Escolar Documentos
Profissional Documentos
Cultura Documentos
Table of Contents ......................................................................................... Chapter 1 An Introduction to BTS312 .......................................................... 1.1 System Overview .............................................................................. 1.2 System Characteristics ..................................................................... 1.2.1 Integrated RF Component Technology .................................... 1.2.2 Mature RF Technology ............................................................. 1.2.3 Advanced E-Abis Technology .................................................. 1.2.4 Powerful O&M Functions .......................................................... 1.3 Application Merits.............................................................................. 1.3.1 Wide Coverage ......................................................................... 1.3.2 Expenditure Reduction ............................................................. 1.3.3 Smooth Evolution ..................................................................... 1.3.4 Multiple Transmission Modes ................................................... 1.4 Structure Overview ........................................................................... 1.4.1 Logical Structure ....................................................................... 1.4.2 Software Structure .................................................................... 1.4.3 Cabinet Structure ...................................................................... 1.5 Main Functions .................................................................................. 1.5.1 Basic Software Relative Functions ........................................... 1.5.2 Basic Hardware Relative Functions.......................................... 1.6 Technical Indices .............................................................................. Chapter 2 Hardware Architecture ................................................................. 2.1 Overview ........................................................................................... 2.2 TRX/CDU Frame ............................................................................... 2.2.1 CDU .......................................................................................... 2.2.2 EDU .......................................................................................... 2.2.3 ECDU ....................................................................................... 2.2.4 SCU .......................................................................................... 2.2.5 TRX .......................................................................................... 2.2.6 PBU .......................................................................................... 2.3 Common Resource Frame ................................................................ 2.3.1 PSU .......................................................................................... 2.3.2 PMU.......................................................................................... 2.3.3 TMU .......................................................................................... 2.3.4 TES ........................................................................................... 2.3.5 ASU .......................................................................................... 2.3.6 ABB .......................................................................................... 2.3.7 ABA .......................................................................................... 2.4 Other Parts of the Cabinet ................................................................ i 1-1 1-1 1-2 1-2 1-2 1-2 1-3 1-3 1-3 1-4 1-4 1-4 1-4 1-4 1-6 1-7 1-8 1-8 1-9 1-9 2-1 2-1 2-3 2-3 2-4 2-5 2-6 2-6 2-10 2-12 2-12 2-12 2-14 2-17 2-18 2-20 2-21 2-21
2.4.1 TDU .......................................................................................... 2.4.2 FMU .......................................................................................... 2.4.3 Switch Box ................................................................................ 2.4.4 Fan Box .................................................................................... 2.4.5 Air Box ...................................................................................... 2.5 Antenna and Feeder System ............................................................ 2.5.1 Antenna .................................................................................... 2.5.2 Feeder ...................................................................................... 2.5.3 Lightning Arrester ..................................................................... 2.5.4 Tower-top Amplifier (Optional) .................................................. 2.6 Power Supply System ....................................................................... 2.6.1 Overview ................................................................................... 2.6.2 Overall Structure ....................................................................... 2.6.3 Technical Specifications ........................................................... 2.7 Environment Monitoring System ....................................................... 2.7.1 Outlook of Environment Monitoring instrument ........................ 2.7.2 Function Provided by Environment Monitoring Instrument ....... 2.7.3 Environment Monitoring Instrument Inputs ............................... 2.7.4 Alarm Indicators........................................................................ 2.7.5 Executing Devices .................................................................... 2.7.6 Communication ......................................................................... 2.8 Lightning Protection System ............................................................. 2.8.1 Lightning Protection for DC Power Supply ............................... 2.8.2 Lightning Protection for AC Power Supply ............................... 2.8.3 Lightning Protection for Trunk Cables ...................................... Chapter 3 Software Architecture .................................................................. 3.1 Overview ........................................................................................... 3.2 Signaling Control Processing (SCP) Program .................................. 3.3 Baseband Signal Processing Program ............................................. 3.4 Operation and Maintenance Program ............................................... Chapter 4 External Interfaces ....................................................................... 4.1 Abis Interface .................................................................................... 4.1.1 Introduction ............................................................................... 4.1.2 Physical Layer .......................................................................... 4.1.3 Data Link Layer ........................................................................ 4.1.4 Layer 3-Traffic Management .................................................... 4.1.5 Layer 3-Operation and Maintenance ........................................ 4.2 Um Interface ..................................................................................... 4.2.1 Introduction ............................................................................... 4.2.2 Interface Protocol Model ........................................................... 4.2.3 Physical Layer ..........................................................................
2-21 2-23 2-24 2-24 2-25 2-25 2-25 2-27 2-27 2-27 2-28 2-28 2-30 2-32 2-36 2-36 2-37 2-37 2-38 2-38 2-39 2-39 2-40 2-42 2-43 3-1 3-1 3-2 3-4 3-5 4-1 4-1 4-1 4-6 4-7 4-8 4-12 4-14 4-14 4-15 4-15
4.2.4 Data Link Layer ........................................................................ 4.2.5 Signaling Layer ......................................................................... Chapter 5 Functions and Performance ........................................................ 5.1 Networking Functions ....................................................................... 5.1.1 E1 Networking .......................................................................... 5.1.2 SDH Networking ....................................................................... 5.1.3 Networking for Satellite Transmission ...................................... 5.2 Main RF Functions ............................................................................ 5.3 Baseband Processing ....................................................................... 5.3.1 Channel Types Supported ........................................................ 5.3.2 Channel Combinations Supported ............................................ 5.4 Signaling Processing ........................................................................ 5.5 Operation and Maintenance .............................................................. 5.5.1 Software Loading ...................................................................... 5.5.2 Abis Interface Management...................................................... 5.5.3 Air Interface Management ........................................................ 5.5.4 Testing Management ................................................................ 5.5.5 Status Management ................................................................. 5.5.6 Processing of Event Reports .................................................... 5.5.7 Equipment Management .......................................................... 5.5.8 Site Configuration ..................................................................... 5.5.9 Tracing Operations ................................................................... 5.5.10 Miscellaneous Functions ........................................................ 5.6 System Indices .................................................................................. 5.7 Radio Interface Indices ..................................................................... 5.7.1 Receiver Part ............................................................................ 5.7.2 Transmitter Part ........................................................................ Chapter 6 Configuration and Typical Application ......................................... 6.1 Configuration ..................................................................................... 6.1.1 Cell Configuration ..................................................................... 6.1.2 Configuration of the Common Resource Frame ....................... 6.1.3 Configuration of the TRX/CDU Frame ...................................... 6.1.4 Configuration of the Antenna .................................................... 6.2 Typical Configuration ........................................................................ 6.2.1 S (4/4/4) Configuration ............................................................. 6.2.2 S (2/2/2) Configuration ............................................................. 6.2.3 O (6) Configuration ................................................................... 6.2.4 O (4) Configuration ................................................................... Appendix A Abbreviations ............................................................................
4-20 4-23 5-1 5-1 5-1 5-3 5-4 5-6 5-8 5-8 5-9 5-9 5-12 5-12 5-13 5-14 5-16 5-16 5-17 5-18 5-20 5-20 5-21 5-21 5-23 5-23 5-26 6-1 6-1 6-1 6-2 6-2 6-4 6-4 6-4 6-6 6-8 6-10 A-1
Table of Contents ......................................................................................... Chapter 1 Overview ...................................................................................... 1.1 Introduction to BTS Terminal Maintenance....................................... 1.2 Introduction to BTS Terminal Maintenance Operations .................... 1.2.1 User Login ................................................................................ 1.2.2 Interface Operation ................................................................... Chapter 2 Site Maintenance ......................................................................... 2.1 Overview ........................................................................................... 2.2 Site Administrationship ..................................................................... 2.3 OpStart Site ...................................................................................... 2.4 View Resource .................................................................................. 2.5 Forced Load SW ............................................................................... 2.6 SW Activate ...................................................................................... 2.7 Site Hierarchical Reset ..................................................................... 2.8 Site Test ............................................................................................ 2.9 Site Environment Monitoring ............................................................. Chapter 3 Cell Maintenance ......................................................................... 3.1 Overview ........................................................................................... 3.2 Cell Attributes Management .............................................................. 3.3 Cell Extended Attribute Management ............................................... 3.4 OpStart Cell ...................................................................................... 3.5 Change Cell Administrative State ..................................................... 3.6 Cell Performance Test ...................................................................... Chapter 4 BT Maintenance .......................................................................... 4.1 Overview ........................................................................................... 4.2 OpStart BT ........................................................................................ 4.3 Change BT Administrative State ....................................................... 4.4 BT Reinitialization ............................................................................. 4.5 BT Test ............................................................................................. Chapter 5 Channel Maintenance.................................................................. 5.1 Overview ........................................................................................... 5.2 Channel Attributes Management ...................................................... 5.3 OpStart Channel ............................................................................... 5.4 Change Channel Administrative State .............................................. 5.5 Loop Test .......................................................................................... Chapter 6 RC Maintenance .......................................................................... 6.1 Overview ........................................................................................... 6.2 RC Attributes Management............................................................... 6.3 RC Extended Attributes Management .............................................. 6.4 OpStart RC ....................................................................................... 6.5 Change RC Administrative State ......................................................
i 1-1 1-1 1-1 1-1 1-2 2-1 2-1 2-1 2-3 2-4 2-4 2-6 2-7 2-9 2-9 3-1 3-1 3-2 3-4 3-6 3-6 3-7 4-1 4-1 4-2 4-2 4-3 4-4 5-1 5-1 5-2 5-3 5-3 5-4 6-1 6-1 6-2 6-3 6-4 6-4
6.6 RC Reinitialization ............................................................................. Chapter 7 Board Maintenance ..................................................................... 7.1 Overview ........................................................................................... 7.1.1 Board Maintenance .................................................................. 7.1.2 Board Maintenance Operations ................................................ 7.2 Board Reset ...................................................................................... 7.3 OpStart Board ................................................................................... 7.4 Board Self-test .................................................................................. 7.5 Change Board Administrative State .................................................. 7.6 Board Information ............................................................................. 7.7 Loop Test .......................................................................................... 7.8 Board Alarm ...................................................................................... 7.9 Clock Operation ................................................................................ 7.10 Set Antenna and Feeder Parameters ............................................. 7.11 CDU Operation ...............................................................................
6-5 7-1 7-1 7-1 7-2 7-4 7-4 7-5 7-5 7-6 7-7 7-8 7-9 7-10 7-11
2.2.2 Mobile Station Fails to Access the Network ............................. 2.2.3 MS Frequent Location Updating ............................................... 2.3 Loading Fault .................................................................................... 2.3.1 Software Loading Failure .......................................................... 2.3.2 Base Station Initialization Failure ............................................. 2.4 Signaling Fault .................................................................................. 2.4.1 OML Link Blocked .................................................................... 2.4.2 RSL Link Blocked ..................................................................... 2.5 Antenna and Feeder System Fault ................................................... 2.5.1 Fault Description ....................................................................... 2.5.2 Introduction to the Antenna and Feeder System ...................... 2.5.3 Fault Analysis and Location...................................................... 2.5.4 Troubleshooting Procedure ...................................................... 2.6 Optical Channel Fault ....................................................................... 2.6.1 Fault Description ....................................................................... 2.6.2 Fault Analysis and Location...................................................... 2.6.3 Troubleshooting Procedure ...................................................... 2.7 Board Fault ....................................................................................... 2.7.1 TMU .......................................................................................... 2.7.2 CDU .......................................................................................... 2.7.3 EDU .......................................................................................... 2.7.4 SCU .......................................................................................... 2.7.5 TRX .......................................................................................... 2.7.6 PBU .......................................................................................... 2.7.7 PMU.......................................................................................... 2.7.8 PSU .......................................................................................... 2.7.9 TEU .......................................................................................... 2.7.10 TES .........................................................................................
2-12 2-14 2-15 2-15 2-17 2-19 2-19 2-19 2-20 2-20 2-21 2-21 2-21 2-22 2-22 2-22 2-22 2-23 2-23 2-25 2-29 2-32 2-34 2-36 2-38 2-42 2-43 2-45
HUAWEI
1. System Description 2. Maintenance Console Description 3. BTS Maintenance
Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. Please feel free to contact our local office or company headquarters.
Trademarks
TELLIN, InfoLink, Netkey, Quidway, SYNLOCK, Radium, M900/M1800, TELESIGHT, Quidview, Musa, Airbridge, Tellwin, Inmedia, VRP, DOPRA, iTELLIN, HUAWEI OptiX, C&C08 iNET, NETENGINE, OptiX, iSite, U-SYS, iMUSE, OpenEye, Lansway, SmartAX, infoX, TopEng are trademarks of Huawei Technologies Co., Ltd. All other trademarks mentioned in this manual are the property of their respective holders.
Notice
The information in this manual is subject to change without notice. Every effort has been made in the preparation of this manual to ensure accuracy of the contents, but all statements, information, and recommendations in this manual do not constitute the warranty of any kind, express or implied.
Related Manuals
The following manuals provide more information about the M900/M1800 Base Transceiver Station (BTS312). Manual M900/M1800 Base Transceiver Station (BTS312) User Manual M900/M1800 Base Transceiver Station (BTS312) Installation Manual Content It provides an overall introduction to the BTS312, including the software structure, hardware structure, applications, technical specifications and maintenance method. It provides information for the system installation, including the hardware installation and software installation.
Intended Readers
The manual is intended for the following readers:
z z
Conventions
This manual uses the following conventions:
I. General conventions
Convention Arial Arial Narrow Description Normal paragraphs are in Arial. Warnings, cautions, notes and tips are in Arial Narrow.
II. Symbols
Eye-catching symbols are also used in this document to highlight the points worthy of special attention during the operation. They are defined as follows: Caution: Means reader be extremely careful during the operation. Note: Means a complementary description.
Environmental Protection
This product has been designed to comply with the requirements on environmental protection. For the proper storage, use and disposal of this product, national laws and regulations must be observed.
HUAWEI
Table of Contents
Chapter 1 An Introduction to BTS312 ......................................................................................... 1-1 1.1 System Overview ............................................................................................................... 1-1 1.2 System Characteristics ...................................................................................................... 1-2 1.2.1 Integrated RF Component Technology................................................................... 1-2 1.2.2 Mature RF Technology............................................................................................ 1-2 1.2.3 Advanced E-Abis Technology ................................................................................. 1-2 1.2.4 Powerful O&M Functions ........................................................................................ 1-3 1.3 Application Merits............................................................................................................... 1-3 1.3.1 Wide Coverage........................................................................................................ 1-3 1.3.2 Expenditure Reduction............................................................................................ 1-4 1.3.3 Smooth Evolution .................................................................................................... 1-4 1.3.4 Multiple Transmission Modes.................................................................................. 1-4 1.4 Structure Overview ............................................................................................................ 1-4 1.4.1 Logical Structure ..................................................................................................... 1-4 1.4.2 Software Structure .................................................................................................. 1-6 1.4.3 Cabinet Structure .................................................................................................... 1-7 1.5 Main Functions................................................................................................................... 1-8 1.5.1 Basic Software Relative Functions.......................................................................... 1-8 1.5.2 Basic Hardware Relative Functions ........................................................................ 1-9 1.6 Technical Indices ............................................................................................................... 1-9 Chapter 2 Hardware Architecture ................................................................................................ 2-1 2.1 Overview ............................................................................................................................ 2-1 2.2 TRX/CDU Frame................................................................................................................ 2-3 2.2.1 CDU......................................................................................................................... 2-3 2.2.2 EDU......................................................................................................................... 2-4 2.2.3 ECDU ...................................................................................................................... 2-5 2.2.4 SCU......................................................................................................................... 2-6 2.2.5 TRX ......................................................................................................................... 2-6 2.2.6 PBU ....................................................................................................................... 2-10 2.3 Common Resource Frame .............................................................................................. 2-12 2.3.1 PSU ....................................................................................................................... 2-12 2.3.2 PMU ...................................................................................................................... 2-12 2.3.3 TMU....................................................................................................................... 2-14 2.3.4 TES ....................................................................................................................... 2-17 2.3.5 ASU ....................................................................................................................... 2-18 2.3.6 ABB ....................................................................................................................... 2-20 2.3.7 ABA ....................................................................................................................... 2-21
2.4 Other Parts of the Cabinet ............................................................................................... 2-21 2.4.1 TDU ....................................................................................................................... 2-21 2.4.2 FMU....................................................................................................................... 2-23 2.4.3 Switch Box............................................................................................................. 2-24 2.4.4 Fan Box ................................................................................................................. 2-24 2.4.5 Air Box................................................................................................................... 2-25 2.5 Antenna and Feeder System ........................................................................................... 2-25 2.5.1 Antenna ................................................................................................................. 2-25 2.5.2 Feeder ................................................................................................................... 2-27 2.5.3 Lightning Arrester.................................................................................................. 2-27 2.5.4 Tower-top Amplifier (Optional) .............................................................................. 2-27 2.6 Power Supply System...................................................................................................... 2-28 2.6.1 Overview ............................................................................................................... 2-28 2.6.2 Overall Structure ................................................................................................... 2-30 2.6.3 Technical Specifications........................................................................................ 2-32 2.7 Environment Monitoring System...................................................................................... 2-36 2.7.1 Outlook of Environment Monitoring instrument..................................................... 2-36 2.7.2 Function Provided by Environment Monitoring Instrument ................................... 2-37 2.7.3 Environment Monitoring Instrument Inputs ........................................................... 2-37 2.7.4 Alarm Indicators .................................................................................................... 2-38 2.7.5 Executing Devices................................................................................................. 2-38 2.7.6 Communication ..................................................................................................... 2-39 2.8 Lightning Protection System ............................................................................................ 2-39 2.8.1 Lightning Protection for DC Power Supply............................................................ 2-40 2.8.2 Lightning Protection for AC Power Supply............................................................ 2-42 2.8.3 Lightning Protection for Trunk Cables................................................................... 2-43 Chapter 3 Software Architecture ................................................................................................. 3-1 3.1 Overview ............................................................................................................................ 3-1 3.2 Signaling Control Processing (SCP) Program................................................................... 3-2 3.3 Baseband Signal Processing Program .............................................................................. 3-4 3.4 Operation and Maintenance Program ............................................................................... 3-5 Chapter 4 External Interfaces....................................................................................................... 4-1 4.1 Abis Interface ..................................................................................................................... 4-1 4.1.1 Introduction.............................................................................................................. 4-1 4.1.2 Physical Layer ......................................................................................................... 4-6 4.1.3 Data Link Layer ....................................................................................................... 4-7 4.1.4 Layer 3 - Traffic Management ................................................................................. 4-8 4.1.5 Layer 3 - Operation and Maintenance .................................................................. 4-12 4.2 Um Interface .................................................................................................................... 4-14 4.2.1 Introduction............................................................................................................ 4-14 4.2.2 Interface Protocol Model ....................................................................................... 4-15 4.2.3 Physical Layer ....................................................................................................... 4-15
ii
4.2.4 Data Link Layer ..................................................................................................... 4-20 4.2.5 Signaling Layer...................................................................................................... 4-23 Chapter 5 Functions and Performance ....................................................................................... 5-1 5.1 Networking Functions ........................................................................................................ 5-1 5.1.1 E1 Networking ......................................................................................................... 5-1 5.1.2 SDH Networking...................................................................................................... 5-3 5.1.3 Networking for Satellite Transmission..................................................................... 5-4 5.2 Main RF Functions............................................................................................................. 5-6 5.3 Baseband Processing........................................................................................................ 5-8 5.3.1 Channel Types Supported ...................................................................................... 5-8 5.3.2 Channel Combinations Supported .......................................................................... 5-9 5.4 Signaling Processing ......................................................................................................... 5-9 5.5 Operation and Maintenance ............................................................................................ 5-12 5.5.1 Software Loading .................................................................................................. 5-12 5.5.2 Abis Interface Management .................................................................................. 5-13 5.5.3 Air Interface Management..................................................................................... 5-14 5.5.4 Testing Management ............................................................................................ 5-16 5.5.5 Status Management .............................................................................................. 5-16 5.5.6 Processing of Event Reports................................................................................. 5-17 5.5.7 Equipment Management ....................................................................................... 5-18 5.5.8 Site Configuration.................................................................................................. 5-20 5.5.9 Tracing Operations................................................................................................ 5-20 5.5.10 Miscellaneous Functions..................................................................................... 5-21 5.6 System Indices................................................................................................................. 5-21 5.7 Radio Interface Indices .................................................................................................... 5-23 5.7.1 Receiver Part......................................................................................................... 5-23 5.7.2 Transmitter Part..................................................................................................... 5-26 Chapter 6 Configuration and Typical Application...................................................................... 6-1 6.1 Configuration...................................................................................................................... 6-1 6.1.1 Cell Configuration.................................................................................................... 6-1 6.1.2 Configuration of the Common Resource Frame ..................................................... 6-2 6.1.3 Configuration of the TRX/CDU Frame .................................................................... 6-2 6.1.4 Configuration of the Antenna .................................................................................. 6-4 6.2 Typical Configuration ......................................................................................................... 6-4 6.2.1 S (4/4/4) Configuration ............................................................................................ 6-4 6.2.2 S (2/2/2) Configuration ............................................................................................ 6-6 6.2.3 O (6) Configuration.................................................................................................. 6-8 6.2.4 O (4) Configuration................................................................................................ 6-10 Appendix A Abbreviations ...........................................................................................................A-1
iii
M1800 BTS M900 BTS MS M900 BTS MSC: Mobile Switching Center HLR: Home Location Register AUC: AUthentication Center VLR: Visitor Location Register OMC BSC: Base Station Controller BTS: Base Transceiver Station MS: Mobile Station EIR: Equipment Identify Register SMC: Short Message Center VM: Voice Mailbox OMC: Operation/Maintenance Center HLR/AUC/EIR SMC&VM
Figure 1-1 Position of the BTSs in the GSM system A BTS connects with the BSC via the Abis interface. The air interface (Um interface), is used to realize the radio transmission between the BTS and the MS as well as the associated control functions. The BTS processes messages on layer 1, layer 2, and non-transparent transmission layer 3 on radio links and performs the related control functions, including:
z z z z
Interfacing with the BSC Radio channel management Operation and maintenance functions Signaling protocol functions
1-1
Expansion based on the inheritance of the investment: BTS expansion can make the utmost of all the antenna and feeder parts. Modular structure with good performance: RF combiner, divider and low noise amplifier are integrated in CDU (Combining and Distribution Unit). All parts for TRX processing including baseband processing, RF processing, power amplification and power supply are all integrated in one TRX (Transceiver unit). Modular structure can reduce internal cable connections, improve system reliability and facilitate installation and maintenance.
Intelligent CDU: Fine monitor and control function, excellent O&M, level 2 standing wave ratio alarm, low noise amplifier alarm, TTA (Tower Top Amplifier) alarm, TTA power supply. Auto protection against emergency: Close transmission power when transmit path antenna feeder is abnormal; power off to bypass LNA (Low Noise Amplifier) when TTA is abnormal so as to ensure normal system operation. Receive gain can be adjusted via remote control to ensure the sensitivity of the receive system.
RF hopping and baseband frequency hopping are provided to improve system anti-interference capability. It has good performance in practical application. Advanced digital RF technology is adopted to raise batch consistency, manufacture scalability and stability of the RF system.
APL (Advanced Phase Locking) technique solves the problem of clock jittery, by using high-precision clock and characteristic software phase lock technique. The problems such as SDH clock phase jittery, signal out of lock during transmission via satellite are solved.
1-2
With a tolerance of up to a bit error rate of 1E-4, i.e. 2 levels higher than the common 1E-6 bit error rate, a better and smooth voice quality can be obtained even in transmission through microwave, and satellite.
The system can tolerate a intermittent link failure of less than 2 seconds, which makes the BTS312 more suitable for applications in unstable conditions such as SDH transmission switching, microwave, satellite transmission etc.
Protection against long transmission delay on the Abis to support satellites networking.
Local end maintenance: provide man machine interface (MMI), and implement maintenance, monitoring and management to all objects of the BTS through the local end maintenance console.
Remote end maintenance: O&M network is made in the GSM system. The authorized user can use any workstation in the network via the remote maintenance console to perform remote O&M to BTS NEs in the system.
System state monitoring provides system running indices indication, resource state indication. Security management provides MS login authentication, command authority restriction, unsecured operation indication and user group management. Test: self-test of functions, loop-back test. Upgrade: automatically check the system for upgrade. System upgrading can be performed via remote loading. The system can be restored to its previous version if system upgrading fails.
z z
When configuring TRX, the nominal value of transmission power at the cabinet feeder port is 40W. When PBU (Power Boost Unit) is equipped, the nominal value of transmission power can reach 80W; When EDU (Enhanced Duplexer Unit) is adopted, the RF signal combining consumption can be reduced and the BTS coverage can be expanded.
Support dual timeslot expansion function (Theoretically, a maximum coverage of 120km can be supported).
1-3
It supports multiplexing of 15:1, hence greatly reducing transmission expenditure. Transmission equipment such as SDH is integrated, providing a solution for future upgrade and wideband radio access and reducing transmission equipment investment.
High reliability: Centralized power supply while providing power to various modules in a distributed way. BTS312 can provide DC +24V, DC -48V and AC 220V to satisfy different power supply requirement.
Mixed dual band plug-in of 900MHz and 1800MHz modules of 6 cells. GPRS (General Packet Radio Service), which helps to realize smooth evolution from 2G to 2.5G.
