with the compla aint ticket number. acknowle The com mplaint mes ssage is au utomatically forwarded to the concerne ed Sub-div visional As ssistant Ex xecutive En ngineer (Electrica al) (AEE) or r Executive Engineer ( (Electrical) (EE) ( for necessar ry action.
Interactiv ve website
Consume ers can log on o to the on nline web po ortal www.be escomhelplin ne.com and directly log in their com mplaints. The ey can also monitor m the s status of the eir complaint ts on this we eb portal.
Custome er Interaction n Meeting (CIM)
For bette er customer service s and timely dispo osal of consume er complaints s, Consumer Interactive e Meetings s (CIMs) are held once in n a month in n all Subdivisions to resolve and a redress complaints. Refer to the CIM schedule s at the end of th his handboo ok for further de etails.
To provi de d better ser rvice to customers, the Soujanya S co ounters and s service stations are being rem modelled and refurbishe ed to ensure quick and efficient e custo omer service e. Training programs s to sensitise e the field st taff to improv ve their beha aviour with customers c are being
imparted.
1 11
BESCOM has initiated use of Facebook to reach out to its consumers, employees and citizens. Most of the BESCOM employees/officers are members of Facebook, & this community includes from MD to field staff. Some of the active pages are Namma BESCOM, MD BESCOM etc. Facebook is being used as a platform to disseminate information about new initiatives, power interruptions, Consumer Interaction Meetings, etc. In addition, issues related to electricity supply, important circulars, meeting notices, proceedings and tender notifications are being posted on Facebook.
Appeal to Ombudsman
If the consumer is not satisfied with the orders of the CGRF, he/she can make further representation to the Ombudsman. For more details contact: The Ombudsman Karnataka Electricity Regulatory Commission, 6th Floor, Mahalakshmi Chambers, MG Road, Bangalore - 560001 Tel: 91-80-25320213, 214, 339, 765 Fax: 91-80-25320338 email:kerc35@bsnl.in Email: kerc35@bsnl.in
12
13
FAQs (contd)
6. What are the different voltage levels?
The declared voltages are as below:
EHT Supply
Alternating Current, 3-phase, 50 c/s, 66/110/220/400 KV or 2-phase supply at 220 KV
10. Should consumers provide space in their premises to erect transformers for MS buildings?
The space for transformers and other associated equipment are to be provided as specified in Karnataka Electricity Regulatory Commission (KERC) (Recovery of Expenditure for Supply of Electricity) Regulations 2004 and its amendments from time to time.
11. Why is the consumption of one consumer different from their neighbour who has the same equipment?
Even though the same electrical gadgets and appliances are used by two consumers, their usage patterns are not generally the same. Usage of electrical gadgets and appliances depend mostly on lifestyle, individual habits and personal preferences. So, electricity consumption of consumers is not the same.
14
FAQs (contd) (
12. Why y does ener rgy consumption var ry from season to se eason?
Usag ge of electrica al appliances is strongly in nfluenced by seasons. We e tend to use heaters durin ng winte er and air-con nditioners dur ring summer. Days are sho orter and nigh hts are longer r during winte er, which h results in hi igher lighting loads during winters.
13. Does s the cons sumption of a ceilin ng fan dep pend on t the speed set on th he regu ulator?
Yes, when a fan runs at a higher speed, it consumes c more power.
14. Ther re are thre ee people in my hou usehold an nd six in m my neighbours. Eve en so, my m bill is higher h than n that of my y neighbou ur. Why?
Even n though the same electr rical gadgets and applian nces are used by two co onsumers, the eir usag ge patterns ar re not genera ally the same. Usage of ele ectrical gadge ets and applia ances depend ds of most tly on lifestyle e, individual habits and p personal pref ferences. So, electricity consumption c Cons sumers is not the same.
Formal letter requesting for f electricity y duty exemption/tax exe emption C Copy of regis stration form or approval from one of f the compet tent authorit ties Certificate or letter statin C ng the date o of commenc cement of operations fo or the locatio on w where exemp ption is reque ested S Sale deed, pa artnership de eed or land documents In ndemnity bond
On duly d receiving all document ts, the electric city duty/tax exemption e is granted g from the next meter billing g cycle. The following cate egories of ind dustries are eligible e for cla aiming electric city duty/tax on o their bills: l l l l l n Technolog y and Biotechnology units Information 100 percen nt export-orie ented units Export pro ocessing zone es Industries set up in Spe ecial Economi ic Zones (SEZ Zs) IT parks an nd Electronic Hardware Te echnology units
1 15
16
FAQs (contd) (
23. Wha at are Delay yed Payme ent Charge es?
Delay yed Payment Charges (D DCP) are the e charges lev vied at a rate of 1 perce ent of the tot tal elect tricity bill amo ount (includin ng taxes and duties) if the e bills are no ot paid within the due dat te. For the t purpose of o computatio on of time lim mit for paymen nt of bills, the e day of presentation of bill, the date d of the bill l or the date of o issue of the e bill, as the case c may be, will not be ex xcluded.
