Você está na página 1de 1

GOVERNMENT OF ANDHRA PRADESH ABSTRACT R&B Common SSR for all Engineering Departments Fixation of Cement and Steel

el Rates for the month of May, 2013 (3rd month of 4th quarter) Orders Issued. ---------------------------------------------------------- ----

TRANSPORT, ROADS AND BUILDINGS (R.I) DEPARTMENT


G.O.Rt.No. 615 G.O.Ms.No. 94, T.R & B, (R.I) Dept., Dated: 16.04.2008. From ENC(I.W) I&CAD Lr. No. ENC/IW/P&M/ EE.III/ DEE10/ 5 AE/13305/13, Vol.-18 Dated: 20. 05. 2013. *** ORDER: The Engineer-in-Chief (IW) I&CAD, in his letter 2nd read above, has informed that in terms of orders issued in G.O.1st read above the Sub-Committee of Engineers which met on 13.05.2013, has finalized the rates of Cement & Steel for the month of May, 2013, (3rd month of 4th quarter) of 2012-13 SoR and requested to approve the same. 2. Government, after careful examination of the matter hereby approves the rates of cement & steel, for the month of May, 2013, (3rd month of 4th quarter) of 2012-13 SoR, as detailed below:Sl. No. 1. Material CEMENT a) Ordinary Portland Cement (43/53 grade) b) Portland Pozzolana Cement c) Portland Slag Cement STEEL 6 mm M.S.Rods M.S.Flats Mild steel, structural steel, i.e Angles channels & I-sections TMT /HYSD bars Fe-415 Fe-500 M.S.Plates HSCR Steel bars Fe-500 P.C. drawn steel wire/H.T. Wire 3 mm P.C. drawn steel wire/HT wire 4 mm H.R.Sheet in coils 1.6 mm H.R.Sheet in coils 2.0 mm 5.5/6.0 mm M.S wire rod coil Foundry Grade Pig Iron (2.00 to 2.24) (Excluding Taxes) Rates fixed for May, 2013 (Rate for 1 MT.) 1. 2. Dated: 22.06.2013. Read the following:

Rs.4,100/- (Rupees Four Thousand one hundred Only) Rs.3,950/- (Rupees Three Thousand Nine fifty only) Rs.4,000/- (Rupees Four Thousand only) Rs.42,500/- (Rupees Forty Two Thousand Five Hundred only) Rs.41,800/- (Rupees Forty One Thousand Eight Hundred only) Rs.44,000/- (Rupees Forty Four Thousand only)

2. 3. 4. 5 a. b. 6. 7. 8. 9. 10. 11. 12. 13.

Rs.43,000/- (Rupees Forty Three Thousand only) Rs.46,000/- (Rupees Forty Six Thousand only) Rs.43,000/- (Rupees Forty Three Thousand only) Rs.49,000/- (Rupees Forty Nine Thousand only) Rs.58,500/- (Rupees Fifty Eight Thousand and five hundred only) Rs.57,500/- (Rupees Fifty Seven Thousand and Five Hundred only) Rs.49,000/- (Forty Nine Thousand only) Rs.48,000/- (Rupees Forty Eight Thousand only) Rs.46,000/- (Rupees Forty Six Thousand only) Rs.27,500/- (Rupees Twenty Seven Thousand Five Hundred only) dealing with PWD works

3. All the Heads of Departments/Corporations, Universities, Agencies shall take action accordingly.

4. This order issues with the concurrence of Fin. Dept. vide their, U.O.No.16288/594/ EXpr.PW-II/2013, Dated: 19.06.2013. (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) S.P.SINGH PRINCIPAL SECRETARY TO GOVERNMENT The Engineer-in-Chief (IW), I & CAD Dept. (P&M Cell), Hyderabad. The Engineer-in-Chief (R&B), Admn. & NH, Hyderabad. The Director of Works Accounts, A.P., Hyderabad. //FORWARDED BY ORDER// SECTION OFFICER

Você também pode gostar