k#N
Document No.
MIE-QMS WP-14-10
Issue no.02
Page:
Level_______
Level_______
2.2 Shop
ShopCode __________
Station Code
S/N
Cost Elements
Sub-Ope.
Name
Tasks Code
(leve ----)
Task Description
Item dimension
(LxWxt)
Qty/unit
(in Pcs)
370x325x12
110x35X10
120x55X10
120x55X10
110x35X10
8
4
8
4
7490X385X6
175X94X6
2180x666x6
2
4
2257x450x6
1582x955x4
7490X385X6
370x325x12
Baffle
Sub -Total
(01.01.02) Rectification and Grinding
01.02.02.01 01.01.02.02.01 Web plate
01.01.02.02.01 Connecting plate
Labor
Hr.
Machine Material
Production % of Completion
Hr.
Cost
Cost
per station/shop
of
110x35X10
120x55X10
120x55X10
110x35X10
175X94X6
250x220x10
250x220x10
325*160*10
140X115x10
1310x130x10
20*12*10
100*60*10
80x50x10
304X80X6
406x95x8
184x95x8
12
Sub -total
01.01.03.
02
12
481x158x8
320x220x8
320x180x8
114x64x8
112x74x8
1928*188*8
809*148*8
615*148*8
421*148*8
70*60*8
181x60x8
32
254x145x8
32
405x105x8
114x64x8
112x74x8
70x60x8
300x280x8
7200x6820x4
fixing plate
120x75x6
12
plate at front
200x145x6
304x80x6
175x94x6
fixing plate
105x50x6
reinforcement plate
Rear brake system valve support
340x40x6
130x100x6
110x70x6
80x60x6
370.59x40x5
2258x450x6
01.01.03.05.03 support -I
105x50x5
790x50x5
178x50x5
Sub -total
01.01.03.05Cutting Procedure on 5 mm thickness
Sub -total
01.01.03.06Cutting procedure on 4 mm thickness
01.01.03.06.01 Side Plate (Tool Box)
01.01.03.06.02 Vertical Part of Bumber
01.01.03.06.03 Air Cylinder Support Beam
01.01.03.06.04 Internal Cross member 1st
01.01.03.06.05 Internal Cross member 2 st
01.01.03.06.06 Internal Cross member 3 st
226x150x4
384x375x4
1060x244x4
890x254x4
890x374x4
890x404x4
1
1
4
3
01.01.03.06.07
01.01.03.06.08
01.01.03.06.09
01.01.03.06.10
01.01.03.06.11
01.01.03.06.12
01.01.03.06.13
01.01.03.06.14
01.01.03.06.15
01.01.03.06.16
01.01.03.06.17
795x234x4
2496x189x4
2500x254x4
400x217x4
228x25x4
91x40x4
7500x6820x4
116x30x4
897x30x4
50x30x4
63x50x4
3
1
1
2
10
2
1
2
2
1
1
Sub -total
7480x280x3
1200x261x3
850x318x3
2
2
8
177x20x2
142x20x2
2000*1414*2
2000*318*2
496*436*2
1
2
1
1
2
494*434*2
403*150*2
1254x700x2
430x429x2
420x30x2
690x30x2
790x510x2
890x471x2
280x104x2
100x50x2
1342x800x2
2
1
1
2
2
2
2
1
2
2
1
7880x892x2+
2
6320x388x2+
2
2
1
1310x130x10
1928x188x8
834x148x8
639x148x8
445x148x8
2180x666x6
2
2
1
1
1
4
sub-total
Bottom Reinforcement
Side frame (draw bar)
Cross member long
Cross member medum
Cross member Short
Saddle
181x60x8
254x160x8
32
32
177x20x2
142x20x2
7180x220x3
1200x202x3
850x318x3
888*254*4
2
2
8
1
888*374*4
888*404*4
708*400*3
1760*895*3
2000*1414*2
496x434x2
1080xEx dia.
