Você está na página 1de 5

Sr RF Engineer

Resume keywords summary: Sr RF Engineer, TEMS, Huawei, MCOM, M2000, PRS, NASTAR, Ericsson, CME, UMTS, 2G, I-RAT, HSPA/HSPA+

Contact Information
Please log in to see the contact information!

Work Experience
Experience level: 5-10 years Profile/Cover Letter: ASHISH TANDON Mobile +91-9621523789 (M) +91 9793760188 E-Mail ashishtandon13@gmail.com / ashishtandon13@yahoo.co.in Seeking assignments in RF Planning & Optimization with an organization of high repute Currently having a work visa for RSA with 2 years validity and B1/B2 visa for US with 10 yrs validity. Executive Summary Result proven professional with 5+ years of experience in Radio frequency planning, network optimization, drive testing of wireless network & RF survey with a sound knowledge of UMTS/GSM. Excellent knowledge on planning and optimization tools like TEMS investigation, Genex probe, Genex assistant, iManager 2000, LMT, PRS, Sonar, CME, MCOM, MapInfo, Nastar GSM/WCDMA, Actix, MIPT A true believer with expertise in managing operations with key focus on ensuring optimal utilization of resources and timely deliveries. A self motivated person which good interpersonal skills & strong analytical, problem solving & organisational abilities.

Organisational Experience

Huawei Technologies Ltd, South Africa, (Through First Point Group, London) Since Nov10 2G/3G RF Optimization Consultant for Vodacom Phase III/IV Swap project Accountabilities RRC/RAB Setup Success rate, CS/PS call drop rate improvement after swap Responsible for the improvement for Code/power/CE/Iub Congestion Recommendations for WBPP Card to overcome CE congestion, escalate TX issues to control Iub Congestion. TP Analysis for the overshooting cells and for the missing neighbor analysis with the help of NASTAR 2G-3G and 3G-2G Neighbor Audit, Inter freq, Inter RAT HO audit Responsible for the improvement of R99/HSDPA/HSUPA KPIs SC re-Planning, PCPICH power distributions for customer complain area.

Identifying High RTWP cells and recommendation to improve RTWP by optimizing the attenuation values. Daily report generation with the help of PRS. Traffic dimensioning to improve the TCH/SDCCH blocking. Recommendations to change of FRHR dynamic threshold settings and including addition of TRx in order to Network Performance Improvement. Analysis of TCH/SDCCH drop on day to day basis using KPIs and resolving the problem of cells having high drops by either changing the frequencies or replacing faulty hardwares. KPI monitoring on daily basis on cell level and BSC Level and resolving the problems with high CDR, CSSR and poor HOSR. Traffic/Power mapping based on the field measure power & Surveyed power and traffic data for before the swap, provided by Operator. Frequency optimization in order to improve the network quality by considering Co-Adjacent channel interference. Involved in swap execution from Motorola to Huawei & analysis of pre-benchmark test & postbenchmark test. Post-swap optimization. Also, actively participated in getting approval from customer and final network acceptance. To enable the features on GSM like Flex Abis enable, PDCH on DCS band in IUO N/W Recommendation for the addition/deletion of neighbors on the basis of Measurement Reports data provided by NASTAR. Involve in the Optimization activities for Voice /Data. To monitor the Performance and KPIs during the time of swap and provide the Hourly/Daily/Weekly report regarding the swap activities and plan of action Thoroughly involved in the Worst cells Optimization activities. Involved in the activities of cell level acceptance and cluster level acceptance immediate after the swap

Previous Assignment NSN/Huawei Technologies Ltd, Tanzania (Through GTL Tanzania Ltd) June10 Nov10 Team Leader/Sr. RF Engineer for Zain/Airtel Re-Launching GSM 900/1800/UMTS project Highlights 2G-3G and 3G-2G Neighbor Audit, Inter freq, Inter RAT HO audit RRC/RAB Setup Success rate, CS/PS call drop rate improvement after swap TP Analysis for the overshooting cells Analyzed results of drive test of the network with competitors network and provided solutions for bad quality or poor signal and patches, if any. Recommend new macro sites based on drive test results, analysis and necessary actions on customer complaints, high utilized cells, etc. to project team for execution. Improved handover success rate by removing/defining neighbors using NASTAR GSM and by removing co BCCH/BSIC neighbors. Handled interference analysis of Co-channel (C/I) and Adjacent channel (C/A). Network Optimization by KPI analysis on cell to cell ( BTS 3900) basis and BSC level ( BSC6900) and change the parameters as per the requirement.