24. Wha at are minim mum mont thly charge es or fixed charges?
This is the minim mum amount per month that a consum mer has to p pay even if no n electricity is consumed during the month.
25. Wha at is Multiplication Fa actor and how h is it ca alculated? How is it different d fo or each h consume er?
Multiplying Factor r (MF) is us ed e to calculat te the bill am mount of cons sumers. Ener rgy meters are erally designe ed to continu uously withst tand 440 volts and a maximum of 40A 4 current. If gene consumer load is more than 40A or supply voltage is higher than 440 volts, curre ent and voltag ge trans sformers are used in the metering m circu uit to restrict current c and voltage v to the rated capaci ity of the e meter. The ese transforme ers reduce th he current and voltage app plied to the meter m in certa ain propo ortion, which is called tra ansformation ratio. The consumption c recorded by y the meter is, i there efore, less tha an the actual consumption n of the consu umer in the sa ame proportio on. To arrive at the actual a consum mption of a co onsumer, the consumption n registered b by the meter is i multiplied by b a pro oportionality fa actor called multiplying m fac ctor. MF = CT Ratio x VT V Ratio The ratio for CT and a VT for a particular p cons sumer is desi igned in acco ordance with the t consumer rs tern. load requirement and load patt
Bills of Residential/Industrial/Comm B mercial Cons sumers (less than 40K KW) billed on o si ingle part tariff consist of o :
l l l l
Energy cha arges Fixed char rges Tax on sal e of electricity y ayment charg ges Delayed pa
Bills of Indus B strial and Co ommercial C Consumers (More ( than 4 40KW) billed d on two pa art ta ariff consist of: o
l l l l l
Maximum demand char rges harges Energy ch Tax on s ale a of electricit ty Delayed payment p char rges Power fac ctor penalty
1 17
FAQs (contd) (
27. How w can I calc culate my electricity e c consumpti ion?
Use the t ready rec ckoner availab ble on www.b bescom.org to o estimate you ur energy con nsumption. Th he type of appliances, their powe er consumptio on and the nu umber of unit ts they would d consume per th for the num mber of hours of usage are e listed in the website. w mont You can calculate e your electricity consump ption with the e help of the e ready recko oner. For more accurate assessm ment, refer to the wattage of your appli iance mentioned on its na ame plate. Yo ou must t accurately re ecord the hou urs of usage f for each appliance; otherw wise your calc culations wou uld be misleading. m
28. Who om should I contact for f commo on billing and meterin ng queries?
Even n though effo orts are made e to eliminate billing erro ors, if you fac ce any problems, you ma ay conta act the Soujanya counter established e in n each Sub-division of the j jurisdictional area.
29. Wha at should new n consumers do, i if they do not receive their firs st electricit ty bill?
The meters of all consumers are a read once e every month h using Spot Billing Machine (SBM). Th he mete er readings ar re recorded area-wise and on a specific c date. If the intimation regarding the ne ew consumer is received after the e metering cy ycle in that area, the new Consumers meter readin ng would appear only y in the next billing cycle reading. r If the e New consum mer does not get a bill eve en after two months s of initial po ower connection, then the e consumer s should conta act a Soujany ya nter immediate ely in the resp pective jurisdiction. coun
31. Who om should I contact if the tariff applied is not correc ct?
If the e tariff applied d is incorrect, , you must co ontact the are ea Soujanya c counter or AA AO of the Subdivisi ion to get the bill corrected d.
32. Wha at should I do if the meter m readi ing on the bill appear rs incorrec ct?
If you u find that your meter read ding on your bill is incorrect, then you h have to regist ter a complaint at yo our Section Office, O Sub-div vision Office or o Soujanya counter. On r receiving the complaint, th he mete er readings will w be checked and necess sary action will w be taken. Once the issue is resolve ed, you will w be informe ed of the sam me.
33. Wha at should I do if my current c bil ll shows arrears a eve en though I have dul ly paid all previou us bills wit thin the stipulated pe eriod?
While e printing the electricity bil ll, payment details up to a certain date only are con nsidered due to syste emic arrangem ment. Payme ents made afte er this date will, w therefore, not reflect in n the new bill. If the copy c of the receipt of th he earlier pa ayment is submitted to th he area Souj janya counte er, nece essary correct tions will be made m on the bill b and you ca an then pay th he balance bi ill amount.
1 18
FAQs (contd)
34. Why does a bill indicate nil or low units even though the consumption has been regular?
This irregularity may be due to a defective meter or metering installation. To avoid getting huge bills later on, bring this to the notice of the Sub-division immediately, by contacting the area Soujanya counter. Lower bills may also be due to wrong readings taken while billing. This may be due to human error, although every care is taken to avoid such errors.
