Boiler 3

No

Description

1
2

Bored pile, SCM pile (nos)


Excavation of foundation (m3)

Concrete of foundation(m3)

Pipe installation (D2420)

Back filling

Total Q'ty Up to now

Percentage
completed (%)

263
19,161

263
19161

100%
100%

2,740

890

32%

Bored pile (nos)


Excavation (m3)
Concrete (m3)

Summary Quantity
Back of boiler 3
Percentage
Total Q'ty Up to now
completed (%)
139
11,556

139

1,101

Boiler 4
Total Q'ty Up to now

100%
0%

263
19,161

0%

2,740

263

Percentage
completed (%)
100%
0%
0%

Total
263

Up to now
Completed

19,161

17,245

2,740

385

Summary Quantity
Back of boiler 4
Percentage
Total Q'ty Up to now
completed (%)
139
11,556

139

1,101

As of
Turbine Building & deaerator bay &
Percentage
Total Q'ty Up to now
completed (%)

100%
0%

792
85,379

0%

11,186

792

100%
0%
0%

7/9/2013
Central Control Building
Main Cooling Water Piping
Percentage
Percentage
Total Q'ty Up to now
Total Q'ty Up to now
completed (%)
completed (%)
106
9,785

106
50

911

100%
1%
0%

4970
66,931
1063
57,157

4395
15,111

88%
23%

180

17%

9,679

17%

Remarks

4.77

HAI PHONG 2 - 2 x 300 MW - THERMAL POWER PROJECT


PROGRESS OF CONCRETE PILING WORKS
Sl No
1

AREA

SCOPE

UP TO LAST
MONTH

DURING THIS
MONTH

Coal Handling System:

CUMULATIVE

Percentage
Completed

BALANCE

Transfer Tower A

36

24

24

12

66.67%

Coal Handling Trestle 2

48

22

10

32

16

66.67%

Coal Sampling room

18

14

15

83.33%

Coal Storage shed

325

50

74

124

201

38.15%

2 ESP / Ash handling / FGD control building

36

12

18

30

83.33%

Turbine building, deaerator & Bunker Bay

792

534

213

747

45

94.32%

FGD absorber

50

25

18

43

86.00%

92

76

16

92

100.00%

244
3,120

1,950

402

2,352

244
768

0.00%
75.38%

UP TO LAST
MONTH
4,395
10,100
-

DURING THIS
MONTH
10,119
34
399
210
115
453

Water Treatment Plant Building


air flue rack & circling pumping house (FGD
6 area)
TOTAL
5

PROGRESS OF SOIL & CEMENT MIX PILING WORKS


Sl No
1
2
3
4
5
6
7
8

AREA
Main Cooling Water Piping
Coal Storage yard
Waste Water Treatment Plant
Clarifier Tanks
Filter Water Storage Tanks
Chemical Dosing Room
Boiler make up water treatment
Sewage water treatment plant

SCOPE
4,970
53,323
189
399
1,170
441
780
87

CUMULATIVE
4,395
20,219
34
399
210
115
453
-

BALANCE
575
33,104
155
960
326
327
87
-

Percentage
Completed
88.43%
37.92%
17.99%
100.00%
17.95%
26.08%
58.08%
0.00%

Remarks

start from 30/05/2011


start from 09/05/2011
start on 24/May
start from 01/05/2011
start on 14/April
start on 6/Feb & finished on
20/6 and 5/July
start on 30/March
finished on 3/May

Remarks

start from 16/06


start from 11/06 and finish on 23/06/2011
start from 4/06
start from 17/06
start from 14/06

Area of foundation

CT

SJ

SJ a

CT a

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
1
2
3
1
2
3
1
2
4
5
6
7
8

Back of Boiler 3 (4)


Area
6.4
10.471
10.471
6.4
10.471
2.56
10.471
10.471
6.4
10.471
16
12.8
10.471
10.471
6.4
6.4
10.471
2.56
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
46.4
10.98
14.4
46.4
10.98
14.4
6.4
10.471
6.4
10.471
2.56
10.471
10.471

Remarks

20.942
20.942
32
20.942

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Total (m2)
h (m)
Volume (m3)
CT