Multiple built-in transmission modes: 75 /E1, 120/E1 and SDH. The BTS has powerful transmission adaptability.
Abis
TDU
ABB&ABA
Um
CBUS/TBUS/DBUS
TTA
CDU
FHBUS
TTA
TRX
BSC
E1 Fiber(Optinal)
TTA
TTA
TMU
TRX
TEU TES
CDU
TTA
TTA
PSU
PMU FMU
Common Unit
TRX
CDU
As shown in Figure 1-2, the hardware of BTS312 includes the following three functional parts: common unit, carrier unit and antenna unit.
I. Common Unit
The common unit consists of the Timing/transmission and Management Unit (TMU), the Timing Distribution Unit (TDU), the Transmission Extension Unit (TEU), the Transmission Extension power Supply unit (TES), the Fan Monitor Unit (FMU), the Power Supply Unit (PSU), the Power Monitoring Unit (PMU), the switch box, the fan box and the air box.
z z z z z
TMU is the basic transmission and control function entity in a BTS TDU is installed on the top of the cabinet. TEU is an optional unit used for SDH transmission. TES is the power supply unit of TEU. FMU within the fan box controls the normal operation of fans and reports alarms in case of fan failure. PSU is the power supply unit for the whole system. PMU is the power monitoring unit. ABB is the Abis bypass board for the BTS312 in the chain networking. ABA is the Abis bypass assistant board. Switch box: distributed power supply is adopted to improve the reliability of power supply. Fan box: FMU is installed within the fan box. Air box is the inlet for the cool air. It is part of the cooling system to guarantee the normal operation of BTS.
z z z z z
z z
TRX is a software and hardware entity that performs all processing functions of one carrier. PBU is the output power booster of TRX. It also provides the function of alarm collection. CDU supports broadband hybrid combining. At the transmitting end, signals of 2 channels are combined into 1 (2-into-1), while at the receiving end signals from 2 channels are divided into 4 (or 8 in case of only one channel) channels.
EDU is a low-loss duplex divider unit which can achieve the transmitting and diversity receiving of signals for two TRXs. SCU fulfills 4-into-1 combining. It is used to save CDUs.
1-5
Radio interface signal processing unit, i.e., the Um interface media access layer running in the digital signal processing unit of the TRX module, Signaling processing unit, including radio resources management (RR), Abis interface link layer protocol (LAPD), Abis interface media access control layer, Um interface link layer protocol (LAPDm), etc. which run in the signaling processing unit of TRX module,
Operation and maintenance unit, including BTS fault management, performance management, configuration management, security management, data management, Abis interface transmission control and local man-machine interface, which run in the TMU unit.
BTS software also includes the programs handling the communication among various units in BTS.
MS CM MM BTS BSC
RR L3 L2 L1 LAPDm Sign. Layer 1 RR LAPDm Sign. Layer 1 BTSM LAPD Sign. Layer 1
RR BTSM
BSSAP SCCP
Um
Abis
CM: Connection Management MM: Mobility Management RR: Radio Resource Management BTSM: BTS Management BSSAP: Base Station Subsystem Application Part
LAPD: Link Access Protocol on D channel LAPDm: Link Access Protocol on Dm channel SCCP: Signaling Connection Control Part MTP: Message Transfer Part
Standard cabinet. Strong and simple structure. Aluminum alloys are used to reduce the cabinet's weight.
1-7
Good shielding effect and conductivity. Wind tunnels ensure good ventilation and heat dissipation. Simple and convenient installation and maintenance.
Support both 900MHz and 1800MHz frequency systems. Support EGSM/RGSM extended frequency band services. All data services prescribed in Phase II+. Support GPRS. Support Phase I/Phase II /Phase II+ compatible LAPDm protocol. Support Phase I/Phase II/Phase II+ compatible system message issuing and resources instruction. Support CS-1/CS-2/CS-3/CS-4 radio channel coding scheme. Support FR (Full Rate) / EFR (Enhanced Full Rate) / HR (Half Rate) and all kinds of speech coding scheme. Support broadcast short message and point-to-point short message. Support paging queue. Support A5/1, A5/2 encryption/decryption. Support basic data dynamic configuration. Support basic data dynamic configuration. Support measurement report preprocessing. Support Abis,10:1, 12:1 and 15:1signaling multiplexing. Support BCCH carrier cooperation. Support immediate assignment combination and paging combination, boosting the radio channel efficiency. Support discontinuous transmission (DTX) enhancing the anti-interference ability and reducing the power consumption. Support DRX. Support omni cell and directional cell. Support chain/tree/start/loop networking. Support locked, fast pull-in, holdover and free run clock modes. Support synchronous, asynchronous and quasi-synchronous handover. Support Um interface tracing and internal interface tracing. Support remote and local loading of software. Support dynamic and static power control. Support satellite transmission and Abis 16k signaling transmission. Support extended cell.
z z
z z z z z z z z z
z z z z z z z z z
1-8
Chapter 1
Support scanning uplink frequency band. Support Huaweis G-II power control algorithm. Support multi-cell (up to 12 cells) configuration. Support timeslot based baseband/RF frequency hopping. Support Class3 MS large power.
Support eight E1s and 12 antenna feeders. Support built-in optical transmission boards TEU and TES. Support 24 switching/digital inputs, 8 digital outputs and 8 analog inputs. Support cabinet combination. Support storage battery management. Support both M900 and M1800 modules. Support lightning protection at trunk ports, power supply ports and RF ports. Support E1 bypass after BTS power failure Support PBU (Power Boost Unit) and EDU (Enhanced Duplexer Unit). Support monitoring external power. The power monitoring module reports the alarm when there is no power input. Support the report of BTS bar code, software version and hardware version of part of the boards Support TMU self-correcting crystal oscillation central frequency. Support clock backup and master/slave clock handover. Support clock pull-in mode. Support E1/RF self-loop test.
z z z z
Power supply system 220V AC: 150 ~ 280V AC/45 ~ 65Hz -48V DC: -40 ~ -60V DC 24V DC: 19 ~ 29V DC
1-9
Transmitting power TRX output power: 40W (46dBm) or 60W (47.8dBm) TRX+PBU output power: 80W (49dBm)
1-10
2-1
RX
RX
RX
RX
CDU
CDU
AIR BOX
TX TX TX TX
RX
RX
RX
RX
CDU
CDU
FAN BOX
FAN BOX
TX
TX
TX
TX
RX
RX
RX
RX
CDU
CDU
P S U
P S U
P S U
P S U
P S U
P S U
P M U
T T TT T M M EE E U U SU U
AIR BOX
CDU: Combiner and Divider Unit PMU: Power supply Management Unit PSU: Power Supply Unit TEU: Transmission Extension Unit TRX: Transceiver TMU: Timing/Transmission Management Unit TES: Transmission Extension power Supply TDU: Timing Distribution Unit
2-2
2.2.1 CDU
I. General
CDU combines and filters the transmitted signals, filters, amplifies and distributes received signals. It also provides feed circuit for the tower-top amplifier through a bias-T circuit. Through bridge combing (broadband combing) used in BTS312, multiple TX and RX signals can be multiplexed on a single antenna unit. The 2 channels of transmitting signals are combined into 1 (2-into-1), while at the receiving end signals from 1 of the 2 channels are divided into 4 (or 8 in case of only one channel) channels. Each CDU provides a diversity receiving branch.
Tx signal input
Combiner
Rx signal output
Duplexer
Test coupler
Amp. feeder
Divider
Rx signal output
LNA
Divider
LNA
Rx filter
Amp. feeder
2-3
Besides the combining and dividing functions, CDU also has the following alarm detection functions:
z
VSWR (Voltage Standing Wave Ratio) monitoring: Monitoring the status of antenna system. When the detected VSWR exceeds the threshold 1.5:1, the CDU reports minor alarm and the corresponding indicator on the panel is on. When the VSWR exceeds the threshold 2.5:1, the CDU reports critical alarm, the corresponding indicator on the panel is on, and signal transmission will stop 1 minute later.
Low noise amplifier fault alarm: The fault signal is extracted from the power supply current of the low noise amplifier. When the current exceeds a certain level, alarm signals and indications are generated.
Tower-top amplifier alarm: When there is tower-top amplifier in service, the CDU determines the operation status of the amplifier according to its working current. If the current exceeds preset value or there is no current, alarm signal will be generated.
Control functions: Remotely control the low noise amplifier attenuation (dynamic control 15 levels, in steps of 1dB) both in the main receiving path and diversity receiving path, supply/cut the feeder depends on whether tower-top amplifier is equipped, cut the feeder to the amplifier in case of alarm.
Note: The input power of the CDU configured in BTS312 is 60W. When PBU is used, ECDU with large power should be configured.
2.2.2 EDU
I. General
EDU is a low-loss duplex and dividing unit aimed to solve the issue of wide coverage. It can perform the duplex function for two TRXs, the filtering of transmitted/received signals, low noise amplification, and dividing function. It also provides feeder to the tower-top amplifier. Each TRX uses its own antenna, so no combination of signals is needed. For received signals, 1-to-2 dividing is employed.
2-4
EDU
Tx signal input
Duplexer
Test coupler
Amp. feeder
Rx signal output
Divider Divider
Rx signal output
Tx signal input
Duplexer
Test coupler
Amp. feeder
Figure 2-3 Functional blocks of the EDU Besides the combining and dividing functions, the EDU also provides the following alarm detection functions:
z
VSWR (Voltage Standing Wave Ratio) monitoring: Monitoring the status of the antenna system. When the VSWR exceeds the threshold 2.5:1, the EDU reports alarm.
Low noise amplifier fault alarm: The status of the LNA can be determined based on the power supply current. When the current exceeds a certain level, alarm signals and indications are generated.
Tower-top amplifier alarm: When there is tower-top amplifier in service, EDU determines the operation status of the amplifier according to the working current of amplifier. If the current exceeds preset value or there is no current, alarm signal will be generated.
Control functions: Remotely control the low noise amplifier attenuation (dynamic control 15 levels, in steps of 1dB) both in the main receiving path and diversity receiving path, supply/cut feeder depends on whether tower-top amplifier is equipped, cut the feeder to the amplifier in case of alarm.
2.2.3 ECDU
The functions and external interfaces (including dimensions) of ECDU are the same as that of CDU. It implements combination of transmitted signals, dividing of received signals, and duplex functions. The difference is that the maximum power input of ECDU reaches 100W.
2-5
2.2.4 SCU
I. General
SCU combines the signals from 4 TRXs into 1 channel for transmission. It employs the electric bridge with 3dB power loss to achieve the broadband combing. Used together with CDU, it can achieve the combination of signals from multiple TRXs. The introduction of SCU is to reduce the number of CDUs, hence saving costs.
3 4
Combiner
2.2.5 TRX
I. General
TRX is the key part of the BTS which receives various types of management and configuration information issued by the TMU and reports its status and alarm information to the TMU. The TRX separates the received information from the mobile stations through demodulation and balancing into signaling and speech information, and transmits them upward (i.e. to BSC and MSC). The downlink signaling and speech information is sent to the CDU and the antenna after being processed by the TRX. With a modular structure, the TRX module contains both the baseband processing unit, and the radio frequency unit.
2-6
CBUS
PAU RCU
SCP: Signaling Processing Unit PAU: Power Amplifier Unit RPU: RF signal Processing Unit CBUS: Control Bus
DSP: Digital Signal Processing Unit CUI: Carrier Unit Interface RCU: Receiving Unit TDP: Transmitter Driver and PLL unit TBPU: TRX Baseband signal Processing Unit FH_BUS: Frequency Hopping Bus DBUS: Data Bus
Figure 2-5 Structure of the TRX unit 1) Baseband signal processing unit (TBU)
The TBU consists mainly of the Signaling Processing Unit (SCP), the Digital Signal Processing unit (DSP), and the Carrier Unit Interface (CUI). As the GSM system is a time division multiplexing system, the operation of the TRX relies on various clocks. So the TRX contains some clock processing logical units.
z
The SCP processes signaling protocols on different BTS interfaces, including the layer 2 protocol LAPDm with the mobile station (MS), the layer 2 protocol LAPD with the BSC interface, and the layer 2 protocol (DCL) with the operation & maintenance module (OMU), as well as layer 3 non-transparent messages. The SCP also handles DSP program loading and alarm processing of the whole TRX module.
z
The DSP performs such functions as signal encoding/decoding, signal demodulation, interleaving and de-interleaving, and speech/data communication with the TRAU. It sends the signaling received from the MS to the SCP, receives signaling sent from the SCP, and performs corresponding encoding/decoding according to related protocols. It sends the downlink data via the CUI to the carrier unit RPU.
z
2-7
The CUI is the interface between the DSP and the RPU. It supports baseband hopping, and according to system configuration can work in either hopping or non-hopping mode (when the system works in the RF hopping mode, the hopping interface works in non-hopping mode and the hopping functions are completed by the carrier unit). The CUI samples and filters the uplink intermediate frequency signals sent from the RPU, and sends them to the DSP for demodulation and combination.
z
The TRX extracts clocks sent from the TMU over the clock buses. To ensure the reliability, the clock buses work in active/standby mode. These clocks include the frame clock, the octet bit clock, and the frame number.
The clock processing part in the TRX first chooses either the active clock or the standby clock, then makes frequency division calculation and generates the timeslot number and bit clocks required by the local TRX. 2) Radio frequency signal processing unit (RPU)
The RPU consists of 3 parts: Receiving Unit (RCU), Transmitter Driver and PLL unit (TDP), and Power Amplification Unit (PAU).
z
The RCU provides diversity reception functions, that is, the receiver consists of two completely independent channels, and the input signals come from the main antenna and diversity antenna. In complicated radio transmission areas where one antenna receives very poor signal, the signal received from the other (diversity) antenna may be of a better quality. The BTS receives signals from both the main channel and the diversity channel, then handles demodulation after combination algorithms. It can provide 3~5dB diversity gain, thus improving the communication quality. Each receiving channel consists of down conversion circuits. The received signals are sent to the frequency mixer after filtering and amplification, so as to generate intermediate frequency signals, which after further filtering and amplification are directly sent to the baseband unit for digital demodulation processing.
z
This unit consists of 3 parts, transmitter excitation, frequency synthesizer, and PLL testing. Transmitter excitation unit directly modulates the I and Q signals sent from the baseband unit through the orthogonal modulator into the radio signals for transmission. This works rather simple and reliable.
2-8
Chapter 2
After modulation, the signal controlled by the APC provides the power amplifier unit (PAU) with a certain power level. The transmitter excitation unit also provides the dynamic and static power control at the base station. Static power control (the maximum transmission power of the base station) is specified during network planning. In contrast, dynamic power control is performed during communication. Static power control has 0~10 levels (level 0 is 46dBm), decrementing by 2dBm each level. Dynamic power control has 0~15 levels, decrementing by 2dBm each level. To reduce noise in the radio environment and improves the network capacity and service quality, the base station transmission power should be kept as low as possible as long as the communication quality can be ensured. So each traffic channel is kept at the lowest possible dynamic power level, with all idle channels transmission shut down. Moreover, transmitter excitation also provides the over-power alarm signal and under-power alarm signal of the TRX. When the TRX output power is 3dB higher than the specified level, over-power alarm will be generated. When the TRX output power is 3dB lower than the specified level, under-power alarm will be generated. Frequency synthesizer is the essential part of the whole transceiver. It generates various local oscillation for the up/down frequency conversions, such as transmitter local oscillation, receiver local oscillation, and PLL test local oscillation. Each of the transmitter local oscillation and receiver local oscillation has two loops to achieve hopping loop switchover. PLL testing is designed for TRX loopback testing. It attenuates part of the signals coupled by the power amplifier output into the receiving frequency band through frequency conversion, then sends them to the receiver after coupling. It is used to check the TRX transmit channel and the receive channel.
z
The PAU mainly performs radio signal amplification. Its maximum output power level can be 46dBm or 47.8dBm. It also provides feed sampling signals controlled by the transmitter APC, and the following alarm information:
z
Over-temperature alarm, when the temperature of the power amplifier exceeds 85C, the power amplifier unit reports the high-temperature alarm via the baseband unit, and automatically turns off the power amplifier.
Over standing wave alarm, when the standing wave at the power amplifier output end exceeds 3.5, it reports standing wave alarm to the baseband unit.
III. Interface
External interfaces of the TRX module includes:
2-9
CBUS2: the interface between the TRX and the TMU. The TMU performs management and maintenance on the TRX module through the CBUS. DBUS1, DBUS2: the switching functions of TMU switch the DBUS of the TRX to the Abis interface. The uplink and downlink signaling processed by the SCP and the uplink and downlink speech data processed by the DSP are all transmitted through the DBUS. TIMING_BUS: it receives the frame clock and 1/8-bit clock as well as frame number of the TDU, and obtains the various clock signals required by the TBU board through the clock unit interface. FH_BUS: used to transmit hopping data between TRX modules when the BTS is in the baseband hopping mode. Radio interface: the TRX radio interface has 1 transmit terminal and 2 receive terminals. The function of the 2 receive terminals is the main reception and diversity reception. The TRX radio interfaces are connected to the CDU. Panel display: on the panel, there are 4 LED indicators, from top to bottom they are power supply indicator, SCP running indicator, DSP running indicator, and fault indicator.
IV. Indices
Power supply: +26V DC. Average power consumption: 150W approximately.
2.2.6 PBU
I. General
The Power Booster Unit (PBU) is a kind of TRX output power amplifier aimed to solve the problem of wide coverage. It can enhance the Effective Radiation Power (ERP) of the antenna and enlarge the coverage area of a BTS. The maximum output power of the PBU reaches 49!1dBm. The PBU comprises the power synthesizer module, the alarm management module and the power supply module. It can amplify the output power of 1 TRX.
2-10
Amp. & phase control 26V Power module 26V 8V 26V 8V Alarm output Couple Output
Power Synthesizer Module Power amplify control Control signal generation Alarm collection Alarm collect & output Alarm Management Module
PBU
Figure 2-6 Functional blocks of PBU The PBU couples the 40W power signals output from the TRX into main channel signals and coupled channel signals. The main channel signals, after delay filtering, enter the power synthesizer unit. The coupled channel signals are amplified into 60W signals before being sent to the power synthesizer unit. To obtain final combined signals, amplitude and phase control will be conducted on the 2 channels of input signals. The generation of control signals and the collecting/reporting of alarms are completed by the alarm management module. While the coupling, controlling and synthesizing of power signals are performed by the power synthesizer module. 1) Power synthesizer module
Under the control of alarm management module, the power synthesizer module amplifies TRX output signals, and at the same time provides power control and alarm information, and alarm signals to the alarm management module, which detects power amplification functionality and reports alarms. 2) Alarm management module
The alarm management module receives from the power synthesizer module the power control and alarm information, and alarm signals. It is responsible for the detection of power amplification functionality and the control over amplitude and phase. It also reports the relevant alarms. 3) Power supply module
The power supply module supplies power to the power synthesizer module and the alarm management module.
2-11
2.3.1 PSU
PSU is a built in power supply module. Depending on the power supply mode, BTS312 uses the power supply module of different models. When 220V AC is adopted, the BTS uses the power supply module with 220V AC input and +26V DC output. When +48V DC is adopted, it uses the module with +48V DC input and +26V DC output. When +24V DC is used, no power supply module is needed. One PCU can supply power to two TRXs in N+1 flow-equalization hot-standby mode. The working current of the module is 25A.
Note: For detailed descriptions, please refer to section 2.6, "Power Supply System".
2.3.2 PMU
I. General
PMU (Power Monitoring Unit) is close to the power supply module, managing the power supply of the module. There are two types of PMUs: PMU for the DC/DC module and PMU for the AC/DC module. The main difference between these two is the battery management function. To reduce work load, both the AC/DC module and the DC/DC module share one monitoring board.
II. Functions
Following describes the AC/DC module monitoring board. 1)
z
Control Switch on/off of the power module (remote control available), with an output signal of 12V/10mA Floating/equalizing charge of battery and current limit control
2-12
Connect/disconnect control of battery protection load, with a 230.5V output low-voltage alarm, loading power-on/off condition Switch signals AC mains on/off signal and high-/low-voltage signal (12V/10mA) Four fault status parameters (12V/10mA) provided to the monitoring board by 4 AC/DC modules Fan monitoring status parameters (normally, 12V/10mA) Fuse on/off status parameters of external battery (-0.3V<normal voltage difference <0.3V) Current and voltage analog signals Battery group current (A) Total load current (A) Busbar voltage (V) Panel design
2)
z z
z z
3)
z z z
4)
PMU normal running indicator RUN: A green indicator flashes once per 500ms when the monitoring module runs normally, it remains off or on when the system monitoring module does not work). System fault alarm indicator ALM: 1 red indicator. 5) Description of interface setting
The monitoring board provides one RS485 port to report monitoring information to TMU. The illustration of the monitoring by the PMU is shown in Figure 2-7.
AC power supply
AC/DC
AC/DC
...
AC/DC
Load
Fan
PMU
Fuse
Battery
2-13
2.3.3 TMU
I. General
TMU is located in the common frame of M900/M1800 BTS312. It is the timing, transmission and management function entity of BTS312. It has the following main functions:
z
Provides channel multiplexing and flexible networking modes (including star-, tree-, and chain- connections). Provides Man-Machine Interfaces (MMI) and operation & maintenance links for software loading, fault management, configuration management, performance management and security management, etc.
Provides centralized BTS clock and its management, and clock hot standby function. Provides alarm signal input ports, and handles external alarm collection and control.
Two TMUs can be configured in the basic cabinet, providing clock source in hot standby mode and serving to increase the number of E1 interfaces (each TMU provides 4 E1 interfaces). In combined cabinet configurations, TMU boards are configured in the basic cabinet only.
DBUS BIU
Maintenance Terminal
MMI
OMU
CBUS
EAC
MCK
MCK
TDU
BSC: Base Station Control BIU: Base Station Interface Unit EAC: External Alarm Collector CBUS: Control Bus
TBUS
TMU: Timing/Transmission and Management Unit OMU: Operation and Maintenance Unit TDU: Timing Distribution Unit MCK: Main Clock module DBUS: Data Bus TBUS: Timing Bus
2-14
1)
The BIU handles conversion and reconversion between digital signals of the BTS internal HWs and the HDB3 codes (on E1 lines). It switches timeslots on HW to achieve flexible timeslot configuration, extracts superior clock signals, supports external clock input, and outputs accurate clock signals through phase locking and frequency division. It synchronizes internal bus data transmission, or generates free-run clock signals when superior clocks are not available (due to E1 line or BSC fault) to synchronize internal bus data transmission, and generates alarm and reports them to OMU. One BIU module can support a maximum of 4 E1 lines. The BIU modules on the two TMU boards in one cabinet can be mutually extended, and the data on the 8 mutually extended E1 lines can be freely switched. The E1 interfaces on the BIU module can be respectively connected to the BSC or to the higher/lower level BTS to complete star, tree, and chain connections. 2) Operation and maintenance unit (OMU)
The OMU module is the core control and processing center of the TMU. Through the OMU, performance parameters of various BIU and MCK units can be directly configured. The OMU receives fault alarms, handles fault management, and communicates via internal control buses with the CPU of various units (TRX, CDU, PMU, TES, etc.) in the BTS, so as to complete the operation and maintenance of the whole system. It collectively loads and saves the software of various BTS units before loading software for each unit according to demands. Moreover, it supports the Man-Machine Interface (MMI) connecting to the PC. The Flash memory of the OMU module can store two different versions of BTS software. One is the software currently used by the BTS and the other one is the previous BTS software. It can load either version according to the requirements to each board. When the software on the BTS needs to be upgraded, the new version can be loaded from the BSC through OML and saved on the OMU to replace the old version. Meanwhile, the OMU keeps the original software version of the BTS as a backup, in case the loading should fail. 3) Main clock module (MCK)
The MCK is configured with an OCXO (oven controlled crystal oscillator) compliant with the stratum 3 A standard, and phase-locking and frequency-division circuits. According to system configuration, the MCK can work in the free-run mode or software phase-locked mode to output a reference clock SREF with a stability better
2-15
than 5x10-8. Moreover, it can provide the frame clock FCLK used by radio interfaces, the octet bit clock OBCLK, and the frame number (FN). The clock source of a synchronous cell is provided by the MCKs on the two TMU boards in the basic cabinet of the basic cabinet group. The MCK modules on the two boards work in hot standby mode. Switchover is made automatically in case of active board failure, which will be reported to the OMU. 4) External alarm collector (EAC)
The EAC collects the alarm signals from environment monitors, including 8 inputs of digital signals for fire, smog, (high/low) temperature, humidity, water, BTS room door control (open/closed), cabinet door control (open/closed), and air-conditioning alarms. For expansion, the EAC also reserves 16 input channels for digital signals, 8 input channels for analog signals and 8 output channels for digital signals. The collected alarm signals are reported to the OMU.
