STRICTLY CONFIDENTIAL
Version 1.0
09 February 2013
Icons
Icon Meaning Caution Sample Data Note Tip
Typographic Conventions
Type Style Example text Description Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options. Cross-references to other documentation. Emphasized words or phrases in body text, titles of graphics and tables. Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE. Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools. Keys on the keyboard, for example, function keys (such as F2) or the ENTER key. Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation. Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
Example text
EXAMPLE TEXT
Example text
<Example text>
Version 1.0
Page 2 of 38
09 February 2013
Contents
Project Maintenance ...................................................................................................................... 6 Update WBS Elements .............................................................................................................. 6 Update POC Weights ............................................................................................................... 12 Update Contract Status Monitoring .......................................................................................... 16 Sales Order to Client ................................................................................................................... 17 Create Sales Order (for Change Order)................................................................................... 17 Budget Revision ........................................................................................................................... 25 Create Budget Revision Proposal Authorization ...................................................................... 25 Create Budget Revision Proposal ............................................................................................ 30 Approve Budget Revision Proposal ......................................................................................... 35
Version 1.0
Page 3 of 38
09 February 2013
Version 1.0
Page 4 of 38
09 February 2013
Version 1.0
Page 5 of 38
09 February 2013
System Prerequisite
Updated PROJECT STRUCTURE with LEVEL 2 WBS ELEMENTS
Procedure
1. Access the transaction. SAP Menu Transaction Code Logistics Project System Project Project Builder CJ20N If in a current transaction: /oCJ20N to open to a new window and retain current task. /nCJ20N to open to a new window and close current task.
Version 1.0
Page 6 of 38
09 February 2013
Press ENTER or
button
PROJECT is accessed
Alternate Procedure In the PROJECT BUILDER INITIAL SCREEN, double click the PROJECT from the LAST PROJECTS PROCESSED WORKLIST
Version 1.0
Page 7 of 38
09 February 2013
3. Select the PROJECT DEFINITION and click the WBS ELEMENT OVERVIEW icon
4. To insert WBS ELEMENTS under Change Order, select the WBS ELEMENT under it
icon
Version 1.0
Page 8 of 38
09 February 2013
Note As general rule, the coding mask for WBS ELEMENTS from LEVEL 3 thereon will be:
WBS ELEMENT is limited to 24 characters only and should be unique in the entire system. The PROJECT STRUCTURE will be as agreed by Contracts and Project considering the outline of Bill of Quantities and manageability of operations The lowest WBS ELEMENT of an outline should have a definite Phase Code. This will be used in the reporting of actual costs and accomplishment in the Cost Report. Budget is also set at this level.
Sample Data Level 3 4 5 4 4 WBS Element 1772A-3-0000-01 1772A-3-0100-01-01 1772A-3-0110-01-01-01 1772A-3-0200-01-02 1772A-3-3100-01-03 Description Exploration of Existing Underground Tunnel General Requirements Management and Technical Overhead Existing Conditions Earthworks
Version 1.0
Page 9 of 38
09 February 2013
Press ENTER
Note WBS Elements of General Requirements for the Change Order can be created if Actual Costs can be separated from General Requirements of Project Cost. On the other hand, if it cannot be separated, Actual Costs for the General Requirements of Change Order can be combined with Project Cost.
6. Once the PROJECT has been finalized, press the icon to save the PROJECT STRUCTURE. The Data saved message shall be displayed to confirm that your PROJECT has been saved.
Version 1.0
Page 10 of 38
09 February 2013
Note For requisitions, see K105 Project Requisitions and K106 Acceptance, Monitoring and Issuances
Results
PROJECT STRUCTURE has been updated with Change Order WBS ELEMENTS
Version 1.0
Page 11 of 38
09 February 2013
System Prerequisite
Updated PROJECT STRUCTURE with Change Order WBS ELEMENTS
Procedure
1. Access the transaction. SAP Menu Transaction Code Logistics Project System Project Project Builder CJ20N If in a current transaction: /oCJ20N to open to a new window and retain current task. /nCJ20N to open to a new window and close current task.
This will bring you to the PROJECT BUILDER screen. 2. Access the PROJECT using Worklist Method from Update WBS Elements procedure
In the PROJECT BUILDER initial screen, double click the PROJECT from the LAST PROJECTS PROCESSED WORKLIST
Version 1.0
Page 12 of 38
09 February 2013
PROJECT is accessed
Note As a general rule, the WBS ELEMENTS with entered budget should have equivalent POC WEIGHTS. POC WEIGHTS will be used to roll-up accomplishment in the structure. It should be in whole number. To compute for the POC Weight, either budget or contract amount can be used. POC Weight should be in whole number.
