Você está na página 1de 26

2008-8-7

Security Level:

Core Network Product Overview

www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Core Network Overview


SMC SCP HLR9820 M2000
MML MA P CAP MA P
Video MailBox Video RBT

MSOFTX 3000
BICC/SI P

MSOFTX 3000
SIP SIP H.248 RTP

SIGTRAN

SG 7000
SIGTRAN H.248 ISUP/TUP

IP /MPLS Backbone
SIGTRAN H.248

VIG8920
RTP

UMG 8900
TDM

UMG 8900
STP

UMG 8900 2G BSS


MSC Server: MSOFTX3000 MGW: UMG8900

PSTN

3G RAN

NGN
SG: Sg7000 EMS: M2000

Concents
CS
p p p

MSOFTX3000 Product Overview UMG8900 Product Overview HLR9820 Product Overview

MSOFTX3000
Large capacity IDEA Model
Subs: BHCA: Power: Racks Footprint: 1M V/G MSC : 3000K 8.2 KW 3 1.44 M2

Carrier-class reliability design The 1+1 backup for all key components and distributed processing ensure the carrier-class reliability of the MSOFTX3000 Availability: 99.999%, MTBF - 42 yrs, MTTR (hrs) - 1, Downtime (Mins/Yr) adopts <3 MSOFTX3000 N68-22 cabinet. It conforms to IEC-297 standard.

600 mm (width)* 800 mm (depth)* 2200 mm (height) N68-22 cabinet has a 46U inside space (1U=44.45mm=1.75inches) and includes a power distribution frame

Three 19-inch frames per cabinet

Inner Networking in MSC SERVER


Expand Frame by Frame Basic Frame 0#
Frame 0# FE Standby iGWB FE FE To the billing center

To the billing center

Expansion Frame 1#
Frame 1#

LAN Switch in plane 1

GE

Active iGWB

LAN Switch in plane 0

BAM

Expansion Frame 2#
Frame 2# Emergency WS Hub To the network Management center

Expansion Frame 9#

Frame 9# WS Host Background WS WS

Logical Hardware Architecture of MSC SERVER


IM BITS WCKI WEPI WEPI/ WEAM WBFI/ WIFM WBAI/ WAFM WCPC SLLPM SPM
IM: Interface Module SLLPM: Signaling Lower Layer Processing Module

E1/T1 ATM-2M FE ATM

WCCU WVDB WCDB

SPM: Service Processing Module OMM: Operation &Maintenance Module SSM: System Support Module

WBSG WMGC

LAN BUS OSTA BUS NMS WS BC BAM WSIU/WSMU iGWB OMM SSM

Board & Frame Impression in MSC SERVER


0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Back View

W W W W W B B B B S F F A A I I I I I U W C D B
0 0

W W W W W H S H B B S I S A A C U C I I W S M U
7 7 8 8 9 9

W C K I W M G C
12 12

W C K I W B S G
15 15

U P W R U P W R
17 17 18 18

U P W R U P W R
19 19 20 20

UPWR: Universal Power WCKI: Clock Interface Unit WSMU: System Mgnt. Unit WSIU: System Interface Unit WHSC: Hot-Swap & Ctrl. Unit WALU: Alarm Unit WBFI: Back insert FE Int. Unit WIFM: IP Forward Module WBAI: Back Insert ATM Int. Unit WAFM: ATM Forward Module WMGC: Media Gateway Ctrl. Unit WBSG: Broadband Signal Gateway

Front View

W W W W C I I A D F F F B M M M
1 1 2 2 3 3 4 4

W A F M
5 5

W S M U
6 6

W A F M
10 10

W A F M
11 11

W M G C
13 13

W B S G
14 14

W A L U
16 16

Basic Frame: 0 W W W W W W W E E E E E E S P P P P P P I I I I I I I U W C S U
0

Back View

W W W H S H S I S C U C W S M U
7 8 9

U P W R W C C U
10

U P W R U P W R
19 20

WEPI: E1_Pool Interface Unit WCSU: Wireless Calling Control & signaling process Unit WEAM: E1 ATM forward Module WCCU: Wireless Call Control Unit WCDB: Central Database Board WVDB: VLR Database Board

Front View

W C S U
1

W C S U
2

W C S U
3

W E A M
4

W E A M
5

W S M U
6

W C C U
11

W V D B
12

W V D B
13

W B S G
14

W W B A S L G U
15 16

U P W R
17 18

Expansion Frame: 1~9

Board Function Overview


Board name Function Processing capability/supported subscriber capacity
WSMU To provide management to the equipment To enable extended functions of the WSMU. The subrack number can be customized through the WSIU WHSC switch of the WSIU. The upstream Ethernet port can provide FE interface to communicate with other subracks as well as BAM/BAU. UPWR Responsible for power supply 1+1 backup; Two such boards must be configured in each control subrack. Four such boards must be configured in each control subrack. WCKI To provide clock 1+1 backup; Two such boards must be configured in the basic subrack only. WALU Responsible for alarm Once such board must be configured in each control subrack. Fixed configuration in control subracks 1+1 backup; Two such boards must be configured in each control subrack.

