Você está na página 1de 20

261

18.50

18.75

19.00

19.30

19.60

20.00

25.00

25.00

25.00

5.00

6.00

7.00

8.00

9.00

10.00

15.00

20.00

25.00

17.50

3.00

18.25

17.25

2.50

4.50

17.00

2.00

18.00

16.50

1.50

4.00

16.00

1.00

17.75

15.00

0.50

3.50

2.67

3.08

3.64

4.00

4.17

4.37

4.61

4.88

5.19

5.36

5.54

5.74

5.96

6.20

6.48

6.77

7.11

7.50

139.33

129.08

115.09

86.00

81.06

75.98

70.48

64.54

57.93

54.22

50.31

46.16

41.74

37.01

31.90

26.31

20.22

13.50

Leads in Av. speed No.of


Kms
KMS. Kms./Hrs. Trips
Done
L
S
N=8/2(L/S)+1 2NL+6

46.44

43.03

38.36

28.67

27.02

25.33

23.49

21.51

19.31

18.07

16.77

15.39

13.91

12.34

10.63

8.77

6.74

4.50

Qty.of
Diesel
Ltr.

2383.53

2208.08

1968.82

1471.17

1386.73

1299.82

1205.76

1104.01

990.99

927.53

860.60

789.67

714.11

633.14

545.78

450.04

345.93

230.94

0.995

0.922

0.822

0.614

0.579

0.543

0.503

0.461

0.414

0.387

0.359

0.330

0.298

0.264

0.228

0.188

0.144

0.096

228.90

212.05

189.08

141.29

133.18

124.83

115.80

106.02

95.17

89.08

82.65

75.84

68.58

60.80

52.41

43.22

33.22

22.18

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

10

5997.43

5805.13

5542.90

4997.46

4904.91

4809.65

4706.56

4595.03

4471.16

4401.60

4328.25

4250.51

4167.69

4078.94

3983.20

3878.26

3764.16

3638.12

11

599.74

580.51

554.29

499.75

490.49

480.96

470.66

459.50

447.12

440.16

432.82

425.05

416.77

407.89

398.32

387.83

376.42

363.81

12

6597.18

6385.64

6097.19

5497.20

5395.40

5290.61

5177.21

5054.53

4918.27

4841.76

4761.07

4675.56

4584.46

4486.84

4381.52

4266.08

4140.57

4001.93

13

2473.94

2075.33

1676.73

1374.30

1293.79

1209.58

1124.00

1036.18

947.10

903.69

859.64

814.93

769.53

723.42

676.56

630.22

582.27

533.59

14

Cost of
Cost of Cost of
Hire
Total
Diesel
Qty.of Mobile Oil
6
Charges
cost
Add 10%
(Cost per
@
Mobile Oil
@
Mazdoor of Truck.
Rs.
overhead Total of
Trip
51.32
Ltr.
230.00
270.00 1765.00 (6+8+9+10) charges. (11+12) col. 13/3

Carriage of Material over distance exceeding 0.50 Km. including loading and unloding.

STATEMENT C (for 2012-2013) P.W.PUNE CIRCLE

25.00

20.00

15.00

10.00

9.00

8.00

7.00

6.00

5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

0.50

15

Lead
in
Kms.

262

25.00

30.00

30.00

30.00

30.00

30.00

30.00

30.00

30.00

30.00

40.00

40.00

40.00

40.00

30.00

35.00

40.00

45.00

50.00

60.00

70.00

80.00

90.00

100.00

125.00

150.00

175.00

200.00

0.73

0.82

0.94

1.10

1.04

1.14

1.26

1.41

1.60

1.85

2.00

2.18

2.40

2.35

296.91

293.18

288.35

281.86

214.70

211.71

208.11

203.65

198.00

190.62

186.00

180.55

174.00

147.18

98.97

97.73

96.12

93.95

71.57

70.57

69.37

67.88

66.00

63.54

62.00

60.18

58.00

49.06

Qty.of
Diesel
Ltr.

5079.12

5015.32

4932.76

4821.72

3672.73

3621.73

3559.99

3483.72

3387.12

3260.79

3181.84

3088.53

2976.56

2517.70

2.121

2.094

2.060

2.013

1.534

1.512

1.486

1.455

1.414

1.362

1.329

1.290

1.243

1.051

487.78

481.65

473.72

463.06

352.71

347.82

341.89

334.56

325.29

313.15

305.57

296.61

285.86

241.79

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

1620.00

6.L.F. - PAY LOAD factor/Trip

5.Higher charges of Truck Rs. 1765/day

4.Mazdoor for Loading /Unloding RS. 270./Day

3.Consumptionof Mobile Oil - 1Ltr. per 140 Kms. of travel (oil rate is Rs. 230/Ltr.)

2.In col. 4 of Kms. Done allowance of 6 KMS. is considered.

Note:1.No. of trips in working of 8 hours N =8/2(L/S)+1

Leads in Av. speed No.of


Kms
KMS. Kms./Hrs. Trips
Done
L
S
N=8/2(L/S)+1 2NL+6

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

1765.00

10

8951.90

8881.98

8791.48

8669.78

7410.44

7354.54

7286.87

7203.29

7097.41

6958.95

6872.41

6770.14

6647.42

6144.49

11

895.19

888.20

879.15

866.98

741.04

735.45

728.69

720.33

709.74

695.89

687.24

677.01

664.74

614.45

12

8642.69

7811.84

7078.75

6345.65

5612.56

4879.47

4146.37

3779.83

3413.28

3046.73

2872.55

14

125.00

100.00

90.00

80.00

70.00

60.00

50.00

45.00

40.00

35.00

30.00

15

Lead
in
Kms.