Version 1.0
Page 13 of 38
09 February 2013
4. In the POC WEIGHT field, enter the POC WEIGHT of the WBS ELEMENT
Sample Data Level 3 4 5 4 4 Description Exploration of Existing Underground Tunnel General Requirements Management and Technical Overhead Existing Conditions Earthworks 25,941 31,817 23,426 POC Weight
Version 1.0
Page 14 of 38
09 February 2013
Press ENTER. Continue to enter all POC WEIGHTS in the corresponding WBS ELEMENTS.
Note When WBS Elements for Change Order are added, Project Cost POC Weights may also be adjusted.
5. Once the PROJECT has been finalized, press the icon to save the PROJECT STRUCTURE. The Data saved message shall be displayed to confirm that your PROJECT has been saved.
Results
POC WEIGHTS has been entered
Version 1.0
Page 15 of 38
09 February 2013
System Prerequisite
Created Awarded PROJECT
Procedure
For procedures see K107 Progress Reporting and Projection Update; Update Contract Status Monitoring
Results
CONTRACT STATUS has been updated
Version 1.0
Page 16 of 38
09 February 2013
System Prerequisite
Created Awarded Project CUSTOMER MASTER DATA
Procedure
1. Access the transaction. SAP Menu Transaction Code Logistics Sales and Distribution Sales Order Create VA01 If in a current transaction: /oVA01 to open to a new window and retain current task. /nVA01 to open to a new window and close current task.
This will bring you to the CREATE SALES ORDER: INITIAL SCREEN. 2. On the CREATE SALES ORDER: INITIAL SCREEN, enter the code of the ORDER TYPE in the ORDER TYPE field, 1000 in SALES ORGANIZATION field and 01 in DISTRIBUTION CHANNEL field
Note ORDER TYPE for Client SALES ORDER will correspond to the following: YEC1 Original Contract YEC2 Additive Change Order YEC3 Deductive Change Order
Version 1.0
Page 17 of 38
09 February 2013
Sample Data Name of Project: <NAC Tower> Project Definition: <1772A> Plant: <1772> Client: <Manta Equities, Inc.> Change Order no. 1 (Gross of VAT): <Php 139,688.07> Business Unit: <01> Buildings Reference Quotation: n/a Payment Terms: <10% Retention, Balance 30 days>
3. In the DIVISION field, enter the corresponding code for the Business Unit. Click list.
to select from
Press ENTER, the CREATE ADDITIVE CHANGE ORDER: OVERVIEW screen will be displayed
Version 1.0
Page 18 of 38
09 February 2013
4. In the SOLD-TO PARTY field, enter the CUSTOMER NUMBER of the Client. To select from list, click The Restrict Value Range (1) dialog box will appear, in the SEARCH TERM field enter the Client name. To wild search, add * at start and end. Press ENTER
Version 1.0
Page 19 of 38
09 February 2013
6. Enter 21 in the MATERIAL column, and order QUANTITY 1 and UNIT AU then press ENTER.
A warning message <000010> ::Enter Pricing will appear, this means that Price is not yet entered.
Press ENTER to continue 7. Another warning message <000010>:: Enter Plant will appear, this means that Plant is not yet entered.
8. Enter code for PAYMENT TERMS in the PAYMENT TERMS field. To Select from list, click
Version 1.0
Page 20 of 38
09 February 2013
9. To enter price, select the line item, then from the menu bar: Goto > Item > Conditions
Version 1.0
Page 21 of 38
09 February 2013
Note Amount in the SALES ORDER should be in NET of VAT Maximum amount for HEADER LEVEL or total of SALES ORDER is 99,999,999,999.99 Maximum amount for ITEM LEVEL of SALES ORDER is 999,999,999.99. If amount exceeds limit for item level, item should be divided into multiple items.
Sample Data Change Order no. 1 (Gross of VAT): <Php 139,688.07> Change Order no. 1 (Net of VAT): <Php 124,721.49>
Version 1.0
Page 22 of 38
09 February 2013
Then press ENTER. The price will be transferred in the first row of the table.
Note For Deductive Change Order, the amount will still be entered in absolute value (positive).
11. Select ACCOUNT ASSIGNMENT tab, and enter the WBS ELEMENT to receive Revenue from the SALES ORDER
Version 1.0
Page 23 of 38
09 February 2013
Note As general rule, SALES ORDER will be assigned to the LEVEL 1 WBS ELEMENT of the PROJECT STRUCTURE, which was assigned as BILLING ELEMENT (see Update WBS Structure procedures)
button
12. Then press SAVE icon, message Additive ChangeOrder <100155> has been saved will be displayed to confirm that the Sales Order has been saved
Note Take note of the six (6) digit SALES ORDER NUMBER. This will be used in billing.
Results
SALES ORDER for Change Order created
Version 1.0
Page 24 of 38
09 February 2013
System Prerequisite
Created Awarded Project
Procedure
Access Transaction 1. Access the transaction. SAP Menu Transaction Code ZBUDGET_USER If in a current transaction: /oZBUDGET_USER to open to a new window and retain current task. /nZBUDGET_USER to open to a new window and close current task.