Configuration principle

Board Function Overview


WCCU WCSU/ WEPI Responsible for service processing, call control and charging functions. The WCSU is responsible for service processing, call control and charging functions. Each board can provide thirty-two 64k links or two 2M links through two pinch cards (CPC). The WEPI provides external E1 signaling interface over TDM. WCDB Responsible for processing the trunk data of the system and allocate MSRN/HON number and resource management. Responsible for registration and management of the resource unit SCTP/H.248/SAAL processing capability The WIFM is responsible for IP lower-layer distribution and lower-layer processing of the SIGTRAN protocol stack. The WBFI provides external FE interface used for IP signaling bearer over the Mc interface,etc. To implement VLR entity function 1+1 backup 1+1 backup

Number of WEPIs = Number of WCSUs+Numbers of WEAMs+Numbers of WSGU 1+1 backup;

WMGC WBSG WBFI/ WIFM

1+1 backup N+1 load share 1+1 backup;

WVDB

1+1 backup

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 9

Concents
l

CS
p p p

MSOFTX3000 Product Overview UMG8900 Product Overview HLR9820 Product Overview

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 10

UMG8900
Largest Capacity (IDEA Model)

Erl: Switch fabric: STM1 or E1: Power: Racks: Footprint:

40K 128G 112 or 7168 11.9 KW 5 2.4 M2

Carrier-class reliability design The 1+1 backup for all key components and distributed processing ensure the carrier-class reliability of the UMG8900. Availability: 99.999%, MTBF - 43.59 yrs, MTTR (hrs) - 0.8, Downtime (mins/Yr) - 1.1
l

UMG8900 adopts N68-22 cabinet. It conforms to IEC-297 standard.


600 mm (width)* 800 mm (depth)* 2200 mm (height) N68-22 cabinet has a 46U inside space (1U=44.45mm=1.75inches) and includes a power distribution frame

Three 19-inch frames per cabinet

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 11

UMG8900 Overview
0 1 2 3 4 5 6 7 M N E T M M P U 6 7 8 M N E T M M P U 8 9 9 M T N B 10 11 12 13 14 15 M M B L U M F L U B L U M M M M B L U B L U B L U B L U 0 M C L K 1 2 3 4 5 6 M T N C M O M B 6 7 8 7 8 M T N C M O M B 9 10 11 12 13 14 15 M M M M M M C C E E H H 3 2 R R D D M M E E M M B L U B L U M M M B L U B L U B L U M M B L T N M M M M M C C C N L M M L K B B U N L U

M M 3 B B M C M F 2

U B

M M F L U 0 F L U 1

M M F L U 2 F L U 3

M M F L F L

M M M F L F L F L U

M M F L U F L U

M M M M V P V P V C P M D 2 F 3

M M C C M M F F 4 5

M M M C S M P F F S P F

C C U U

U U 4 5

U U

D D 0 1

10 11 12 13 14 15

9 10 11 12 13 14 15

SSM-256 Frame

SSM-32 Frame

256K TDM Switching Capacity 16G Package Switching Capacity Supporting 32 ~ 7168 E1 Cascaded mode: 1 SSM-256+ 14 SSM-32 (16K TDM Cascading Capability)

96K TDM Switching Capacity 12G Package Switching Capacity Supporting 32~ 1152 E1 Cascaded mode SSM-32+2 SSM-32

MGW Board Function Overview


TDM Service Processing Module

Board ME32/ MT32 MECU ME32: 32 E1 MT32: 32 T1

Function

Capacity 32 E1/32T1 Support 2048 64ms EC channels or 1024 128ms EC channels per MECU

Configuration Principle Load-Sharing backup Resource pool mode(N+1 configuration)