=63.5
2446x1"
300x1"
1
2
5
Pipe-01 (Front)
565x4"
Bottom,
Rear &Sheeting
top sheet
(Tool box)
Side & Bottom
(Reserve
fuel
tanker)
sub-total
(01.01.09) Activities done on notching
01.01.09.01 Interna Pannel (Reserve fuel)
sub-total
(01.01.10) Activities done on band saw
01.01.10.01Cutting of pipes
01.01.10.01.01
01.01.10.01.02
01.01.10.01.03
01.01.10.01.04
01.01.10.01.05
01.01.10.01.06
01.01.10.01.07
01.01.10.01.08
01.01.10.01.09
01.01.10.01.10
01.01.10.01.11
01.01.10.01.12
Pipe-02 (Front)
Pipe-03 (Front)
Pipe-04 (Front)
Pipe-01 (Rear)
Pipe-02 (Rear)
Pipe-03 (Rear)
470.5x4"
2690x4"
750x4"
160x4"
700x4"
500x4"
20x30
Drainge pipe
60x20
01.01.10.02Cutting of u-channels
01.01.10.02.01 Iter-2 (Reserve fuel carrier)
01.01.10.02.02 Iter-3 (Reserve fuel carrier)
01.01.10.02.03 Iter-4 (Reserve fuel carrier)
01.01.10.02.04 Item-5 (Reserve fuel carrier)
01.01.10.02.05 Item-6 (Reserve fuel carrier)
01.01.10.02.06 Item-10 (Reserve fuel carrier)
01.01.10.02.07 Item-11 (Reserve fuel carrier)
01.01.10.02.08 Item-12 (Reserve fuel carrier)
01.01.10.02.09 Item-12 (Reserve fuel carrier)
01.01.10.02.10 Item-13 (Reserve fuel carrier)
01.01.10.02.11 Item-14 (Reserve fuel carrier)
01.01.10.02.12 Fixing U-Profile 1 (Refuel carrier)
01.01.10.02.13 Fixing U-Profile 2 (Refuel carrier)
1
1
1
1
1
1
20
2
1050x60x30x6
2000x60x30x6
1022x50x25x5
370x60x30x6
200x60x30x6
710x50x25x5
950x50x25x5
156x100x50x5
206x100x50x5
115x60x30x6
85x60x30x6
156x100x50x5
206x100x50x5
2
2
2
2
2
4
2
8
8
4
4
8
8
625*60*30*6
650*60*30*6
212x40x20x5
4
8
01.01.10.03Cutting of Rods
01.01.10.03.01 Wheel clamp head
dia. 20*275
318*40*40*4
70x70x7
2
4
1558x40x40x4
1339x40x40x4
40x40x40x2
4
2
01.01.10.05Cutting of T-profile
01.01.10.05.01 T-Profile
6496x30x30x5
361x30x30x5
sub-total
1500*160*160*8*
13
886*160*160*
8*13
886*160*160*
8*13
2
2
2
Lower Plate
External cross member
7518x150x12
792 *234 *4
2
10
01.01.12.03
Front beam
2500*304*4
01.01.12.04
Rear beam
2500*250*4
01.01.12.05
384*375*4
01.01.12.06
1060*244*4
01.01.12.07
2000*1414*2
01.01.12.01
(01.01.12) Rolling
01.01.12.01
01.01.12.02
01.01.12.03
340x50x6
7200x6820x4
2258x450x6
2
1
4
01.01.12.04
T-Profile
6496x30x30x5
01.01.12.05
Fuel guid
361x30x30x5
III-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Machine Shop
(01.02) Activities done on Machine shop
01.02.0
1
Drilling operation
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
250X220X10
100X60X10
2
8
200x60X30x6
110x70X6
2
1
12
1.6
12
Plate no support
Rear light holder
Junction box support
01.02.01.05
01.02.01.06
01.02.01.07
708x400X3
600X490X2
403x150x2
2
2
1
270xDia. 76
110xDia 52
100xDia 70
56xDia 75
266xDia 55
1
2
2
4
2
1.6
16
sub-total
S/N
IV-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Welding Shop
Task Description
Item dimension
(LxWxt)
Qty/unit
(Pcs)
Cost Elements
Labor Machine Material Production % of Completion
Hr.
Hr.