9847.09 13539.75 200.00

9770.17 11907.40 175.00

9670.63 10275.04 150.00

9536.76

8151.49

8090.00

8015.56

7923.61

7807.15

7654.84

7559.65

7447.16

7312.16

6758.94

13

Cost of
Cost of Cost of
Hire
Total
Diesel
Qty.of Mobile Oil
6
Charges
cost
Add 10%
(Cost per
@
Mobile Oil
@
Mazdoor of Truck.
Rs.
overhead Total of
Trip
51.32
Ltr.
230.00
270.00 1765.00 (6+8+9+10) charges. (11+12) col. 13/3

Carriage of Material over distance exceeding 0.50 Km. including loading and unloding.

263

947.10

1036.18

1124.00

1209.58

1293.79

1374.30

1676.73

6.00

7.00

8.00

9.00

10.00

15.00

769.53

3.00

5.00

723.42

2.50

903.69

676.56

2.00

4.50

630.22

1.50

859.64

582.27

1.00

4.00

533.59

0.50

814.93

3.50

Cost per
trip

Lead in Km.

279.45

229.05

215.63

201.60

187.33

172.70

157.85

150.61

143.27

135.82

128.26

120.57

112.76

105.04

97.04

88.93

108.79

73.90

66.82

59.71

52.60

45.48

38.35

34.79

31.22

27.66

24.09

20.51

16.93

13.36

9.78

6.19

Compo.

L.F. 6.00
3

Fuel

Unit Cum

Lime,Murum, Building Rabish

349.32

286.31

269.54

251.99

234.17

215.87

197.31

188.27

179.09

169.78

160.32

150.71

140.95

131.30

121.31

111.16

L.F. 4.80

Unit Cum

Earth

135.99

92.38

83.52

74.64

65.75

56.85

47.93

43.48

39.03

34.57

30.11

25.64

21.17

16.70

12.22

7.73

Compo.

Fuel

307.66

252.17

237.39

221.94

206.24

190.12

173.78

165.81

157.73

149.53

141.20

132.74

124.14

115.64

106.84

97.91

L.F. 5.45

Unit Cum

119.77

81.36

73.56

65.74

57.91

50.07

42.22

38.30

34.37

30.45

26.52

22.58

18.64

14.71

10.76

6.81

Compo.

Fuel

Manure of Sludge

STATEMENT -C 1(2012-2013) PUNE CIRCLE

558.91

458.10

431.26

403.19

374.67

345.39

315.70

301.23

286.55

271.64

256.51

241.14

225.52

210.07

194.09

177.86

L.F. 3.00

217.59

147.81

133.64

119.43

105.20

90.95

76.69

69.57

62.45

55.31

48.17

41.02

33.87

26.72

19.55

12.37

10

Compo.

Fuel

Excavated Rock
Unit Cum

264

Cost per
trip

2075.33

2473.94

2872.55

3046.73

3413.28

3779.83

4146.37

4879.47

5612.56

6345.65

7078.75

7811.84

8642.69

10275.04

11907.40

13539.75

Lead in Km.

20.00

25.00

30.00

35.00

40.00

45.00

50.00

60.00

70.00

80.00

90.00

100.00

125.00

150.00

175.00

200.00

2256.63

1984.57

1712.51

1440.45

1301.97

1179.79

1057.61

935.43

813.24

691.06

629.97

568.88

507.79

478.76

412.32

345.89

1403.32

1228.23

1053.14

878.04

707.25

636.78

566.31

495.85

425.38

354.91

319.68

284.45

249.21

215.01

179.60

144.20

Compo.

L.F. 6.00
3

Fuel

Unit Cum

Lime,Murum, Building Rabish

2820.78

2480.71

2140.63

1800.56

1627.47

1474.74

1322.01

1169.28

1016.56

863.83

787.46

711.10

634.74

598.45

515.40

432.36

L.F. 4.80

Unit Cum

Earth

1754.15

1535.29

1316.42

1097.56

884.06

795.98

707.89

619.81

531.72

443.64

399.60

355.56

311.52

268.76

224.51

180.25

Compo.

Fuel

2484.36

2184.84

1885.33

1585.81

1433.37

1298.85

1164.34

1029.83

895.31

760.80

693.55

626.29

559.03

527.07

453.93

380.80

L.F. 5.45

Unit Cum

1544.94

1352.18

1159.42

966.65

778.62

701.04

623.46

545.89

468.31

390.73

351.94

313.15

274.36

236.71

197.73

158.75

Compo.

Fuel

Manure of Sludge

4513.25

3969.13

3425.01

2880.90

2603.95

2359.58

2115.22

1870.85

1626.49

1382.12

1259.94

1137.76

1015.58

957.52

824.65

691.78

L.F. 3.00

Unit Cum

2806.65

2456.46

2106.27

1756.09

1414.50

1273.56

1132.63

991.69

850.76

709.83

639.36

568.89

498.42

430.02

359.21

288.40

10

Compo.

Fuel

Excavated Rock

265

903.69

947.10

1036.18

1124.00

1209.58

1293.79

1374.30

5.00

6.00

7.00

8.00

9.00

10.00

2.50

4.50

723.42

2.00

859.64

676.56

1.50

4.00

630.22

1.00

814.93

582.27

0.50

3.50

533.59

769.53

Lead in
Kms.

3.00

Cost
per
Trip

274.86

258.76

241.92

224.80

207.24

189.42

180.74

171.93

162.99

153.91

144.68

135.31

126.04

116.45

106.72

88.69

80.18

71.66

63.12

54.57

46.01

41.74

37.47

33.19

28.90

24.61

20.32

16.03

11.73

7.42

Compo.

L.F.5.00
3

Fuel

Unit Cum

Sand,Stone below 40 mm
Normal size, Brick, Sider
agree Timber

297.47

280.04

261.81

243.29

224.28

205.00

195.60

186.07

176.39

166.57

156.58

146.44

136.41

126.03

115.50

L.F. 4.62

Unit Cum

95.98

86.78

77.55

68.31

59.06

49.80

45.18

40.55

35.92

31.28

26.64

21.99

17.35

12.69

8.04

Compo.