36. Does the BESCOM meter reader read the meters every month, or is the bill prepared on estimated consumption every month?
Yes, BESCOM meter readers read the meters of all consumers of an area on a specific date of the month, using Spot Billing Machines (SBMs). Only in cases of locked doors, burnt meters, or meter not recording, the average consumption of previous months will be considered for billing.
37. What might be the reason for the bill showing that units have been consumed even though the premises was unoccupied or locked for a long period?
If your bill shows a wrong reading, register a complaint at any Soujanya counter. On receiving the complaint, the meter reading is checked and the meter is tested. If meter tests healthy, it means that the meter had recorded correctly. The responsibility of the consumers main switch rests on the consumer. If someone has used electricity supply by tapping from the main switch, BESCOM is not responsible for the same. The owner has to pay the units recorded. It is, therefore, the owners responsibility to keep the meter secure, with access restricted to a few authorized persons.
19
FAQs (contd) (
39. Can a consumer replace the main s supply fus se installed d by the co ompany?
No, the t meter bo oards, main cut-outs, c fuse es, etc. should, on no acc count, be inte erfered with by b anyo one other than the compa anys authoris sed representatives. The seals that ar re fixed on th he mete ers must neve er be tampered with. The company se eals are place ed to protect the apparatu us. Shou uld this be ig gnored, disob beyed or disr regarded, the e consumer renders hims self liable to a pena alty under the Electricity Ac ct, 2003.
40. How w can I calc culate my energy e bill based on the tariff?
You can calculate e your bill based on the LT / /HT table prov vided at the e end of this handbook.
41. Why y are Chequ ue paymen nts not acc cepted tow wards bills? ?
In a previous p occa asion, if a che eque was dish honoured for insufficient fu unds, then further paym ments towards s bills are not accepted by cheque.
43. Wha at is the ave erage Pow wer Factor (PF) that I should ma aintain? What W is the pena alty that is levied if it t is not maintained?
It is the t responsibility of the HT T consumer to o determine th he capacity of f PF correctio on apparatus and maintain m an average a PF of f not less than n 0.90.
If f the PF goes below 0.90 0 Lag, a surcharge of 3 paisa per un nit consume ed is levied fo or ev very reductio on of PF by 0.01 below 0.90 Lag. The PF, whe n computed as the ratio T o of KWh to KVAh K is det e ermined up to 3 decima als (ignoring figu ures in the other o decimal places), and a then ro ounded off to o the nearest se econd decim mal as illustra ated below:
l l 0.8949 is rounded r off to o 0.89 0.8951 is rounded r off to o 0.90
With respect to electronic Tri-V Vector meters, the recorded average PF P over the billing b period is considered for billing purposes s. If the same e is not availa able, the ratio of KWh to KV VAh consume ed in the e billing month is considere ed.
45. Wha at should I do when the existing g building is demolis shed and a new build ding is con nstructed? ? Should I surrender s the t old RR R Number or o should I cont tinue with the t same? ?
In ca ase of demolition and construction c of a buildin ng, the exist ting installati ion should be b surre endered and agreement should s be term minated. M eter e and serv vice mains will be removed. Fresh h service will l be arranged d for the new wly constructe ed building tre eating it as a new building. Tem porary p power r supply from m the existing g RR numbe er will not be e arranged fo or constructio on purpo oses in such cases.
2 20
FAQs (contd) (
46. Wha at should I do to obta ain concess sion of Ind dustrial Tar riff if my co ompany is s enga aged in sof ftware/hard dware dev velopment? ?
For firms f engaged d in software/ /hardware dev velopment, th he benefit of c concession of f industrial tar riff is ex xtended only from f the date e of productio on of certificat te issued by the Director, Department of Inform mation Tech nology n and Biotechnology, Government t of Karnataka a.
47. Shou uld I subm mit a certific cate issued d by the Di irector of D Departmen nt of Infor rmation Te echnology and Biotec chnology if i the name e of my company has s chan nged?
Yes, you have to o submit a ce ertificate issued by the Director of the Department of Informatio on Tec hnology h and Biotechnology B y afresh, if the e name of you ur company h has been chan nged.
48. Wha at is the pro ocedure to o get exten nsion of the e period of f temporar ry supply? Will the connection be disconnecte ed if extension is not t obtained? ? Is there at can be paid p to ext tend the pe eriod of tem mporary su upply? any penalty tha
To e xtend x the per riod of tempor rary supply, you y must apply to the jurisd dictional area Sub-division at lea ast one week before the da ate of expiry o of the tempor rary supply, d uly paying the e up-to-date powe er supply charges and any y other arrears s. Otherwise, the temporar ry supply will not be further exten nded. There is no penalty clause c for ma aking paymen nts after the expiry of period of temporar ry supp ply -- either pe eriod has to be extended o or power would be disconne ected.