Provide the EC function

MS2L

- 2 * TDM STM-1 -MS2L support optical port

2 * STM-1 optical interface board

- Load-sharing - 1+1 backup or N+1 (intra-frame) backup mode

MFLU/ MBLU

Cascading board In cascading of: - 1 SSM-256 Frame - 4 SSM-32 Frame ( TDM) - 1 SSM-32 Frame (Packet Cascading)

- 4*8K TDM Cascading - 2*GE Packet Cascading

- 1+1 backup - Only used in central switching frame

MGW Board Function Overview


IP Service Processing Module

Board

Function

Capacity 800Kpps Message Transfer 8 * FE 1 * GE

Configuration Principle Inserted in the front universal slots in the master/slave relationship in pairs; 1+1 backup 1+1 backup - 1+1 backup - 1+1 load sharing (The front board is MHRU)

MHRU High-speed Routing Forward Unit: Processing the IP message ME8T 8 * FE Ports MG1O 1 * GE Ports

MGW Board Function Overview


Signaling Adaptation Module
Board MSPF Function Provides the built-in signaling gateway function of the TDM common channel signaling, including: MTP2- M2UA MTP3- M3UA Q.921- IUA Capacity Configuration Principle

1 SPF Board support Load-sharing backup - 16 MTP2 links (M2UA) - 16 MTP3 links (M3UA) - 64 PRI links (IUA) - 1 -2M links (M2UA/M3UA)

Service Resource Module Name Function Capacity Configuration Principle Resource Pool N+1 backup

MVPD5

MVPD5:1024 channels MPTY

Concents
CS
p p p

MSOFTX3000 Product Overview UMG8900 Product Overview HLR9820 Product Overview

HLR 9820
Largest Capacity IDEA Model

MAX Subscribers : 6 Million MAX MML command : 2K/sec Racks: 3 Power: 9.3 KW Footprint: 1.44 M2 Bearer Networking Mode : TDM ATM IP MAX Links : LSL- 2560, HSL-170, ATM-160,IP- 334

46U

Huawei OSTA2.0, is designed for telecommunications equipment and high-performance processing platform, compatible with the next generation telecommunications hardware architecture standards (ATCA); N68E-22 cabinet is a standard 19" cabinet and OSTA 2.0 is 14 U high and 19" wide

14U

PICMG:PCI Industrial Computer Manufacturers Group

Mature next generation telecom platform

Hardware Structure
Integrated cabinet
Dual-10 channels of PDBs (3U) Filler panel (1U)

Extended cabinet
Dual-10 channels of PDBs (3U) Filler panel (1U)

OSTA1.0 subrack (9U)

OSTA1.0 subrack (9U)

Air deflector (2U)

Air deflector (2U)

The integrated cabinet include, : One power distribution box (PDB) One OSTA 1.0 subrack One air deflector One OSTA 2.0 subrack One KVMS Four LAN switches One disk array

OSTA1.0 subrack (9U) OSTA2.0 subrack (14U) Air deflector (2U) Filler panel (2U) Non-standard filler panel (1U) KVMS (1U) Filler panel (1U) LAN switch (1RU) Cabling rack (1U) LAN switch (1RU) Cabling rack (1U) LAN switch (1RU) Cabling rack (1U) LAN switch (1RU) Cabling rack (1U) Filler panel (3U) Disk array (2U) Non-standard filler panel (1U) Filler panel (3U)

OSTA2.0 subrack (14U)

The extended cabinet include, One PDB Two SAU subracks One air deflector One OSTA 2.0 subrack

Filler panel (1U)

Logical Architecture
Signaling network

HLR-FE

Signaling processing SAU

O&M

BAM: Back Admin Module BE: Back End FE: Front End DSU: Data Service Unit DRU: Data Routing Unit SAU: Signaling Access Unit SMU: Subscriber Management Unit
Data storage Data service

BAM NMS SCF

Subscriber data management DRU Cluster SMU

DSU Cluster 1

DSU Cluster 2

DSU Cluster 3

BOSS SMF

SCF: Subscriber Control Function SMF: Subscriber Management Function


HLR-BE

DBMS

HLR9820

USC-HLR ConfigurationOSTA 1.0 (TDM Networking)


0 W E P I 1 W E P I 2 W E P I 3 W E P I 4 W E P I 5 W E P I 6 W S I U 7 W H S C 8 W S I U 9 W H S C 10 W E P I 11 W E P I 12 W E P I 13 W E P I 14 W E P I 15 W E P I 16 17 P O W E R 18 19 P O W E R 20 B A C K