Fuel

Stone aggrigates 40 mm
Normal size,and Above

323.36

304.42

284.61

264.47

243.81

222.85

212.63

202.27

191.75

181.07

170.22

159.19

148.29

137.00

125.55

L.F. 4.25

Unit Cum

104.34

94.33

84.30

74.26

64.20

54.14

49.11

44.08

39.04

34.00

28.96

23.91

18.86

13.80

8.74

Compo.

Fuel

Soling stone

STATEMENT -C 1(2012-2013) PUNE CIRCLE

229.05

215.63

201.60

187.33

172.70

157.85

150.61

143.27

135.82

128.26

120.57

112.76

105.04

97.04

88.93

L.F. 6.00

Unit Cum

73.90

66.82

59.71

52.60

45.48

38.35

34.79

31.22

27.66

24.09

20.51

16.93

13.36

9.78

6.19

10

Compo.

Fuel

Concrete Block
(Form)

266

Cost
per
Trip

1676.73

2075.33

2473.94

2872.55

3046.73

3413.28

3779.83

4146.37

4879.47

5612.56

6345.65

7078.75

7811.84

8642.69

10275.04

11907.40

13539.75

Lead in
Kms.

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.00

60.00

70.00

80.00

90.00

100.00

125.00

150.00

175.00

200.00

2707.95

2381.48

2055.01

1728.54

1562.37

1415.75

1269.13

1122.51

975.89

829.27

755.97

682.66

609.35

574.51

494.79

415.07

335.35

1683.99

1473.88

1263.76

1053.65

848.70

764.14

679.58

595.02

510.46

425.90

383.62

341.34

299.05

258.01

215.53

173.04

130.55

Compo.

L.F.5.00
3

Fuel

Unit Cum

Sand,Stone below 40 mm
Normal size, Brick, Sider
agree Timber

2930.68

2577.36

2224.04

1870.71

1690.87

1532.20

1373.52

1214.84

1056.16

897.48

818.14

738.81

659.47

621.76

535.49

449.21

362.93

L.F. 4.62

Unit Cum

1822.50

1595.10

1367.71

1140.32

918.50

826.99

735.47

643.96

552.44

460.93

415.17

369.41

323.65

279.23

233.25

187.27

141.29

Compo.

Fuel

Stone aggrigates 40 mm
Normal size,and Above

3185.82

2801.74

2417.66

2033.57

1838.08

1665.59

1493.09

1320.60

1148.11

975.62

889.37

803.12

716.88

675.89

582.10

488.31

394.52

L.F. 4.25

Unit Cum

1981.16

1733.97

1486.78

1239.59

998.47

898.98

799.50

700.02

600.54

501.05

451.31

401.57

351.83

303.54

253.56

203.58

153.59

Compo.

Fuel

Soling stone

2256.63

1984.57

1712.51

1440.45

1301.97

1179.79

1057.61

935.43

813.24

691.06

629.97

568.88

507.79

478.76

412.32

345.89

279.45

L.F. 6.00

Unit Cum

1403.32

1228.23

1053.14

878.04

707.25

636.78

566.31

495.85

425.38

354.91

319.68

284.45

249.21

215.01

179.60

144.20

108.79

10

Compo.

Fuel

Concrete Block
(Form)

267

Cost
per
Trip

533.59

582.27

630.22

676.56

723.42

769.53

814.93

859.64

903.69

947.100

1036.18

1124.00

1209.58

1293.79

1374.30

1676.73

Lead in
Kms.

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

6.00

7.00

8.00

9.00

10.00

15.00

239.53

196.33

184.83

172.80

160.57

148.03

135.30

129.10

122.81

116.42

109.93

103.35

96.65

90.03

83.18

76.23

Unit M. Tonne
L.F.7.00

93.25

63.35

57.27

51.18

45.09

38.98

32.87

29.82

26.76

23.71

20.65

17.58

14.52

11.45

8.38

5.30

Fuel
Compo.

Steel, Cement,Stone
block,G.I.C.I.C.C.&A.C.
Pipes below mm/dia. steel
& plate Glass in packs and
distemper A.C.sheet &
fitting iron sheet

372.61

305.40

287.51

268.79

249.78

230.26

210.47

200.82

191.03

181.10

171.01

160.76

150.35

140.05

129.39

118.58

Unit M. Tonne
L.F. 4.50

145.06

98.54

89.09

79.62

70.14

60.64

51.13

46.38

41.63

36.88

32.12

27.35

22.58

17.81

13.03

8.25

Fuel
Compo.

Tar bitumen, Roofing


Felt &Flooring
Asphalt etc.

304.86

249.87

235.24

219.92

204.36

188.40

172.20

164.31

156.30

148.17

139.92

131.53

123.01

114.58

105.87

97.02

Unit M. Tonne
L.F. 5.50

118.68

80.62

72.89

65.14

57.38

49.61

41.83

37.95

34.06

30.17

26.28

22.38

18.47

14.57

10.66

6.75

Fuel
Compo.

Steam Coal (Form)

STATEMENT -C 1(2012-2013) PUNE CIRCLE

558.91

458.10

431.26

403.19

374.67

345.39

315.70

301.23

286.55

271.64

256.51

241.14

225.52

210.07

194.09

177.86

Unit M. Tonne
L.F.3.00

217.59

147.81

133.64

119.43

105.20

90.95

76.69

69.57

62.45

55.31

48.17

41.02

33.87

26.72

19.55

12.37

10

Fuel
Compo.

Mating , Thating
Bamboos & Ballies
Ceilings, Boards
Rubber ,PVC pipes

268

Cost
per
Trip

2075.33

2473.94

2872.55

3046.73

3413.28

3779.83

4146.37

4879.47

5612.56

6345.65

7078.75

7811.84

8642.69

10275.04

11907.40

13539.75

Lead in
Kms.