49. Wha at are the benefits b of demand-b based tariff f if adopted d by consu umers?
Demand-based ta ariff is where the consume er is permitted d to have con nnected load more than th he sanc ctioned load. The T billing de emand will be e the sanction ned load, or m maximum dem mand recorde ed in the e Tri-Vector meter m during the month, w whichever is higher. h If the maximum m dem mand recorde ed is mo ore than the sanctioned s loa ad, penal cha arges of twice the normal ra ate is applicable.
52. Wha at are the different d typ pes of met ters based on usage? ?
E Electromecha anical meter rs - Single ph hase/ Three phase mete er (1st gener ration) E Electrostatic meters - Sin ngle phase/ T Three phase e meter (2nd d generation) LT ETV Mete er(Direct and d CT operate ed) S Smart meters s 3rd gene eration
2 21
FAQs (contd) (
53. Wha at do you mean m by Me eter Not Re ecording (MNR)?
A me eter is said to o be under MNR if the diffe erence in ene ergy consump ption recorded between tw wo consecutive periods is zero. It could c be due to internal or r external fact tors.
54. Wha at do you mean m by faulty meter and what are its cau uses?
A fau ulty meter is a meter that does not rec cord or record ds with an er rror beyond the t permissib ble limits s. The various s causes for faulty f meters include:
T The meters ageing a factor T The meter ma ay be fast or r slow creep ping
58. Wha at is the wa arranty per riod given to t a consu umer for a new energ gy meter?
Unless otherwise stated, the warranty w of a n new energy meter m is for a p period of five years from th he date of purchase.
2 22
FAQs (contd)
60. What do you mean by TOD meters and (TOU)?
Time of Day (TOD) metering, also known as Time of Usage (TOU) or Seasonal Time of Day (SToD) metering involves dividing the day, month and year into tariff slots and assigning higher rates at peak-load periods and low tariff rates at off-peak load periods. While this can be used to automatically control usage on the part of the consumer (resulting in automatic load control), it is often simply the consumers responsibility to control their own usage or pay accordingly (voluntary load control). TOD metering also allows utilities to plan their transmission infrastructure appropriately.
23
FAQs (contd)
66. What is ABT?
.Availability Based Tariff (ABT): l l l It is a performance-based tariff for the supply of electricity by generators owned and controlled by the central/ state government It is also a new system of scheduling and despatch, which requires both generators and beneficiaries to commit to day-ahead schedules. It is a system of rewards and penalties seeking to enforce day ahead pre-committed schedules, though variations are permitted if notified one to one-and-a- half hours in advance. The order emphasises prompt payment of dues. Non-payment of prescribed charges will be liable for appropriate action.
Remote systems
72. An ELCB with 30mA setting trips very often, thus causing inconvenience. Is it safe to install an ELCB with a higher setting?
Any leakage current over and above 30mA flowing through the human body becomes a part of the circuit, which can cause cardiopulmonary failure (stopping of breathing and heart function) at least for a short while. Hence, it is not advisable to install ELCBs of settings higher than 30mA. The cause of tripping and probable leakage in the circuit should be established and attended to.
24
FAQs (contd) (
73. Is it safe s to ope erate the geyser g with h wet hand ds while in the bathro oom?
Wet hands are a good conduc ctor of Electricity. Any swi tch, t especiall ly in the bath room must not be op perated with wet w hands. Wipe W your han nds dry before e operating sw witches.
76. Wha at should be b done wh hen someb body gets an a electrica al shock?
In ca ase of electrical accidents, do the following steps:
T Turn OFF the e main suppl ly switch imm mediately. In nsulate yours self with a dry board or insulating material m befor re removing the person in co ontact with the t live part.
Im mmediately call c for a do octor and pro oceed to giv ve artificial re espiration to o the victim till t m medical assis stance arrive es.
2 25
FAQs (contd)
77. Is it safe to use water to douse an electrical fire? What should be done in the event of a fire in Electrical wiring or gadgets?
No, water should never be used to douse the fire when the circuit on fire is live, that is, carrying Electricity. The Electricity supply should be switched OFF first (to make the circuit DEAD or DE ENERGISED) before pouring water on the burning equipment/shock. It is recommended to keep small fire extinguishers in the house.
80. Can I use the electricity provided to my house for illumination on festivals or for some repair works?
Use of power within the consumers premises for temporary purposes for bona fide use is permitted, subject to the condition that the total load of the installation does not exceed the sanctioned load. Where it is intended for temporary use for floor polishing and other such portable equipment in the premises having permanent supply, such equipment should be provided with an ELCB of adequate capacity.
26
FAQs (contd)
84. What are the different programs under DSM?
Energy Efficiency The emphasis is on reducing overall energy consumption and peak demand over several years. Peak Load Management The emphasis is on reducing peak demand consistently over a season. Demand Response The emphasis is on reducing peak demand for short periods of time for a few days during a year.