SJ

Cta

1
2
3
4
4
5
6
7
8
9
10
10
11
12
13
14
1
1
3
1
2
4

6.4
10.471
10.471
12.8
10.471
10.471
6.4
6.4
10.471
2.56
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
550
2
1,101
Boiler 3(4)
25.6
132.0
21.2
16
16
25.6
140.8
25.6
64.4
34.32
6.4
6.4
19.2
25.6
102.4
34.32
34.9
34.9
16.0
39.7
132.0
16

281.6
128.8
12.8
38.4
204.8

CT

No

4
16
5
25.6
6
140.8
7
25.6
8
64.4
10
6.4
11
19.2
13
102.4
Total (m2)
1370
h (m)
2
Volume (m3)
2,740
Central control house
1
23.2
2
25.6
3
25.6
4
23.2
5
25
6
25
7
25
8
25
9
10.5
10
10.5
11
10.5
12
10.5
13
10.5
14
10.5
15
10.5
15
10.5
16
10.5
16
10.5
17
10.5
18
10.5
21
16
22
25
23
25
24
16
25
25
26
25
Total (m2)
455.252
h (m)
2
Volume (m3)
911
Turbine
Item
1
JA8
32.2

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

JA2
JX1
JA12
J1/A-2/11
J1/A-5/12
JA13
J1/A-13
J1/A-2/13
JA14
J1/A-14
J2/A-14
J2A-2/13
J2/A-13
J2/A-4/12
J2/A-12
JJ2
J1/A-8
J1/A-1/8
J2/A-8
J2/A-1/8
J3/A-8
J3/A-1/8
JB8
J4/A-9
JB9
JN2
JB10
JB11
JB12
JB13
JB14
JC8
JC9
JC10
JC11
JC12
JC13
JC14
JM5
JM6
JM7
JM8
JD8
JD9

25.76
195.946
34.4
6.4
6.4
25.76
6.4
6.4
25.76
6.4
10.469
6.4
6.4
6.4
6.4
461.64
6.4
6.4
6.4
6.4
6.4
6.4
43.459
6.4
25.76
25.44
25.76
25.76
25.76
25.76
25.76
85.6
64
64
64
64
64
64
98.977
97.92
97.92
97.92
85.6
64

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89

JD10
JD11
JD12
JD13
JD14
JE8
JE14
J1/A-2/4
JA5
J1A-5/5
J1/A-6
JA6
J1/A-2/6
J1/A-7
JA7
J2/A-5
J2/A-4/5
J2/A-?
J2/A-2/6
J2/A-7
J3A-4/5
J3A-5
J3A-7
J4A-5
J4A-4/5
J4A-???
J4A-2/6
J4A-7
JB5
JB6
JB7
JC5
JC6
JC7
JM3
JM4
JD5
JD6
JD7
JE7
JA1
JA2
JX1
J1/A-1

64
64
64
64
64
60.48
25.76
6.4
34.4
6.4
6.4
25.76
6.4
6.4
25.76
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
43.459
43.459
43.459
64
64
64
97.92
97.92
64
64
64
32.2
25.76
25.76
195.946
6.4

90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130

J1/A-1/1
J2/A-1
J2A-1/1
JJ1
J3/A-1
J3/A-1/1
J4A-1
J4/A-2
JB1
JB2
JB3
JN1
JB4
JC01
JC1
JC2
JC3
JC4
JM1
JM2
JD01
JD1
JD2
JD3
JD4
JE1a
JE1
JDB1
JDB1
JDB1
J3A6
J3A2/6
JDB1
JDB1
JDB1
J3A6
J3A2/6
J3A-12
J3A-4/12
J3A-14
J3A8

6.4
10.469
6.4
461.64
10.469
6.4
6.4
6.4
43.459
43.459
43.459
25.44
43.459
66.78
64
64
64
64
97.92
97.92
66.78
64
64
64
64
25.76
25.76
31.954
31.954
31.954
2.832
2.832
31.954
31.954
31.954
2.832
2.832
6.4
6.4
10.469
6.4

Total (m2)
h (m)

5,593
2

Volume (m3)

11,186

384.8

204.8
34.32
12.8
38.4
25.6
128.8
444.72
889.44
64.4

6.4
140.8
211.6
423.2