Cost
Cost
per station/shop
1
2
3.34
1
4
11.34
01.03.02.01
01.03.02.02
01.03.02.03
01.03.02.04
01.03.02.05
01.03.02.06
Vertical
reinforcement
tacking
& welding
Tack
& weld
bottom (lower)
reinforcement
plate on lower longitidunal beam (from both
side)
Transport the frame to the next work station
(using over head cran
01.03.02.07
01.03.02.08
0.66
1
01.03.02.09
01.03.02.10
01.03.02.11
01.03.02.12
01.03.02.13
1
1
01.03.02.14
16
01.03.02.15
01.03.02.16
01.03.02.17
01.03.02.18
0.17
01.03.02.19
0.17
01.03.02.20
0.5
01.03.02.21
01.03.02.22
01.03.02.23
Grinding(using
& Polishing
Slotting
flame (finishing)
cutting) the frame
chequer plate to fix brackets that ties with the
shell bracket
Flame cutting of 2 holes of rear beam for
electrical lines
01.03.02.24
01.03.02.25
01.03.02.26
1
0.08
0.34
52.92
Trolley Fabrication
01.03.03.01
01.03.03.02
01.03.03.03
4
1
2
01.03.03.04
01.03.03.05
01.03.03.06
01.03.03.07
0.34
0.5
0.34
1.5
01.03.03.09
0.17
01.03.03.10
0.17
01.03.03.08
01.03.03.11
10.02
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.04.06
01.03.04.07
16
4
8
8
2
6
0.17
44.17
1
1
1.5
0.67
01.03.05.05
01.03.05.06
01.03.05.07
10
01.03.05.08
0.34
17.51
for tire)
01.03.06.02
01.03.06.03
01.03.06.04
01.03.06.05
0.75
1
2
1.5
0.75
6
2
0.25
6
8.25
01.03.08.02
01.03.08.03
6
13
01.03.09.02
1
1.5
2.5
10
6
6
11
4.67
4
1.33
10
12
Fabrication of Shell
01.03.12.01
01.03.12.02
15
6
01.03.12.03
01.03.12.04
Shell
Ass. (Three
Shell segment
Circumferencial
WeldSegment)
& Chentini
weld (continous)
10
0.5
Baffle fitting
& welding
(Stagered
welding)
Dome
end tacking
& welding
(Front
&
Rear)
Upper flange (foot valve) tacking &
welding (from external)
Rolled Plate tacking & weld on Shell (at
four Position)
Saddle positioning, tacking & welding (at
same position)
Tack & weld upper fixing bracket ( 8 pcs
per each (4)Saddel)
Mechanical Driving hole flame cutting(at
top Position)
12
0.33
01.03.12.15
0.41
01.03.12.16
01.03.12.17
01.03.12.05
01.03.12.06
01.03.12.07
01.03.12.08
01.03.12.09
01.03.12.10
01.03.12.11
01.03.12.12
01.03.12.13
01.03.12.14
01.03.12.18
13
2
24
0.5
20
1
4
30
9
2
0.5
0.5
137.7
01.03.13.01
01.03.13.02
01.03.13.03
10
2
14
Ladder Fabrication
01.03.14.01
01.03.14.02
01.03.14.03
01.03.14.04
Mount
pipeon
onthe
thejigjig& tack
Mount the
the vertical
steel pipes
with the&vertical
Mount
tack thepipe
fixing plate with the
vertical pipe
0.5
Final weld
0.5
15
01.03.15.02
Ladder Fitting
01.03.15.03
01.03.15.04
14
28
16
Discharge preparation
01.03.16.01
01.03.16.02
01.03.16.03
01.03.16.04
01.03.16.05
0.3
1.3
17
Water Test
01.03.17.01
Preparation work
1.34
348.1
01.03.17.02
01.03.17.03
01.03.17.04
01.03.17.05
01.03.17.06
3
0.42
3
0.42
6
S/N
V-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Painting Shop
Item
Qty/unit
dimension(LxWxt)
(Pcs)
Cost Elements
Production % of Completion
Labor Machine Material
Cost
per station/shop
Hr.
Hr.
Cost
01.04.01.01
24
01.04.01.02
Washing
12
01.04.01.03
1.5
15
Rectification
01.04.02.01
Task Description
Final Painting
01.04.03.01
Washing
01.04.03.02
01.04.03.09
01.04.03.10
01.04.03.03
01.04.03.04
01.04.03.05
01.04.03.06
01.04.03.07
01.04.03.08
2.33
30
22.4
2.42
0.5
10
11.8
1.15
2.5
17.4
153
S/N
V-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Finishing Shop
Task Description
Item
Qty/unit
dimension(LxWxt)
(Pcs)
Cost Elements
Production % of Completion
Labor Machine Material
Cost
per station/shop
Hr.