III. Interfaces
Abis interface: A TMU provides 4 E1 interfaces. 2 TMU boards can provide up to 8 E1 interfaces for connection with the BSC or other BTS (corresponding to different configuration modes of the BTS). Internal data bus DBUS: provides two 32-timeslot TDMA buses (i.e. DBUS1 and DBUS2) and corresponding clock signals, connecting the TRXs of one cabinet group, and transmitting traffic and signaling data of TRXs. When there are less than 10 TRXs in one cabinet group, 2 buses can work in the active/standby mode. Internal control bus CBUS: The communication between TMUs is implemented through CBUS1, and that between TMU and TRX is implemented through CBUS2. CBUS3 is responsible for the communication between TMU and low-rate control parts like CDU, PMU and TES, and between TMU and external monitors. For details, refer to Figure 2-8. Internal clock bus TIMING_BUS: provides clocks (frame synchronization clock FCLK, octet bit clock OBCLK) and frame No. (FN) required by radio interfaces for all TRXs in the synchronous cell, and the highly accurate reference clock SREF for the radio frequency processing unit. Alarm input interface EAC: provides 24 digital signal inputs, 8 analog signal inputs and 8 digital signal outputs. Among them, the 8 digital signal inputs are external environment alarm inputs, while the remaining 16 digital signal inputs, 8 analog signal inputs and 8 digital signal outputs are reserved for user extension. Man machine interface: a standard asynchronous serial port or network port, it completes the communication with PC, enabling the operation personnel to perform various operations locally.
2-16
External synchronization clock interface: inputs highly accurate 2MHz clock compliant with G.703 wave forms, which is used as the frequency reference of E1 and system data buses.
IV. Indices
Board size: 280mm233mm. Power supply: +26V DC. Average power consumption: 15W.
2.3.4 TES
TES provides TEU with various types of working power supplies and handles communication transfer. It provides +5V and -5V power and ringing current, so that TEU board can work normally to perform transmission network functions, thus realizing base station built-in transmission. TES can communicate with TEU and TMU to achieve information reporting from TEU to TMU.
I. Functions
The TES board has the main functions as follows:
z z z
Provides the transmission board with DC power supply, including +5V and -5V. Achieves the communication between TMU and TEU. Provides transmission board with ring current, the ringing current signal is the 75V/25Hz sine wave AC signals.
II. Structure
The structure of the TES unit is shown in Figure 2-9.
+26 V input To the 1st TEU To the 2nd TEU To two TEUs simultaneously To two TEUs simultaneously
1st +5V output 2nd +5V output -5 V output Ringing current output
Communication module
Figure 2-9 TES structure
2-17
1)
The power supply module of the TES board includes two parts, the DC/DC conversion circuit and the DC/AC conversion circuit. The DC/DC conversion circuit converts two +24V DC supplies into +5V DC and one +24V DC supply into 5V DC. The DC/AC conversion circuit converts +24V DC into 75V AC ringing current. The ringing current is featured by high performance ringing current signal sources, sine wave output, low distortion, light weight, and high power density. Its output voltage is 75V AC, and its output current is 40mA, with a standard tone of 25Hz.
Note:
Figure 2-9 shows that TES can provide power for 2 TEU boards. So one TEU board can be configured in the 6 carrier cabinets of M900/ M1800 BTS312, and two TEU boards in 12 carrier cabinets.
2)
Communication module
The main function of the communication module is to handle the communication between TES and TMU, between TES and TEU, and to acquire the PCB version No. and cabinet No. of the TES board. The serial port communication between TES and TMU is implemented through RS485 standard. TES is connected with CBUS3 via the level conversion circuit. The serial port communication between TES and TEU adopts the point-to-point mode, with the serial port level as the TTL level. Communication with TMU mainly includes reporting transmission network information and transmission board information from TEU to TMU, as well as reporting TES board status information to TMU. Communication with TEU is mainly to acquire transmission network and base station transmission board information.
III. Indices
The board's size is 280mm233mm, occupying one standard board position.
2.3.5 ASU
Due to the complexity of network, the base station is required to support multiple external interfaces and flexible networking modes. Besides the E1 interfaces, M900/M1800 BTS312 also has the built-in transmission system. It supports the 155M SDH optical interfaces. All these interfaces are provided
2-18
by TEU. The built-in transmission system makes product networking more flexible and saves user's investment on transmission equipment. ASU board is used in SDH transmission network.
I. Basic features
ASU uses Huawei-developed ASIC transmission chips, so the system has an high performance/price ratio and stability. One board integrates all the functions of standard SDH transmission equipment including double STM-1 optical interfaces, 8 E1 electrical interfaces, full cross capabilities, 3 necessary clock phase-lock working modes, orderwire, RS232 transparent transmission serial ports, and Ethernet interfaces. The ASU board provides 4 E1 interfaces with re-timing functions. When users want to use this function (e.g., in the case when GSM and DDN have very high requirements on clock precision), this can be set through network management. Meanwhile, in application cases such as the GSM base station and private networks, the user can be provided with 64kbit/s sub-rate cross functions between the first 4 E1 so that maximum utilization of transmission resources are achieved.
II. Functions
The ASU SDH optical synchronous transmission system is standard STM-1 transmission equipment. Based on the existing sound technologies of Huawei SBS155/622 products, it is fully compatible with the existing SBS155/622 products. According to networking requirements, it can be configured as a Terminal Multiplexer (TM), Add/Drop Multiplexer (ADM) or regenerator (REG). It can be used to form ring-, chain-, and point-to-point network topological structures. It can also be combined with Huawei SBS155/622H and SBS155/622B products to form complex networking structures so as to enhance network performance and provide powerful services protection functions (channel protection or multiplexing segment protection solutions are optional). It is a cost-effective optical transmission device built in BTS. The ASU has inherited merits of powerful network management capacity and convenient operations from Huawei's standard transmission equipment. It uses the same set of network management system as all the Huawei SBS series of SDH optical transmission equipment. It can completely meet the OAM & P function specified in ITU recommendations.
III. Interfaces
ASU provides the following interfaces:
z z
Line optical interfaces: 2 (interface type: SC/PC interface) Electrical interface: 4~8 (E1/T1)
2-19
Orderwire: 1 Ethernet interface: 1 User RS232 port (point to point): 1 Network management interface: Ethernet/RS232
2.3.6 ABB
I. General
In practice, chain networking is usually adopted in BSS networking. This networking mode has the advantage of simple structure and low cost, but also it has the disadvantage that when power failure occurs at a site, all services of the downstream sites will be interrupted. ABB provides of Abis interface bypass function as a solution to the problem above.
II. Functions
ABB is applied in the environment of BTS chain networking. It is in charge of the BTS transmission trunk. When power failure occurs at a certain level (in the middle) of BTS in the chain networking, ABB will bypass the Abis transmission line off this site, and directly connect it to the downstream BTS. In this way, even if power failure occurs at the middle level site in chain networking environment, the services of the downstream site will not be affected. See Figure 2-10.
BSC
ABB TMU
ABB TMU
ABB TMU
Site1
Site2
Site3
Figure 2-10 ABB working principle ABB can also perform loop back at the transmission line, so that in the case of power failure at the last level BTS, ABB will loop back the E1 signal for BSC to detect the quality of the entire transmission link.
2-20
2.3.7 ABA
I. General
ABA realizes the communication between ABB and TMU. ABB communicates with TMU via CBUS3. But the slot of ABB does not provide the connection with CBUS3. Therefore, ABA is used to provide the connection between them. Via ABA, part of the signals from ABB (e.g. the signals of ABA on position) can be transmitted to CBUS3 on the backplane of common resource frame.
In the simplex RS485 bus structure, it distributes the clocks generated by the active TMU in the basic cabinet to various extension cabinets, The clock signal process is shown in Figure 2-11.
A-bis
TMU
TDU
2-21
The TDU of each cabinet is connected to the bus. After receiving clock signals, it transfers them to the TRX in the local cabinet. The TDU of the last cabinet is connected to an adapter. All the TDUs form a chrysanthemum ring of a clock bus, as shown in Figure 2-12.
C D U C D U C D U
C T T T T D R R R R U X X X X C T T T T D R R R R U X X X X T T T T C D R R R R U X X X X
P M
C D U C D U C D U
C D U C D U
T T T T
R R R R
X X X X T T T T
R R R R
X X X X
T T T T C D R R R R U X X X X
P T M M
T
M
PSU
PSU
U U U
Extension Cabinet
Basic Cabinet
Figure 2-12 Clock bus connection in a synchronous cell 2) Data Bus (DBUS)
DBUS is for the data connection between TMU and TRX. Each TMU provides 2 full duplex DBUS link and TRX connection, called DBUS1 and DBUS2. The physical feature of DBUS is differential RS485, TDMA synchronous bus and distribution of 32 timeslots is similar to that of PCM. The active TMU has DBUS connections to each TRX in the same cabinet. The active and standby links are led from the main cabinet to the 24 TRXs in the local cabinet group. There is no DBUS connection between cabinet groups. 3) Control Bus (CBUS)
CBUS1 is for the communication between the TMUs of this same site. It adopts RS485 semi-duplex bus, asynchronous transmission. The link layer conforms to HDLC protocol. The bus rate is 256 kbit/s. Since only the PCM link in main cabinet group has the operation and maintenance signaling of BTS. The master TMU in main cabinet group is to send the operation and maintenance signaling to the slave TMUs in the two extension cabinet groups. CBUS2 is for the control link between TMU and TRX.
2-22
The physical feature is differential RS485 interface, semi-duplex bus. The link layer conforms to HDLC protocol. The bus rate is 2 M. The 2 M clock of DBUS is used as the clock of CBUS2. There is no CBUS2 connection between cabinet groups. CBUS3 is for the connection between TMU and some low rate control parts, such as CDU, PMU and environmental monitoring instruments. The physical feature is differential RS485 interface. The link layer conforms to DLC protocol, differential transmission and master/slave communication. The bus rate is 9.6 kbit/s. There is no CBUS3 connection between cabinet groups. 4) Frequency Hopping Bus (FHBUS)
FHBUS is used in baseband FH. FHBUS physically shares the same cable with CBUS2, CBUS3 and DBUS. The difference is that FHBUS connects only to TRX. FHBUS is an 8 bit parallel bus, semi-duplex, and conforms to RS-485 criteria. FHBUS is for the connection between all TRXs in the same cabinet group (for BTS312, at most 24). There is no FHBUS connection between cabinet groups. Transfers E1 signals in the local cabinet TMU provides 4 sets of identical circuits E1 for lines. Plus the 4 E1 lines on the standby TMU board, there are altogether 8 E1 signals that are transmitted on the coaxial cable to each cabinet top where the TDU sends them via coaxial cable to BSC. Provides alarm channels Inputs of 8 external and 16 extended digital alarm signals and 8 analog alarm signals, as well as outputs of 8 digital control signals, are sent via the TDU to the TMU board and the environment alarm box. The input of the DC alarm signals of fuses and output of DC contactor control signals are also sent via the TDU to the PMU of this cabinet.
2.4.2 FMU
FMU is in the fan box, used to control the fans. The small size of the base station cabinet sets higher requirements for heat dissipation. A perfect heat dissipation design should include air tunnels (mainly related to structure), expected dissipation amount (mainly related to circuit working temperature, environment temperature, system total power and efficiency), original calculation of system heat (simulation makes better result if tools are available), fan type, fan monitoring unit, and system heat design testing and verification, etc. The functions and circuits of FMU are based on the fan type, specific fan control requirements and control modes, as well as the specific system heat design.
2-23
This part of circuit consists of power supply filtering and power supply voltage dropping. It completes the processing works from system power supply to the working power supply needed by fans, and provides feed to the fans. 2) Fan speed control
It controls the fan speed so that the fan can maintain a constant rotation speed, meeting the system heat design requirements. 3) Alarm detection
Fan faults have 2 types, blocking and short-circuiting, both may stop fan running. The FMU monitors the fan rotation speed, and determines the fan status (normal or faulty). If fault is detected, alarm will be reported to the PMU. 4) Interfaces
The FMU provides the following ports: fan 24V power supply input port, fan box power supply input port, and fan fault alarm terminal, which outputs low levels in case of fan failure.
2-24
Cabinet
2.5.1 Antenna
The antenna is the terminal of transmitting and the start of receiving. Antenna gain, coverage pattern (including azimuth angle, pitch angle and declination angle), and front/back ratio will affect system performance. A network planner sets these parameters according to network requirements.
I. Antenna gain
Antenna gain indicates the antenna feature of electromagnetic radiation in specific directions. Normally, the higher the gain, the stronger the field strength in the main beam radiation direction (which means a larger coverage area), but nearby blind area might occur.
2-25
Chapter 2
III. Polarization
Polarization is used to describe the direction of electric field. Mobile communication antennas include single polarization antennas and dual polarization antennas. For the later antennas, two antenna's polarization directions are vertical to each other. So using of dual polarization antennas can reduce the number of antennas needed.
IV. Diversity
Radio communication is much more complex than fixed line communication because of electromagnetic wave propagation. In urban areas, the propagation of electromagnetic waves has the following features:
z
The average value of field strength varies slowly with distance and time. Such variation abides by the logarithmic normal distribution. This is called slow fading. The instantaneous value of field strength presents a selective fading along transmission paths due to multi-path transmission. Its fading pattern abides by the Rayleigh distribution. This is called fast fading.
Either fast fading or slow fading will affect the quality of mobile communications, or even lead to communication interruption. The diversity receiving technology is one of the most effective ways to deal with fast fading. Two receiving signals from two different antennas effectively decrease the fading effect. Diversity includes polarization diversity and space diversity. In existing mobile communication systems, either the space diversity or polarization diversity can be used. Theoretical inferences show that in case of space diversity, when the distance between two antennas is greater than 10 wavelengths, desirable diversity gain can be obtained. Polarization diversity enjoys the advantage of convenient antenna installation and space saving and is more widely used nowadays.
2-26
V. Antenna spacing
To reduce interference on the receivers, enough spacing should be reserved between receiving and transmitting antennas. Spacing is determined by the out-band noise of the transmitter and receiver sensitivity. In the GSM system, the antenna spacing should be greater than 30dB.
2.5.2 Feeder
To reduce transmission loss, the base station uses low loss RF cables. There are several types of main feeders available, including 7/8-inch and 5/4-inch. 1/2-inch super-flexible jumpers are used between the antenna and the main feeder, between the antenna and the tower-top amplifier, and between the cabinet and the lightning arrester.
2-27
Besides, the tower-top amplifier also has the by-pass function in case of DC power failure. The DC power supply of tower-top amplifier is fed through the center conductor of the receiving feeder by the CDU. Since it is an outdoor device, a reliable waterproof sealing is required. The tower-top amplifier can operate under -40oC ~ +70oC.
Triplex tower-top amplifier Transmitting filter BTS By-path Bias-T
Receiving filter
Receiving filter
2-28
centralized anti-lightning protection, and AC and DC power distribution. That is, each cabinet should have its own power supply system. The power supply monitoring board installed on each cabinet monitors its own power supply module and part of environment parameters inside the cabinet, and reports them to TMU via general monitoring bus to realize the management and monitoring of the power supply. The AC and DC inputs of the system has the following 3 modes, among them only one can be selected: 220V AC: Used for the AC power supply cabinet, with the AC/DC module and batteries attached. -48V DC: Used for the DC power supply cabinet with the DC/DC module, no battery attached. +24V DC: Used for the DC power supply cabinet, without AC/DC module or DC/DC module, nor any battery. The power supply input goes through the AC EMI filter or DC EMI filter to the wiring terminals on the top of the cabinet, then to the backplane busbars in the common frame. 220V AC and -48V DC are input to different sockets from the backplane busbar, so as to avoid mistaken insertion. No matter whether it is the 220V AC power distribution, -48V DC power distribution solution, or the +24V power distribution, their outputs are all collected to the output busbars of the power supply backplane. Then, the +26V DC is led out from the busbar, along the cabinet wiring trough to the copper bar of the distribution box. The +26V DC input from the battery is connected to the current diverter on the power supply backplane, and then distributed through the distribution copper bar in the distribution box to various power-consuming modules. They are respectively led out from the distribution copper bar, passing the over-current protection devices set separately for each power-consuming unit in the distribution box, and then connected to the outlet terminals on the backplane of the distribution box. When the power to a unit is cut due to over-current, other units will not be affected. The illustration of the entire power supply system is as shown in Figure 2-15.
2-29
220V AC IN -48V DC IN
Load
...
EMI filter
26V DC OUT
DC contactor
Battery group
Fuse
2-30
AC input anti-lightning power distribution unit A1441Z Input bus 220V AC input
PSU
PSU
PMU
288mm60.96mm266.7mm. The structure of the DC/DC power supply system is shown in Figure 2-17.
2-31
PSU
PSU
PMU
Input mode: two single-phase 3-line inputs, with two active/standby AC inputs (automatic switchover)
z z
2)
Rating voltage: AC150~280V/45~65Hz Rating current: 16A High-/low-voltage protection AC input low-voltage protection: 1453V AC AC input low-voltage recovery: 1553V AC AC input high-voltage protection: 2803V AC
3)
z z z
2-32
Chapter 2
AC input high-voltage recovery: 2653V AC Anti-lightning indices Max. through-flow: 40kA, once, 8/20s impact current wave Rating through-flow: 20kA, 20 times, 8/20s impact current wave
4)
z z
Working temperature: -5~45C Storage temperature (not installed): -40~70C Atmospheric pressure: 70~106kpa Relative humidity: 15%~85% Input voltage: 150~280V AC /45~65Hz Input low-voltage protection point: 1455V AC Input low-voltage recovery point: 1655V AC Input high-voltage protection point: 2905V AC Input high-voltage recovery point: 2755V AC Output voltage range: 20.0~30.0V DC Floating charge voltage: 26.80.2V DC Equalizing charge voltage: 28.30.2V DC Output high-voltage protection point: 30.50.5V DC Input low-voltage protection point: 12~14.5A DC output rating current: 25A Output current limiting point: 26.2~27.5A Voltage stabilizing precision: 1% Load adjustment rate: 0.5% Voltage adjustment rate: 0. % Output noise voltage Weighted phone noise voltage: 2.0mV Broadband noise voltage: 30mV (3.4kHz~30MHz) Peak-peak value noise voltage: 200mV Discrete noise voltage: 5mV (3.4kHz~150kHz) 3mV (150kHz~200kHz) 2mV (200kHz~500kHz)
2-33
Chapter 2
1mV (500kHz~30MHz)
z z
Power supply efficiency: 86% Dynamic performance Load effect recovery time: 200s 25%~50%~25% load fluctuation 50%~75%~59% load fluctuation Load effect output over-adjustment: 5%
z z z z
Sound: 50dB Power on/off over-impact range: 10% Startup delay: 3~8s Safety requirements Input-housing, input-output, and output-housing insulation resistance: 2M Test condition: Ambient temperature: 20C Relative humidity: 90% Voltage: 500V DC
Insulation strength AC-earth and AC-DC insulation can endure 50Hz 1500V (valid value) AC for one minute without any breakdown or flashover, and the current leakage is no more than 30mA. DC-earth insulation can endure 50Hz 500V (valid value) AC for one minute without any breakdown or flashover, and the current leakage is no more than 10mA. Radiation and interference At 10kHz-1000MHz, the conduction interference level on the power cable of the tested power supply equipment is smaller than the maximum value of Class A in Table 1 of GB 6833.10. Reliability MTBF: 510 h
4
High temperature endurance Burn-in test shows that after the power system works in full load for consecutive 4 hours in a high ambient temperature of 402C, its technical indices are still in normal range.
Working temperature: -5~45C Storage temperature (not installed): -40~70C Atmospheric pressure: 70~106kpa
2-34
Chapter 2
Relative humidity: 15%~85% Input voltage: -40~ -60V DC Input low-voltage protection point: -360.5V DC Input low-voltage recovery point: -390.5V DC Input high-voltage protection point: -630.5V DC Input high-voltage recovery point: -610.5V DC Range of output voltage: 20.0V DC~30.0V DC Output voltage: 26.8V DC0.2V DC Output high-voltage protection point: 30.50.5V DC DC output rating current: 25A Output current limiting point: 26.2~27.5A Voltage stabilizing precision: 1% Load adjustment rate: 0.5% Voltage adjustment rate: 0.1% Output noise voltage Weighted phone noise voltage: 2mV Broadband noise voltage: 30mV (3.4kHz~30MHz) Peak-peak value noise voltage: 200mV Discrete noise voltage: 5mV (3.4~150kHz) 3mV (150~200kHz) 2mV (200~500kHz) 1mV (0.5~30MHz)
z z
Power supply efficiency: 86% Dynamic performance Load effect recovery time: 200s 25%~50%~25% load fluctuation 50%~75%~59% load fluctuation Output over-adjustment: 5%
z z
Startup delay: 3~8s Safety requirements Input-housing, input-output, and output-housing insulation resistance: 2M Test condition: Ambient temperature: 205C Relative humidity: 90% Experimental voltage: 500VDC
Insulation strength
2-35
Chapter 2
Input-output, input-housing, and output-housing insulation can endure 750V DC for one minute without any breakdown or flashover, and the current leakage is no more than 10mA.
z
Radiation and interference At 10kHz-1000MHz, the conduction interference level on the power line of the tested power equipment is smaller than the maximum value of Class A in Table 1 of GB 6833.10. Reliability Mean Time Between Failures (MTBF): 510 h.
4
High temperature endurance Burn-in test shows that after the power system works in full load for continuously 4 hours in a high ambient temperature of 452C, its technical indices are still in normal range.
Length (L) x Width (W) x High (H) = 390mmx270mmx55mm. The outlook of the environment monitoring instrument is shown in Figure 2-18.
Realtime display of temperature and humidity Time display Generating alarms including fire, smog, temperature, humidity, water and 3 kinds of burglar alarms A panel control keyboard 10 switch parameter inputs (opto-electrical isolation) 6 relays (maximum 5A/220V) to drive external executors 2 PWM (pulse width modulation) outputs (8-bit resolution, with a basic clock 500kHz) Driving of 7 independent open-collector gates (absorbing current: 300mA) Capable of communicating with TMU via the RS422 port
z z z z
z z
Temperature: frequency-type temperature and humidity transducer Humidity: frequency-type temperature and humidity transducer Smog: Ion type smoke sensitive probe or opto-electrical type smoke sensitive probe
2-37
Flame (optional): fire probe or high temperature difference sensitive probe Anti-burglary detection: infrared detector, opto-electrical detector, and magnetic sensor Other sensor inputs: besides the quantitative temperature and humidity signal parameters, the above sensor input signals can be extended into 10 switch parameters
Fire alarm: fire alarm is determined by the high temperature and smog probe Smog alarm: smog sensor timeout alarm Temperature upper limit: an alarm is generated when the environment temperature exceeds the set temperature limit Temperature lower limit: an alarm is generated when the environment temperature is lower than the set temperature limit Abnormal humidity: an alarm is generated when the environment humidity goes beyond the normal range between the upper and lower limits Water: the alarm is generated when water is detected Air-conditioning: an alarm is generated in case of failure of air-conditioning equipment. Opto-electrical: used for anti-burglary purpose, the alarm is generated when the opto-electrical switch is triggered. Infrared: used for anti-burglary purpose, the alarm is generated when the infrared sensor detects outputs. Access control: used for anti-burglary purpose, the alarm is generated when the magnetic access control switch is triggered.
z z
If there are multiple input signal channels for the same kind of sensor, alarm in any channel will be regarded as the same kind of alarm, regardless of the specific channel sending the alarm. Except temperature and humidity sensors, all other sensors can be extended up to 10 channels at the most.
Relay A starts the cooling devices, activated when the temperature exceeds the set upper limit.
2-38
Relay B starts the heater, activated when the temperature drops lower than the set lower limit. Relay C starts the desiccator, activated when the humidity exceeds the set upper limit. Relay D starts the moistener, and is activated when the humidity is lower than the set lower limit. Relay E starts the fire-extinguisher, activated when the fire alarm is given. Relay F starts the anti-burglary alarm, activated in case of burglary alarm.
z z
Two Pulse Width Modulation (PWM) outputs are driven by the open-collector gate, with a driving current of 300mA, a period determined by the user, default value as 1 second, and a resolution of 8 bits (0~255). Seven open-collector gate outputs, with a driving current of 300mA to control the executors specified by the user.
2.7.6 Communication
There are two-way communication links between the environment monitoring instrument and the TMU. The environment monitoring instrument can detect data through this link and report the alarm information to the TMU. The TMU can set the alarm parameters by issuing the relevant commands, and control the protection device for the start of the environment monitoring instrument.
used as the trunk cable for BTS312. For optical fiber the fiber pigtail is used for the connection with the base station, therefore, its lightning protection is not covered here.
2-39
In case of -48V DC, the GND of the DC power cable is normally grounded at both ends, i.e. at the power supply equipment and the communication equipment. If the grounding point of the communication equipment is different from that of the power supply equipment, a surge current could be caused from the GND of DC power supply to the grounding point of the communication equipment due to the transient potential difference between the two grounding points.
The effect of alternating magnetic field during lightning includes the following two cases. First, the GND of the DC power supply is grounded at both ends of the power supply equipment and the communication equipment. If the grounding of the power supply is connected with that of the communication equipment at some point, induced current will be generated in the alternating magnetic field of lightning through the close loop formed by the GND of DC power supply and the grounding cable of the two equipment. Second, the alternating magnetic field of lightning will generate an induced electric potential at both ends of the negative wire of DC power supply.
If the DC power cables of several devices (including the devices with subscriber lines, such as the switch) in the telecom equipment room are connected to the same set of power terminals, the lightning current induced by the subscriber lines can be transferred to the DC power supply of other equipment through the power supply system, because the subscriber lines are powered by DC power supply.
Surge current is led in through AC power cables and output to DC power cables through the primary power supply.
Huawei provides a DC lightning arrester which is connected in serial to -48V power supply to protect the equipment efficiently from lightning strike.