20.00

25.00

30.00

35.00

40.00

45.00

50.00

60.00

70.00

80.00

90.00

100.00

125.00

150.00

175.00

200.00

1934.25

1701.06

1467.86

1234.67

1115.98

1011.25

906.52

801.79

697.07

592.34

539.98

487.61

435.25

410.36

353.42

296.48

Unit M. Tonne
L.F.7.00

1202.85

1052.77

902.69

752.61

606.21

545.81

485.41

425.01

364.61

304.21

274.01

243.81

213.61

184.29

153.95

123.60

Fuel
Compo.

Steel, Cement,Stone
block,G.I.C.I.C.C.&A.C.
Pipes below mm/dia. steel
& plate Glass in packs and
distemper A.C.sheet &
fitting iron sheet

3008.83

2646.09

2283.34

1920.60

1735.96

1573.05

1410.15

1247.24

1084.33

921.42

839.96

758.51

677.05

638.34

549.76

461.19

Unit M. Tonne
L.F. 4.50

1871.10

1637.64

1404.18

1170.73

943.00

849.04

755.08

661.13

567.17

473.22

426.24

379.26

332.28

286.68

239.47

192.27

Fuel
Compo.

Tar bitumen, Roofing


Felt &Flooring
Asphalt etc.

2461.77

2164.98

1868.19

1571.40

1420.33

1287.04

1153.76

1020.47

887.18

753.89

687.24

620.60

553.95

522.28

449.81

377.33

Unit M. Tonne
L.F. 5.50

1530.90

1339.89

1148.88

957.87

771.54

694.67

617.80

540.92

464.05

387.18

348.74

310.30

271.87

234.56

195.93

157.31

Fuel
Compo.

Steam Coal (Form)

4513.25

3969.13

3425.01

2880.90

2603.95

2359.58

2115.22

1870.85

1626.49

1382.12

1259.94

1137.76

1015.58

957.52

824.65

691.78

Unit M. Tonne
L.F.3.00

2806.65

2456.46

2106.27

1756.09

1414.50

1273.56

1132.63

991.69

850.76

709.83

639.36

568.89

498.42

430.02

359.21

288.40

10

Fuel
Compo.

Mating , Thating
Bamboos & Ballies
Ceilings, Boards
Rubber ,PVC pipes

STATEMENT - C1 (2012-2013) PUNE CIRCLE

Lead in
Kms.

Cost per
Trip

Bricks/Modular
Bricks / Trade bricks
and
Empty Cement bags.
Unit 1000 Nos.

Cum
L.F.2.00

Fuel
Compo.

Glass blocks
(Hollow)
100 mm
& 200 mm

Tiles half round


Tiles / Roofing
tiles
Unit 1000 Nos.

Cum
L.F.3.20

Fuel
Compo.

Unit 1000 Nos.

Cum
L.F. 10.00

Fuel
Compo.

0.50

533.59

266.80

18.56

166.75

11.60

53.36

3.71

1.00

582.27

291.13

29.33

181.96

18.33

58.23

5.87

1.50

630.22

315.11

40.08

196.94

25.05

63.02

8.02

2.00

676.56

338.28

50.80

211.42

31.75

67.66

10.16

2.50

723.42

361.71

61.54

226.07

38.46

72.34

12.31

3.00

769.53

384.77

72.26

240.48

45.16

76.95

14.45

3.50

814.93

407.47

82.97

254.67

51.86

81.49

16.59

4.00

859.64

429.82

93.67

268.64

58.54

85.96

18.73

4.50

903.69

451.84

104.36

282.40

65.22

90.37

20.87

5.00

947.10

473.55

115.04

295.97

71.90

94.71

23.01

6.00

1036.18

518.09

136.43

323.81

85.27

103.62

27.29

7.00

1124.00

562.00

157.80

351.25

98.63

112.40

31.56

8.00

1209.58

604.79

179.14

377.99

111.96

120.96

35.83

9.00

1293.79

646.90

200.46

404.31

125.29

129.38

40.09

10.00

1374.30

687.15

221.71

429.47

138.57

137.43

44.34

15.00

1676.73

838.36

326.38

523.98

203.99

167.67

65.28

20.00

2075.33

1037.67

432.60

648.54

270.37

207.53

86.52

269

Lead in
Kms.

Cost per
Trip

Bricks/Modular
Bricks / Trade bricks
and
Empty Cement bags.
Unit 1000 Nos.

Cum
L.F.2.00

Fuel
Compo.

Glass blocks
(Hollow)
100 mm
& 200 mm

Tiles half round


Tiles / Roofing
tiles
Unit 1000 Nos.

Cum
L.F.3.20

Fuel
Compo.

Unit 1000 Nos.

Cum
L.F. 10.00

Fuel
Compo.

25.00

2473.94

1236.97

538.81

773.11

336.76

247.39

107.76

30.00

2872.55

1436.27

645.03

897.67

403.14

287.25

129.01

35.00

3046.73

1523.37

747.64

952.10

467.27

304.67

149.53

40.00

3413.28

1706.64

853.34

1066.65

533.34

341.33

170.67

45.00

3779.83

1889.91

959.04

1181.20

599.40

377.98

191.81

50.00

4146.37

2073.19

1064.74

1295.74

665.46

414.64

212.95

60.00

4879.47

2439.73

1276.14

1524.83

797.59

487.95

255.23

70.00

5612.56

2806.28

1487.54

1753.92

929.71

561.26

297.51

80.00

6345.65

3172.83

1698.94

1983.02

1061.84

634.57

339.79

90.00

7078.75

3539.37

1910.34

2212.11

1193.96

707.87

382.07

100.00

7811.84

3905.92

2121.74

2441.20

1326.09

781.18

424.35

125.00

8642.69

4321.34

2634.13

2700.84

1646.33

864.27

526.83

150.00

10275.04

5137.52

3159.41

3210.95

1974.63

1027.50

631.88

175.00

11907.40

5953.70

3684.69

3721.06

2302.93

1190.74

736.94

200.00

13539.75

6769.88

4209.97

4231.17

2631.23

1353.98

841.99

270

STATEMENT - C1 (2012-2013) PUNE CIRCLE


S.W.Pipes
Lead in
Kms.