Switch on street lights just at dusk, that is, at 6:30 PM; switch off the lights just before sunrise, that is, by 5:30 AM. Switch off lights (except for security lighting) in parks and gardens immediately after the public exit in the evenings, that is, by 8:00 PM. Take action for reducing 50 percent pow er on hoardings, boards and advertising illumination. Make provision for dimmers for street lights. Put these lights on three phases so that alternative street lights are on in different phases with a facility to switch off these lights whenever necessary. Switch off a third of the street lights on high masts after 10:00 PM.
27
28
Demand based tariff (optional) where sanctioned load is above 5 KW but below 50 KW, Fixed Charges is 620 Ps /unit For 0 - 50 units 720 Ps /unit
Rs . 45 per KW of billing demand Rs . 60 per KW of billing demand 150 0 to 500 units 400 Ps /unit 501 to 1000 units 470 Ps/unit
TARIFF
DEMAND CHARGES Rs.180/kVA of billing demand/month TOD Tariff at the option of the Consumer Time of Day 22.00 Hrs to 06.00 Hrs 06.00 Hrs to 18.00 Hrs 18.00 Hrs to 22.00 Hrs Rs.180/kVA of billing demand/month
ENERGY CHARGES 380 paise/unit Increase+ / reduction (-) in energy charges over the normal tari applicable (-) 125 paise per unit 0 + 100 paise per unit For the first one lakh units For the balance units 550 paise per unit 510 paise per unit
HT 1
Railway Traction and Effluent Treatment Plants HT-2(a)(i) Rs.180/kVA of billing demand/month 480 paise per unit for all the units Tariff applicable to Bangalore Metropolitan Railway Corporation Ltd., (BMRCL) Rs.180/kVA of billing demand/month Rs.170/kVA of billing demand/month HT-2(a)(iI) Railway Traction and Effluent Treatment Plants Rs.180/kVA of billing demand/month HT-2 (b)(i) Rs.200/kVA of billing demand/month Rs.190/kVA of billing demand/month HT-2 (b)(ii) TOD Tariff at the option of the Consumer Time of Day 22.00 Hrs to 06.00 Hrs 06.00 Hrs to 18.00 Hrs 18.00 Hrs to 22.00 Hrs Energy charges/ Minimum Charges Rs.30 /HP/PM of sanctioned load Rs.10 /HP/PM of sanctioned load Energy charges/ Minimum Charges 460 paise per unit for all the units For the first one lakh units 510 paise per unit For the balance units 540 paise per unit
480 paise per unit for all the units For the first two lakh units 670 paise per unit For the first two lakh units 650 paise per unit
For the balance units 700 paise per unit For the balance units 680 paise per unit
Increase+ / reduction (-) in energy charges over the normal tari (-) 125 paise per unit 0 + 100 paise per unit 125 paise per unit subject to an annual minimum of Rs.1000 per HP/Annum 85 paise/unit 85 paise/unit 295 Ps. Per unit subject to an annual minimum of Rs.1000/- per HP of sanctioned load.
HT-4
470 paise/unit 820 paise / unit (weekly minimum of Rs.160/- per KW is not applicable
HT 5 Rs.210/HP/month for the entire sanction 67 HP and load / contract demand above
Contact Us Zonal and Circle Officers Contact numbers Zonal Officers Contact numbers
BMAZ
CEE(C,O&M) Office CEE(C,O&M) Mobile 080-22113868 94490-45888 cebmaz.work@gmail.com 080-22114420 94490-46585 sebmaz.work@gmail.com Circle Officers Contact numbers Email ID SEE(C,O&M) Office SEE(C,O&M) Mobile Email ID 080-22276366 9448234567 ceebraz123@yahoo.in, cebraz.work@gmail.com 080-22126744 9448452103 sebraz.work@gmail.com
BRAZ
CTAZ
08194 231466 9448461466 chiefcz@rediffmail.com 08194 230088 9448279580 sectz.work@gmail.com
NORTH
080- 22100415 94498-44604 senorthcircle.work@gmail.com 080-22100436 94490-46579 seebcnbescom@gmail.com 080-65602255
WEST
080- 23132113 9449050909 seewest.work@gmail.com 080-23132113 9449844839 eeowestcircle.work@gmail.com --
SEE(C,O&M) Office SEE(C,O&M) Mobile Email ID EE(C,O&M) Office EE(C,O&M) Mobile Email ID Circle Conrol Room Number
BR C
SEE(C,O&M) Office SEE(C,O&M) Mobile Email ID 080-22100412 94482-79007 gmbrc2005@rediffmail.com/ sebrc.work@gmail.com/ dcabrc.work@gmail.com 080-22131437 94484-52101 eebrc.work@gmail.com 9483539007
TUMKUR
SEE(C,O&M) Office SEE(C,O&M) Mobile Email ID 0816-2278599 94482-79006 setmkrcircle.work@gmail.com 0816-2252189 9448279388 eetmkrcircle.work@gmail.com EE(C,O&M) Office EE(C,O&M) Mobile Email ID Circle Conrol Room Number 9483527177
Monthly Schedule
Name of the Circle Bangalore North
3pm to 5pm
on all days mentioned below (even if it is a holiday)
1st W eek
Monday
Sub Division :C1 Location: C1 Sub Division Office, BCC Complex, Rajajinagar , Bangalore-10.