-48V
Over-current protection
Inductor
Inductor
-48V
Over-current protection
Over-current protection
Over-current protection
Input
V-sensitive resistor V-sensitive resistor V-sensitive resistor TVS component
Output
GND
GND
Figure 2-19 Functional block diagram In addition to its basic function, the lightning arrester is designed with the function of alarm display to facilitate maintenance. The logic diagram is shown in Figure 2-20.
-48V GND
-48V GND
2-41
-48V
A
Over-current protection
-48V
B
Current-limit resistor V-sensitive resistor Green LED
GND
GND
Figure 2-22 Functional block diagram of the AC lightning arrester The lightning protection system features:
z
Symmetric design, N and L wires can be connected freely without affecting the performance.
2-42
Chapter 2
2-level lightning protection guarantees high reliability and less possibility of damage by lightning strikes. 2-level protection and 2-level alarm are provided (visible alarm. If either level fails, corresponding indicator will be off. On/off signals of the dry contactor are also provided). The circuits are designed in parallel so that the maintenance personnel can repair them without power-off.
The total through-flow current is 40A. There are two output terminals so that two cabinets can share one anti-lightning box.
Inductor
AC indicator
Discharge tube
2-43
LightningProof Box
Figure 2-24 E1 lightning protection board All E1 cables are protected by the lightning protection board, which is able to avoid the thunder current from entering the cabinet via E1 cable. Even the strong current impact can be discharged by the discharging tube. The lightning protection board is illustrated in Figure 2-25.
E1-Tip 4.7 E1-Tip
Discharging tube PE PE
2-44
3-1
Signal transmission over radio channels features high bit error rate due to its time-varying characteristics, interference of various random noises, multi-path fading, and shadowing effect. To ensure high quality signal transmission, the signals carrying user and signaling data shall be transformed into another form suitable for radio transmission at the transmitting end, and converted back to the original form at the receiving end. Such conversion includes the processes burst of channel coding/decoding, and interleaving/de-interleaving, modulation/demodulation. The baseband signal processing program runs in the TBU of the TRX module. formatting, encryption/decryption
III. Operation & maintenance program and transmission equipment control program
The operation and maintenance program is the common control part in the BTS312 software as well as the core of BTS operation and maintenance functions. The functions of the operation and maintenance program include BS software loading, BS initializing, BS operational status monitoring and management, alarm collection, resource utilization and interface message tracing. The BTS interface equipment (hardware) is integrated as a module in the TMU, and the corresponding transmission equipment control system is also integrated into the operation and maintenance software for controlling the transmission link between BSC and BTS. Through the control program of the transmission equipment, the transmission links between BTS and BSC can be flexibly configured to support star, tree, and chain topologies. This control program also supports the remote loopback test via the TMU. The operation & maintenance program and transmission equipment control program run in the TMU board.
Radio resource management functions specified in GSM 08.58 and GSM 04.08. Coordination with TMU board software to implement operation and maintenance functions specified in GSM 12.21.
3-2
Data link layer functions (LAPD, GSM 08.56) on the Abis interface. Data link layer functions (LAPDm, GSM04.05, GSM 04.06) on the Um interface. Data link layer functions on the internal interface with TMU.
CBUS signaling channel control functions with TMU. Mailbox communication functions based on the HPI interface with DSP.
The layer 3 functions of the signaling processing program include 3 parts: radio subsystem management, operation & maintenance interface management and LAPD layer 2 entity management. The radio subsystem management part includes: Radio link management, including setup and release of radio links between BTS and MS, and transmitting transparent messages between MS and NSS. Dedicated channel management, i.e., dedicated channel activation/deactivation, signaling and user data encryption/decryption, dynamic power control of BS and MS, MS timing advance control, etc. Common control channel management, such as random access detection, dispatching, combining and sending of immediate-assignment messages and paging messages, system message modification, etc. TRX management, such as idle channel quality detection, reporting BTS overload information and other kinds of faults. The operation & maintenance interface part interfaces and works with the operation & maintenance program to perform the following functions:
z z z z z
TRX software loading. TRX initializing. Alarm and status management. Equipment self-testing. Resources monitoring and signaling tracing.
The LAPD layer 2 management part manages data link entities at the Abis interface side. The architecture of the signaling processing program is shown in Figure 3-1.
3-3
LAPD
HDLC
LAPDm
DBUS
CBUS
Mailbox
BSC
TMU
CHDSP
LAPD: Link Access Protocol on the D channel LAPDm: Link Access Protocol on the Dm channel TMU: Timing/Transmission and Management Unit CBUS: Control BUS
SCP: Signaling Control Processing HDLC: High-level Data Link Control BSC: Base Station Controller DBUS: Data BUS CHDSP: Channel Digital Signal Processing
Digital demodulation functions. Encoding and decoding, interleaving and de-interleaving of speech, data, and signaling on the radio channel. Encryption and decryption of speech, data, and signaling on the radio channel. In-band control and transmission functions of speech and data. Rate adaptation of speech and data between the radio channel encoding module and the transcoder. Provisioning of the internal signaling with L3 module and primitive
z z z
Figure 3-2 shows the architecture of the baseband signal processing program.
3-4
O&M module
Subchannel n processing
BIU: Base station Interface Unit CUI: Carrier Unit Interface controller
Figure 3-2 Architecture of the baseband signal processing program As shown in the figure, in the downlink direction, signaling and speech are first channel-encoded and interleaved, then the sequence-correlated bits are decorrelated and formatted into bursts. After encryption and modulation, they are sent to the carrier interface unit. The process is reversed in the uplink direction.
Subchannel 1 processing
Interleaving module
Deinterleaving module
...
Cyphering module
Decyphering module
I/O module
BIU
SCP
CUI
3-5
I. Hardware architecture
The BTS312 operation and maintenance program runs on the TMU board. The active and standby TMUs monitor the operation/maintenance and management on all devices of a BTS. The TMU is connected with BSC and local maintenance terminals in the uplink direction, and connected with various boards of the BTS in the downlink direction, as shown in Figure 3-3.
BSC MMI Active TMU Extended TMU CDU TRX CDU PMU PMU PMU Low speed DCL BSC: Base Station Controller TMU: Timing/ Transmission and Management Unit PMU: Power Monitoring Unit TBU: Transceiver Baseband Unit LR DCL: Low-bit Rate Diagnostic Control Link MMI: Man Machine Interface CDU: Combiner & Divider Unit TES: Transmission Extension power Supply Unit HR DCL: High-bit Rate Diagnostic Control Link Low speed DCL PMU LR DCL High speed DCL PMU TRX CDU CDU TRX High speed DCL PMU Standby TMU TRX CDU CDU TRX HR DCL Standby TMU TRX High speed DCL
II. Functions
Layer 3 signaling functions
z
Remote software loading for all parts of the BTS312 (including BTS itself), so there is no need to replace the program firmware at site. Monitoring and controlling the status of all channels and boards, as well as blocking/unblocking of all channels. Setting of the BTS operational parameters, such as BTS attributes, carrier related attributes and channel related attributes, and controlling of the Abis interface circuits.
BTS devices testing, including loopback testing of the BTS radio unit, testing of boards, and locating faults if any fault is detected.
3-6
Interface tracing, especially on the Um interface along with other BTS internal interfaces. Alarm monitoring, detection of BTS internal alarms, such as various board alarms, and external environment alarms (e.g., temperature, humidity, fire, etc.). In case of any major alarm, the operation and maintenance unit can take corresponding protection measures, such as cutting off power amplifier power supply, to prevent further damage to the equipment.
Operation and maintenance (network management) functions defined in TS GSM 12.21 and TS GSM 08.59. Other operation and maintenance functions.
Data link layer (LAPD, GSM 08.56) at the Abis interface. High-speed DCL data link layer (HDLC based 1-N, active/standby, bidirectional acknowledged communication protocol). Low speed DCL data link layer (1-N, active/standby, bidirectional acknowledged communication protocol). Local maintenance terminal serial port data link layer (point to point, active/standby, bidirectional acknowledged communication protocol).
I/O functions
z z z z
Abis link, I/O functions of PCM specified timeslot. High speed DCL, I/O functions based on HDLC. Low speed DCL, I/O functions based on UART. UART-based I/O functions with local maintenance terminal.
III. Structure
The BTS312 operation and maintenance program comprises the L3 module, the modules of various link layers, the communication port I/O module, the common module and the transmission equipment control module, as shown in Figure 3-4.
3-7
LAPD
MMI
I/O
I/O
I/O
I/O
I/O
A-bis
CDU
MMI
BIU module
LAPD: Link Access Protocol on D channel MMI: Man-Machine Interface I/O: Input / Output TBU: Transceiver Baseband Unit
DCL: Diagnostic Control Link BIU: BTS Interface Unit TMU: Timing/Transmission and Management Unit CDU: Combiner and Divider Unit
Figure 3-4 Structure of operation and maintenance program The BTS312 operation and maintenance program has interface relationships with all other program modules in the system. The BTS312 operation and maintenance program is a multitask realtime program designed with message-oriented and data structure-oriented method. Its object-oriented data structure is represented in the mapping relationship between the tree-type logic structure of the site and the physical boards. Between the functional modules, information is exchanged in form of messages, which reduces the coupling and enhances the cohesion. This design method helps to enhance the system reliability and expandability. The transmission equipment control module
z
Performs sub-channel multiplexing and demultiplexing functions on the radio channels, and timeslot switching at the Abis interface or the BS interface. Monitors the TMU board BIU running status, including E1 line local asynchronization and remote alarming, loop interruption alarming, BS interface link status, etc., and displays (with TMU board indicator) the running status or reports it via the operation and maintenance module when necessary.
3-8
Support all services defined in the GSM 02 series of specifications. Support smooth expansion of BTS.
Physical electrical parameters. Channel structure. Signaling transmission procedure. Configuration and control procedure. Maintenance and operation support.
Layer 3: Transparent transmission of layer 3 messages from the A interface and radio resource management function. Layer 2: (data link layer) based on the LAPD protocol. Layer 1: (the physical layer) 2048kbit/s PCM digital link. The related protocols of the Abis interface are: GSM 08.52 defines the basic principles for the Abis interface specifications, and the function division between BSC and BTS. GSM 08.54 defines the physical layer architecture of the Abis interface. GSM 08.56 defines the data link layer protocols of the Abis interface. GSM 08.58 defines the layer 3 procedures. GSM 12.21 defines the transmission system of the OM message on the Abis interface. GSM 08.60 defines the in-band control protocol of the remote transcoders and rate adapters.
z z z z
z z z z
4-2
Table 4-1 Division of services and functions between BTS and BSC
Function MSC-BSC channel BSC-BTS channel Channel configuration management Frequency hopping Management Execution Channel allocation DCCH management Link monitoring Channel release Idle channel observation Power control decision System information management System information broadcast BCCH/CCCH management Radio channel management Channel code Transcoding/rate adaptation Measurement Uplink measurement Measurement report handling Traffic measurement Calculation Indication to MS during random access Indication to MS during handover Indication to MS during conversation Management Execution Management Handover access check Random access check Immediate assignment DTX paging management DTX paging execution Note 2 Note 1 Channel allocation Congestion indication Channel allocation Congestion indication Location BTS BSC/MSC Remarks
Timing advance
LAPDm function Radio channel management Ciphering Handover Mobility management Call control Note: 1. The support of power control in BTS is optional.
2. The initial measurement data is reported by BTS to BSC via the Abis interface. As an option, the BSC/BTS may support preprocessing of the initial data in BTS, which reduces the load of BSC.
4-3
Single TRX. Multiple TRXs are connected with the BSC via a common physical connection. Multiple TRXs are connected with the BSC via different physical connections.
BSS
A-bis TRX BCF TRX A A-bis TRX TRX BTS2 BTS1
MSC BSC
BCF
TRX is the functional entity that supports 8 physical channels that belong to the same TDMA frame, which is defined in the PLMN. The BCF (Base Control Function) is the functional entity that performs common control functions including BTS initialization, software loading, channel configuration, operation and maintenance.
There are two types of channels at the Abis interface which are:
z
Traffic channels with rates of 8kbit/s, 16kbit/s and 64kbit/s respectively, carrying speech or data from radio traffic channels. Signaling channels with rates of 16kbit/s, 32kbit/s or 64kbit/s respectively, carrying signaling between BSC and MS, and between BSC and BTS.
4-4
Different Terminal Equipment Identifiers (TEIs) are assigned to get unique addresses of TRXs and BCFs. For each TRX and BCF, 3 separate logical links are defined with each TEI, as shown in Figure 4-2: RSL: Radio Signaling Link, used to support traffic management procedures, one for each TRX. OML: Operation & Maintenance Link, used to support network management procedures. L2ML: Layer 2 Management Link, is used to transfer the layer 2 management messages.
BSC RS L OML L2ML SAPI=0 SAPI=62 SAPI=63 BTS
TRX BCF
TEI 1
Layer 2
RS L OML L2ML
TRX
TEI 2
TEI
Management
OML L2ML
SAPI=62 SAPI=63
BCF
TEI 4
BCF
Figure 4-2 Abis interface layer 2 logical links For Abis signaling, refer to Figure 4-3, which is explained in the following text. BSC and BTS do not resolve CM (Connection Management) and MM (Mobility Management) messages. These messages are transferred over the A interface by DTAP (Direct Transfer Application Part). At the Abis interface, DTAP messages are transferred as layer 3 transparent messages. RR (Radio Resource Management) messages are mapped onto the BSSAP (BSS Application Part) in BSC. In BTS, most of RR messages are handled as transparent
4-5
messages. However, some of them have to be interpreted and executed by BTS (for example, encryption, random access, paging and assignment), these messages are processed by the BTSM (BTS Management) entities in the BSC and the BTS. The layer 2 protocol of the Abis interface is based on the LAPD. The LAPD addresses the TRX (or BCF) through TEI. Different logical links are used for traffic management message (RSL, i.e., Radio signaling link), network management message (OML, i.e. Operation & Maintenance link), and L2 management messages (L2ML, i.e., Layer 2 Management link). Layer 1 of the Abis interface is the physical layer hardware-based bottom driver, responsible for receiving and sending data to the physical link.
MS CC MM
BTS
BSC
L3 L2 L1
RR RR LAPDm Sign. Layer 1 LAPDm Sign. Layer 1 BTSM LAPD Sign. Layer 1
BSSAP
SCCP MTP
Um
CM: Connection Management MM: Mobility Management RR: Radio Resources Management LAPD: Link Access Protocol on the D Channel LAPDm: Link Access Protocol on the Dm Channel
A-bis
BTSM: BTS Management BSSAP: Base Station Subsystem Application Part SCCP: Signaling Connection Control Part MTP: Message Transfer Part
channel. Therefore transcoding and rate adaptation is needed. This function is realized on the physical layer of the Abis interface by the Transcoder & Rate Adapter Unit (TRAU) located at the BSC side or MSC side, depending on the network requirements. In this case, all speech, data and signaling should be transmitted at the Abis interface at the rate of 16kbit/s or 64kbit/s according to the GSM 08.60 requirements. But before the transmission, rate adaptation and multiplexing is required, according to ITU-T I.460 recommendation. Data coding is described in GSM 08.20. The in-band control protocol of TRAU is specified in GSM 08.60.
Providing one or more data link connections on the D-channel. Frame delimiting, alignment and transparency, allowing recognition of a sequence of bits transmitted over a D-channel as a frame. Sequence control, so as to maintain the sequential order of frames transmitting over a data link connection. Detection of transmission, format and operation errors on a data link connection. Performing recovery operation based on the detected transmission, format, and operation errors. Notifying the management entity of unrecoverable errors. Traffic control.
z z
z z
The data link layer provides the means for information transfer between multiple combinations of data link connection points. The information may be transferred through point-to-point data link connections or broadcast data link connections.
Realizing the interworking of the MS and BSS/NSS on the Um interface. Implementing part of the radio resource management functions under the control of the BSC.
The traffic management message is divided into the transparent and non-transparent messages. The transparent message refers to the messages forwarded without interpretation or being processed by the BTS. The non-transparent message refers to the messages processed and constructed by the BTS.
4-8
Traffic management procedures Allocation of channel data links Transparent message Non-transparent message NM procedures SAPI = 62 NML LAPD Layer 1 L2 management procedures SAPI = 63 L2ML
LAPDm
Figure 4-4 Abis interface layer 3 signaling model The traffic management messages can also be divided into four groups in terms of functions, which are:
z
Radio link layer management message, used for the management of the data link layer on the radio channel. Dedicated channel management message, used for the management of dedicated channels (SDCCH and TCH). Common control channel management message, used for the management of common control channels. TRX management message, used for TRX management.
Transparency and group of the message is determined by the message identifier at the head of the message.
Receive procedure of a transparent L3-message in acknowledged mode: Through this procedure the BTS indicates the BSC to receive a transparent Um interface RIL3 message in acknowledged mode. Transfer procedure of a transparent L3-message in unacknowledged mode: Through this procedure the BSC requests the BTS to send a transparent Um interface RIL3 message in unacknowledged mode. Receive procedure of a transparent L3-message in unacknowledged mode: Through this procedure the BTS indicates the BSC to receive a transparent Um interface RIL3 message in unacknowledged mode. Link error indication procedure: Through this procedure the BTS indicates the BSC incase of any abnormality in the radio link layer.
4-10
Base station transmission power control procedure: The BSS uses this procedure to control the transmission power of the activated channel in TRX. The base station transmitting power control decision should be implemented in the BSC, or in the BTS. Connection failure procedure: The BTS uses this procedure to indicate to the BSC that an activated dedicated channel is already disconnected. Physical environment content request procedure: The BSC uses this procedure to obtain the physical parameters of a specific channel. This usually occurs before a channel change. This is an optional procedure. SACCH information change procedure: The BSC uses this procedure to instruct the BTS to change the information (system information) filled in a specific SACCH channel.
Radio resources indication procedure: The BTS uses this procedure to indicate the interference level on each idle dedicated channel of the TRX to the BSC. Traffic control procedure: The FUC uses this procedure to indicate the overload condition of the TRX to the BSC, the cause possibly being CCCH overload, ACCH overload or processor overload. Error reporting procedure: The BTS uses this procedure to report to the BSC about detected downlink message errors that can not be reported by other protocols.
There are 4 kinds of objects to be managed, which are sites, BTS, TRX, and channels, as shown in Figure 4-5.
SITE
BTS0
BTS1
BTSn
TRX0
TRX1
TRXm
Channel0
Channel1
Channel7
Addressing of network management messages is realized by means of managed object types and cases. For each object case in BTS there is a complete layer 2 connection description. The setup of the first connection uses one (semi-) permanent default TEI. Subsequent connections use the TEIs provided when setting up TEI procedures. Object cases can also use layer 3 addresses. The mixed use of layer 2 and layer 3 addressing enables one BTS site to have one or multiple physical links. 3) Managed object state
4-12
Management state
The management state of managed objects is only controlled by the BSC. There are three kinds of states, including:
z
Locked: indicates that BSC has disconnected all calls going through this managed object, and no new calls can be connected to this managed object. Shutting down: indicates that new services can not be connected to this managed object, but those existing calls will be maintained. Unlocked: indicates new services can be connected to this managed object.
Operational state
There are two operational states:
z
Disabled: indicates that resources are completely inoperable, and can no longer provide services to the users. Enabled: indicates that all or part of resources are available and can be used.
Available state
The available state is a specific explanation of the operational state. Following are the different states available in the system:
z
In test: The state during which a resource is being tested. The operational state is "disabled". Failed: It shows that the source/object is not working due to some internal error. The operational state is "disabled". Power off: This resource needs power supply. Its operation state is "disabled". Off line: This resource needs manual or automatic operations. Its operation state is "disabled". Dependency: If a resource depends on other resources and those resources are not available then it will also be not available/operable. The operational status is "disabled".
z z
Degraded: Services provided by this resource are degraded in a certain sense, such as rate or operational capacity. Its operation state is "enabled". Unequipped: Hardware or software of the managed objects is not equipped. Its operation state is "disabled".
4-13
All formatted O&M messages are sent on layer 2 in form of I frames. A group of procedures, called structured procedures, are based on the combination of several elementary procedures. For a specific object, if a certain elementary procedure is not completed, the system will not start its subsequent elementary procedures. When there is no response against the formatted operation and maintenance message from the peer layer 3 before timeout, the elementary procedure is said as not completed. When the previous elementary procedure has not received any response (ACK or NACK) before layer 3 timeout, then no subsequent elementary procedure is sent to this object case. The default timeout for layer 3 is 10s. If part of an original message is not understood or supported, the whole message is discarded. If the ACK message returned by an object is a positive reply, it is used to notify the message sender that the command is or is going to be executed. If the NACK message (i.e. a negative acknowledgement) is returned, it is used to notify the message sender that the command execution has failed, and how it failed. There are mainly the following types of elementary procedures:
z z z z z z z
Software loading management Abis interface management Transmission management Air interface management Testing management State management and event reporting Equipment state management
4.2 Um Interface
4.2.1 Introduction
In a public land mobile network (PLMN), MS is connected via the radio channel to the fixed network so that a call can be routed to the specific destination. In order to achieve the interconnection between MS and BTS a set of standard protocols on radio channel signal transmission are specified, which are called the radio interface, or simply the Um interface in GSM. The Um interface is the most important interface in the GSM system. It is necessary to follow a standard interface so that a complete compatibility can be achieved between different networks of different manufactures, which is the basic condition for global roaming. It also determines the spectrum availability of the GSM cellular system, which is an important measure to evaluate a radio system.
4-14
Channel architecture and access capability MS-BTS communication protocols Maintenance and operation features Performance features Service features
Signaling layer (L3) Data link layer (L2) Physical layer (L1)
Figure 4-6 Um interface layered structure The first layer is the physical layer at the bottom. It includes various channels, and provides basic radio channels for information transmission to the higher layer. The layer 2 is the data link layer using the LAPDm protocol. It includes various data transmission structures, and controls data transmission. The layer 3 is the signaling layer (also called network layer). It includes various messages and programs, and controls services. L3 includes 3 sub-layers, which are radio resources management (RR), mobility management (MM), and connection management (CM).
4-15
Physical layer
Figure 4-7 Physical layer interface The physical layer provides the following services:
z
Access capability: The physical layer provides transmission services through a series of limited logical channels, which are mapped onto the physical channels. Error code detection: The physical layer provides error-free transmission services, including error detection and correction. Ciphering.
III. Timeslot and frame structure Both FDMA and TDMA techniques are used by the Um interface, along with frequency hopping. The units transmitted on the Um interfaces are called bursts, each of which comprises over 100 modulated bits. A burst occupies the 200kHz channel, with a duration of 0.577ms (15/26ms) called burst period (BP). The time and frequency window it occupies is called timeslot, as shown in Figure 4-8.
Frequency 3 2 1 Time 0 1 2 BP 15/26ms Time slot 3 4 5 6 7 8
200 kHz
4-16
Each timeslot corresponds to a basic physical channel. Each carrier is divided into 8 timeslots, which can be used by different subscribers. These 8 neighboring timeslots form a basic unit called frame. A complete hierarchy of GSM frames is illustrated in Figure 4-9.
1 hyperframe=2048 superframe=2715 648TDMA frame (3 h28m53s760ms)
0 1 2 3 2044 2045 2046 2047
(120ms)
24
1TDMA=8 TS (120/26=4.61ms)
0 1 2 3 4 5 6 7
Figure 4-9 Channel frame structure One TDMA frame has a duration of 4.615ms (120/26ms), consisting of 8 timeslots. Each timeslot contains 156.25 code elements. An MS sends information on specific timeslots, and the remaining timeslots are used by other MSs. Higher order frames, called multiframe, consists of 26 or 51 frames. Multiframe of 26 frames has a duration of 120 ms and carries traffic channel, slow associated control channel and fast associated control channel. Similarly, a 51-frame multiframe has a duration of 235.365 ms and carries control channel information. One superframe consists of 51 traffic multirames or 26 control frames and consists of 5126 TDMA frames with a total duration of 6.12 seconds. The highest order frame is called hyperframe and consists of 2,048 superframes or 2,715,648 (20485126) frames. The time duration of the hyperframe is 3 hrs, 28 min and 52.76 sec. The frame number is transferred over SCH channels. Frame numbers are necessary in the hopping algorithm.
4-17
Normal Burst (NB): Used to carry information of traffic channels, and control channels except for RACH. It contains 116 encrypted bits and 8.25 guard bits. Frequency-correction burst (FB): Used for MS frequency synchronization. FB is equivalent to the un-modulated carrier with a +1625/24 frequency offset, it has the same guard period as NB. Synchronization burst (SB): Used for MS timing synchronization. SB has a long training sequence bits and can carry the information of TDMA frame numbers (FN) and BS identification code (BSIC). Random access burst (AB): Used for MS random access. AB has a longer guard period (68.25 bits). Dummy burst (DB): Used to fill in the domain when there is no information sent. DB has the same structure as NB, except that the bit flow is a fixed bit sequence.
V. Channel type
According to different characteristics, channels are grouped into different types, which are discussed briefly in the following text. 1) Traffic channel (TCH)
TCH channel carries voice or user data. A full rate traffic channel (TCH/F) carries the information with a total bit rate of 22.8kbit/s. On the TCH channel, the following traffic channels are provided:
z z z z
Full rate speech traffic channel (TCH/FS) 9.6kbit/s full rate data traffic channel (TCH/F9.6) 4.8kbit/s full rate data traffic channel (TCH/F4.8) 2.4kbit/s full rate data traffic channel (TCH/F2.4) Control channel
2)
Control channels carry signaling and synchronization data. According to different processing tasks, there are 3 types of control channels: broadcast channel, common control channel and dedicated control channel.
