Escolar Documentos
Profissional Documentos
Cultura Documentos
2011
PAGE 1 OF 4
RELAY DETAILS
1.1Rev01 I0733014 Ir=1A, Ur=110V, 50Hz
LV1 SIDE
2) Stability
Indra/Nilesh/Murgan PERFORMED BY M.DEVARAJULU CHECKED BY
JSWEL Title: TEST REPORT FOR RET 670 RELAY Doc. No: Date: Page: HV
0.217L0 0.217L0 0.217L240 0.217L240 0.217L120 0.217L120
EM/F/58/00 24.02.2011
PAGE 2 OF 4
PHASE
R-phase R-phase Y-phase Y-phase B-phase B-phase
HV
0.568L0 0.568L0 0.568L240 0.568L240 0.568L120 0.568L120
LV-1
1.449L210 1.449L195 1.449L90 1.449L75 1.449L330 1.449L315
LV-2
1L180 1L150 1L60 1L30 1L300 1L270
REMARKS
STABLE TRIP STABLE TRIP STABLE TRIP
3)Test Slope ( checked for (a) ES1=1.25,S2=30% & (b) ES1=1.0,S2=30%,ES2=1.5,S3=50%) a)S2=30%
Current @ 1.3% R-phase Y-phase B-phase Current @ 1.5% R-phase Y-phase B-phase HENCE S2=33% FOUND HV 0.738L0 0.738L240 0.738L120 HV 0.852L0 0.852L240 0.852L120 LV-1 1.884L210 1.884L90 1.884L330 LV-1 2.174L210 2.174L90 2.174L330 I1=443.3A I2=547A Id1=104A Ib1=495 I11=511A I22=642A Id2=131A Ib2=576A
b) S3=50%
Current @ 1.6% R-phase Y-phase B-phase Current @ 1.8% R-phase Y-phase B-phase HENCE S3=51% FOUND HV 0.909L0 0.909L240 0.909L120 HV 1.021L0 1.021L240 1.021L120 LV-1 2.319L210 2.319L90 2.319L330 LV-1 2.609L210 2.609L90 2.609L330 I1=545 I2=810 Id1=265 Ib1=677 I11=613 I22=925 Id2=313 Ib2=769
Operated 15
0.149/1,100/50Hz 0.149/1,100/50Hz 0.149/1,100/50Hz
Remark
b) I5/I1
19/01/13 DATE Indra/Nilesh/Murgan PERFORMED BY M.DEVARAJULU CHECKED BY
JSWEL Title: TEST REPORT FOR RET 670 RELAY Doc. No: Date: Page: EM/F/58/00 24.02.2011
PAGE 3 OF 4
Phase
R-phase Y-phase B-phase
Setting 25 %
Operated
0.255/1,250/50Hz 0.255/1,250/50Hz 0.255/1,250/50Hz
Remark
B. HV Restricted Earth Fault Protection:PHASE Setting in % of Primary current 40% X I base Set Value in Amps 200A Operated Value 200.5 A ( 0.401A) Master Trip operated or Not Operated Remarks
C. LV Restricted Earth Fault Protection:PHASE Setting in % of Primary current 40% X Ibase Set Value in Amps 1200A Operated Value 0.397A Master Trip operated or Not Operated Remarks
2) TOC2
PHASE R Y B Setting in % of Primary current 550%X Ibase 550%X Ibase 550%X Ibase Set Value in Amps 1875.5 1875.5 1875.5 Operated Value I(A) 3.2L0 3.2L240 3.2L120 T(sec) 0.03 0.03 0.03 Master Trip operated or Not operated operated operated Remarks
E. HV Residual Earth Fault Protection based on residual current (TEF-1):19/01/13 DATE Indra/Nilesh/Murgan PERFORMED BY M.DEVARAJULU CHECKED BY
JSWEL Title: TEST REPORT FOR RET 670 RELAY Doc. No: Date: Page:
Operated Value 0.04 0.04 0.04 operated
EM/F/58/00 24.02.2011
PAGE 4 OF 4 Master Trip operated or Not
PHASE R Y B
Remarks
Remarks
19/01/13 DATE
Indra/Nilesh/Murgan PERFORMED BY
M.DEVARAJULU CHECKED BY