Cost
per
Trip

100mm

0.50

533.59

111.16

7.73

1.00

582.27

121.31

1.50

630.22

2.00

S.W.Pipes
150mm

Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.4.80 Compo. L.F. 2.40 Compo.

200mm

250mm

Unit
100 mtrs.
L.F.1.35

Fuel
Compo.

Unit
100 mtrs.
L.F.1.05

Fuel
Compo.

10

222.33

15.47

395.25

27.50

508.18

35.36

12.22

242.61

24.44

431.31

43.45

554.54

55.86

131.30

16.70

262.59

33.40

466.83

59.37

600.21

76.34

676.56

140.95

21.17

281.90

42.34

501.15

75.26

644.34

96.77

2.50

723.42

150.71

25.64

301.43

51.28

535.87

91.17

688.97

117.21

3.00

769.53

160.32

30.11

320.64

60.22

570.03

107.05

732.89

137.64

3.50

814.93

169.78

34.57

339.55

69.14

603.65

122.92

776.12

158.04

4.00

859.64

179.09

39.03

358.18

78.06

636.77

138.77

818.70

178.42

4.50

903.69

188.27

43.48

376.54

86.97

669.40

154.61

860.65

198.78

5.00

947.10

197.31

47.93

394.62

95.86

701.56

170.43

902.00

219.12

6.00

1036.18

215.87

56.85

431.74

113.69

767.54

202.12

986.84

259.87

7.00

1124.00

234.17

65.75

468.33

131.50

832.59

233.78

1070.48

300.58

8.00

1209.58

251.99

74.64

503.99

149.28

895.98

265.40

1151.98

341.22

9.00

1293.79

269.54

83.52

539.08

167.05

958.37

296.97

1232.19

381.82

10.00

1374.30

286.31

92.38

572.63

184.76

1018.00

328.46

1308.86

422.31

15.00

1676.73

349.32

135.99

698.64

271.99

1242.02

483.53

1596.88

621.68

20.00

2075.33

432.36

180.25

864.72

360.50

1537.28

640.89

1976.51

824.00

271

S.W.Pipes
Lead in
Kms.

Cost
per
Trip

100mm

25.00

2473.94

515.40

224.51

30.00

2872.55

598.45

35.00

3046.73

40.00

S.W.Pipes
150mm

Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.4.80 Compo. L.F. 2.40 Compo.

200mm
Unit
100 mtrs.
L.F.1.35

1030.81

268.76

634.74

3413.28

45.00

250mm

Fuel
Compo.

Unit
100 mtrs.
L.F.1.05

Fuel
Compo.

10

449.01

1832.55

798.24

2356.13

1026.31

1196.90

537.53

2127.81

955.60

2735.76

1228.63

311.52

1269.47

623.03

2256.84

1107.61

2901.65

1424.07

711.10

355.56

1422.20

711.11

2528.36

1264.20

3250.74

1625.41

3779.83

787.46

399.60

1574.93

799.20

2799.87

1420.80

3599.83

1826.74

50.00

4146.37

863.83

443.64

1727.66

887.28

3071.39

1577.39

3948.93

2028.07

60.00

4879.47

1016.56

531.72

2033.11

1063.45

3614.42

1890.58

4647.11

2430.74

70.00

5612.56

1169.28

619.81

2338.57

1239.62

4157.45

2203.76

5345.30

2833.41

80.00

6345.65

1322.01

707.89

2644.02

1415.78

4700.48

2516.95

6043.48

3236.08

90.00

7078.75

1474.74

795.98

2949.48

1591.95

5243.52

2830.14

6741.66

3638.75

100.00

7811.84

1627.47

884.06

3254.93

1768.12

5786.55

3143.32

7439.85

4041.42

125.00

8642.69

1800.56

1097.56

3601.12

2195.11

6401.99

3902.42

8231.13

5017.39

150.00

10275.04

2140.63

1316.42

4281.27

2632.84

7611.14

4680.61

9785.75

6017.93

175.00

11907.40

2480.71

1535.29

4961.42

3070.58

8820.30

5458.80

11340.38

7018.46

200.00

13539.75

2820.78

1754.15

5641.56

3508.31

10029.45

6236.99

12895.00

8018.99

272

STATEMENT - C1 (2012-2013) PUNE CIRCLE


S.W.Pipes
250mm

S.W.Pipes

Lead in
Kms.