W C S U

W C S U

W C S U

W C S U

W C S U

W C S U

W S M U

W S M U

W C S U

W C S U

W C S U

W C S U

W C S U

W C S U

W A L U

P O W E R

P O W E R

F R O N T

Configuration of the extended service subrack in the TDM networking

USC-HLR ConfigurationOSTA 1.0 (IP Networking)


0 1 2 3 4 5 6 W S I U 7 W H S C 8 W S I U 9 W H S C 10 W B F I 11 W B F I 12 13 14 15 16 17 P O W E R 18 19 P O W E R 20 B A C K

W C C U

W C C U

W C C U

W C C U

W C C U

W C C U

W S M U

W S M U

W I F M

W I F M

W B S G

W B S G

W B S G

W A L U

P O W E R

P O W E R

F R O N T

Configuration of the basic service subrack in the IP networking

USC-HLR ConfigurationOSTA 1.0


Board WALU Function Monitors the alarms generated. Configuration Rules Only one WALU board is configured in each subrack. In the TDM networking or ATM 2M networking, two WCKI boards working in active/standby mode are configured in the basic subrack

WCKI

Obtains the clock signal. Exchanges data between the SAU and the HDU, and data between the basic subrack and the extended subrack in the SAU. The WHSC is used for intra-board communication in the service subrack. Exchanges data between the WSMU and the BAM. Adds or deletes the service subrack, loads data to the boards in the service subrack, or deletes boards from the service subrack based on the command sent from the BAM. Processes TDM signaling messages over the MTP1/MTP2 layer, and then sends the processed messages to the WCSU boards. Processes ATM 2M signaling messages, and then sends the processed messages to the WEAM boards.

WHSC

Two WHSC boards working in active/standby mode are configured in each subrack.

WSIU

Two WSIU boards working in active/standby mode are configured in each subrack. Two WSMU boards working in active/standby mode are configured in each subrack.

WSMU

WEPI

The WEPI boards must be configured in pairs. Each pair of WEPI boards work in active/standby mode.

USC-HLR ConfigurationOSTA 1.0


Board Function Processes TDM signaling messages over the MTP3/SCCP/TCAP layer, and then sends the processed messages to the HDU. Configuration Rules

WCSU

1+1 backup

WBFI

Receives IP signaling messages, and In the IP networking, WBFI boards (working in active/standby mode) and then sends the received messages to two WIFM boards (working in active/standby mode) are configured. the WIFM boards. Dispatches the IP signaling messages In the IP networking, two WBFI boards (working in active/standby mode) to the WBSG boards. and two WIFM boards (working in active/standby mode) are configured. Processes IP signaling messages over the M3UA layer and ATM signaling messages over the MTP3b layer, and then sends the processed messages to the WCCU boards. The number of WBSG boards is half of the number of WCCU boards. At least two WBSG boards working in load-sharing mode must be configured.

WIFM

WBSG

WCCU

Processes broadband signaling messages over the 1+1 backup MTP3/SCCP/TCAP layer, and then sends the processed messages to the HDU.

USC-HLR ConfigurationOSTA 2.0


0 F C I 1 2 F C I 3 4 5 6 S W I 7 S W I 8 9 10 11 12 13 G E I G E I G E I B A C K F R O N T

BAM: Back Admin Module INU: Installation Unit FCI: FE Interface SMI: Service management Interface SCU: Service Control Unit DRU: Data Routing Unit

D M U

D R U

D M U

D R U

S C U

D S U

S W U

S W U

S C U

D S U

I N U

B A M

B A M

BASIC SUB RACK

6 S W I

7 S W I

10 11 12 13 G E I G E I

B A C K F R O N T

DMU: Data Management Unit DSU: Data Service Unit SMU: Subscriber Management Unit BAM: Back Administration Module

S C U

D R U

S C U

D R U

S C U

D S U

S W U

S W U

S C U

D S U

D S U

S M U

D S U

S M U

Extended SUB RACK

USC-HLR Configuration - OSTA 2.0


Board Name DSU DMU SCU INU BAM Program DSU DB2 SCF INU BAM Physical Board USP1 USP1 USP2 USP2 USP2 Back Board None FCI None GEI GEI Specifications 1.5 million subscribers Only one pair DMU 2.0 million subscriber Only one Only one pair Remark Data Service Unit Data Management Unit Service Process Unit Installation Unit Back Administration Module SMU SMU USP2 GEI Only one pair Subscriber Management Unit DRU*16 G FE USP3 None 5.0 million dynamic Data Routing Unit

Thank you
www.huawei.com

Você também pode gostar