Você está na página 1de 16

Mobility Office

Daily GSM MAPA

7/10/2013

Circle Name
DATE DAY

Daily GSM MAPA Month-Year


PARAMETER TARGET (Metro/Circle) 1 Fri 2 Sat 3 Sun 4 Mon 5 Tue 6 Wed 7 Thu 8 Fri 9 Sat 10 Sun

(A) 1 2 3 4 5

INSTALLED CAPACITY Switching Network Capacity HLR (K) No of MSCs Total MSC Capacity (Erls) Total MSC Capacity (BHCA) IN Prepaid (Equipped BHCA) Radio Network Capacity BSC Total Sites Macro Micro IBS Cells TRXs Radio Network Capacity (Erl) SUBSCRIBERS DATA HLR Subs (at 00:00 hrs) Registered Un-Registered Total HLR VLR Subs (at NBH) Attached Detached Total VLR IN Subs. (Prepaid) Installed Active Disconnections Recharges First call to IVR In Grace Period (Total) 1 - 30 days 31 - 60 days 61 - 90 days Roamers (at NBH) In-Roamers (Total) In-Roamers (National) In-Roamers (Intnl) Out-Roamers (Total) Out-Roamers (National)
1 Rev4.0

6 7 7a 7b 7c 8 9 10 (B) 11 12 13

14 15 16

17 18 19 20 21 22 23 24 25

26 27 28 29 30

157025222.xls.ms_office

Mobility Office

Daily GSM MAPA

7/10/2013

31

Out-Roamers (Intnl) GPRS No of Regd GPRS subscribers NETWORK USAGE Switching Network Usage Network Busy Hour - Start Time BH Traffic (Erl) Switch BHCA Prepaid BHCA Radio Network Usage Avg Traffic Full Rate (Erlangs) Avg Traffic Half Rate (Erlangs) BBH Traffic Full Rate (Erlangs) BBH Traffic Half Rate (Erlangs) NBH Traffic Full Rate (Erlangs) NBH Traffic Half Rate (Erlangs) NBH Period Radio Network Utilitization(BBH) VMS Usage Voice Mail Boxes Equipped Voice Mail Boxes Assigned SMS Usage SMS Capacity (Msg/Sec) No. Of MO SMS No. OF MT SMS (Switch) SMS Delivered during Busy Hour SWITCH KPIs ( 24 hrs)

32

33 34 35 36

<=80%

37 38 39 40 41 42 43 44

<=70%

45 46

47 48 49 50

51 52

SCR without A release counters SCR with A release counters

>=90% >=99%

157025222.xls.ms_office

Rev4.0

Mobility Office

Daily GSM MAPA


>=45% >=92% >=97% >=99.99% <=80%

7/10/2013

53 54 55 56 57

Completion Call Rate Paging success rate Location Update Success Rate Network Availability (Switch/IN/GPRS) Peak Processor Load (MSCs) SWITCH KPIs ( NBH)

58 59

Trunk Route Utilization Rate (NBH) Trunk Route Congestion Rate (NBH) RADIO NETWORK KPIs (24 hrs)

<=70% <=2%

60 61 62 63 64 65 66 67 68 69 70 71 72

Random Access Success Rate SDCCH Congestion (secs)/cell SDCCH Time Congestion% SDCCH Blocking (%) SDCCH Drop Call Rate TCH Congestion (secs)/cell TCH Time Congestion% TCH Blocking (%) TCH Assignment Success Rate TCH Setup Success Rate TCH HO Success Rate TCH Drop Call Rate BTS Network Availability (Excluding Infrastrucure Reasons) RADIO NETWORK KPIs (NBH)

>=98.5% <=50 sec/cell <=0.2% <=0.3% <=1% <=200 sec/cell <=1.2% <=1.5% >98% >=97% >=98% <=1.8% >=99.99

73 74 75 76 77 78 79 80 81 82 83 84 85

Random Access Success Rate SDCCH Congestion (secs)/cell SDCCH Time Congestion% SDCCH Blocking (%) SDCCH Drop Call Rate TCH Congestion (secs)/cell TCH Time Congestion% TCH Blocking (%) TCH Assignment Success Rate TCH Setup Success Rate TCH HO Success Rate TCH Drop Call Rate Erlang Minutes Per Drop CELL WISE KPIs (During Cell Busy Hour) % of Cells with Random Access Success Rate >=95% % of Cells with SDCCH Time Congestion <=0.85% % of Cells with SDCCH Blocking <=1% % of Cells with SDCCH Drop <=2% % of Cells with Tch Time Congestion <=3% % of Cells with TCH Blocking <=5% % of Cells with TCH Assignment Success Rate >=95%