Cost
per
Trip

300mm

350mm

400mm

10

0.50

533.59

635.23

44.20

808.47

56.25

1270.45

88.39

1976.26

137.50

1.00

582.27

693.18

69.82

882.22

88.86

1386.35

139.64

2156.55

217.23

1.50

630.22

750.26

95.42

954.87

121.45

1500.52

190.84

2334.14

296.87

2.00

676.56

805.43

120.96

1025.09

153.95

1610.85

241.92

2505.77

376.32

2.50

723.42

861.22

146.52

1096.09

186.48

1722.43

293.03

2679.34

455.83

3.00

769.53

916.11

172.05

1165.96

218.97

1832.23

344.09

2850.13

535.25

3.50

814.93

970.16

197.55

1234.74

251.42

1940.31

395.09

3018.26

614.59

4.00

859.64

1023.38

223.02

1302.48

283.85

2046.76

446.05

3183.84

693.85

4.50

903.69

1075.82

248.47

1369.22

316.24

2151.63

496.94

3346.98

773.03

5.00

947.10

1127.50

273.90

1435.00

348.60

2255.00

547.80

3507.78

852.13

6.00

1036.18

1233.55

324.84

1569.97

413.43

2467.09

649.67

3837.70

1010.60

7.00

1124.00

1338.10

375.72

1703.03

478.20

2676.19

751.45

4162.96

1168.92

8.00

1209.58

1439.97

426.53

1832.69

542.85

2879.94

853.06

4479.91

1326.98

9.00

1293.79

1540.23

477.28

1960.29

607.45

3080.46

954.56

4791.83

1484.87

10.00

1374.30

1636.07

527.89

2082.27

671.86

3272.15

1055.78

5090.00

1642.32

15.00

1676.73

1996.10

777.10

2540.50

989.04

3992.21

1554.20

6210.10

2417.65

20.00

2075.33

2470.64

1030.00

3144.45

1310.90

4941.27

2059.99

7686.42

3204.43

Unit
Unit
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.0.84 Compo. L.F. 0.66 Compo. L.F.0.42 Compo. L.F.0.27 Compo.

273

S.W.Pipes
250mm

S.W.Pipes

Lead in
Kms.

Cost
per
Trip

300mm

350mm

400mm

10

25.00

2473.94

2945.17

1282.89

3748.40

1632.77

5890.34

2565.78

9162.75

3991.22

30.00

2872.55

3419.70

1535.79

4352.35

1954.64

6839.40

3071.57 10639.07 4778.00

35.00

3046.73

3627.06

1780.09

4616.26

2265.57

7254.13

3560.18 11284.20 5538.05

40.00

3413.28

4063.43

2031.76

5171.64

2585.87

8126.86

4063.51 12641.78 6321.02

45.00

3779.83

4499.79

2283.42

5727.01

2906.18

8999.59

4566.85 13999.36 7103.99

50.00

4146.37

4936.16

2535.09

6282.38

3226.48

9872.32

5070.18 15356.94 7886.95

60.00

4879.47

5808.89

3038.43

7393.13

3867.09 11617.78 6076.85 18072.10 9452.88

70.00

5612.56

6681.62

3541.76

8503.88

4507.70 13363.24 7083.53 20787.26 11018.82

80.00

6345.65

7554.35

4045.10

9614.63

5148.31 15108.70 8090.20 23502.42 12584.75

90.00

7078.75

8427.08

4548.43 10725.37 5788.92 16854.16 9096.87 26217.58 14150.68

100.00

7811.84

9299.81

5051.77 11836.12 6429.52 18599.62 10103.54 28932.74 15716.61

125.00

8642.69 10288.91 6271.74 13094.98 7982.22 20577.83 12543.49 32009.95 19512.09

150.00

10275.04 12232.19 7522.41 15568.25 9573.98 24464.39 15044.82 38055.71 23403.05

175.00

11907.40 14175.47 8773.08 18041.51 11165.73 28350.95 17546.15 44101.48 27294.01

200.00

13539.75 16118.76 10023.74 20514.78 12757.49 32237.51 20047.48 50147.24 31184.97

Unit
Unit
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.0.84 Compo. L.F. 0.66 Compo. L.F.0.42 Compo. L.F.0.27 Compo.

274

275

Cost
per
Trip

533.59

582.27

630.22

676.56

723.42

769.53

814.93

859.64

903.69

947.10

1036.18

1124.00

1209.58

1293.79

1374.30

1676.73

2075.33

Lead
in
Kms.

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

6.00

7.00

8.00

9.00

10.00

15.00

20.00

125mm

150mm

200mm

710.73

574.22

470.65

443.08

414.24

384.93

354.86

324.35

309.48

294.40

279.09

263.54

247.75

231.70

215.83

199.41

182.74

296.30

223.55

151.86

137.30

122.70

108.09

93.45

78.79

71.48

64.16

56.83

49.49

42.15

34.80

27.45

20.09

12.71

945.05

763.54

625.82

589.16

550.81

511.84

471.85

431.28

411.51

391.46

371.10

350.43

329.43

308.09

286.98

265.15

242.98

393.99

297.25

201.92

182.57

163.15

143.72

124.25

104.77

95.04

85.31

75.56

65.81

56.04

46.27

36.50

26.71

16.91

1134.06

916.24

750.98

706.99

660.97

614.21

566.22

517.54

493.82

469.75

445.32

420.51

395.31

369.70

344.38

318.18

291.58

472.79

356.70

242.31

219.08

195.78

172.46

149.10

125.72

114.05

102.37

90.68

78.97

67.25

55.52

43.80

32.05

20.29

1890.10

1527.07

1251.64

1178.32

1101.62

1023.68

943.70

862.57

823.03

782.91

742.20

700.85

658.85

616.17

573.97

530.30

485.97

787.98

594.50

403.85

365.13

326.31

287.44

248.51

209.54

190.09

170.62

151.13

131.62

112.09

92.54

73.00

53.42

33.81

10

Unit
Unit
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.2.92 Compo. L.F.2.196 Compo. L.F.1.83 Compo. L.F.1.098 Compo.

100mm

2578.06

2082.89

1707.21

1607.20

1502.58

1396.27

1287.18

1176.52

1122.59

1067.87

1012.34

955.94

898.66

840.44

782.88

723.31

662.85

11

Unit
100 mtrs.
L.F.0.805

1074.78

810.89

550.84

498.03

445.07

392.06

338.96

285.81

259.28

232.72

206.14

179.53

152.89

126.22

99.57

72.86

46.12

12

Fuel
Compo.

250mm

3336.55

2695.70

2209.49

2080.06

1944.66

1807.07

1665.88

1522.67

1452.87

1382.05

1310.18

1237.19

1163.06

1087.71

1013.21

936.12

857.86

13

Unit
100 mtrs.
L.F.0.622

1390.99

1049.46

712.90

644.56

576.02

507.41

438.68

369.89

335.56

301.19

266.78

232.35

197.87

163.35

128.87

94.29

59.68

14

Fuel
Compo.