FCCH: Frequency-correction channel, used for MS frequency correction. SCH: Synchronization channel, used for MS frame synchronization and BS identification. BCCH: Broadcast control channel, used to send cell information.
4-18
PCH: Paging channel, used by BTS to page MS. RACH: Random access channel, for random access of MS to the network. It is unidirectional channel from MS to BSS. AGCH: Access grant channel, used to assign dedicated control channels for the successfully accessed MS.
SDCCH/8: Standalone Dedicated Control Channel SACCH/C8: Slow Associated Control Channel/SDCCH/8 SACCH/TF: Slow Associated Control Channel/TCH/F FACCH/F: Fast Associated Control Channel/Full Rate SDCCH/4: Standalone Dedicated Control Channel/BCCH/CCCH SACCH/C4: Slow Associated Control Channel/SDCCH/4
4-19
I. Functions
1) General
LAPDm transfers information among layer 3 entities via the radio interface on the Dm channel. LAPDm supports multiple layer 3 entities and physical layer entities, and signaling of BCCH, PCH, AGCH and DCCH. LAPDm functions include:
z
Provide one or multiple data link connections on the Dm channel. These DLCs are distinguished by data link connection identifiers. Support frame type identification. Support transparent transmission of layer 3 message units among layer 3 entities. Sequence control, so as to maintain frame sequence order passing through the DLC. Detection of format and operation errors on data links. Traffic control.
z z
z z
4-20
Contention decision of data links setup when there are access requests to RACH. Operation types
2)
The data link layer used to transfer layer 3 messages has two types of operations i.e. unacknowledged and acknowledged operations. They can exist on the same Dm channel.
Unacknowledged operation
In this type of operation, layer 3 information is transferred in the form of Unnumbered Information (UI) frames. On the data link layer, UI frames are not acknowledged, nor is traffic control or error recovery performed. Unacknowledged operation applies to all control channels except RACH.
Acknowledged operation
In this type of operation, layer 3 information is transferred in numbered information frames (I). The data link layer acknowledges all I frames. Unacknowledged frames are resent for error recovery. In the case the data link layer can not recover the error codes, it sends an error indication to the management layer. Besides, traffic control protocols are defined for acknowledged operation. The acknowledged operation applies to DCCH. 3) Information transfer modes
Information transfer in BCCH: BCCH exists only in the direction from BTS to MS, used to broadcast system information messages to MSs. On BCCH, only the unacknowledged operation is permitted.
Information transfer in PCH+AGCH: only exists in the direction from BTS to MS. Only the unacknowledged operation applies to PCH+AGCH. Information transfer in DCCH: Both unacknowledged operation and
acknowledged operations apply to DCCH, and are determined by layer 3. 4) Data link release The multiframe operation can be released as:
z
Normal release in which BTS and MS exchange DISC frames and UA frames or DM frames, and Local release with no frame exchange.
4-21
Provide data link connection for the unacknowledged transfer of layer 3 message units among layer 3 entities. Identification of data link connection end points; it permits a certain layer 3 entity to identify other layer 3 entities. Sending frames according to message priority. Messages are not detected on data link layer.
z z
The primitive used in unacknowledged information transfer services is DL_UNIT DATA_REQUEST/INDICATION. The primitive DL_UNIT DATA_REQUEST is used when layer 3 requests the unacknowledged operation to transfer messages. At the receiving terminal, the primitive DL_UNIT DATA_INDICATION is used to indicate the arrival of this kind of messages.
Provide data link connection for the acknowledged information transfer among layer 3 entities. Identification of data link connection end points, it permits a certain layer 3 entity to identify other layer 3 entities Ensure the integrity of data link layer message unit sequences in case of nonphysical faults. Notify the corresponding layer entities in case of fault, such as sending sequence error etc. Notify the management layer in case non-recoverable errors. Traffic control. Send frames according to the indicated SAPI value. Segmentation and concatenation control functions.
z z z z
4-22
DL_DATA_REQUEST/INDICATION: used for transmitting and receiving the information in case layer 3 requests the acknowledged mode. DL_ESTABLISH_REQUEST/INDICATION/CONFIRM: multiframe mode. for setup of the
The physical layer provides the following services to the data link layer:
z z z z z z
Physical layer connection for transparent frame transfer. Indication of physical state of the Dm channel. Sending data link layer message units. Providing frame synchronization. Error control, ensuring a low error rate in data link layers. Receiving random access burst. Management layer services
3)
MDL_ERROR_INDICATION, used by layer 2 to report unrecoverable errors to the management layer. MDL_RELEASE_REQUEST, used by the management layer to release layer 2 channels.
Setup, operation and release (radio resources management) of dedicated radio channel connections.
4-23
Location update/registration, authentication and TMSI reallocation (mobility management). Setup, maintenance and termination (call control) of circuit switched calls. Support supplementary services. Support short message services.
z z z
Layer 3 consists of 3 sub-layers including connection management (CM), mobility management (MM) and radio resources management (RR). The layer 3 functions are performed by the layer 3 signaling protocols between the mobile station and the network on the two sides of the Um interface. Here, no consideration is given to the function allocation between different entities inside the base station system. Layer 3 and its supported lower layer functions provide higher layers with mobile network signaling (MNS) services. Interaction between layer 3 and higher layers and between services interfaces of layer 2 as well as that among neighboring sub-layers in layer 3 can be described in primitives and parameters. On layer 3, information switching among peer entities is performed by 3 sub-layers.
I. Structure
Layer 3 contains 3 sub-layers, which are further discussed here: Radio Resources (RR) management handles the setup, maintenance, and release of physical channels and logical channels, as well as cross-cell transfer on the request of CM sub-layer. Mobility Management (MM) deals with the all necessary functions of mobile features to support mobile subscribers. It notifies the network when the mobile station is activated and deactivated, or the location area is changed. It is also responsible for the security of activated radio channels. Connection Management (CM) sublayer consists of 3 functional entities including, Call Control (CC), Short Message Service (SMS) support, and Supplementary Service (SS) support. These entities have the functions described below:
z
Call Control (CC) deals with all necessary functions to setup or release the circuit switching connections in which either the mobile subscriber is a caller or a called party.
Supplementary Service (SS) support deals with all necessary functions to support GSM supplementary services. Short Message Service (SMS) support performs all necessary functions to support point-to-point GSM short message services.
4-24
Besides the above functions, layer 3 includes other functions related to message transmission, such as multiplexing and demultiplexing. These functions are specified by radio resource management and mobility management. Their task is to determine message routing according to protocol discriminator (PD) and transaction identifier (TI) on the head of message. In the uplink direction, MM routing function is to transfer CM entity messages and messages of MM itself to the service access point of the RR sub-layer, and multiplex them when multiple messages are transmitted in parallel. The RR routing function is to distribute messages according to the PD of transferred messages and the actual channel configuration. In the downlink direction, RR sub-layer routing function can distribute the messages from different services access points of layer 2 according to PDs. If the PD equals the RR, then this message is sent to the RR entity of this sub-layer. The remaining messages are provided to the MM sub-layer through the service access point RR-SAP. The routing function of the MM sub-layer is to transfer messages from the RR sub-layer to the MM entities according to PDs and TIs, or to the various entities of the CM sub-layer through each MM-SAP. Figure 4-10 shows the protocol model of the layer 3 signaling.
4-25
MNCC-SAP
MNSS-SAP
MNSMS-SAP
SS
SMS
MMSS-SAP MMSMS-SAP
MM
MM
CC
SS
SMS
Figure 4-10 Layer 3 protocol model of the Um interface The RR sub-layer at the bottom receives services provided by layer 2 through various service access points (i.e., various types of channels) of layer 2, and provides services via RR-SAP to the MM sub-layer. The MM sub-layer provides services to the three entities (CC, SS and SMS) on the CM sub-layer through different service access points MMCC-SAP, MMSS-SAP and MMSMS-SAP respectively. The 3 independent entities on the CM sub-layer provide services to higher layers through MNCC-SAP, MNSS-SAP and MNSMS-SAP respectively.
L3 signaling
SAPI 0
RR-SAP
RR RR
PD
..
RR
SAPI 3
SACCH
Services provided by layer 3 at the MS side include Registration services, i.e., IMSI attach and detach operations. Call control services, including normal MOC setup, emergency MOC setup, call hold, call completion, and call-dependent supplementary services. Support for call-independent supplementary services. Support for short message services.
z z
4-26
2)
z
Services provided by layer 3 at the network side include Call control service, including call setup, call hold, call termination and call-dependent supplementary service support. Support for call-independent supplementary services. Support for short message services. Inter-layer services between the mobile station and network side
z z
3)
MS side Mobility management sub-layer RR primitive RR SAP Radio resources management sub-layer Peer layer protocol of RR sub-layer
Network side
4-27
MS side CC SS SMS CC
Network side
SS
SMS
4-28
5.1.1 E1 Networking
With one site as a basic unit, M900/M1800 BTS312 supports star, tree, chain and ring E1 networking topologies, which are illustrated in Figure 5-1.
star networking
tree networking
BSC
BTS0
BTS1
BSC
BTS0
BTS1
chain networking
ring networking
Figure 5-1 The BTS312 E1 networking mode Each TMU board provides 4 E1 interfaces and each cabinet can be configured with 2 TMU boards. If one interface is connected to the superior network, a maximum of 7 tributaries can be provided. A comparison between various connection modes is made in the following.
5-1
I. Star networking
Each site is connected directly to BSC by an E1 link, which brings very convenient maintenance and simple network construction. Signals pass through very few nodes, which means that no BTS depends on one another. So in the case of the failure of one BTS, other BTSs will not be affected. This networking mode is usually applied in densely-populated urban areas to facilitate easy expansion. But this type of networking requires a relatively large number of transmission links.
5-2
In practice a cellular network can have one or more than one network topology according to the actual physical and geographical requirements. So, considerable amount of transmission equipment investment can be saved and service quality can be ensured if the networking modes are applied correctly.
5-3
BTS0 TMU
E1 Optical fiber
ASU
Optical fiber
BSC
E1
155A
ASU
E1
TMU
BTS1
Optical fiber
ASU
E1
Optical fiber
TMU BTS2
BSC
E1
155A
Optical fiber
Optical fiber
5-4
MSC
Ground station Ground receive E1 station BSC BTS SDH/PDH or microwave/cable BTS
BTS
BTS
Figure 5-4 Networking for satellite transmission Networking for satellite transmission is now faced with technological difficulties, which is much related to some inherent features of satellite transmission, such as long transmission delay and poor stability of transmission links. These difficulties greatly constrains the promotion and application of satellite networking. To overcome these problems, Huawei offers an effective and complete solution as described in the following.
During satellite transmission, there is a fixed delay of hundreds of milliseconds during the signaling control process on the Abis interface. To avoid timeout release of the activated call due to transmission delay, multiple timers are used for the signaling between BTS and BSC.
z
Handover
Due to the delay, the handover command issued from the BSC arrives at the BTS in hundreds of milliseconds, which leads to the degeneration of the voice quality of the mobile phone during this period. But in M900/M1800 BTS312, the functions of filtering, interleaving, PN judgement and prediction of the measurement report can be adjusted by setting parameters, and a special handover algorithm can be used to eliminate the impact of time delay.
5-5
Satellite transmission delay affects the alignment of the TRAU frames. As the delay in the common transmission modes is short, the TRAU frame adopts the simple fixed cyclic frame alignment. While in satellite transmission, the CCU (channel coder unit) adopts the self-adaptive alignment, which ensures that data can be aligned in a timely and correct manner in any delay amount, and that the transmission voice is of high quality.
low noise amplifier), a BTS can also compensate the loss of feeders of different lengths, thus ensures the consistency in system receiving gain.
V. RF Hopping
RF hopping is another important tool to enhance the performance of the base station. It enhances not only the anti-fading ability of uplinks and downlinks, but also the security of communication. The BTS312 supports both frequency hopping and non-frequency hopping modes. When frequency hopping is required, the transceiver controlled by BSC can change its carrier frequency according to a hopping sequence which can be set through OMC. In non-hopping mode, the transceiver is locked at a certain frequency. The frequency hopping of the BTS312 is realized through the real-time switchover between two frequency synthesizers. This implementation mode has two advantages, one is that the requirement about the rate of the frequency synthesizer can be reduced, the other is that one of the two frequency synthesizers can function as a backup to enhance the system reliability in non-frequency hopping mode. Besides the traditional frame hopping, the BTS312 supports timeslot (TS) hopping, which further enhances the anti-fading ability.
Static power control is used to adjust the service coverage range of BTS, i.e. it defines the coverage area of the cell. It has 0~10 power levels in step of 2dB. When a mobile station moves and the distance to BTS changes, BSC can adjust BTS transmitting power according to the distances automatically. This process is called dynamic power control. It has 0~15 different power levels in steps of 2dB. The power control at each level adopts automatic power closed-loop control (APC), which ensures a minimum power deviation. When a timeslot is idle, as there are no downlink signals, BSC will send a command to BTS to shut down the transmitting power of this timeslot. These power control functions can enhance the efficiency of transmitters, the reliability of power amplifier, and can also cut the interference of transmitters to the minimum.
TCH/EFS: Enhanced Full-rate Speech Traffic Channel TCH/FS: Full-rate Speech Traffic Channel TCH/F14.4: Full-rate Data Traffic Channel (14.4kbit/s) TCH/F9.6: Full-rate Data Traffic Channel (9.6kbits) TCH/F4.8: Full-rate Data Traffic Channel (4.8kbit/s) TCH/F2.4: Full-rate Data Traffic Channel ( 2.4kbit/s) FCCH: Frequency-Correction Channel SCH: Synchronization Channel BCCH: Broadcast Control Channel PCH: Paging Channel RACH: Random Access Channel AGCH: Access Grant Channel SDCCH/8: Standalone Dedicated Control Channel
5-8
SACCH/C8: Slow Associated Control Channel/SDCCH/8 SACCH/TF: Slow Associated Control Channel/TCH/F FACCH/F: Fast Associated Control Channel/Full Rate SDCCH/4: Standalone Dedicated Control Channel/BCCH/CCCH SACCH/C4: Slow Associated Control Channel/SDCCH/4 CBCH: Cell Broadcast Channel
The interworking between MS and BSS/NSS on the Um interface. Management function of the radio resources under the control of the BSC.
The BTS312 signaling processing includes radio link management, dedicated channel management, common channel management and TRX management.
5-9
Link release request procedure: Through this procedure BSC requests the BTS to release a radio link. Transfer procedure of a transparent L3-message in acknowledged mode: Through this procedure BSC requests the BTS to send a transparent Um interface RIL3 message in acknowledged mode. Receive procedure of a transparent L3-message in acknowledged mode: Through this procedure BTS indicates the BSC to receive a transparent Um interface RIL3 message in acknowledged mode. Transfer procedure of a transparent L3-message in unacknowledged mode: Through this procedure BSC requests the BTS to send a transparent Um interface RIL3 message in non-acknowledged mode. Receive procedure of a transparent L3-message in unacknowledged mode: Through this procedure BTS indicates the BSC to receive a transparent Um interface RIL3 message in non-acknowledged mode. Link error indication procedure: Through this procedure BTS indicates BSC incase of any abnormality in the radio link layer.
5-10
Radio channel release procedure: BSC uses this procedure to instruct BTS to release a radio channel, which is not in use state. MS power control procedure: BSS uses this procedure to control the transmitting power of the MS related to a specific activated channel. MS power control decision must be implemented in BSC, and as an optional procedure in BTS. Base station transmission power control procedure: BSS uses this procedure to control the transmission power of the activated channel in TRX. The base station transmitting power control decision should be implemented in BSC, or in BTS. Connection failure procedure: BTS uses this procedure to indicate to BSC that an activated dedicated channel is already disconnected. Physical environment content request procedure: BSC uses this procedure to obtain the physical parameters of a specific channel. This usually occurs before a channel change. This is an optional procedure. SACCH information change procedure: BSC uses this procedure to instruct BTS to change the information (system information) filled in a specific SACCH channel.
5-11
5-12
If upgraded version is needed, the designated version of TMU or TRX can be remotely loaded. After receiving the software, TMU will save them to Flash memory. If the remote end needs to run the loaded software, it can be driven by activation operation so that TMU can run the software saved in Flash memory.
TEI set up (for both OML and RSL) Signaling channel connection set up
5-13
Signaling channel disconnection Traffic channel connection set up Traffic channel disconnection
Interference level limit Interference average value Connection failure decision threshold: the BER or the receiving level threshold. T200, including the T200 timing values of the following channels:
5-14
SDCCH FACCH (full rate) FACCH (half rate) SACCH (relevant to TCH, SAPI=0) SACCH (relevant to SDCCH) SDCCH (SAPI=3) SACCH (relevant to TCH, SAPI=3)
z z z z z z z z z z z
Maximum timing advance Overload indication period CCCH load threshold CCCH load indication period RACH busy decision threshold RACH load average TS number BTS air timer Maximum number of physical channel message retransmissions (Ny1) BCCH absolute RF number Base station identification code (BSIC) Configuration start time
Channel combination mode Frequency hopping serial number Mobile allocation index offset (MAIO) RF absolute channel numbers table Configuration start time Training sequence number
5-15
TRX Abis link testing Functional object self-test, including: Site self-test Cell self-test TRX self-test Board self-test
5-16
status is required to remain consistent from bottom to top. Availability status is the specific explanation of operation status. Consistency of these 3 kinds of states is vitally important, for inconsistency will result in resources waste as some available channels might not be distributed, or abnormal service provision occurs due to possible distribution of damaged channels. TMU monitors the setup and disconnection of various communication links, and checks the status of the boards in realtime. If any change occurs, it will immediately report the change to BSC and MMI, and display it through the OMC.
I. Board alarms
When any board alarm occurs or disappears, the board reports it to TMU, and TMU will report it to BSC or MMI immediately. According to the cause, an alarm may be classified into one of the following categories:
z
This mainly refers to an out-of-synchronization alarm of either the local end or remote end of E1 port, or loop interruption alarm.
z
Clock alarm
5-17
Over/under voltage alarm of power supply of the carrier part, and power supply fault alarm.
z
General alarms
Hardware faults of various boards, internal bus alarms, and software running errors. After receiving alarm messages from a board, TMU will take the corresponding measures according to the alarm severity. For a critical alarm, immediate measures will be taken to reduce any possible damage, such as resetting the board or switching off the carrier power supply, etc. TMU reports all the alarms to BSC and MMI to display them at the graphic interface.
5-18
III. Re-initialization
In some cases, the running object may require re-initialization, which is mostly caused by the failure of the equipment or the need to reconfigure large quantity of data. And it can be initiated by the command from BSC via TMU.
5-19
5-20
is reported to the TMU, from which it is transferred transparently to the BSC or saved in the log buffer area.
Number of TRXs 12 11 10
Current (A)
5-21
Number of TRXs 9 8 7 6 5 4 3 2 1
Voltage (V) 26.8 26.8 26.8 26.8 26.8 26.8 26.8 26.8 26.8 65.2 58.3 51.2 44.4 37.4
Current (A)
Power consumption (W) 1751 1564 1377 1190 1003 816 629 442 255
II. Clock
Frequency: 1.3107 Hz, with the precision upon leaving the factory better than 0.1 Hz. Frequency deviation varied with temperature changes: < 0.05 ppm (temperature from 0C to 70C). Annual aging rate: < 0.1 ppm.
5-22
No. 3 4 5
V. Physical characteristics
Dimensions: 1880 mm (H) 650 mm (W) 500 mm (D). Weight: Empty cabinet 180 kg. Fully configured cabinet 3312 kg.
M900 BTS Static sensitivity: better than -110dBm. Multipath sensitivity: better than -104dBm under TU3, TU50, RA250 and HT100 transmission conditions. M1800 BTS Static sensitivity: better than -109dBm. Multipath sensitivity: better than -104dBm under TU3, TU50, RA250 and HT100 transmission conditions.
2)
z z
5-23
In the static transmission condition, the relationship between the input levels and the M900 BTS Type II BER measured on the TCH/FS channel is given in Table 5-3:
Table 5-3 Relationship between the M900 BTS Type II BER and input levels
-84dBm~-40dBm <10-4
-40dBm~-15dBm <10-3
2)
M1800 BTS
In the static transmission condition, the relationship between input levels and M1800 BTS Type II BER measured on the TCH/FS channel is given in Table 5-4: Table 5-4 Relationship between the M1800 BTS Type II BER and input levels Input level range Type II BER Static sensitivity level~-84dBm <2 % -84dBm~-40dBm <10-4 -40dBm~-23dBm <10-3
When the sine wave interference signals with frequency and level as shown in Table 5-5 are input together with the -101dBm useful signals into the M900 BTS receiver, the BER still meets the requirements.
Table 5-5 Frequency and level of M900 BTS sine wave interference signals
Where f0 is the useful signal frequency, and f is the interference signal frequency.
5-24
2)
M1800 BTS
When the sine wave interference signals with frequency and voltage level as shown in Table 5-6 are input together with the -101dBm useful signals into the M1800 BTS receiver, the BER still meets requirements
Table 5-6 Frequency and level of M1800 BTS sine wave interference signals
Where f0 is the useful signal frequency, and f is the interference signal frequency.
f is the random continuous GSM modulated interference signal frequency, and f0 is the useful signal frequency.
For M900 BTS, when the useful signals with a sensitivity 3dB higher than the reference sensitivity are input to the receiver simultaneously with two -43dBm interference signals, the TYPE II BER measured on the TCH/FS channel is better than 2%, and the carrier relationship and modulation forms of interference signals satisfy GSM 11.21 specifications. 2) M1800 BTS
5-25
For M1800 BTS, when the useful signals with a sensitivity 3dB higher than the reference sensitivity are input to the receiver simultaneously with two -49dBm interference signals, the TYPE II BER measured on the TCH/FS channel is better than 2%, and the carrier relationship and modulation forms of interference signals meet GSM 11.20 specifications.
Both the M900 BTS and M1800 BTS transmitters have 10 levels for static power adjustment, with a step length of 21dB. On each static power level, the absolute precision is better than 3dB. 2) Dynamic power control
Both the M900 BTS and M1800 BTS transmitters have 15 levels for dynamic power adjustment, with a step length of 21.5dB. On each dynamic power level, the absolute precision is better than 3dB.
5-26
dB +4 +1 -1 -6 -30
10 8 10
542.8
10 8 10
t (us)
Note:
Testing results are the same for both M900 and M1800 BTSs.
Power of various deviating frequency points of M900 and M1800 BTSs are shown in Table 5-8 and Table 5-9 respectively. Table 5-8 Power of various deviating frequency points of M900 BTS Frequency deviation Max. power level (dBc) at relative carrier 100kHz 200kHz 250kHz 400kHz 600kHz ~1.2MHz 1.2MHz ~1.8MHz 1.8MHz ~6MHz 6MHz
0.5
-312
-33
-60
-70
-73
-75
-80
Table 5-9 Power of various deviating frequency points of M1800 BTS Frequency deviation Max. power level (dBc) at relative carrier 100kHz 200kHz 250kHz 400kHz 600kHz ~1.2MHz 1.2MHz ~1.8MHz 1.8MHz ~6MHz 6MHz
0.5
-312
-33
-60
-70
-73
-75
-80
5-27
2)
Transient spectrum
For M900 and M1800 BTSs, the power levels caused by handover at the various deviating frequency points are shown in Table 5-10 and Table 5-11 respectively. Table 5-10 Power levels of M900 BTS caused by handover at various deviating frequency points Frequency deviation Maximum power level (dBc) of relative carrier 400kHz -50 600kHz -58 1.2MHz -66 1.8MHz -66
Table 5-11 Power levels of M1800 BTS caused by handover at various deviating frequency points Frequency deviation Maximum power level (dBc) of relative 400kHz -50 600kHz -58 1.2MHz -66 1.8MHz -66
V. Intermodulation suppression
1) M900 BTS
For interference signals coming from the antenna into the transmitter, the intermodulation signal suppression of the transmitter is over 70dBc (or under -36dBm), and the levels of the 3rd order and 5th order intermodulation signals falling within the 890~915MHz frequency band are under -98dBm. The suppression of the intermodulated signal after multi-carrier combination is over 70dBc (or under -36dBm) when it falls within the 935MHz~960MHz frequency band, and that falling within the 890MHz~915MHz frequency band has an output level under -98dBm. 2) M1800 BTS
For interference signals coming from the antenna into the transmitter, the intermodulation signal suppression of the transmitter is over 70dBc (or under -36dBm), and the levels of the 3rd order and 5th order intermodulation signals falling within the 1710~1785MHz frequency band are under -98dBm. The suppression of the intermodulated signal after multi-carrier combination is over 70dBc (or under -36dBm) when it falls within the 1805MHz~1880MHz frequency band, and that falling within the 1710MHz~1785MHz frequency band has an output level under -98dBm.
5-28
1)
z z z
M900 BTS 9kHz~1GHz: <-36dBm 890MHz~915MHz: <-98dBm 1GHz~12.75GHz: <-312dBm M1800 BTS 9kHz~1GHz: <-36dBm 1710MHz~1785MHz: <-98dBm 1GHz~12.75GHz: <-312dBm
2)
z z z
5-29
Synchronous omni cell, 1~24TRXs. Synchronous 2 sector-cells, 1+1~24+24 TRXs. Synchronous 3 sector-cells, 1+1+1~24+24+24 TRXs.