This will bring you to the DISPLAY VIEW USER-LIST FOR PS BUDGET INTERFACE: OVERVIEW screen.
2. The screen will be in the display mode, to switch to edit mode, click DISPLAY -> CHANGE icon
Version 1.0
Page 25 of 38
09 February 2013
The NEW ENTRIES: OVERVIEW OF ADDED ENTRIES screen will be displayed 4. In the USERNAME column, enter the SAP USERNAME of the persons to be authorized
Version 1.0
Page 26 of 38
09 February 2013
5. In the USER TYPE column, select the type of authorization to be given by clicking the drop down list box arrow
Note Types of authorization are: Project User will allow user to enter Project Budget revisions Contract User will allow user to approve Project Budget proposals
Sample Data Authorization for RFCUDIA: <Project User> Authorization for RLCRUZ: <Contract User>
Version 1.0
Page 27 of 38
09 February 2013
Sample Data Full Name for RFCUDIA: <Roma F. Cudia> Full Name for RLCRUZ: <Rhodelynne L. Cruz>
7. Once done, click SAVE icon, message Data was saved will be displayed to confirm that the new users and authorizations are saved
8. Click BACK
Revise User Authorization 9. To change User Authorization, in the DISPLAY VIEW USER-LIST FOR PS BUDGET INTERFACE: OVERVIEW screen, click the drop down list box arrow the user to be revised and select user authorization in the USER TYPE of
Sample Data Change authorization for RLCRUZ, from <Contract User> to <Project User>
Version 1.0
Page 28 of 38
09 February 2013
10. Once done, click SAVE icon, message Data was saved will be displayed to confirm that the revised authorizations are saved
Results
Authorization for Budget Revision is created
Version 1.0
Page 29 of 38
09 February 2013
System Prerequisite
Project with updated WBS ELEMENTS Authorization for Budget Revision Proposal creation
Procedure
1. Access the transaction. SAP Menu Transaction Code ZPSBI If in a current transaction: /oZPSBI to open to a new window and retain current task. /nZPSBI to open to a new window and close current task.
This will bring you to the BUDGET UPDATE APPROVAL: INITIAL SCREEN 2. In the PROJECT PROFILE field, enter the PROJECT PROFILE of the Product Line of the PROJECT. To select from list, click
Note Project Profiles are: ZDMCI01 Building Project ZDMCI02 Infrastructure Project ZDMCI03 Power Project ZDMCI04 Water Project ZDMCI05 Non-Billable Project
Sample Data Project: <NAC Tower> Project Profile: <DMCI Billable Project - Building>
Version 1.0
Page 30 of 38
09 February 2013
Version 1.0
Page 31 of 38
09 February 2013
icon
The CURRENT AMOUNT column contains the current budget. The SUPPLEMENT Column allows for amount for additional budget. The RETURN column allows for budget deductions.
Note The table will only allow budget to be entered in the active cells which will be the lowest level WBS Elements.
Version 1.0
Page 32 of 38
09 February 2013
WBS Element
1772A-3-0000-01 1772A-2-0100-01-01 1772A-2-0110-01-01-01 1772A-2-0200-01-02 1772A-2-3100-01-03
Description
Exploration of Existing Underground Tunnel General Requirements Management and Technical Overhead Existing Conditions Earthworks
Budget Revision
icon
The budget revision will be summed up in the SUPPLEMENT or RETURN column and the total budget will be computed in the UPDATED BUDGET column
Version 1.0
Page 33 of 38
09 February 2013
Click
Results
Budget Revision proposal is created
Version 1.0
Page 34 of 38
09 February 2013
System Prerequisite
Created Budget Revision Proposal Authorization for Budget Revision Proposal approval
Procedure
1. Access the transaction. SAP Menu Transaction Code ZPSBI If in a current transaction: /oZPSBI to open to a new window and retain current task. /nZPSBI to open to a new window and close current task.
This will bring you to the BUDGET UPDATE APPROVAL: INITIAL SCREEN 2. In the PROJECT PROFILE field, enter the PROJECT PROFILE of the Product Line of the PROJECT. To select from list, click
Note Project Profiles are: ZDMCI01 Building Project ZDMCI02 Infrastructure Project ZDMCI03 Power Project ZDMCI04 Water Project ZDMCI05 Non-Billable Project
Sample Data Project: <NAC Tower> Project Profile: <DMCI Billable Project - Building>
Version 1.0
Page 35 of 38
09 February 2013
The CURRENT AMOUNT column contains the current budget. The SUPPLEMENT Column contains the amount for additional budget. The RETURN column contains budget deductions. 5. To approve budget proposal, check Approved by Contracts check box
Version 1.0
Page 37 of 38
09 February 2013
Results
Budget Revision proposal is either approved or rejected
/hmacain /agmejorada
Version 1.0
Page 38 of 38