>=98% <=12 sec/cell <=0.3% <=0.5% <=1.2% <=50 sec/cell <=1.4% <=2% >=97% >=95% >=97% <=2% >=80

86 87 88 89 90 91 92

>=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90


3 Rev4.0

157025222.xls.ms_office

Mobility Office

Daily GSM MAPA


>=95/90 >95/90 <10%

7/10/2013

93 94 95

% of Cells with TCH Drop <=3% % of Cells with Handover Success Rate >=95% % of Cells with Utilization >=90% SINGTEL KPIs (24 Hrs)

96 97

SDCCH Drop Call Rate TCH Drop Call Rate CIRCLE SPECIFIC DATA

<=1% <=1.8%

98 99

BTS Network Availability (Including all Reasons)


EDGE Enabled TRXs

157025222.xls.ms_office

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

11 Mon

12 Tue

13 Wed

14 Thu

15 Fri

16 Sat

17 Sun

18 Mon

19 Tue

20 Wed

21 Thu

22 Fri

23 Sat

24 Sun

25 Mon

26 Tue

27 Wed

157025222.xls.ms_office

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

157025222.xls.ms_office

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

157025222.xls.ms_office

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

157025222.xls.ms_office

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

28 Thu

29 Fri

30 Sat

31 Sun

157025222.xls.ms_office

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

157025222.xls.ms_office

10

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

157025222.xls.ms_office

11

Rev4.0

Mobility Office

Daily GSM MAPA

7/10/2013

157025222.xls.ms_office

12

Rev4.0

Mobility Office

Vendor-1 GSM MAPA

7/10/2013

Circle Name <Vendor-1> GSM MAPA Month-Year


DATE DAY PARAMETER TARGET (Metro/Circle) 1 Fri 2 Sat 3 Sun 4 Mon 5 Tue 6 Wed 7 Thu 8 Fri 9 Sat 10 Sun 11 Mon 12 Tue 13 Wed 14 Thu 15 Fri 16 Sat

Radio Network Capacity 1 2 2a 2b 2c 3 4 5 BSC Total Sites Macro Micro IBS Cells TRXs Radio Network Capacity (Erl) Radio Network Usage 6 7 8 9 10 11 12 13 Avg Traffic Full Rate (Erlangs) Avg Traffic Half Rate (Erlangs) BBH Traffic Full Rate (Erlangs) BBH Traffic Half Rate (Erlangs) NBH Traffic Full Rate (Erlangs) NBH Traffic Half Rate (Erlangs) NBH Period Radio Network Utilitization(BBH) RADIO NETWORK KPIs (24 hrs) 14 15 16 17 18 19 20 21 22 23 24 25 Random Access Success Rate SDCCH Congestion (secs)/cell SDCCH Time Congestion% SDCCH Blocking (%) SDCCH Drop Call Rate TCH Congestion (secs)/cell TCH Time Congestion% TCH Blocking (%) TCH Assignment Success Rate TCH Setup Success Rate TCH HO Success Rate TCH Drop Call Rate RADIO NETWORK KPIs (NBH) 26 27 28 29 30 31 32 33 34 35 36 37 38 Random Access Success Rate SDCCH Congestion (secs)/cell SDCCH Time Congestion% SDCCH Blocking (%) SDCCH Drop Call Rate TCH Congestion (secs)/cell TCH Time Congestion% TCH Blocking (%) TCH Assignment Success Rate TCH Setup Success Rate TCH HO Success Rate TCH Drop Call Rate Erlang Minutes Per Drop CELL WISE KPIs (During Cell Busy Hour) % of Cells with Random Access Success Rate >=95% % of Cells with SDCCH Time Congestion <=0.85% % of Cells with SDCCH Blocking <=1% % of Cells with SDCCH Drop <=2% % of Cells with Tch Time Congestion <=3% % of Cells with TCH Blocking <=5% % of Cells with TCH Assignment Success Rate >=95% % of Cells with TCH Drop <=3% % of Cells with Handover Success Rate >=95% % of Cells with Utilization >=90%
157025222.xls.ms_office