300mm

R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.

STATEMENT -C1 (2012-2013) PUNE CIRCLE

276

4879.47

5612.56

6345.65

7078.75

7811.84

8642.69

60.00

70.00

80.00

90.00

100.00

125.00

2675.29

2424.23

2173.17

1922.11

1671.05

1419.99

1453.25

1308.45

1163.66

1018.86

874.07

729.27

656.88

2883.54

4146.37

50.00

1294.46

584.48

200.00 13539.75 4636.90

3779.83

45.00

1168.93

512.08

2523.76

3413.28

40.00

1043.40

441.80

175.00 11907.40 4077.88

3046.73

35.00

983.75

369.05

2163.98

2872.55

30.00

847.24

150.00 10275.04 3518.85

2473.94

25.00

1804.20

125mm

150mm

200mm

6165.64

5422.31

4678.98

3935.65

3557.30

3223.47

2889.64

2555.81

2221.98

1888.15

1721.23

1554.32

1387.40

1308.08

1126.57

3834.22

3355.82

2877.42

2399.03

1932.37

1739.84

1547.31

1354.77

1162.24

969.71

873.44

777.17

680.91

587.46

490.72

7398.77

6506.78

5614.78

4722.78

4268.77

3868.17

3467.57

3066.97

2666.38

2265.78

2065.48

1865.18

1664.88

1569.70

1351.88

9357.96

7871.30

7114.61

6446.95

5779.28

5111.62

4443.96

3776.30

3442.46

3108.63

2774.80

2616.16

2253.13

5754.85

4798.06

3864.74

3479.68

3094.61

2709.55

2324.48

1939.41

1746.88

1554.35

1361.82

1174.92

981.45

10

4601.06 12331.29 7668.44

4026.99 10844.63 6711.64

3452.91

2878.83

2318.84

2087.81

1856.77

1625.73

1394.69

1163.65

1048.13

932.61

817.09

704.95

588.87

Unit
Unit
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.2.92 Compo. L.F.2.196 Compo. L.F.1.83 Compo. L.F.1.098 Compo.

100mm

2959.82

Cost
per
Trip

Lead
in
Kms.

16819.57

14791.80

12764.03

10736.26

9704.15

8793.47

7882.80

6972.12

6061.45

5150.77

4695.44

4240.10

3784.76

3568.38

3073.22

11

Unit
100 mtrs.
L.F.0.805

10459.56

9154.51

7849.47

6544.43

5271.41

4746.19

4220.97

3695.75

3170.53

2645.31

2382.70

2120.09

1857.48

1602.56

1338.67

12

Fuel
Compo.

250mm

21768.09

19143.73

16519.36

13894.99

12559.23

11380.62

10202.01

9023.41

7844.80

6666.19

6076.89

5487.59

4898.28

4618.25

3977.40

13

Unit
100 mtrs.
L.F.0.622

13536.88

11847.88

10158.88

8469.88

6822.32

6142.58

5462.83

4783.09

4103.34

3423.60

3083.72

2743.85

2403.98

2074.05

1732.52

14

Fuel
Compo.

300mm

R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.

277

Cost
per
Trip

533.59

582.27

630.22

676.56

723.42

769.53

814.93

859.64

903.69

947.10

1036.18

1124.00

1209.58

1293.79

1374.30

1676.73

2075.33

Lead in
Kms.

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

6.00

7.00

8.00

9.00

10.00

15.00

20.00

450 & 500 mm dia.

600 mm

800, 900 & 1000


mm dia.

3780.21

3054.15

2503.28

2356.64

2203.23

2047.36

1887.39

1725.14

1646.06

1565.82

1484.39

1401.70

1317.71

1232.35

1147.94

1060.60

971.93

1575.95

1189.01

807.70

730.26

652.61

574.88

497.02

419.08

380.18

341.24

302.26

263.24

224.18

185.07

146.00

106.83

67.62

6917.78

5589.09

4581.00

4312.65

4031.92

3746.67

3453.93

3157.00

3012.28

2865.46

2716.43

2565.12

2411.40

2255.19

2100.72

1940.89

1778.64

2952.89

2227.87

1513.40

1368.31

1222.81

1077.16

931.27

785.24

712.34

639.38

566.35

493.24

420.05

346.78

273.56

200.17

126.70

7083.05

5722.62

4690.45

4415.68

4128.25

3836.18

3536.45

3232.42

3084.25

2933.92

2781.33

2626.40

2469.01

2309.07

2150.91

1987.26

1821.13

9162.01

8625.30

8063.84

7493.33

6907.86

6314.00

6024.57

5730.92

5432.87

5130.23

4822.81

4510.39

4201.44

3881.79

3557.27

2956.17

2672.76

2388.56

2104.06

1819.08

1533.83

1391.45

1248.93

1106.27

963.46

820.50

677.37

534.36

391.01

247.49

10

2883.99 13835.56 5767.98

2175.88 11178.18 4351.76

1478.09

1336.38

1194.28

1052.03

909.54

766.91

695.72

624.46

553.13

481.73

410.25

338.69

267.18

195.50

123.75

Unit
Unit
Unit
Unit
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
L.F.0.549 Compo. L.F.0.300 Compo. L.F.0.293 Compo. L.F.0.15 Compo.

350 & 400 mm dia.

41506.69

33534.54

27486.02

25875.89

24191.52

22480.00

20723.59

18941.99

18073.70

17192.75

16298.60

15390.69

14468.42

13531.16

12604.33

11645.36

10671.81

11

Unit
100 mtrs.
L.F.0.05

17303.94

13055.29

8868.52

8018.29

7165.67

6312.18

5457.24

4601.49

4174.34

3746.78

3318.80

2890.37

2461.49

2032.12

1603.08

1173.02

742.48

12

Fuel
Compo.

1200 mm dia.