A single BTS312 cabinet may contain a maximum of 12 TRXs. A synchronous cell with more than 12 TRXs can be configured in more than one cabinet, which can be called "combined cabinet configuration". Combined cabinet configuration means that one basic cabinet supports (maximum) one extension cabinet, and the cabinets are connected via clock cables, O&M cables, etc. In combined cabinet configuration, the cabinet with TMU board is called the "basic cabinet", and the cabinet without TMU board is called the "extension cabinet". The extension cabinet and the basic cabinet share the same TMU board. Clock, data, and maintenance & operation signals required by the extension cabinet are sent via cables from the basic cabinet to the extension cabinet. One basic cabinet, or 1 basic cabinet plus 1 extension cabinet, is called a cabinet group. Each cabinet group can support a maximum of 24 TRXs. When the number of TRXs in a synchronous cell exceeds 24, multiple cabinet groups can be configured. The cabinet group which provides the cell clock source is called the "basic cabinet group". In the basic cabinet group, the basic cabinet has 2 TMU boards. Other cabinet groups are called "extension cabinet groups" and 1 or 2 TMU boards can be configured in the basic cabinet of each extension cabinet group.
6-1
Clock and maintenance operation signals are sent via cables from the basic cabinet of the basic cabinet group to the basic cabinet of the extension cabinet group, and then from the basic cabinet of each cabinet group to the extension cabinet of this cabinet group. Cabinet (group) configuration should observe the following rules: When there are less than 12 TRXs in a synchronous cell, one cabinet is configured for this cell. When there are over 24 TRXs in a synchronous cell, combined cabinets are configured in accordance with the following rules:
z
The minimum antenna rule, i.e., to use as few as possible antennas for cell configuration. The minimum cabinet rule, i.e., to use as few as possible cabinets for cell configuration. The complete synchronous sector rule, i.e., all TRXs of a synchronous sector are configured in the same cabinet group. The basic cabinet priority rule, i.e., TRXs are configured in the basic cabinet in preference, and the number of TRXs in the basic cabinet is not less than that in any extension cabinet.
P S U
P S U
P S U
P S U
P M U
T T T M M E U U S
T T E E U U
6-2
slots. When SCU module and CDU module are installed, the full configuration of TRX/CDU frame is shown in Figure 6-2. The typical configuration (2 TRXs) of TRX/CDU frame equipped with EDU is shown in Figure 6-3. The typical configuration (4 TRXs) of TRX/CDU frame equipped with CDU and PBU is shown in Figure 6-4.
C D U
S C U
T R X
T R X
T R X
T R X
E D U
T R X
T R X
C D U C D U
P B U P B U
T R X T R X
P B U P B U
T R X T R X
Note: CDU slot can also be installed with EDU. TRX slot can be installed with PBU, but PBU should be on the left of the corresponding TRX. One PBU can only amplify the power for the corresponding TRX. When PBUs are configured, the corresponding CDU slot should be installed with ECDU or EDU, instead of CDU or SCU.
6-3
Antenna
Each sector is configured with 2 sets of single polarization antennas. A total of 6 such antennas are needed for the 3 sectors. Or, each sector is configured with one set of dual polarization antenna, and 3 sets of such antennas are needed for the 3 sectors.
RF cable set
M900/M1800 BTS312 S (4/4/4) configuration cables are used.
6-4
TDU
T R X
T R X
T R X
T R X
AIR BOX
C D U
S C U
T R X
T R X
T R X
T R X
FAN BOX
C D U
S C U
T R X
T R X
T R X
T R X
P S U
P S U
P S U
P S U
P S U
P P S M U U
TT T T T MM E E E UU S U U
AIR BOX
6-5
Antenna
Three sets of dual polarization antennas or six sets of single polarization antennas should be configured.
RF cable set
The BTS S (2/2/2) configuration cables are used.
6-6
TDU
E D U
T R X AIR BOX
T R X
E D U
T R X
T R X
FAN BOX
E D U
T R X
T R X
P S U
P S U
P S U
P S U
P S U
P M U
AIR BOX
6-7
Antenna
Two sets of single polarization antennas are configured, both of which are receiving/transmitting antennas. Or, one set of dual polarization antenna is configured.
RF cable set
The BTS O (6) configuration cables are used.
6-8
AIR BOX
C D U
T R X FAN BOX
S
T R X
C D U
S
C
T R X
T R X
T R X
T R X
C
U
P S U
P S U
P S U
P S U
P M U
T TTTT M ME E E U US UU
AIR BOX
6-9
Antenna
One set of dual polarization antenna or two sets of single polarization antennas should be configured.
RF cable set
The BTS O (4) configuration cables are used.
6-10
TDU
AIR BOX
E C D U
P B U
T R X
P B U
T R X
FAN BOX
E C D U
P B U
T R X
P B U
T R X
P S U
P S U
P S U
P S U
P S U
P M U
AIR BOX
6-11
Appendix A Abbreviations
A AB ACCH ACU AGCH AI ARFCN B BA BCC BCCH BER BFI Bm BP BSC BSIC BSS BSSAP BSSMAP BSSOMAP BTS BTSM C CA CBCH CC CCCH CCH CDU Cell Allocation Cell Broadcast CHannel Call Control Common Control CHannel Control Channel Combining and Distribution Unit BCCH Allocation Base Transceiver Station (BTS) Color Code Broadcast Control CHannel Bit Error Ratio Bad Frame Indication Full-rate traffic channel Burst Period Base Station Controller Base transceiver Station Identity Code Base Station Sub-System Base Station Sub-System Application Part Base Station Sub-System Management Application Part Base Station Sub-System Operation and Maintenance Application Part Base Transceiver Station BTS Management Access Burst Associated Control CHannel Alternating Current Unit Access Grant CHannel Action Indicator Absolute Radio Frequency Channel Number
A-1
CM CMB C/R CRC CUI D DB DCCH DCL DCU DL DLCI Dm DRX DTAP DTX E EAC EDU ETS ETSI F FACCH FACCH/F FB FCCH FCS FH FN FU G GMSC GMSK GSM
Connection Management Common resource Backplane Command/Response field bit Cyclic Redundancy Check (3 bit) Carrier Unit Interface Controller
Dummy Burst Dedicated Control CHannel Diagnostic Control Link Direct Current Unit Data Link (layer) Data Link Connection Identifier Control channel Discontinuous reception (mechanism) Direct Transfer Application Part Discontinuous transmission (mechanism)
External Alarm Collection Enhanced duplexer unit European Telecommunication Standard European Telecommunications Standards Institute
Fast ACCH Fast Associated Control Channel/Full rate Frequency correction Burst Frequency Correction CHannel Frame Check Sequence Frequency Hopping Frame Number Frame Unit
Gateway Mobile-services Switching Centre Gaussian Minimum Shift Keying (modulation) Global System for Mobile communications
A-2
H HDLC HLR HPA HSN I ID IE IF IMEI IMSI ISDN ISUP IWF L L1 L2 L2ML L3 LA LAPB LAPD LAPDm Lm M MA MACN MAI MAIO MAP MCK MM MMI MPH Mobile Allocation Mobile Allocation Channel Number Mobile Allocation Index Mobile Allocation Index Offset Mobile Application Part Main Clock board Mobility Management Man Machine Interface Management entity - Physical layer [primitive] Layer 1 Layer 2 Layer 2 Management Link Layer 3 Location Area Link Access Protocol Balanced Link Access Protocol on the D channel Link Access Protocol on the Dm channel Half rate traffic channel Identification/IDentity Signaling information element Information frames International Mobile station Equipment Identity International Mobile Subscriber Identity Integrated Services Digital Network ISDN User Part (of signalling system No.7) Interworking Function High level Data Link Control Home Location Register High magnification Power Amplifier board Hopping Sequence Number
A-3
MS MSC MSISDN MTP N NB NM O OCXO O&M, OM OMC OML OSI OSI RM P PAD PAU PBU PCH PCM PH PLMN PMU PP PSTN PSU R RACH RBER RCU RFN RIL3 RNTABLE RPU
Mobile Station Mobile-services Switching Centre, Mobile Switching Centre Mobile Station International ISDN Number Message Transfer Part
Oven voltage Control Oscillator Operations & Maintenance Operations & Maintenance Centre Operations & Maintenance Link Open System Interconnection OSI Reference Model
Packet Assembly/Disassembly facility Power Amplifier Unit Power Booster Unit Paging Channel Pulse Code Modulation Physical (layer) Public Land Mobile Network Power Monitor Unit (board) Point-to-Point Public Switched Telephone Network Power Supply Unit
Random Access CHannel Residual Bit Error Ratio Receiver Unit Reduced TDMA Frame Number Radio Interface Layer 3 Table of 128 integers in the hopping sequence Radio frequency Process Unit
A-4
RR RSL RSM(RR') RXLEV RXQUAL S SABM SACCH SACCH/C4 SACCH/C8 SACCH/T SACCH/TF SAP SAPI SB SCCP SCH SCN SCU SDCCH SFH SID SIM SMS SMSCB SS STU T TA TBU TC TCH TCH/F TCH/F2.4
Radio Resource management Radio Signalling Link Radio Sub-system Management Received signal level Received Signal Quality
Set Asynchronous Balanced Mode Slow Associated Control CHannel Slow Associated Control CHannel/SDCCH/4 Slow Associated Control CHannel/SDCCH/8 Slow Associated Control CHannel/Traffic channel Slow Associated Control CHannel/Traffic channel Full rate Service Access Point Service Access Point Indicator Synchronization Burst Signaling Connection Control Part Synchronization CHannel Sub-Channel Number Simple combining Unit Stand-alone Dedicated Control CHannel Slow Frequency Hopping Silence Descriptor Subscriber Identity Module Short Message Service Short Message Service Cell Broadcast Supplementary Service Site Test Unit (board)
Timing Advance Transceiver Baseband Unit Transcoder Traffic CHannel A full rate TCH A full rate data TCH (2.4kbit/s)
A-5
TCH/F4.8 TCH/F9.6 TCH/FS TDMA TDP TEI TES TEU TDU TI TMSI TMU TN TRAU TRB TRX TS
A full rate date TCH (4.8kbit/s) A full rate data TCH (9.6kbit/s) A full rate Speech TCH Time Division Multiple Access Transmitter Driver and PLL Terminal Equipment Identifier Transmission Extension power Supply unit Transmission Extension Unit Timing Distribution Unit Transaction Identifier Temporary Mobile Subscriber Identity Timing/Transmission and Management Unit Timeslot Number Transcoder and Rate Adaptor Unit Transceiver Backplane Transceiver Time Slot Technical Specification
A-6
HUAWEI
Table of Contents
Chapter 1 Overview ....................................................................................................................... 1-1 1.1 Introduction to BTS Terminal Maintenance ....................................................................... 1-1 1.2 Introduction to BTS Terminal Maintenance Operations..................................................... 1-1 1.2.1 User Login ............................................................................................................... 1-1 1.2.2 Interface Operation ................................................................................................. 1-2 Chapter 2 Site Maintenance ......................................................................................................... 2-1 2.1 Overview ............................................................................................................................ 2-1 2.2 Site Administrationship ...................................................................................................... 2-1 2.3 OpStart Site ....................................................................................................................... 2-3 2.4 View Resource................................................................................................................... 2-4 2.5 Forced Load SW ................................................................................................................ 2-4 2.6 SW Activate ....................................................................................................................... 2-6 2.7 Site Hierarchical Reset ...................................................................................................... 2-7 2.8 Site Test............................................................................................................................. 2-9 2.9 Site Environment Monitoring.............................................................................................. 2-9 Chapter 3 Cell Maintenance ......................................................................................................... 3-1 3.1 Overview ............................................................................................................................ 3-1 3.2 Cell Attributes Management .............................................................................................. 3-2 3.3 Cell Extended Attribute Management................................................................................ 3-4 3.4 OpStart Cell ....................................................................................................................... 3-6 3.5 Change Cell Administrative State ...................................................................................... 3-6 3.6 Cell Performance Test ....................................................................................................... 3-7 Chapter 4 BT Maintenance ........................................................................................................... 4-1 4.1 Overview ............................................................................................................................ 4-1 4.2 OpStart BT ......................................................................................................................... 4-2 4.3 Change BT Administrative State........................................................................................ 4-2 4.4 BT Reinitialization .............................................................................................................. 4-3 4.5 BT Test .............................................................................................................................. 4-4 Chapter 5 Channel Maintenance.................................................................................................. 5-1 5.1 Overview ............................................................................................................................ 5-1 5.2 Channel Attributes Management ....................................................................................... 5-2 5.3 OpStart Channel ................................................................................................................ 5-3 5.4 Change Channel Administrative State............................................................................... 5-3 5.5 Loop Test ........................................................................................................................... 5-4 Chapter 6 RC Maintenance........................................................................................................... 6-1 6.1 Overview ............................................................................................................................ 6-1
i
6.2 RC Attributes Management ............................................................................................... 6-2 6.3 RC Extended Attributes Management ............................................................................... 6-3 6.4 OpStart RC ........................................................................................................................ 6-4 6.5 Change RC Administrative State ....................................................................................... 6-4 6.6 RC Reinitialization.............................................................................................................. 6-5 Chapter 7 Board Maintenance...................................................................................................... 7-1 7.1 Overview ............................................................................................................................ 7-1 7.1.1 Board Maintenance ................................................................................................. 7-1 7.1.2 Board Maintenance Operations .............................................................................. 7-2 7.2 Board Reset ....................................................................................................................... 7-4 7.3 OpStart Board .................................................................................................................... 7-4 7.4 Board Self-test ................................................................................................................... 7-5 7.5 Change Board Administrative State................................................................................... 7-5 7.6 Board Information .............................................................................................................. 7-6 7.7 Loop Test ........................................................................................................................... 7-7 7.8 Board Alarm ....................................................................................................................... 7-8 7.9 Clock Operation ................................................................................................................. 7-9 7.10 Set Antenna and Feeder Parameters............................................................................ 7-10 7.11 CDU Operation .............................................................................................................. 7-11
ii
Chapter 1 Overview
1.1 Introduction to BTS Terminal Maintenance
In GSM systems, the BTS is usually installed far from the BSC side and unattended. Maintenance and monitoring over BTS terminal can be carried out at the BSC side or at the BTS side when local BTS terminal maintenance is necessary. In BTS terminal maintenance, the PC (desktop or laptop, usually the latter) that is installed with BTS terminal maintenance software is connected through serial communication cables and crossover cables to the TMU, which is the operation and maintenance unit of the BTS (there is a 9-pin serial communication cable port and a network port on TMU). Similar to BTS maintenance, BTS terminal maintenance is carried out by BTS logic objects. For details of BTS logic objects and their various states, refer to the module BTS Maintenance.
II. Login
Click on the fifth button in the toolbar, or select [User/User Login] in the menu, and a user login dialogue box will pop up. Input the user name and password in this dialogue box, and click <OK>, as shown in Figure 1-1. If the login succeeds, this dialogue box closes automatically, and the maintenance personnel are able to perform operations, while if the login fails, causes are displayed.
1-1
1-2
This section focuses on the function of the alarm box. BTS logic objects and their functions will be discussed in the following sections. The interface of [Site Maintenance Terminal System] is shown in Figure 1-3. The bottom part of this interface (blue in Figure 1-3) is where BTS alarm information is to be displayed. Click on any piece of the alarm information displayed, and the detailed explanation of the alarm will be provided in the popped up window (as shown in Figure 1-5). Right click to display a menu, as shown in Figure 1-4. Select to set, save, clear the alarm information, or browse along the list of alarm information.
1-3
1-4
BSC and the local BTS terminal. Therefore, site administrationship will be granted to one side at a time. When a site is installed and begins to run, BSC has the site administrationship by default. Therefore the maintenance personnel need to obtain site administrationship before performing any operation at the BTS terminal. When the operation is over, please release the site administrationship.
Note:
Site administrationship is desired for maintenance operations (e.g., operations over site, cell, base band, signaling channel, carrier or boards that result in change in data settings). Otherwise, no operations can be made, and the maintenance personnel will be prompted: "invalid administrationship".
II. Access
Enter the BTS terminal maintenance console, and select [Site/Site Administrationship]. Click <Obtain> or <Release> in the popped up dialogue box to obtain or release site administrationship, and the operational result will be displayed in this box, as shown in Figure 2-2.
Figure 2-2 Site administrationship When the operation is over, the administrationship must be released. Otherwise, maintenance personnel will be blocked from performing remote maintenance. The interface of releasing the administrationship is shown in Figure 2-3.
2-2
II. Access
Enter the maintenance console at the BTS terminal, and select [Site/OpStart Site]. Click <OK> in the popped up message box [Start Site Operation]. The operational result will be displayed in the status bar, as shown in Figure 2-4.
2-3
II. Access
Enter the BTS maintenance console, and select [Site/View Resource]. And the resource utilization status of the TRX and the TMU of the site will be displayed in the popped up window. Select in [Resource Type] to determine the type of resource whose utilization status is to be viewed. Figure 2-5 below shows the utilization status of the CPU.
2-4
II. Access
Enter the BTS maintenance console, select [Site/Forced load SW], and the dialogue box [SW Download] will pop up. Select the proper parameter or input the proper values in this dialogue box, and click <Begin>. The progress of software loading will be displayed at the maintenance console, as shown in Figure 2-6. When it is promoted that Software loading successful, click <Close> to complete the forced software loading from the maintenance console to the BTS.
The data for software loading is Send Window transferred with the window size as one 1~49 Size unit Version number of the software to be loaded For which type of board the software
Version
File ID
2-5
Field name
Value range
2.6 SW Activate
I. Function
After the forced BTS software loading, activate the software. The software upgrading task is not yet completed before the loaded software is activated. This task is completed in this section.
II. Access
Enter the BTS maintenance console, select [Site/SW Activate], and the interface [SW Activate] (as shown in Figure 2-7 and Figure 2-8) will pop up. Input the version number of the software to be activated, select the corresponding board number and file ID, and click <OK>. If the activation is successful, the prompt Request of activating software is confirmed will be displayed.
2-6
Board No.
File ID
2-7
II. Access
Enter the maintenance console of the BTS, select [Site/Site Reset Hierarchically]. The interface [Site Hierarchical Reset] will pop up. Select the level of the resetting in this interface, and click <OK>, as shown in Figure 2-9.
Please see the definition of this level of resetting on the interface. In this level of Fourth Level Reset resetting, base station TMU hardware resetting is performed, and the base station re-applies for BSC data configuration.
2-8
II. Access
Enter the BTS maintenance console, and select [Site/Site Test]. The interface [Site Test] will pop up. Click <OK>, and the test results will be displayed in the window, as shown in Figure 2-10.
Caution: In this system, burglary alarm, fire alarm and smoke alarm are all reported as burglary alarm. Therefore, the occurrence of any of them will trigger the burglary alarm.
2-9
II. Access
Enter the BTS maintenance console, and select [Site/Environment Monitoring Setup]. The interface [Environment Monitoring Setup] will pop up, as shown in Figure 2-11.
Figure 2-11 Environment monitoring setup Resetting of the environment monitoring instrument is performed when the equipment is in abnormal service. Select [Reset] in Select Operation Type. Click <OK>, then the resetting can be performed and the operational result will be displayed, as shown in Figure 2-12.
2-10
Figure 2-12 Resetting operation When the burglary alarm is confirmed or cleared, please clear the burglary alarm record. Select [Clear Burglary Alarm] in Select Operation Type. Click <OK>, the burglary alarm record will be cleared, and the operational result will be displayed in the status bar, as shown in Figure 2-13.
2-11
Conditions for the generation of environment alarms can be determined by the upper and lower limits for temperature and humidity. Select [Set Temperature and Humidity] in Select Operation Type and set the upper and lower limits for alarm generation in Temperature and humidity. Click <OK>. The operational result is displayed in the status bar, as shown in Figure 2-14.
Figure 2-14 Set the upper and lower limits for temperature and humidity With the implementation of relay operation, maintenance can startup and close some relevant equipment. Select [Relay Operation] in Select Operation Type, and set the starting and closing of the relevant relays in Relay Operation. Click <OK> and the operational result will be displayed, as shown in Figure 2-15.
2-12
Figure 2-15 Relay operation Select Disable the EAC Alarm, and the alarm report will be shut down for 10 minutes. This is performed by the maintenance personnel in equipment maintenance to prevent the mis-occurrence of false alarms caused by their operations. Select Disable the EAC Alarm in Select Operation Type, and click <OK>. The operational result will be displayed, as shown in Figure 2-16.
2-13
Note: Site administrationship is desired for all operations that result in the change of cell attribute or administration status. For details, please refer to the section "2 Site Maintenance".
3-1
II. Access
Open the BTS maintenance console, and select [Cell/Cell Attributes Management]. The interface [Cell Attributes Management] will pop up. Input the proper values in this interface, and click <Set>, as shown in Figure 3-2, Figure 3-3, and Figure 3-4. Then click <Refresh> to obtain the cell attributes.
3-2
As there are six interference levels, it is necessary The six parameters from Interference level to configure 6 parameters. The BTS calculates the -115 ~ -85 should be boundary interference level on the channel according to the arranged in ascending
3-3
User Manual M900/M1800 Base Transceiver Station (BTS312) Field name Meaning
Maintenance Console Description Chapter 3 Cell Maintenance Value range order and fall within the range. Recommended value
MR (measurement report) from the mobile station. After the calculation is compared with the six levels, the interference level of the channel can be obtained. It is mentioned in interference level boundary that Interference the BTS calculates the interference level according average to the MR from the mobile station, but this parameter parameter decides when BTS makes a calculation after a certain amount of reports are received. BTS makes comparisons according to the report Connection from the mobile station, the error rate and the level failure threshold value it receives, and decides if the connection fails. This is to decide the timer interval for waiting for T200 response when there is no response after messages are transferred. Max time The farthermost timing advance in the cell's advanced coverage area. The BTS will calculate the occupation rate of the channel once a certain period so as to judge if the Overload period channel is overloaded. The amount of the certain period is decided by the overload period. Ratio between the number of successful random CCCH load accesses in a time unit and the number of collisions threshold during this time unit. CCCH load Deciding the interval for the report to the network indication period side if CCCH is overloaded. RACH busy threshold Deciding the level value of the random access threshold.
0 ~ 255
15
0 ~ 16
14
0 ~ 63 0 ~ 255
63
0 ~ 100%
80% 15s
RACH load Measuring the random access channel load averaging slots average timeslots on RACH. Cell air timer Deciding the period of the timer. Maximum number of physical information NY1 retransmissions. It is a parameter relevant to handover. There are 124 and 374 frequencies respectively in BCCH ARFCN the M900/M1800 system. This field means the number of the frequency of BCCH. BSIC is BTS color code, which equals the sum of BSIC the network color code and the cell color code. This command will not work until it reaches this Starting frame frame number. For immediate start, take the value 0 ~ 42432, 65535 No. 65535.
Usually 6 and 4
65535
3-4
I. Function
To set the cell extended attribute. With cell extended attribute management, cell extended attribute can be obtained.
II. Access
Open the BTS maintenance console, select [Cell/Cell Extended Attribute Management]. The interface [Cell Extend Attribute Administration] will pop up, as shown in Figure 3-5. Click <Refresh> to obtain the cell extended attribute.
3-5
II. Access
Open the BTS maintenance console, and select [Cell/OpStart Cell]. The interface [Start Cell Operation] will pop up. Click <OK>, and the operational result will be displayed in the status bar, as shown in Figure 3-6.
3-6
II. Access
Open the BTS maintenance console, and select [Cell/Change Administrative State]. The interface [Change Cell Administrative State] will pop up. Select the administrative state to be changed into and click <OK>, as shown in Figure 3-7.
II. Access
Open the BTS maintenance console, and select [Cell/Cell Performance Test]. Click <Begin> in the popped up interface, and the test result will be displayed in this interface, as shown in Figure 3-8.
3-7
Chapter 4 BT Maintenance
4.1 Overview
Baseband Transceiver (BT) is a function entity involved in baseband processing. It corresponds to the 8 timeslots at the radio interface. The BTS terminal maintenance over the BT logic objects is shown in Figure 4-1.
Note: Site administrationship is desired for all operations that result in the change of base band attribute or administration status. (Please refer to the section "2 Site Maintenance" for details).
4-1
4.2 OpStart BT
I. Function
To enable the data set at the BT and put the BT into service through BTS terminal maintenance.
II. Access
Enter the BTS maintenance console, select [BT/OpStart BT] and click <OK> on the pop-up interface, and the operational result will be displayed in this interface, as shown in Figure 4-2.
II. Access
Enter the BTS maintenance console, and select [BT/Change BT Administrative State]. Select the BT whose administrative state needs to be changed in the pop-up interface and select the administrative state to be changed, then click <OK>. The
4-2
operational result will be displayed in the right half of this interface, as shown in Figure 4-3.
4.4 BT Reinitialization
I. Function
To reset the hardware of the BT. This will disconnect the users from the BT. Therefore, care should be taken with this function.
II. Access
Enter the BTS maintenance console, select [BT/BT Reinitialization], and click <OK> in the pop-up interface, and the operational result will be displayed in the window, as shown in Figure 4-4.