080-2332 4232
2nd W eek
Friday
Sub Division: N6
Location: N6 Sub Division Office, Near Doddanna School, Magadi Main Road, Sunkadakatte, Bangalore - 91 080-2358 2122
3rd W eek
Friday
Sub Division : N2 Location:N2 Sub Division Office, KHB Colony, Vijayanagar, Bangalore-40
080-2311 1276
4th W eek
Friday
Sub Division : C3 Location: C3 Sub Division Office, Opp. HMT Hospital, Jalahalli, Bangalore-13.
080-2345 2535
Tuesday
Sub Division : W1 Location : W1 Sub Division Office,50 Feet Road,Avalahalli, BDA Layout, Opp. BDA Park, Bangalore-78.
080-2675 6491
Wednesday Thursday
Sub Division : N4 Location: N4 Sub Division Office, No. 488, Peenya - l l Stage, Bangalore - 58
080-2836 1551
Monday
Tuesday
Wednesday Thursday
Sub Division : N5 Sub Division : C6 Location: C6 Sub Location: N5 Sub Division Office, Near Division Office, HMT SRS Gate, I Stage, Main Road, Mattikere, Peenya, Bangalore-58. Bangalore-54.
080-2839 4283 080-2360 1607
Monday
Sub Division : C2 Location: C2 Sub Division Office, 13th Cross, Malleshwaram, Bangalore-03.
080-2334 1286
Tuesday
Sub Division : C5 Location: C5 Sub Division Office, Kaval Byrasandra, L.R.Bande Road Bangalore-32.
080-2365 1515
Wednesday Thursday
Sub Division : N3
Location: N3 Sub Division Office, No.98 Basaveshwaranagar, III Stage, Opp. Gangamma Thimmaiah Choultry, Bangalore-79. 080-2322 8823
Monday
Sub Division : N7 Location: N7 Sub Division Office, J,C.Nagar Bangalore-86.
080-2319 1650
Tuesday
Sub Division : W2 Location: W2 Sub Division Office, No. 11, Sirsi Road, Chamarajapete, Bangalore-18.
080-2670 6820
Wednesday
Sub Division : C7 Location: C7 Sub Division Office, Yelahanka, Police Station Circle, B.B.Road Bangalore-64.
080-2846 3541
Sub Division : C4 Location: C4 Sub Division Office, HGH Layout, Ganganagar, Behind Cake Palace, Bangalore - 34.
080-2333 4199
Sub Division:S6 Location: S6 Sub Division Of fice, 38th Main, 14th Cross, I Phase, JP Nagar , Bangalore-78.
Sub Division : N1 Sub Division : W6 Location: W6 Sub Location:N1 Sub Office, Division Office, Near Division Byatarayanapura, NRS, Rajajinagar, Opp. Traffic Police Bangalore-10. Station, Mysore road,
Bangalore-26.
080-2332 4885
080-2674 8706
Sub Division : W7 Location: W7 Sub Division Office, SLN Complex, Mysore Road, Kengeri, Next to Krishnapriya Convention Hall, Bangalore-60. 080-2848 5876
Bangalore South
Sub Division:S2 Location: S1 sub Location: S2 Sub Division Office, No. 209, Division Office, 45th Cross, Jayanagar Wilson Garden, 7th 8th Block, Sangam Cicle, Cross, Bangalore-27.
Sub Division:S1
Bangalore-11.
Sub division:S10 Location:S10 sub division office, I phase, 14th B cross, JP Nagar, Bangalore-78.
080-2663 9476
Sub division:S4 Location: S4 Sub Division Office, BDA Complex, Koramangala, Bangalore-34.
080-2553 2339
Sub Division:S3
Location:S3 sub Division office, No. 435, 11th Main, 4th Cross, V.S.Building, Opp.Viveknagar Police Station,Viveknagar, Bangalore - 47. 080-2571 6045
Sub Division:S7 Location : S7 Sub Division Office, Next to HAL Childrens Park, HAL Old Airport Road, Bangalore-17.
080-2522 0806 Sub Division:E6 Location : E6Sub Division Office, C.A.Site,16-C Main Road, HAL 2nd Stage, Kodihalli, Bangalore-38. 080-2527 9101
Sub Division:S9 Location: S9 Sub Division Office, Opp. Devegowda Petrol Bunk, Banashankari 2nd Stage, Bangalore - 71.
080-2671 5144
Sub Division:S12 Location: S12 Sub Division Office, 1st A Cross, Behind Brigade Gardenia Apartment Gowravanagara, 7th Stage, JP Nagar, Bangalore-78.