<=70%

>=98.5% <=50 sec/cell <=0.2% <=0.3% <=1% <=200 sec/cell <=1.2% <=1.5% >98% >=97% >=98% <=1.8%

>=98% <=12 sec/cell <=0.3% <=0.5% <=1.2% <=50 sec/cell <=1.4% <=2% >=97% >=95% >=97% <=2% >=80

39 40 41 42 43 44 45 46 47 48

>=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >95/90 <10%
13 Rev4.0

Mobility Office

Vendor-1 GSM MAPA

7/10/2013

17 Sun

18 Mon

19 Tue

20 Wed

21 Thu

22 Fri

23 Sat

24 Sun

25 Mon

26 Tue

27 Wed

28 Thu

29 Fri

30 Sat

31 Sun

157025222.xls.ms_office

14

Rev4.0

Mobility Office

Vendor-2 GSM MAPA

7/10/2013

Circle Name <Vendor-2> GSM MAPA Month-Year


DATE DAY PARAMETER TARGET (Metro/Circle) 1 Fri 2 Sat 3 Sun 4 Mon 5 Tue 6 Wed 7 Thu 8 Fri 9 Sat 10 Sun 11 Mon 12 Tue 13 Wed 14 Thu 15 Fri 16 Sat

Radio Network Capacity 1 2 2a 2b 2c 3 4 5 BSC Total Sites Macro Micro IBS Cells TRXs Radio Network Capacity (Erl) Radio Network Usage 6 7 8 9 10 11 12 13 Avg Traffic Full Rate (Erlangs) Avg Traffic Half Rate (Erlangs) BBH Traffic Full Rate (Erlangs) BBH Traffic Half Rate (Erlangs) NBH Traffic Full Rate (Erlangs) NBH Traffic Half Rate (Erlangs) NBH Period Radio Network Utilitization(BBH) RADIO NETWORK KPIs (24 hrs) 14 15 16 17 18 19 20 21 22 23 24 25 Random Access Success Rate SDCCH Congestion (secs)/cell SDCCH Time Congestion% SDCCH Blocking (%) SDCCH Drop Call Rate TCH Congestion (secs)/cell TCH Time Congestion% TCH Blocking (%) TCH Assignment Success Rate TCH Setup Success Rate TCH HO Success Rate TCH Drop Call Rate RADIO NETWORK KPIs (NBH) 26 27 28 29 30 31 32 33 34 35 36 37 38 Random Access Success Rate SDCCH Congestion (secs)/cell SDCCH Time Congestion% SDCCH Blocking (%) SDCCH Drop Call Rate TCH Congestion (secs)/cell TCH Time Congestion% TCH Blocking (%) TCH Assignment Success Rate TCH Setup Success Rate TCH HO Success Rate TCH Drop Call Rate Erlang Minutes Per Drop CELL WISE KPIs (During Cell Busy Hour) % of Cells with Random Access Success Rate >=95% % of Cells with SDCCH Time Congestion <=0.85% % of Cells with SDCCH Blocking <=1% % of Cells with SDCCH Drop <=2% % of Cells with Tch Time Congestion <=3% % of Cells with TCH Blocking <=5% % of Cells with TCH Assignment Success Rate >=95% % of Cells with TCH Drop <=3% % of Cells with Handover Success Rate >=95% % of Cells with Utilization >=90%
157025222.xls.ms_office

<=70%

>=98.5% <=50 sec/cell <=0.2% <=0.3% <=1% <=200 sec/cell <=1.2% <=1.5% >98% >=97% >=98% <=1.8%

>=98% <=12 sec/cell <=0.3% <=0.5% <=1.2% <=50 sec/cell <=1.4% <=2% >=97% >=95% >=97% <=2% >=80

39 40 41 42 43 44 45 46 47 48

>=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >=95/90 >95/90 <10%
15 Rev4.0

Mobility Office

Vendor-2 GSM MAPA

7/10/2013

17 Sun

18 Mon

19 Tue

20 Wed

21 Thu

22 Fri

23 Sat

24 Sun

25 Mon

26 Tue

27 Wed

28 Thu

29 Fri

30 Sat

31 Sun

157025222.xls.ms_office

16

Rev4.0

Você também pode gostar