4-3
4.5 BT Test
I. Function
BT test includes: BIU loop test TRX self-test The BIU loop test involves the testing of physical links between the Abis signaling channel of the BSC and the baseband part of the TRX. On receiving the command, BT board performs the test, and reports the test result. The operation personnel can judge if the Abis link of the current BT board is normal according to the reported results. In the TRX self-test, self-test is performed over the TRX and the test results are returned.
II. Access
Enter the BTS maintenance console, select [BT/BT Test]. Select test items in the pop-up interface (e.g., BIU loop test /TRX self-test), set Test time and click <Begin> to start the test. When the test is over, the result will be displayed in this interface, as shown in Figure 4-5 and Figure 4-6.
4-4
4-5
Note: Site administrationship is desired for all operations that result in the change of base band attribute or administration status. (Please refer to the section "2 Site Maintenance" for details).
5-1
II. Access
Enter the BTS maintenance console, and select [Channel/Channel Attributes Management]. Input appropriate parameters, and click <Set>. The result of the setting will be displayed on the status bar in the window, as shown in Figure 5-2. Click <Refresh> to obtain the channel attributes.
5-2
II. Access
Enter the BTS maintenance console, and select [Channel/OpStart Channel]. Click <OK> in the pop-up interface, and the operational result will be displayed in the status bar, as shown in Figure 5-3.
II. Access
Enter the BTS maintenance console, and select [Channel/Change Administrative State]. Select the channel whose administrative state is to be changed, and click <OK>. The operational result will be displayed in the sub-window on the right of this interface, as shown in Figure 5-4 and Figure 5-5.
5-3
5-4
that was sent earlier, the TRX report the error rate and thus determines the link quality of the current RF unit. The BIU loop test mainly involves the testing of the connection state between the TMU and the TRX. The data sent from the TRX loops back from the TMU. After comparison, the error rate will be calculated so as to judge if the connection between TMU and TRX is normal.
II. Access
Enter the BTS maintenance console, and select [Channel/Loop Test]. Select appropriate test items in the pop-up interface, set the test time and the power level for the TRX RF self-test. Click <OK> to start the test. For illustration of the TRX FR self-loop test and the BIU loop test, see Figure 5-6 and Figure 5-7 below.
5-5
Chapter 6 RC Maintenance
6.1 Overview
The radio carrier (RC) is a transceiving entity corresponding to the eight timeslots at the radio interface. As can be seen from Figure 6-1, the following radio carrier operations are provided in BTS terminal maintenance:
z z z z z
RC attributes management RC extended attributes management OpStart RC Change RC administrative state RC reinitialization
Note: Site administrationship is desired for all operations that result in the change of base band attribute or administration status. (Please refer to the section '2 Site Maintenance' for details).
6-1
II. Access
Enter the BTS maintenance console, and select [RC/RC Attributes Management]. Input RC attributes in the pop-up interface, and click <Set>. The operational result will be displayed in the status bar in the window, as shown in Figure 6-2. Click <Refresh> to obtain the RC attributes.
6-2
II. Access
Enter the BTS terminal maintenance console, and select [RC/RC Extended Attributes management]. Input the RC extended attributes in the pop-up window, and click <Set>. The operational result will be displayed in the status bar of this window, as shown in Figure 6-3. Click <Refresh> to obtain the RC extended attributes.
6-3
6.4 OpStart RC
I. Function
To put the set RC data (RC attributes and RC extended attributes) into effect.
II. Access
Enter the BTS maintenance console, and select [RC/OpStart RC]. Click <OK>, and the operational result will be displayed in the pop-up interface [Start RC Operation], as shown in Figure 6-4.
II. Access
Enter the BTS maintenance console, and select [RC/Change Administrative State]. In the pop-up interface, select the BT whose administrative state is to be changed and the target administrative state, and click <OK>. The operational result will be displayed in the subwindow on the right of this interface, as shown in Figure 6-5 and Figure 6-6.
6-4
6.6 RC Reinitialization
I. Function
This is the reconfiguration of TRX data and the resetting of TRX. RC resetting will lead to the disconnection of users of the corresponding BT. Therefore, care should be taken with this function.
II. Access
Enter the BTS maintenance console, and select [RC/RC Reinitialization]. Click <OK> in the pop-up window, and the operational result will be shown in this interface, as shown in Figure 6-7.
6-5
6-6
7-1
7-2
Note: Site administrationship is desired for all operations that result in the change of base band attribute or administration status. (Please refer to the section '2 Site Maintenance' for details).
7-3
II. Access
Select [Reset] in the board operation menu, and the result will be displayed in the pop-up interface, as shown in Figure 7-5.
II. Access
Select [OpStart] in the board operation menu, and the operational results will be displayed in the pop-up interface, as shown in Figure 7-6.
7-4
II. Access
Select [Test] in the operation menu, and the test results will be displayed in the pop-up interface, as shown in Figure 7-7.
II. Access
To operate on the administrative state of the logic object: Right click on the icon of the board, and select [Administrative State/Locked (or Unclocked)]. To operate on a certain channel of the logic object: Right click on the icon of the board, and select [Administrative State/Block Channel], and select the channel to be operated on. See the illustration of Figure 7-8.
7-5
II. Access
Right click on the icon of the board, and select [Board Information]. The result of the query will be displayed in the pop-up interface, as shown in Figure 7-9.
7-6
II. Access
Right click on the icon of the board, and select [Loop Test]. The interface [Loop Test] will pop up, as shown in Figure 7-10.
7-7
Valid initial data of the loop test command issued by the TMU to the 0 ~ 255 board. Data increment length of the loop test command issued by the TMU 0 ~ 255 to the board.
7-8
II. Access
Right click on the icon of the board, and select [Board Alarm]. The interface [Board Alarm Information] will pop up. On the left of this window is a visual diagram for board alarms, where each grid stands for an alarm. If the grid is green, the corresponding board is normal, while if red, the board is faulty. In this case, click the grid that is red, and a detailed explanation of the alarm will be displayed in the sub-window on the right of the interface, as shown in Figure 7-11.
II. Access
In the TMU maintenance menu, select [Set CLK Hardware Parameters], then select the clock mode and input the parameters in the pop-up interface. Then click <OK>, and the operational result will be displayed in the window, as shown in Figure 7-12.
7-9
7-10
II. Access
In the CDU maintenance menu (refer to section 7.1), select [Set MDC Parameters], input appropriate parameters in the pop-up interface, click <OK>, and the operational result will be displayed in the status bar, as shown in Figure 7-13.
7-11
II. Access
In the CDU maintenance menu, select [CDU Operation], select the operation to be performed in the pop-up interface, click <OK>, and the operational result will be displayed in the status bar, as shown in Figure 7-14.
7-12
HUAWEI
Table of Contents
Chapter 1 Routine Maintenance Instructions............................................................................. 1-1 1.1 Routine Maintenance Overview......................................................................................... 1-1 1.1.1 Purpose of Routine Maintenance............................................................................ 1-1 1.1.2 Routine Maintenance Classification ........................................................................ 1-1 1.1.3 BTS Routine Maintenance Record & Instructions................................................... 1-2 1.2 Weekly Maintenance Instructions ...................................................................................... 1-8 1.3 Monthly Maintenance Instructions ..................................................................................... 1-9 1.4 Quarterly Maintenance Instructions ................................................................................. 1-10 1.5 Yearly Maintenance Instructions...................................................................................... 1-11 1.6 Return Loss, VSWR and Reflection Coefficient .............................................................. 1-12 Chapter 2 Fault Analysis and Location ....................................................................................... 2-1 2.1 Communication Fault......................................................................................................... 2-1 2.1.1 Introduction to MS's Search for the Network........................................................... 2-1 2.1.2 Call Failure .............................................................................................................. 2-2 2.1.3 No Voice Heard after the Call is Connected ........................................................... 2-5 2.1.4 Unidirectional Talk................................................................................................... 2-6 2.1.5 Poor Voice Quality .................................................................................................. 2-7 2.1.6 Conversation Interruption........................................................................................ 2-8 2.1.7 Cross Talk ............................................................................................................... 2-8 2.1.8 Mobile Station Frequently Disconnected from the Network.................................... 2-9 2.1.9 Immediate Assignment Rejection.......................................................................... 2-10 2.2 Network Fault................................................................................................................... 2-10 2.2.1 Mobile Station Fails to Find a Network ................................................................. 2-10 2.2.2 Mobile Station Fails to Access the Network.......................................................... 2-12 2.2.3 MS Frequent Location Updating ........................................................................... 2-14 2.3 Loading Fault ................................................................................................................... 2-15 2.3.1 Software Loading Failure ...................................................................................... 2-15 2.3.2 Base Station Initialization Failure .......................................................................... 2-17 2.4 Signaling Fault ................................................................................................................. 2-19 2.4.1 OML Link Blocked ................................................................................................. 2-19 2.4.2 RSL Link Blocked .................................................................................................. 2-19 2.5 Antenna and Feeder System Fault .................................................................................. 2-20 2.5.1 Fault Description ................................................................................................... 2-20 2.5.2 Introduction to the Antenna and Feeder System .................................................. 2-21 2.5.3 Fault Analysis and Location .................................................................................. 2-21 2.5.4 Troubleshooting Procedure................................................................................... 2-21 2.6 Optical Channel Fault ...................................................................................................... 2-22
2.6.1 Fault Description ................................................................................................... 2-22 2.6.2 Fault Analysis and Location .................................................................................. 2-22 2.6.3 Troubleshooting Procedure................................................................................... 2-22 2.7 Board Fault ...................................................................................................................... 2-23 2.7.1 TMU....................................................................................................................... 2-23 2.7.2 CDU....................................................................................................................... 2-25 2.7.3 EDU....................................................................................................................... 2-29 2.7.4 SCU....................................................................................................................... 2-32 2.7.5 TRX ....................................................................................................................... 2-34 2.7.6 PBU ....................................................................................................................... 2-36 2.7.7 PMU ...................................................................................................................... 2-38 2.7.8 PSU ....................................................................................................................... 2-42 2.7.9 TEU ....................................................................................................................... 2-43 2.7.10 TES ..................................................................................................................... 2-45
ii
To observe, test and analyze the equipment performance and operating conditions by means of normal maintenance. 2) Unconventional maintenance
To check whether the equipment performance has degraded by observing, testing and analyzing it in artificially-created special conditions. For example, to avoid alarm system fault, the maintenance personnel can deliberately create some faults and check whether the alarm system can generate reports correctly.
Maintenance tasks incurred by equipment fault and network adjustment. For example, the maintenance operations required at the time of user complaint, equipment damage and line fault are unscheduled. In addition, problems found and recorded in routine maintenance are also one of the triggering factors of unscheduled maintenance operations. 2) Daily routine maintenance
1-1
Maintenance operations conducted every day, which help the maintenance personnel keep track of equipment running conditions and solve problems in time. When a problem is found in daily maintenance, please record in detail the exact physical position where it occurs and describe it in detail, so that maintenance operations can be conducted in time to avoid bigger trouble. 3) Periodical routine maintenance
Maintenance operations conducted regularly, which help the maintenance personnel keep track of the long-time performance of the equipment. Periodical routine maintenance includes quarterly and yearly maintenance.
1-2
1-3
Problems remained
1-4
Problems remained
1-5
Problems remained
1-6
Normal
Abnormal
Normal
Abnormal
Problems remained
1-7
Environment condition
Temperature condition
It is normal that the environmental Observe the thermometer indication in temperature in equipment room is the equipment room. 15C~30 C, otherwise it is abnormal Observe the hygrometer indication in the equipment room. It is normal if the environmental humidity in equipment room is 40% ~ 65%, otherwise it is abnormal.
Humidity condition
Dustproof condition
All items should be clean without any visible dust attaching. Then the Observe equipment housing, dustproof condition is good. If any item is equipment interior, floor and desktop. not up to the standard, then the dustproof condition is bad.
Check whether it is normally running The indication of the thermometer is Indoor air conditioner running and whether the refrigeration function consistent with the temperature set and status is good. the refrigeration system works. Board running status Observe whether indicators of all boards are normal.
1-8
Call Test
Make sure the signal lightning arrester, power supply lightning arrester, antenna and feeder lightning arrester are in good condition.
Check the working status of antenna and feeder system Check the running conditions of secondary power supply boards
No alarm.
1-9
1-10
Check the waterproof conditions of the connectors and lightning grounding clips Check the firmness of antenna and tower top amplifier and the tilting angle of the antenna
Do not apply too much force when screwing up the nut with the wrench.
1-11
1-12
VSWR 1.04072 1.03621 1.03221 1.02866 1.0255 1.0227 1.0202 1.01799 1.01601 1.01426 1.0127 1.01131 1.01007 1.00897 1.00799 1.00712 1.00634
Reflection coefficient () 0.01995 0.01778 0.01585 0.01413 0.01259 0.01122 0.01 0.00891 0.00794 0.00708 0.00631 0.00562 0.00501 0.00447 0.00398 0.00355 0.00316
Formulas for calculating reflection coefficient , return Loss RL, and VSWR is displayed in the following table: Reflection coefficient
= Ureflected Uforward VSWR=
VSWR
Uforward+Ureflected UforwardUreflected
1+ 1
1 R alog( 20 )
VSWR1 VSWR+1 VSWR=
RL= 20log
VSWR=
RL= 20log
VSWR+1 VSWR1
1-13
After a mobile station (with a SIM card or after a SIM card is inserted) is powered on, the mobile station searches for the PLMN it logged in last time. If the PLMN does exist, the mobile station attempts to log in.
z z
If the login succeeds, the mobile station will be served by this PLMN. If the login fails because no appropriate cell is available, the mobile station will search at least thirty 900M channels or forty 1800M channels (The process of searching the radio frequency channels actually includes the selection of PLMN).
If the login fails due to the failure of location updating, then it is unnecessary to select the above mentioned frequency channels. However, the available PLMNs must be displayed to the subscriber. Subscribers can then select network in automatic or manual mode.
In automatic network search mode, the mobile station selects the network according to the priority of PLMN list it has saved. While in manual mode, the mobile station displays the available networks to the subscriber and tries to log in to the specified PLMN according to the subscriber's selection. Network search may be affected by the roaming process of the mobile station. This process can be classified into two types: international roaming and domestic roaming. International roaming: in which the mobile station logs in to other PLMNs in a different country from where the HPLMN is located. Domestic roaming: in which the mobile station logs in to other PLMNs in the same country where the HPLMN is located in. When the mobile station is roaming across the country, it will search for a HPLMN periodically. To prevent a mobile station from logging in frequently to a prohibited Location Area (LA) during domestic roaming, the mobile station saves this LA in a table named Forbidden Las for domestic roaming
2-1
of the mobile station equipment. This table will be cleared when the mobile station is powered off or when the SIM card is pulled out. In addition, the mobile station saves in its own SIM card some of the PLMNs where services are prohibited. Only when these PLMNs are selected in the manual network search mode and the location updating succeeds can these PLMNs be deleted from the service-prohibited PLMN table. Failure of mobile station network search indicates the failure in selecting a PLMN or a cell.
2-2
No
SDCCH available?
No
Yes
Assignment is over
No
Yes
TCHF available?
No
No
Yes
2-3
B Possible causes: 1. Improper BTS connection Receiving quality is too poor No Yes 2. Poor TMU clock precision 3. Too much air interference 4. BSC clock is not accurate enough 5. Problems with antenna and feeder system
Yes
Possible causes: 1. Wrong connection of BSC switching 2. TC board abnormal 3. A-interface blocked 4. MSC unable to obtain the No. Of roaming subscribers 5. Some routes are blocked at MSC side
No
Other causes
End
Figure 2-1 Troubleshooting procedures for call failure To clear the faults in originating calls, follow the instructions below: 1) 2) Trace and check Abis interface message via the interface in BSC maintenance console. If the immediate assignment fails, check if any assignment failed because SDCCHs are insufficient. Y The cell capacity is not large enough. In this case, re-configuyre or expand the cell capacity. N The failure of immediate assignment may be caused by data configuration errors. In this case, check the setting of paging parameters of the cell at the data management console. 3) If instead of immediate assignment failure there is TCH assignment failure, check whether the TCHs are insufficient. Y Check Abis interface data mapping relationship at the data management console.
2-4
N The cell capacity is not large enough. In this case, re-configure or expand the cell capacity. 4) If the radio link failure occurs after the TCH channel is established, observe the measurement report on the channel before the failure. Poor quality of BTS or MS signals may be the result of the following factors:
z z z z z z
Improper BTS connection Low TMU clock precision Too much air interference BSC clock not accurate enough Problems with the antenna and feeder system Blind spots in network coverage
The causes for absence of route at network side that causes the disconnection of links may be:
z z z z z
Connection error of BSC switching network Abnormality of TC board Blocking of A-interface Failure of MSC in get roaming subscriber number Blocking of some routes at MSC side
2-5
4) 5)
Trace and query the circuit status at MSC. If some circuit ports are always disconnected, block the port or replace TC board. Check if there is any Public network faults.
2-7
Handling suggestion: reconfigure cell data. 4) The receiving antenna and feeder are abnormal.
Handling suggestion: check whether there are water-penetration, corrosion or short-circuit with the receiving antenna and feeder. 5) 6) Check whether the mobile station is located too far away from the BTS, or in blind area. Fixed network equipment is abnormal.
2-9
2-10
1)
z
At the BTS maintenance console, check whether the operating status or the status indicators of respective boards are normal. Check if the attributes of TRX and TMU boards are consistent with the data configuration of the data management console, and whether the BSC clock is locked by the clock board. If all these items are normal, test whether the power output of the antenna and feeder is normal.
z
Check whether the configurations of CI, LAI, BSIC and CCCH are consistent with those in the radio channel configuration table. 2)
z
The causes of individual MS is fault may be: The MS is not located in a suitable place and RXQUAL (signal quality) is poor or RXLEV (signal level) is too low. Move the MS to an open place and try again. The battery of the MS is low.
Site initialization procedure: Set site logic object Set site hardware object Set site extended attributes Establish multi-point connection Site activation Cell initialization procedure: Create TEI Establish signaling channel connection Establish traffic channel connection Set cell attributes Set cell extended attributes Set RC attributes Set RC extended attributes Set channel attributes Set cell alarm threshold Cell activation Wait for cell status change report
2)
z z z z z z z z z z z
2-11
The result of these two types of initialization will be displayed at the maintenance console on a realtime basis. If the operation succeeds, a solid star will be displayed. If the operation fails, a hollow star together with the cause of failure will be displayed. Clearing hardware problem If the system messages are wrong, correct them. Set the whole table and validate them with the help of dynamic data configuration.
2-12
N Refer to step 2) below. To judge whether the cell has been activated: Select [Obtain Cell Attributes] to view for the information of the corresponding cell at the base station maintenance console. If it is prompted Cell is not initialized, the cell has not been activated. If attribute information about the cell is displayed, the cell has already been in service. 2) For the cell that has not been activated, reset the site that the cell belongs to.
Please note that this will affect the conversation of other cells under the site. During the initialization, the progress indication of respective stages of the initialization will be displayed. Base station initialization is embodied by the initialization of site and cell. Site initialization procedures:
z z z z z
Set site logic object Set site hardware object Set site extended attributes Establish multi-point connection Site activation
Create TEI Establish signaling channel connection Create traffic channel connection Set cell attributes Set cell extended attributes Set RC attributes Set RC extended attributes Set channel attributes Set cell alarm threshold Cell activation Wait for the cell status change report
The result of these two types of initialization will be displayed at the maintenance console in real time. If the operation succeeds, a solid star will be displayed. If the operation fails, a hollow star along with the causes of failure will be displayed. If there is any data error in the initialization, check the corresponding data configuration. If the initialization can not be executed, there is a configuration error in the board corresponding to the main control board of the base station. Check the board and return to Step 1).
2-13
3)
If the cell has already been in service, check whether the clock signal of the cell and TRX board corresponding to BCCH are normal. If they are not, please take corresponding measures.
How to check: Select [Equipment Status Query] at the maintenance console to view the board status. If the icon of the board is red, the board is abnormal. In this case, check whether the hardware of the base station, the communication between TRX and TMU, and whether each board is normally powered on. 4) 5) If the MS is a dual band one, but forcedly set to single band mode, change back into dual band mode. If the MS is improperly set, restore the ex-factory default setting.
Check if the location area codes in different system messages are consistent.
Figure 2-2 [SW Download] interface In this interface, set all items of the software to be loaded, including file name, sending window size, version, and file ID (file type), and then click <Begin> to start the loading
2-15
Caution: The software loaded will not take effect until it is activated.
Interface description: [File ID]: Identifier of various types of board software of the base station. Software No. varies with the types of boards. The file ID must match with the software. TRX_MAIN is the running software for TRX, and TMU_MAIN that of TMU. [Version]: Identifier the software of different versions for the same type of boards. [File Name]: The path and file name of the file loaded. [Send Window Size]: The number of frames of the messages sent by TMU between two responses. Generally it can be set as 49. After the software is successfully loaded, the interface of software loading will be as shown in Figure 2-3. The prompt Load SW successfully will be displayed in the message bar at the bottom of the interface [SW Download]. If the loading does not proceed as described above, it is not successful.
2-16
If the software is loaded via a local MMI, check whether the serial port connection is normal. If the software is loaded via a remote maintenance console, check whether the network connection is normal, and whether E1 line connection is correct. 2) Check whether the management authority is correct. If it is loaded at a local end, the management authority should be obtained at the local end. If it is loaded remotely, the management authority should be released at the local end. 3) Confirm whether the selection of software type is correct. For example, if the loaded software is TRX software, but the selected software type is not TRX_MAIN, then the loading will fail.
Set site logic object Set site hardware object Set site extended attributes Establish multi-point connection Site activation
Create TEI Establish signaling channel connection Establish traffic channel connection Set cell attributes Set cell extended attributes Set RC attributes Set RC extended attributes Set channel attributes
2-17
Corresponding commands or data configuration is sent to the base station during different stages of the initialization.
2-18
2-19
2-20
Note that the distribution of interference band can be viewed at the traffic measurement console using the menu command TCH performance measurement.
Caution: The prerequisite to the above procedures is that the transmission cable from TRX to CDU is not faulty.
3)
Test the antenna VSWR (voltage standing wave ratio) from 1/4 jumper connector connected with TX/RX_ANT port of CDU module. If it is normal, check the pitch angle of the antenna and adjust it to an appropriate angle.
4)
If the VSWR at testing antenna end, tested from 1/4 jumper connector, is abnormal, check section by section the VSWRs of respective connection ports of the connecting cable (including tower-top amplifier, lightning arrester) between this port and the transmitting antenna till the causes that worsen the VSWR are found. The causes may be poor connection of connectors, water leakage due to
2-21
poor waterproofing of connectors, high VSWR of the antenna and feeder lightning arrester, high VSWR and water penetration of the antenna etc. Then take corresponding measures to clear the fault according to the different causes.
2-22
First check whether CPU is normal, i.e., if the RUN indicator on TMU panel stops flashing, CPU is abnormal.
2-23
If it is abnormal, replace the board and then check whether the E1 ports connected to BSC are normal, i.e., if Indicators LI1, LI2, LI3 or LI4 on TMU panel are on or flashing, it indicates that faults have occurred to the corresponding E1 ports. If they are abnormal, refer to Section III 'E1 link alarm (including local alarm and remote alarm)' to solve the problem and then check whether BSC data configuration is correct. If the problem still exists, replace the TMU. 2) The terminal maintenance console shows the fault of the boards or modules other than TMU First check whether the board reported to be faulty is really faulty. Y Refer to relevant chapters or sections to solve the problem. N There may be communication fault between TMU and this board. In this case, solve the problem according to the following instructions: a. Check BSC data configuration and the wiring of the backplane. b. If the problem still exists, replace the TMU board or the board or module that is reported to be faulty. E1 link alarm (including local and remote alarm) When some of the E1 ports are faulty, the line alarm indicators LI1, LI2, LI3 or LI4 on the TMU board are on or flashing. Fault of local E1 port is indicated with the above listed indicators on, while that of the remote E1 ports, with these indicators flashing. To clear this type of fault, first check whether data configuration and line connection are correct. For fault of local E1 port, check if the port reported to be faulty is configured and if the E1 cables are connected. For fault of E1 port that has been configured, connect the receiving and transmitting terminals of the port with a 75 coaxial cable to determine whether the board is faulty. If alarm appears, it may be a TMU fault. Then replace the TMU board. If the site is configured as in cascading mode, check the data configuration relative to the cascaded sites. Clock is in free-run mode In this case, the PLL indicator on TMU panel is on. The clock enters free-run mode due to poor stability or loss of upper level clock reference signal.
2-24
Check whether the configured clock reference source is introduced by the E1 link or form the external clock.
z
If the clock reference signal is introduced by the E1 link, check whether there is E1 link alarm.
Y Refer to Section III, 'E1 link alarm (including local alarm and remote alarm)'. N Test T2M clock on the panel. If this clock is not very stable, there is fault with the upper level clock. Clear the fault of the upper level clock and TMU will automatically switch to the locked mode.
z
If external clock is configured, check: 1) whether the wiring is correct, 2) whether there is any external clock, 3) whether the external clock, if any, meets the requirements.
Clear the fault of the upper level clock and TMU will switch to the locked mode automatically. 13M output clock is found to be inaccurate when tested with a frequency meter Possible causes include:
z z
To clear this fault, check whether T2M signals on the TMU panel are faulty. If yes, there is fault with the upper level clock. In this case, clear the upper level clock fault. Correct the time of the upper level clock, and then: 1) 2) 3) 4) Set the 13M output clock in free-run mode. Send user-defined command to the 13M output clock to adjust the time of it. Check if the 13M output clock returns to normal. If the 13M output clock fails to lock the right frequency within (about) 20 minutes, replace the TMU board.