080-2685 2741
Sub Division:S5 Location: S5 Sub Division Office, 4th Cross,ISRO layout, Bangalore-78.
080-2666 6868
Sub Division:S8 Location: S8 Sub Division Office, Kudllu Gate, Hosur Main Road, Near Munireddy Kalyana Mantapa, Bangalore-68.
080-2573 5623
Sub Division:S11 Location: S11 Sub Division Office, Ground Floor, 24th Cross,Parangi Palya, Sector-2, HSR Layout, Bangalore-105.
080-2258 4384
080-2244 7249
080-2222 6936
080-2654 9050
Sub Division:E1
Sub Division:E2
Location: E2 Sub division office, No.341/1, Miller tank bund road, Queens road cross, behind shifaa hospital, Bangalore-52. 080-2238 6368
Bangalore East
Location:E1 Sub Division Office, Pillanna Garden, III Stage, Near Bilall Masjid, Nagavara Main Road, Bangalore-45. 080-2546 2474
Sub Division:E4 Sub Division:E5 Location:E4 sub division Location: E5 Sub office, ITI Ancillary, Near Division Office, Mahadevapura post office, Cooks Town, Lazar Road, whitefield, Bangalore-48. Bangalore-05.
080-2851 8510 080-2546 5175
Sub Division:E8
Sub Division:W3
Location: W3 Sub Division Office, No. 113/B, Mehta Jeweller Building, Magadi Main Road, Bangalore-23.
080-2314 0026
Sub Division:W4
Location: W4 Sub Division Office, A-Station, Ananda Rao Circle, Bangalore-01.
080-2226 3506
Sub Division:W5 Location: W5 Sub Division Office, Mysugar Building, JC Road, Bangalore-02.
080-2210 6998
080-2542 8737
Bangalore Rural
Sub Division: Kanakapura Location: Kanakpura Urban S/D office, BESCOM, Sangam Road, Kanakapura.
Sub Division: Kanakapura Rural Location: Kanakapura Rural Sub Division Office, BESCOM, Near Bus Stop, Kanakapura.
Sub Division: Ramanagara Urban Location: Ramanagara Urban Sub Division Office BESCOM, Railway Station Road, Opp. Post Office, Ramanagara.
Sub Division: Sub Division: Ramanagara Rural Channapatna Rural Location: Ramanagara Location: Channapatna Rural Sub Division Office, Rural Sub Division Office, BESCOM, 2nd Floor, CMC BESCOM, Channapatna. Building, Opp.Taluk Panchayath,Ramanagara.
0802-7273688 080-27254278
Sub Division: Bidadi Location: Bidadi Sub Division Office, BESCOM, BangaloreMysore Road Bidadi.
080-2728 8158
Sub Division:
Sub Division: Channapatna Urban Nelamangala Location:Channapatna Location: Nelamangala Urban Sub Division Office, Sub Division Office, BESCOM, Near Bus Stand, BESCOM, B.H. Road, Bangalore-Mysore Road, Nelamangala.
Channapatna. 080-2725 4278 080-27722122
Sub Division: Sub Division: Magadi Hoskote Location: Magadi Sub Location: Hoskote Division Office, Sub Division Office, BESCOM, Near PWD BESCOM, KEB Circle, Office, T.B. Road, Hoskote. Magadi.
080-27931116 080-27745211
Sub Division: Doddaballapura Location: Doddaballapura Sub Dvision Office, BESCOM, Opp. I.B, Doddaballapura.
080-27623913
Sub Division: Devanahalli Sub Division: Anekal Location: Devanahalli Location: Anekal
Kolar
Tumkur
Davanagere
080-2752 3380 0802-7522433 080-2727 3323 Sub Division: Sub Division: Sub Division: Chikkaballapura Urban Gowribidanur Chikkaballapura Rural Location: Chikkaballapura Location: Gowribidanur Location: Chikkaballapura Rural Sub Division Urban Sub Division Office, Sub Division Office, BESCOM, Hosur Road, Office, Vapasandra, BESCOM, Opp. Post Gowribidanur BESCOM, Chikkaballapura. Office, Chikkabalapura. 08156- 272 488 08155-285362 08156-272606 Sub Division: Sub Division : Tumkur Sira CSD Rural Sub Division-1 Location: Sira City Location: Tumkur Rural Sub Division Office, Sub Division-1 Office, BESCOM, Amarapura BESCOM, Near Sira Road, Sira. Gate, Tumkur 08135-277 221 0816-2279435 Sub Division: Davanagere Sub Division: Honnali Sub Division: Davanagere City Sub Division-1 Location: Honnali Sub City Sub Division-2 Location: DavanagereCity Sub Division Office, BESCOM, Location: Davanagere City Sub Division-2 Office, Division-1Office,BESCOM, Honnali. BESCOM, Mahaveer Near Vidhyarthi Bhavan, Road, Davanagere. Hadadi road, Davanagere. 08192-259 055 08188-251172 08192-275 413
080-27859047
Sub Division: Chintamani Urban Location:Chintamani Urban Sub Division Office, BESCOM, Chintamani.