Hr.
Cost
01.05.01.02
01.05.01.03
01.05.01.04
01.05.01.05
01.05.01.06
01.05.01.07
01.05.01.08
01.05.01.09
01.05.01.10
0.33
0.33
0.33
0.5
0.17
0.67
0.83
0.33
0.5
0.33
4.32
ELECTRICAL INSTALLATION
01.05.02.01
01.05.02.02
01.05.02.03
01.05.02.04
01.05.02.05
0.33
0.25
0.33
0.5
0.33
1.74
3
01.05.03.01
01.05.03.02
01.05.03.03
01.05.03.04
01.05.03.05
01.05.03.06
01.05.03.07
01.05.03.08
01.05.03.09
01.05.03.10
1.33
0.5
0.83
3
0.17
0.33
0.83
0.67
1
0.5
9.16
ocument No.
QMS WP-14-10
Page:
of
% of Completion
per station Total
% of Completion
per station Total
% of Completion
per station Total
% of Completion
per station Total
Document No.
MIE-QMS WP-14-10
Page:
Issue no.02
of
Form No:WF/PIT/060
Shop:Material Preparation
Product Code:04
Shop Code:04.01
Station Code:04.01.01
S/N
Cost Elements
Sub-Ope.
Name
Tasks Code
(leve ----)
Task Description
Item dimension
(LxWxt)
Labor
Machine Material
Qty/unit
cost/Unit cost/unit. Cost/unit
(in Pcs)
Produ. Cost
% of
Completion per
station/shop
370x325x12
110x35X10
120x55X10
120x55X10
110x35X10
8
4
8
4
7490X385X6
175X94X6
2180x666x6
2
4
1538x955x3
2257x450x6
1538x955x3
Baffle
sub-total
S/N
Cost Elements
Sub-Ope.
Prepared
Name
Tasks Code
Atakelti
(leve ----)
G.
By:Sign:-_______________
Task Description
Item dimension
checked (LxWxt)
by:- Gizaw
Qty/unit
B. (in Pcs)
Sign:-______________
% of
Completion per
Approved
station/shop
By:-Nicodemos
Production
Cost
A.
sign:-___________________
S/N
Sub-Ope.
Name
Tasks Code
(leve ----)
Task Description
Item dimension
(LxWxt)
Labor
Machine Material
Qty/unit
cost/Unit cost/unit. Cost/unit
(in Pcs)
Production
Cost
% of
Completion per
station/shop
7490X385X6
04.01.02.02.02
Connecting plate
370x325x12
04.01.02.02.03
110x35X10
120x55X10
120x55X10
110x35X10
175X94X6
250x220x10
250x220x10
325*160*10
140X115x10
1310x130x10
20*12*10
100*60*10
80x50x10
304X80X6
406x95x8
184x95x8
12
04.01.02.02.05
04.01.02.02.07
sub-total
04.01.03.02
320x180x8
12
481x158x8
320x220x8
Approved By:-Nicodemos A.
sign:-___________________
04.01.03.03
04.01.03.02.09
04.01.03.02.10
04.01.03.02.11
04.01.03.02.12
04.01.03.02.13
04.01.03.02.14
04.01.03.02.15
04.01.03.02.16
04.01.03.02.17
04.01.03.02.18
04.01.03.02.19
112x74x8
1928*188*8
809*148*8
615*148*8
421*148*8
70*60*8
181x60x8
32
254x145x8
32
405x105x8
114x64x8
112x74x8
70x60x8
300x280x8
7200x6820x4
120x75x6
12
plate at front
200x145x6
304x80x6
175x94x6
fixing plate
105x50x6
reinforcement plate
Rear brake system valve support
340x40x6
130x100x6
4
1
110x70x6
80x60x6
370.59x40x5
2258x450x6
04.01.03.05.03 support -I
105x50x5
790x50x5
sub-total
fixing plate
sub-total
04.01.03.05
Approved By:-Nicodemos A.