2.7.2 CDU
I. Sources of Fault Information
TMU fault can be detected from the information gathered from: 1) 2) 3) 4) The alarm box The alarm console CDU indicator status Hardware configuration status panel of the maintenance console
2-25
2) 3) 4)
High VSWR 2 (VSWR2) alarm Tower-top amplifier (TTA) alarm Low noise amplifier (LNA) alarm
Shake the 1/4-inch jumper and 1/2-inch jumper connected with TX/RX_ANT port of CDU, and see if their VSWR is stable. Test the SWR at the 1/4-inch jumper connector connected with TX/RX_ANT port of CDU, and shake the 1/4-inch jumper and the 1/2-inch jumper on top of the cabinet to see if the VSWR changes noticeably.
When the VSWR is less than 1.3:1, the VSWR of the antenna feeder system is regarded as normal. When the VSWR is greater than 1.4:1 or the cable is not correctly connected, it is very probable that the antenna feeder system is faulty. Try to replace the antenna feeder system to further determine whether the system is faulty. If replacement does not help, go to Step 3). If this step shows the antenna feeder system is faulty, please replace the antenna feeder system.
Caution: If a tower top amplifier is installed on the feeder line, cut off its power feed and test if the VSWR of CDU TX/RX_ANT port exceeds the standard by a large degree.
3)
z
Check if CDU is faulty Test if the VSWR of CDU TX/RX_ANT port is more than 1.5:1 which is seriously in contravention of the standard.
2-26
Check the VSWR alarm processing function of CDU: 1) Reset and re-power-on CDU. In this case, the system should react like being restarted. Otherwise, CDU is faulty. 2) Determine whether CDU is faulty by replacing it.
If CDU is found faulty, replace it. If after Step 2) and Step 3) the cause of CDU VSWR alarm fault is not determined, treat it as CDU VSWR alarm or as poor match between TX/RX_ANT and the 1/4-inch jumper connector. In the former case, replace CDU. In the latter case, replace CDU and the 1/4-inch jumper.
4)
Note: The cables from the 1/4-inch jumper to the antenna are connected in the following manner: The 1/4-inch jumper inside the cabinet 1) (N-type male connector to the 7/16 DIN female connector on top of the cabinet)<===>1/2-inch jumper from the cabinet top to the 2) (7/16 DIN male connector to 7/16 DIN female connector) <===>3) Lightning arrestor (7/16 DIN female connector to 7/16 DIN male connector) <===> the feeder line from the sealing window through wall to the triplex tower amplifier 4) (7/16 DIN female connector to 7/16 DIN connector) <===> 1/2 jumper from the feeder line to the triplex tower amplifier 5) (7/16 DIN male connector to 7/16 DIN male connector)<===>triplex amplifier 6) (7/16 DIN female connector to 7/16 DIN female connector) <===>1/2-inch jumper from triplex tower amplifier to the antenna 7) (7/16 DIN male connector to 7/16 DIN male connector)<===> antenna 8) (7/16 DIN female connector).
High standing wave ratio alarm 2 (VSWR2) Check sequence: antenna feeder systemCDU antenna portCDU alarm . 1) CDU reports alarm to the TMU when VSWR2 occurs to it, and reports critical VSWR2 alarm to the TMU if the alarm lasts for more than one minute. After the TMU is informed of the VSWR2 alarm, it sends a command to the TRX to switch off transmitting excitation. 2) Test if the reporting CDU has transmitting power.
Y TMU has not switched off the transmitting excitation. In this case, In this case, go back to the last section "I. High standing wave ratio alarm 1 (VSWR1)" and repeat step 1)-3). N TMU has disabled transmitting excitation. In this case, repeat steps 2) and 3) in the last section "I. High standing wave ratio alarm 1 (VSWR1)". 3) If the fault is not yet located at this point, enable TRX transmitting excitation and repeat Step 1) of the last section "I. (VSWR1)". 4) Replace the CDU. High standing wave ratio alarm 1
2-27
Tower-top Amplifier (TTA) Alarm Check sequence: CDU antenna feeder system (including tower top amplifier) 1) Reset CDU. Is the TTA alarm cleared after the resetting?
Y Proceed with Step 2). N The reported CDU alarm is false. In this case, replace the CDU. 2) Switch on the power supply to CDU tower top amplifier module. Does tower top amplification occur to the CDU? Y CDU voltage output is normal, and the alarm is caused by the insufficient current of the TTA, which shuts down the voltage. In this case, the TTA is normal. 3) Disconnect CDU antenna port with the 1/4-inch jumper. Use a multimeter to check if any short circuiting has occurred to the antenna feeder system; Y The antenna feeder system is faulty. In this case, check the feeder line, jumper and tower amplifier to locate the short circuit (such as water inflow). 4) Connect a galvanometer in series between the antenna port of the CDU and the 1/4-inch jumper. Keep the external conductor of CDU antenna port and the external conductor of the 1/4-inch jumper in good contact. Switch on the power supply to the TTA and measure whether the voltage is 12V and whether the power supply to the selected TTA is within the specified normal range. If the voltage is normal but the current is zero, it indicates the TTA is in a state of bypass. In this case, the TTA is damaged. Please replace it.
Note: If Step 4) cannot be performed due to the limit of the actual conditions, replace this CDU with one that does not comprise a TTA to check whether the antenna feeder system is normal. Here are the procedures for the checking: Power off this CDU, and disconnect the jumpers. Connect the jumpers of the antenna feeder system to the antenna port of the CDU that does not comprise a TTA. Power on the new CDU and switch on the power supply to the TTA. Is the new CDU reporting TTA alarm? Y If any, it indicates that the tower amplifier is faulty.
5)
2-28
Low noise amplifier (LNA) alarm 1) 2) Test the gain from the testing coupling port to RX output port of this channel to see whether it is normal. If not, replace the CDU. Reset the CDU forcedly at the maintenance console. Does the CDU return to normal after the resetting? Judge whether the software is faulty with the result of the resetting. 3) After the CDU is confirmed to be faulty, replace it.
2.7.3 EDU
I. Sources of Fault Information
The fault of EDU can be detected with the information gathered from:
z z z z
The alarm box The alarm information at the alarm console Status of EDU indicators Hardware configuration status at the maintenance console panel
2-29
N There might be fault with the antenna feeder transmission system. 4) Test the standing wave ratio of the outdoor antenna feeder system to determine whether it is faulty and whether parts of the antenna feeder system should be replaced. Below are the instructions: Shake the 1/4-inch jumper and 1/2-inch jumper on top of the cabinet connected with TX/RX_ANT port of EDU, and see if their VSWR is stable. Test the VSWR at the 1/4-inch jumper connector connected with TX/RX_ANT port of EDU, and shake the 1/4-inch jumper and the 1/2-inch jumper on top of the cabinet to see if the VSWR changes noticeably. When the VSWR is less than 1.3:1, the VSWR of the antenna feeder system is regarded as normal. When the VSWR is greater than 1.4:1 or the cable is not correctly connected, you may initially conclude that the antenna feeder system is faulty. Adopt the method of antenna feeder system replacement to further make sure if the system is faulty. When this method fails, go to Step 5). If this step shows the antenna feeder system is faulty, please deal with fault in the way of checking the fault of the antenna feeder system
Caution: If a tower top amplifier is installed on the feeder line, its power feed must be cut off first. Then, test if the SWR of EDU TX/RX_ANT port exceeds the standard by a large degree.
5)
Test to see if the VSWR of EDU TX/RX_ANT port is more than 1.5:1 beyond the standard seriously. When it is confirmed that the VSWR alarm processing function of EDU is abnormal, first reset EDU and power on again. Does the system return to normal? Y If the alarm occurs again, the EDU is normal. If not, the EDU is faulty Secondly, use EDU replacement method to make sure if the EDU is faulty. Y Replace the EDU. If the fault is not yet cleared at this point, switch on the TRX transmitting excitation, and repeat Step 3) to make sure if the alarm is false. 6) If the EDU is found faulty, replace it.
2-30
Standing wave ratio alarm B (VSWRB) Its removal process is the same as with the voltage standing wave alarm A. Top-tower amplifier alarm (TTA) 1) Check sequence: CDU antenna feeder system (including tower amplifier)1) Reset EDU to see if the TTA alarm disappears. If not, a false alarm occurs to EDU and it is necessary to replace the EDU. If the alarm disappears, go to Step 2). 2) Disconnect EDU antenna port with the 1/4-inch jumper. Use a multimeter to check if short circuit occurs to the antenna feeder system; if so, it indicates the antenna feeder system is at fault, and it is necessary to check the feeder line, jumper and tower amplifier to locate the short circuit (such as water inflow). 3) Switch on EDU TTA feeding power, and see if TTA alarm occurs to the EDU. If so, it indicates that EDU voltage output is normal (the alarm arises from the shortage alarm of TTA current, which shuts down the voltage. This is normal). 4) Connect a galvanometer in series between the antenna port of the EDU and the 1/4-inch jumper. Please be sure to keep good electric contact between the external conductor of EDU antenna port and the external conductor of the 1/4-inch jumper. Switch on the feeding power of tower amplifier and measure whether the feeding voltage is accurate (12V) and see if the current of the feeding power of tower top amplifier stays within the normal work current range of the tower amplifier selected. If the voltage is normal but the current is zero, it indicates the tower top amplifier is in a state of bypass, the tower amplifier has been damaged and thus requires replacing.
Note: When the conditions for taking this step are not satisfied, an EDU without its tower top amplifier working properly to check if the antenna feeder system that the EDU with alarm fault corresponds to is normal: connect the jumper of this antenna feeder system to the antenna port of the EDU that works properly (power off this EDU beforehand, and disconnect the jumper as well), and power on EDU as well as the tower top amplifier feeding (TCP), to see if the EDU tower top amplifier gives an alarm. If any, it indicates that the tower amplifier is faulty.
5)
Check each part of the antenna feeder system to locate the fault. If the tower top amplifier is still faulty, replace it.
Low noise amplifier alarm (LNA) 1) 2) Test the gain from the testing coupling port to RX output port of this channel to see whether it is normal. If not, replace the EDU. Utilize the forced reset function of EDU alarm control unit.
2-31
3) 4)
Reset the EDU by force on the terminal maintenance console to check if EDU indicator works properly. Thus, make sure if it is a software false alarm. When EDU fault is located, replace the EDU.
2.7.4 SCU
I. Sources of Fault Information
z z z z
Alarm box View alarm console information Hardware configuration status panel of the maintenance console Downlink signals abnormal
Downlink signals not good Transmitting power very small or the transmitting power of various channels rather unbalanced No transmitting power
Note:
SCU module is a passive component, whose mean time between failures (MTBF) is lengthy, and has no panel indicator. Furthermore, SCU needs to be used together with CDU(not solely used at the front of base station RF). So, when fault occurs, it is not easy to be noticed, and thus it is necessary to check carefully.
Downlink signals not good 1) 2) First remove the fault, if any, of the RF cable between the antenna feeder system, CDU module, TRX module, including TRX, SCU and CDU modules. Use the wireless testing function of a test mobile station (configured with the base station) to check if the antenna feeder system of the base station can receive and transmit signals properly. If the transmitting signals are intermittent or obviously low, various CW of the same antenna are not balanced or signals are not through, it indicates there might be something wrong with TRX transmission and the RF front end, including the antenna feeder system. First remove the fault, if any, of the RF cable between the antenna feeder system,
2-32
CDU module, TRX module, including TRX, SCU and CDU modules (for example, the antenna is not installed, and the feeder line/jumper is not connected well). If there is no fault, check if TRX transmitting power is normal. In the event of any fault with TRX, CDU or the antenna feeder system, go to the flow of dealing with fault with TRX, CDU and the antenna feeder system; otherwise, go to the next step. 3) Test the transmitting insertion loss of SCU module and the return loss (SWR) of each interface, to make sure if they are normal. If the transmitting insertion loss of SCU (including any channel of the four) exceeds 7.1 dB, it indicates it's faulty; if the interface return loss is less than 14 dB, it indicates SCU module is faulty. 4) When the above steps have been completed, if SCU is found faulty, please replace the SCU module Transmitting power very small or the transmitting power of various channels rather unbalanced 1) 2) First check if the installation (connection) from TRX module to the outdoor antenna feeder system is at fault, and if TRX module is abnormal. Check if the installation (collection) of the cable from TRX module to outdoor antenna feeder system is faulty, so as to rule out the fault of cable damage or installation fault; check if TRX module has any alarm, and test to see if its transmitting power is normal. 3) Check CDU module and the parts of antenna feeder system such as feeder line, lightning arrester, tower top amplifier and antenna. Refer to the process flow for CDU fault and antenna feeder system fault for the processing. 4) 5) When Step b) fails to locate the fault, go to Step b) in the section 'downlink signals not good' for processing. Replace SCU. No transmitting power First check if there is anything wrong with CDU module and TRX module. When critical standing wave alarm occurs to CDU, BTS will switch off TRX transmitting power; when standing wave alarm occurs to TRX, BTS will switch off TRX transmitting power. Test to see if SCU combiner output port (TX-COM) is abnormal. If TRX transmitting power is normal, use a spectrum analyzer (connected to high-power attenuator of 60 dB) or power meter at the combiner output port (TX-COM) to test if the output power of each TRX carrier wave connected with SCU is normal. Replace SCU module.
2-33
2.7.5 TRX
I. Sources of Fault Information
1) 2) 3) 4) Alarm box Alarm console TRX indicator status Hardware configuration status panel of maintenance console
V. Power alarm
1) 2) 3) 4) Check whether there is power supply alarm. Check whether there is any clock alarm and whether the clock line between backplanes TRB and CMB is normal. Check whether TRX is firmly inserted. Replace the TRX if the fault still can not be removed.
2-34
Check whether the wiring is correct. If not, modify the wiring as required. Check whether there is any broken line. Check whether TDU module and the wire are properly connected and whether there is any fault in TDU module. If there is, replace the TDU module. Check whether there is fault in TMU module. If there is, replace the TMU module.
X. FPGA alarm
1) 2) 3) Check clock alarm. Reset TRX. Replace TRX if the fault still can not be removed.
2-35
2.7.6 PBU
I. Sources of Fault Information
z z
2-36
Observe the status of PBU indicator View hardware configuration status of maintenance console panel
High voltage standing-wave ratio alarm Overtemperature alarm Underpower alarm Board communication alarm Flash memory alarm EPLD load times alarm EPLD upgrade failure alarm Master clock alarm Slave clock alarm Clock critical alarm
PBU over temperature alarm 1) 2) 3) Check the equipment temperature and environment control equipment. Check the operation of rack fans. If all the temperature control equipment works properly, replace this PBU module. PBU underpower alarm 1) 2) Restart the equipment to see if it can be restored. If it cannot be restored, replace the said PBU module.
PBU board communication alarm 1) 2) Check if PBU is powered on. Replace PBU.
EPLD load times alarm If EPLD is erased for times more than the threshold value (100 times), this alarm will be generated.
2-37
PBU EPLD upgrade failure alarm If EPLD in Flash upgrade software fails to be loaded for three times consecutively, this alarm will occur. PBU master clock alarm 1) 2) 3) 4) Check TMU clock. Check clock transmission line. Check TDU. View if extended TMU is installed.
PBU slave clock alarm 1) 2) 3) 4) TMU clock. Check the clock transmission line. Check TDU. View if extended TMU is installed.
PBU clock critical alarm 1) 2) 3) Check active and standby clock transmission line. Check active and standby clock. Replace PBU unit.
2.7.7 PMU
I. Sources of Fault Information
1) 2) PMU indicator status Hardware status display panel on the maintenance console
measure whether the output voltage is normal. If it does not fall within the operating voltage range, then PSU power supply is abnormal. If it is normal, check whether PMU is properly inserted. If the problem still exists, replace the PMU board. Power supply system alarm In this case, the ALM system alarm indicator on PMU panel is on. It indicates that there are faults in the power supply system. These faults can be viewed via the base station maintenance console and they may be power module alarm, power distribution alarm, and environment alarm. 1) Power module alarm
a) Power module fault First check whether the input voltage and output voltage of the power frame fall within the operating range. If they do not, check the input power supply and output load. If they are normal, pull out the faulty power module from the backplane according to the alarm power module address prompted in the base station maintenance console. Then re-insert when all indicators are off. View the base station maintenance console for any module fault alarm. If there is no fault alarm, then the power module has recovered and can be put into use again. If the alarm reoccurs, replace the faulty power module. b) Power module protection The cause is that the power module input voltage exceeds the operating range or the operating temperature is too high. Check whether there is any over/under-voltage in the input power supply. If it is abnormal, repair the input power supply. If it is normal, check whether the operating temperature of the power module is too high or whether the cooling fan is faulty. If all the above are normal, pull out the power protection module from the backplane according to the alarm power module address prompted in the base station maintenance console. Reinsert the module when all indicators are off. View the base station maintenance console for any module protection alarm. If there is no alarm, then the power module has recovered and can be put into use again. If the alarm reoccurs, replace the power protection module. c) Power module communication failure Check whether PMU and PSU are well inserted. If they are properly installed and of good contact, check via the base station maintenance console to see whether the power module quantity and the data configuration of each module address are correct. If correct, check whether all the inserted modules fail in communication. If all fail in communication and yet it is not sure whether the PMU is normal, replace the PMU. If PMU is confirmed to be normal, replace power frame backplane. If communication failure only occurs to some modules, interchange the positions of the power modules of successful communication with those of communication failure. If the modules that
2-39
previously failed in communication still fail in communication, replace the power module PSU. If the power module of successful communication fails in communication after the interchange, replace the power frame backplane. 2) Power distribution alarm
a) AC input power-off or AC input over/under-voltage In DC/DC power supply system, check whether module communication is successful. If all fail in communication, refer to Subsection c (Power Module Communication Failure) in Section 1) for solutions. When no power module is installed, check via the base station maintenance console to see whether module quantity is set as 0. Check the AC input distribution in AC/DC power supply system. If the distribution wires are normal and AC input voltage is normal as well, check whether the PMU is well inserted. If it is properly installed and of good contact, first consider replacing the PMU. If AC input power-off alarm still exists, replace the power supply backplane. b) DC output over/under-voltage View the busbar voltage via the base station maintenance console and compare it with the actual voltage. If the over/under-voltage is caused by measurement error, check whether the PMU is well inserted. If it is properly installed and of good contact, consider replacing the PMU. If the measurement is made correctly, check when there is DC over-voltage alarm whether the power module or power supply input or power load is abnormal. When there is DC under-voltage alarm, check whether the AC input, power module or power supply input, and power load are abnormal. c) Battery powered off If the conditions for batteries being powered off are met, the monitoring module should stop working and no battery powered off alarm should be detected due to single power supply mode. Check whether the power-off contactor is working. Replace it if it is not working. d) Battery fuse broken Check whether the battery loop fuse, contactor and wiring are normal. If no problem is found with the wiring of the battery loop and devices, check whether the PMU is well inserted. If it is properly installed and of good contact, replace the PMU. e) System output voltage abnormal There is wide differences between the busbar voltage and the specified output voltage. If it is a DC/DC system, the problem may come from the power module or the load. Check whether the power module and the load are abnormal. If it is an AC/DC system, the problem may come from battery pack temperature compensation, power module fault or the load. Check via the base station maintenance console to see
2-40
whether the measured value of the battery pack temperature is correct. If the value is correct, do calculation using the following formula: Temperature compensation voltage = floating charge voltage (battery pack temperature - 25) % temperature compensation coefficient If the battery pack compensation voltage and busbar output voltage calculated deviate within the error range (0.3V), then it is normal. If the deviation is too big, check whether the power module and the load are abnormal. If the temperature sensor measurement value is incorrect and there is no battery pack temperature sensor attached, check whether the PMU is well inserted. If it is properly installed and of good contact, replace the PMU. When there is a battery pack temperature sensor attached, remove the temperature sensor. And if the measured temperature value is the default value 25 C, then the temperature sensor must be defective. Replace the battery pack temperature sensor. If the measured temperature value of the battery pack is not the default value, the PMU temperature measurement circuit may be faulty. Replace the PMU. 3) Environment alarm
a) Ultra high/low ambient temperature or humidity When installing temperature/humidity sensor, check via the base station maintenance console to see whether the measured value is consistent with the actual value. If it is, tackle the environment problem. If the alarm is caused by incorrect measurement, check whether the PMU is well inserted. If it is properly installed and of good contact, replace the sensor first. If the measurement remains inaccurate, replace the PMU. If no temperature/humidity sensor is installed, check whether the PMU is well inserted. If it is properly installed and of good contact, replace the PMU. b) Smoke alarm, infrared alarm and soaking alarm Check whether the PMU is well inserted. If it is properly installed and of good contact, check whether there is any environmental alarm on the site mentioned above. If there is any such alarm, tackle the on-site environment problem. If no such alarm, check whether there is any fault in the sensor and its line. If the sensor and its line are normal, replace the PMU. c) Door control alarm Check whether PMU is well inserted. If it is properly installed and of good contact, and no door control sensor is installed, check whether there is short-circuit jumper connector in the door control sensor interface MC on the power supply backplane. If there is not, install short circuit jumper connector. If there is, replace the PMU. If door control sensor has been installed, check the site for any environmental alarm mentioned above. If such alarm exists, solve the on-site environment problem. If there
2-41
is no such alarm, check whether the sensor and its line are faulty. If they are normal, replace the PMU. d) Fan alarm Check whether PMU is well inserted. If it is well installed and of good contact, check whether the rack feature No. configured in the base station maintenance console is correct. If it is, check whether the fan fault signal input connector has been installed in the fan port of the power supply backplane. Install the connector if it is not installed. If there is a line fault, solve the problem of fan fault signal input line. If everything is normal, replace the PMU.
2.7.8 PSU
I. Sources of Fault Information
1) 2) 3) 4) Alarm box Alarm console PSU indicator status Hardware configuration status panel of the maintenance console
Note:
When system output load is small, individual modules may not work (i.e., the VO indicator is off) due to current equalization. Yet it should not be considered as a fault.
If the green input indicator (VIN) of the power module is on, while the green output indicator (VO) is off or flashing, check by the following procedures 1) Check whether the faulty module is well installed, and whether the two fasteners at the upper and lower sides of the panel are tightly screwed. If not, reinstall the module following the specified module assembly procedure.
2-42
2) 3)
Check whether the system fan is running normally. If it is not running, turn on the fan. When the fan is running normally, and the green output indicator (VO) remains off, then it may be that the module has not yet received the PMU voltage regulation signal. Please wait for half a minute and observe.
4)
If the green output indicator (VO) remains off after the above steps, this module must be faulty.
If none of the three indicators on the module are on, check by the following procedures 1) Check the status of other power module indicators in the same system. If all of them are off, check whether the power supply system input busbar (or connector post) is live or whether the connection is loose. If any problem is found, reconnect the input line. 2) If one or module indicators are on or it is sure the power system input busbar is live, check whether the module is properly installed and whether the two fasteners at the upper and lower sides of the panel are tightly screwed. If not, reinstall the module following the specified module assembly procedure. 3) If the indicator remains off after the above steps, this module must be faulty. If the green input indicator (VIN) and red indicator (ALM) on the module panel are off while the green output indicator (VO) is on, it means that the module itself can normally output power supply. Please make replacement if spares are available. If no spares are available, this module can still work as before and normal power supply function will not be affected. If the red alarm indicator (ALM) on the module panel is on while the green output indicator (VO) is off, check by the following procedures 1) Check the system monitoring for any input over/under-voltage alarms. If such alarm is found, then it is normal that the red indicator (ALM) is on. When the input voltage resumes normal, the module will also resume its normal operation. 2) If the input voltage is normal, check whether the cooling fan of the system cabinet has stopped running. When the fan has stopped for a long time, over temperature protection will occur to the module. Pull out the alarm module according to the power module replacement procedure. Detach the module from the power system and reinsert it into the power supply system frame a few minutes later when it is cooled. Then the module should work normally, otherwise it must be faulty and replacement is needed.
2.7.9 TEU
I. Sources of Fault Information
1) Alarm console
2-43
2) 3)
TEU indicator status Hardware configuration status panel of the base station maintenance console
This alarm means that faults have occurred to the E1 line. Check whether the E1 line connectors are in good contact. E1 line transmits in 75 and 120 resistance
2-44
respectively. Check whether the setting of board toggle switch is correct. The default value of the board is 75. Directly connect the receiving end and sending end of the port using a 75 coaxial cable to determine whether the board is faulty. If any alarm occurs, it can be determined that the TEU board is faulty. Please replace the board. 2) In-board E1 alarm
This alarm means that a fault occurs within the board. Please replace the board. Orderwire blocked Check whether the board has 48V or 24V power supply input, i.e., whether the jumper setting is correct (Jumpers of ASU and PAT are all set to 48V). Replace TEU board. If the problem still exists, replace CMB backplane.
2.7.10 TES
I. Sources of Fault Information
1) 2) 3) Alarm console TES indicator status Hardware configuration status panel of the maintenance console
2-45
In this case, the ALM indicator on TES panel is on, indicating that a communication fault has occurred to the serial port between TES and TEU, and the serial port between the two boards is blocked. First replace the TES board. If the communication alarm does not disappear, replace the TEU board. If the alarm still exists, replace the CMB backplane.
2-46