08154-252197
Sub Division: Chintamani Rural Location: Chintamani Rural Sub Division Office, BESCOM, Near
Government Polytechnic
Chintamani.
08154-252197
Sub Division: KGF Location: KGF Sub Division Office, BESCOM, Champion Reefs, KGF.
08153-276865
Sub Division: Srinivasapura Location: Srinivasapura Sub Division Office, BESCOM, Srinivasapura.
08157-246236
Sub Division: Bagepalli Location: Bagepalli Sub Division Office, BESCOM, Bagepalli.
08150-282298 Sub Division: Sira rural Location:Sira Rural Sub Division Office, Police Station Road, BESCOM, Sira. 08135-275887 SubDivision: Molakalmur Location: Molakalmur SubDivisionOffice, BESCOM, KEBCircle, Molakalmur 08198-229241
Sub Division: Malur Location: Malur Sub Division Office, BESCOM, Opp. Court, Malur.
Sub Division: Mulabagilu Location: Mulabagilu Sub Division Office, BESCOM, Mulabagilu.
08159-242058
Sub Division: Kolar Rural Location : Kolar Rural Sub Division Office, Near Sub Division Office, Town Police Station, Doom BESCOM, M.B Road, Light Circle, BESCOM, Kolar. Kolar.
08152-221293 08152-224859
Sub Division: Madhugiri Location: Madhugiri Sub Division Office, BESCOM, Near Sira Gate, Madhugiri.
08137-284376 Sub Division: Davanagere Rural Location: Davanagere Rural Sub Division Office, BESCOM, Hadadi Road, Davanagere. 08192-259997
Sub Division: Gubbi Location: Gubbi Sub Division Office, BESCOM, M.G.Road, Gubbi.
08131-222223 Sub Division: Santhebennur Location: Santhebennur Sub Division Office, BESCOM, Shanthi sagar road, Santhebennur. 08180-256432
SubDivision: Tiptur Location: Tiptur Sub Division Office, BESCOM, B.H.Road, Next to IB, Tiptur.
08134-251287 Sub Division: Channagiri Location: Channagiri Sub Division Office, BESCOM, Channagiri. 08189-228672
Sub Division: Nittur Location: Nittur Sub Division Office, BESCOM, Nittur.
08131-230440 Sub Division: Anagodu Location : Anagodu Sub Division Office, BESCOM, Anagodu. 08192-212150
Sub Division: Kunigal Location: Kunigal Sub Division Office, BESCOM, Kunigal.
08132-220300 Sub Division: Hiriyur Location: Hiriyur Sub Division Office, BESCOM, Challakere Road, near T.B. Circle, Hiriyur. 08193-220003
Sub Division: Jagalur Location: Jagalur Sub Division Office, BESCOM, Bidarikere Road, near Ambedkar Circle, Jagalur.
08196-227337
08151-232342 08153-255818 Sub Division: Tumkur Sub Division: CSD-2 Turuvekere Location:Turuvekere Location: Tumkur City Sub Division-2 Office, Sub Division Office, BESCOM, Radha Krishna BESCOM, Near New Road, Opp. DDPI office, Bustand, Turuvekere. Someshwarapuram, Tumkur. 08162-256134 08139-287367 Sub Division: Sub Division: Harappanahalli Chitradurga Rural Location: Harappanahalli Location: Chitradurga (R) Sub Division Office, Sub Division Office, BESCOM, Hadagali Road, BESCOM, Near Horticulture Harappanahalli. Office, Chitradurga. 08398-280218 08194-231856
Sub Division: Sub Division: Chikkanayakanahally Pavagada Location: Location: Pavagada Chikkanayaknahally Sub Sub Division Office, Division Office, BESCOM, BESCOM,Pavagada. Chikkanayaknahally
08123-543519 Sub Division: Chitradurga Urban Location: Chitradurga(U) Sub Dvision Office, BESCOM, Behind DC Office, Chitradurga. 08194-222 620 08136-245562
Sub Division: Tumkur CSD-1 Location: Tumkur City Sub Division-1 Office, BESCOM, Varpete, Tumkur.
08162-273 145
Sub Division: Koratagere Location: Koratagere Sub Division Office, BESCOM, Near KSRTC Bus stand, Koratagere
08138-232338
Sub Division: Holalkere Location: Holalkere Sub Division Office, BESCOM, Shimoga Road, Holalkere.
08191-276075
Sub Division: Hosadurga Location: Hosadurga Sub Division Office, BESCOM, Davanagere Road, Hosadurga.
08199-230236
Sub Division: Challakere Location: Challakere Sub Division Office, BESCOM, Challakere.
08195-250696