sign:-___________________
178x50x5
226x150x4
384x375x4
sub-total
04.01.03.06
1060x244x4
890x254x4
890x374x4
890x404x4
795x234x4
2496x189x4
2500x254x4
400x217x4
228x25x4
91x40x4
7500x6820x4
116x30x4
897x30x4
50x30x4
63x50x4
1
1
4
3
3
1
1
2
10
2
1
2
2
1
1
sub-total
7480x280x3
1200x261x3
850x318x3
423x40x3
2
2
8
8
177x20x2
142x20x2
2000*1414*2
2000*318*2
496*436*2
1
2
1
1
2
sub-total
04.01.06.03
Supporter I (Reflector)
Supporter
II (Reflector)
Side & Bottom
sheet (Reserve fuel
tanker)
Top Sheeting
tanker)
Front
& Rear (Reserve
sheeting fuel
(Reserve
fuel
tanker)
Approved By:-Nicodemos A.
sign:-___________________
04.01.06.03.06
04.01.06.03.07
04.01.06.03.08
04.01.06.03.09
04.01.06.03.10
04.01.06.03.11
04.01.06.03.12
04.01.06.03.13
04.01.06.03.14
04.01.06.03.15
04.01.06.03.16
04.01.06.03.17
04.01.06.03.18
04.01.06.03.19
494*434*2
403*150*2
1254x700x2
430x429x2
420x30x2
690x30x2
790x510x2
890x471x2
280x104x2
100x50x2
1342x800x2
2
1
1
2
2
2
2
1
2
2
1
7880x892x2+2
6320x388x2+2
2
1
496x434x2
1
2
5
Pipe-01 (Front)
Pipe-02 (Front)
Pipe-03 (Front)
Pipe-04 (Front)
Pipe-01 (Rear)
Pipe-02 (Rear)
Pipe-03 (Rear)
565x4"
470.5x4"
2690x4"
750x4"
160x4"
700x4"
500x4"
20x30
Drainge pipe
60x20
sub-total
sub-total
2446x1"
300x1"
1
1
1
1
1
1
1
20
2
sub-total
S/N
Cost Elements
Sub-Ope.
Prepared
Name
Tasks Code
Atakelti G.
(leve ----)
By:Sign:-_______________
Task Description
Item dimension
checked by:- Gizaw
(LxWxt)
Qty/unit
B.
(in Pcs)
Sign:-______________
% of
Completion per
Approved By:-Nicodemos
station/shop
A.
sign:-___________________
Production
Cost
S/N
Sub-Ope.
Name
04.01.08.02
Tasks Code
(leve ----)
Task Description
Item dimension
(LxWxt)
Labor
Machine Material
Qty/unit
cost/Unit cost/unit. Cost/unit
(in Pcs)
Production
Cost
% of
Completion per
station/shop
Cutting of u-channels
1050x60x30x6
2000x60x30x6
1022x50x25x5
370x60x30x6
200x60x30x6
710x50x25x5
950x50x25x5
156x100x50x5
206x100x50x5
115x60x30x6
85x60x30x6
156x100x50x5
206x100x50x5
2
2
2
2
2
4
2
8
8
4
4
8
8
625*60*30*6
650*60*30*6
212x40x20x5
4
8
dia. 20*275
318*40*40*4
70x70x7
2
4
1558x40x40x4
1339x40x40x4
40x40x40x2
4
2
6496x30x30x5
361x30x30x5
4
4
sub-total
04.01.08.03
Cutting of Rods
04.01.08.03.01 Wheel clamp head
sub-total
04.01.08.04
sub-total
04.01.08.05
Cutting of T-profile
04.01.08.05.01 T-Profile
04.01.08.05.02 Fuel guid
Approved By:-Nicodemos A.
sign:-___________________
sub-total
1500*160*160*8*13
886*160*160*8*
13
886*160*160*8*
13
2
2
2
400
684.93
56901
57986.3
Lower Plate
Vertical Part of Bumber
7940x200x15
384x375x4
04.01.10.03
1060x244x4
04.01.10.04
890x254x4
04.01.10.05
890x374x4
04.01.10.06
890x404x4
04.01.10.07
795x234x4
04.01.10.08
Front Beam
2496x189x4
04.01.10.09
Rear Beam
2500x254x4
04.01.10.10
2000*1414*2
1310x130x10
1928x188x8
834x148x8
639x148x8
445x148x8
2
2
1
1
1
04.01.10.01
Bottom Reinforcement
Side frame (draw bar)
Cross member long
Cross member medum
Cross member Short
Upper fixing Bracket
lower fixing bracket
04.01.11.08
04.01.11.09
Saddle
2180x666x6
304x80x6
Support I
177x20x2
Support II
142x20x2
7180x220x3
181x60x8
32
254x145x8
32
sub-total
Approved By:-Nicodemos A.