NSN/Huawei Technologies Co. Ltd, Tanzania (Through GTL Tanzania Ltd) Nov09 June10

Team Leader/Sr. RF Engineer for Zain Swap project for 2G & 3G from Ericsson to Huawei Highlights Planned the DT Route for pre-benchmarking and post-benchmarking for swapping of Ericsson/ ALU RNC to Huawei RNC using the DT tool Genex Probe V 2.2 and WCDMA Scanner TSMLW. Detailed analysis of log file for the parameters such as RSCP, Ec/Io, Rx Power, Tx Power, PSC, RLC throughput and also reasons for CSSR, call drop, HSDPA low DL/UL throughput. Based on the log file analysis, prepared reports according to client requirement and tuned the cluster on both parametric level and field optimization. Execute the test for IBS for voice calling, video calling, PS384 and HSPA/HSPA+. Checked the site status from LMT and tracing. Neighbor addition from 2G to 3G and vice versa. For 2G swap - Planned the DT route for single site validation after swapping of BSC using Idle Mode test, Dedicated Mode test, MOS test and PS(EDGE/GPRS). Optimize the cluster and reach to the the KPIs before the target time.

Huawei Technologies Co. Ltd, Tanzania (Through GTL Tanzania Ltd) Jan09 Oct09 Sr. RF Engineer for Zantel TKP project Highlights Planned the DT route and decided cluster boundary for single site verification & cluster optimization. Monitored KPI and optimizing network parameters (Handover Parameters, Cell Parameters) at cell and BSC level using Huaweis M2000 and LMT to improve the KPIs of network for voice & data. Planned DT route for changing from single band (900MHz) to dual band (900/1800MHz). Analyzed log files for voice & data for single site verification & cluster optimization and to detect feeder swap, low C/I cells, overshooting, missing neighbor, Co and Adjacent BCCH cells. Responsible to resolve the interference problem with baseband hopping as well as synthesizer hopping in a single network.

Ericsson India Pvt. Ltd., Lucknow (Through NUTEK India Ltd) May07 Dec08 RF Engineer on Rollout project of Bharti Airtel Highlights Performed drive tests and site migrations using TEMS Investigation and analyzed data of RF drive test to determine network problems, poor coverage areas, interference, call drops and handover problems. Analyze the interference (C/I , C/A) and suggest the new frequency for better quality. Responsible for deciding orientation & tilting of GSM antennas for optimum coverage. Auditing of new sites and verifying the hardware, tilt, antenna height & orientation according to the planning database. Handled clutter analysis for B.T.S. sites and defined azimuth/tilt of antennas. Handled site selection and survey (GSM-900/1800). Prepared excel sheet and map grid with MapInfo Professional. Was responsible for initial tuning and optimization of new sites. Provided marketing inputs for the planning team. Scholastics

BE (Electronics and Telecommunication Engineering) from Bharti Vidyapeeths College of Engineering, Kolhapur in 2007. Class XII from Rani Laxmi Bai Inter College, Lucknow in 2002 Class X from Rani Laxmi Bai Inter College, Lucknow in 2000 Beyond Academia Awarded by Passion for Action Award from GTL Corporate for excellent performance in Zain Swap Project. Got appreciation from Huawei Technologies Co. Ltd, Tanzania (ZAIN 3G & 2G project) for excellent performance in co-ordination and technical skills which helped in achieving the target well before the deadline promised to customer. Got appreciation from Huawei Technologies Co. Ltd, Tanzania (Zantel2G Dual Band project) for excellent performance in drive test and optimization. Was active member of Electronics & Telecommunication Students Association (ETSA) in college. Participated in state level conference organized by TSVP. Winner of Carom Championship at college level. Participated and won in many other games. Actively participated in organization of cultural and technical festivals in college. Personal Profile Date of Birth 1st October 1985 Fathers Name Mr. Rakesh Tandon Correspondence Address Sector 19/343, Indira Nagar, Lucknow (U.P.) 226016 India Marital Status Single Languages Known English, Hindi & Marathi Current Location Johannesburg, South Africa

References - Can be provided on request.

I hereby declare that all the information provided by me in this application is factual and correct to the best of my knowledge and belief

Date Ashish Tandon

No submited work experiences

Background and Experience

No submited educations

Languages
No submited languages

Job Preferences
Job Category: 3g RF Design WCDMA UMTS Job Job Type: Any Job Type Job Status: Flexible Desired Salary: $0 Unspecified Desired Location: Not Specified Willing to Relocate: No

Você também pode gostar