sign:-___________________
04.01.12.06
04.01.12.07
04.01.12.08
04.01.12.09
04.01.12.10
04.01.12.11
1200x202x3
850x318x3
888*254*4
2
8
1
888*374*4
888*404*4
Fender
708*400*3
1
1
475
04.01.13.01
04.01.13.02
04.01.13.03
340x50x6
7200x6820x4
2258x450x6
2
1
4
04.01.13.04
T-Profile
6496x30x30x5
04.01.13.05
04.01.13.06
Fuel guid
Hose housing
361x30x30x5
423x40x3
4
8
775
936.3
59117
60528.3
1163.8 61232
63171
III-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Machine Shop
(04.02) Activities done on Machine shop
04.02.01 Drilling operation
04.02.02
04.02.01.01
04.02.01.02
250X220X10
100X60X10
2
8
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
200x60X30x6
110x70X6
708x400X3
600X490X2
403x150x2
270xDia. 76
2
1
2
2
1
1
270xDia. 76
110xDia 52
1
2
Turning operation
04.02.02.01
04.02.02.02
Approved By:-Nicodemos A.
sign:-___________________
04.02.02.03
04.02.02.04
04.02.02.05
100xDia 70
56xDia 75
266xDia 55
2
4
2
775
1164
65286
63347
IV-Work Break Down Structure for 3-Axle Fuel Cargo Trailer in Welding Shop
S/N
Cost Elements
Sub-Ope.
Name
Item dimension
(LxWxt)
Task Description
% of
Labor
Machine Material
Qty/unit
Productio Completion per
cost/Unit cost/unit. Cost/unit
(Pcs)
n Cost
station/shop
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
975
1229
65462
67666
04.03.02.02
04.03.02.03
04.03.02.04
04.03.02.05
04.03.02.06
04.03.02.07
04.03.02.08
Approved By:-Nicodemos A.
sign:-___________________
04.03.02.09
04.03.02.10
04.03.02.11
04.03.02.12
04.03.02.13
04.03.02.14
04.03.02.15
04.03.02.16
04.03.02.17
04.03.02.18
04.03.02.19
04.03.02.20
04.03.02.21
04.03.02.22
04.03.02.23
1095
1294.2 66727
69116
Trolley Fabrication
04.03.03.01
04.03.03.02
04.03.03.03
04.03.03.04
04.03.03.05
Approved By:-Nicodemos A.
sign:-___________________
04.03.03.06
04.03.03.07
04.03.03.08
04.03.03.09
04.03.03.10
04.03.03.11
(Bolt,
1445
71364.05
04.03.04.02
04.03.04.03
04.03.04.04
04.03.04.05
04.03.04.06
04.03.04.07
1195
04.03.05.02
04.03.05.03
04.03.05.04
Approved By:-Nicodemos A.
sign:-___________________
04.03.05.05
sub-total
04.03.07.02
04.03.07.03
04.03.07.04
04.03.07.05
04.03.07.06
04.03.07.07
04.03.07.08
sub-total
Approved By:-Nicodemos A.
sign:-___________________
04.03.08.04
04.03.08.05
04.03.08.06
04.03.08.07
04.03.08.08
04.03.09.02
04.03.09.03
sub-total
10
04.03.10.07
04.03.10.08
04.03.10.09
Prepared By:- Atakelti G.
Sign:-_______________
Approved By:-Nicodemos A.
sign:-___________________
04.03.10.10
sub-total
Total Production Cost of Plat form Assembling
11
1635
sub-total
12
Fabrication of Shell
04.03.12.01
04.03.12.02
04.03.12.03
04.03.12.04
04.03.12.05
04.03.12.06
04.03.12.07
04.03.12.08
04.03.12.09
04.03.12.10
04.03.12.11
04.03.12.12
04.03.12.13
Approved By:-Nicodemos A.
sign:-___________________
04.03.12.14
04.03.12.15
04.03.12.16
04.03.12.17
04.03.12.18
sub-total
13
sub-total
14
Ladder Fabrication
04.03.14.01
04.03.14.02
04.03.14.03
04.03.14.04
sub-total
15
04.03.15.02
04.03.15.03
04.03.15.04
16
Ladder Fitting
Approved By:-Nicodemos A.
sign:-___________________
01.03.16.02
01.03.16.03
01.03.16.04
01.03.16.05
01.03.16.06
01.03.16.07
01.03.16.08
01.03.16.09
17
Water Test
01.03.17.01
01.03.17.02
01.03.17.03
01.03.17.04
01.03.17.05
01.03.17.06
4895
Cost Elements
Sub-Ope.
Name
Prepared
Sign:-_______________
Task Description
Item dimension
checked (LxWxt)
by:- Gizaw
Qty/unit
B. (Pcs)
Sign:-______________
% of
Productio Completion per
n Cost
station/shop
Approved
By:-Nicodemos
A.
sign:-___________________
S/N
Sub-Ope.
Name
Item dimension
(LxWxt)
Task Description
% of
Labor
Machine Material Productio Completion per
Qty/unit
cost/Unit cost/unit. Cost/unit
(Pcs)
n Cost
station/shop
04.04.01.02
Washing
04.04.01.03
04.04.01.04
sub-total
Final Painting
04.04.03.01
Washing
04.04.03.02
04.04.03.09
04.04.03.10
04.04.03.03
04.04.03.04
04.04.03.05
04.04.03.06
04.04.03.07
04.04.03.08
8850
V-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Finishing Shop
Cost Elements
S/N
Sub-Ope.
Name
Item
dimension(LxWxt)
Task Description
% of
Labor
Machine Material
Qty/unit
Productio Completion per
cost/Unit cost/unit. Cost/unit
(Pcs)
n Cost
station/shop
Approved By:-Nicodemos A.
sign:-___________________
04.05.01.02
04.05.01.03
04.05.01.04
04.05.01.05
04.05.01.06
04.05.01.07
04.05.01.08
04.05.01.09
04.05.01.10
sub-total
ELECTRICAL INSTALLATION
04.05.02.01
04.05.02.02
04.05.02.03
04.05.02.04
04.05.02.05
Approved By:-Nicodemos A.
sign:-___________________
04.05.03.01
04.05.03.02
04.05.03.03
04.05.03.04
04.05.03.05
04.05.03.06
04.05.03.07
04.05.03.08
04.05.03.09
04.05.03.10
8850
1528
240418 250796
Approved By:-Nicodemos A.
sign:-___________________
ocument No.
QMS WP-14-10
Page:
of
o:WF/PIT/060
h Machine
% of
Completion per
station Total
% of
Completion per
stationPrepared
Total
By:- Atakelti G.
Sign:-_______________
Approved By:-Nicodemos A.
sign:-___________________
% of
Completion per
station Total
Approved By:-Nicodemos A.
sign:-___________________
Approved By:-Nicodemos A.
sign:-___________________
Approved By:-Nicodemos A.
sign:-___________________
% of
Completion per
Prepared
station Total
By:- Atakelti G.
Sign:-_______________
Approved By:-Nicodemos A.
sign:-___________________
% of
Completion per
station Total
Approved By:-Nicodemos A.
sign:-___________________
23.1%
Approved By:-Nicodemos A.
sign:-___________________
24.1%
25%
Approved By:-Nicodemos A.
sign:-___________________
26%
% of
Completion per
station Total
26.98%
Approved By:-Nicodemos A.
sign:-___________________
27.6%
Approved By:-Nicodemos A.
sign:-___________________
28.5%
55.9%
Approved By:-Nicodemos A.
sign:-___________________
Approved By:-Nicodemos A.
sign:-___________________
Approved By:-Nicodemos A.
sign:-___________________
73.1%
Approved By:-Nicodemos A.
sign:-___________________
Approved By:-Nicodemos A.
sign:-___________________
87.0%
87%
% of
Completion per
stationPrepared
Total
By:- Atakelti G.
Sign:-_______________
Approved By:-Nicodemos A.
sign:-___________________
% of
Completion per
station Total
90%
% of
Completion per
station Total
Approved By:-Nicodemos A.
sign:-___________________
Approved By:-Nicodemos A.
sign:-___________________
100.0%
Approved By:-Nicodemos A.
sign:-___________________