83013.37

67069.09

54972.05

51751.79

48383.04

44960.01

41447.17

37883.99

36147.41

34385.50

32597.21

30781.39

28936.85

27062.32

25208.67

23290.72

21343.63

13

Unit
100 mtrs.
L.F.0.025

34607.87

26110.59

17737.05

16036.58

14331.34

12624.35

10914.47

9202.98

8348.67

7493.56

6637.60

5780.75

4922.97

4064.24

3206.17

2346.03

1484.96

14

Fuel
Compo.

1800 & 2000 mm dia.

R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.

STATEMENT -C1 (2012-2013) PUNE CIRCLE

278

3046.73

3413.28

3779.83

4146.37

4879.47

5612.56 10223.24 5419.09 18708.53 10153.86 19155.49 9916.94 37417.07 19833.87 112251.20

6345.65 11558.57 6189.22 21152.18 11596.87 21657.52 11326.27 42304.36 22652.55 126913.07

7078.75 12893.89 6959.35 23595.82 13039.88 24159.55 12735.61 47191.64 25471.23 141574.93

7811.84 14229.22 7729.48 26039.47 14482.89 26661.57 14144.95 52078.93 28289.91 156236.80

8642.69 15742.60 9596.11 28808.96 17980.43 29497.22 17560.88 57617.91 35121.76 172853.73 105365.29 345707.46 210730.59

35.00

40.00

45.00

50.00

60.00

70.00

80.00

90.00

100.00

125.00

9575.16

4402.94

9803.92

8443.49

10

4300.20 19150.32 8600.41

3592.10 16492.94 7184.19

60934.66

57450.97

49478.83

11

4648.96 16264.89 8710.85 16653.47 8507.60 32529.78 17015.19 97589.33

3878.83 13821.24 7267.84 14151.44 7098.26 27642.49 14196.51 82927.46

3493.76 12599.42 6546.34 12900.43 6393.59 25198.84 12787.18 75596.53

3108.70 11377.60 5824.83 11649.42 5688.92 22755.20 11377.84 68265.59

2723.63 10155.78 5103.33 10398.41 4984.25 20311.55 9968.50

2349.84

3677.91

98957.66

13

43105.16

14

84869.72 312473.61 169739.44

76413.68 283149.87 152827.37

67957.65 253826.13 135915.30

59501.61 224502.39 119003.23

51045.58 195178.66 102091.16

42589.54 165854.92 85179.09

38361.53 151193.05 76723.05

34133.51 136531.18 68267.02

29905.49 121869.31 59810.98

25801.22 114901.94 51602.44

21552.58

12

200.00 13539.75 24662.58 15336.87 45132.52 28737.00 46210.77 28066.47 90265.03 56132.95 270795.10 168398.85 541590.20 336797.70

175.00 11907.40 21689.25 13423.28 39691.33 25151.48 40639.59 24564.61 79382.66 49129.22 238147.98 147387.66 476295.95 294775.33

150.00 10275.04 18715.92 11509.70 34250.14 21565.95 35068.40 21062.75 68500.28 42125.49 205500.85 126376.48 411001.71 252752.96

8887.92

7552.59

6884.93

6217.27

5549.60

5232.33

8246.47

Fuel
Compo.

2872.55

1962.89

Fuel
Compo.

Unit
100 mtrs.
L.F.0.025

30.00

4506.27

Unit
100 mtrs.
L.F.0.05

2473.94

1800 & 2000 mm dia.

25.00

1200 mm dia.

800, 900 & 1000


mm dia.

600 mm

Unit
Unit
Unit
Unit
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
L.F.0.549 Compo. L.F.0.300 Compo. L.F.0.293 Compo. L.F.0.15 Compo.

450 & 500 mm dia.

Cost
per
Trip

Lead in
Kms.

350 & 400 mm dia.

R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.

STATEMENT -C1 (2012-2013) PUNE CIRCLE


Asbestos Cement Pipes
Lead in
Kms.

Cost
per
Trip

50mm
Unit
100 mtrs.
L.F.6.58

0.50

80mm

Fuel
Compo.

Unit 100
mtrs.
L.F. 4.026

533.59

81.09

1.00

582.27

1.50

100mm

Fuel
Compo.

Unit
100 mtrs.
L.F.2.928

5.64

132.54

88.49

8.91

630.22

95.78

2.00

676.56

2.50

150mm

Fuel
Compo.

Unit
100 mtrs.
L.F.1.83

Fuel
Compo.

10

9.22

182.24

12.68

291.58

20.29

144.63

14.57

198.86

20.03

318.18

32.05

12.18

156.54

19.91

215.24

27.38

344.38

43.80

102.82

15.44

168.05

25.24

231.06

34.70

369.70

55.52

723.42

109.94

18.70

179.69

30.57

247.07

42.03

395.31

67.25

3.00

769.53

116.95

21.96

191.14

35.90

262.82

49.36

420.51

78.97

3.50

814.93

123.85

25.22

202.42

41.22

278.32

56.67

445.32

90.68

4.00

859.64

130.64

28.47

213.52

46.53

293.59

63.98

469.75

102.37

4.50

903.69

137.34

31.72

224.46

51.84

308.64

71.28

493.82

114.05

5.00

947.10

143.94

34.97

235.25

57.15

323.46

78.58

517.54

125.72

6.00

1036.18

157.47

41.47

257.37

67.77

353.89

93.19

566.22

149.10

7.00

1124.00

170.82

47.96

279.19

78.39

383.88

107.79

614.21

172.46

8.00

1209.58

183.83

54.45

300.44

88.99

413.11

122.36

660.97

195.78

9.00

1293.79

196.63

60.93

321.36

99.58

441.87

136.92

706.99

219.08

10.00

1374.30

208.86

67.39

341.36

110.14

469.37

151.44

750.98

242.31

15.00

1676.73

254.82

99.20

416.47

162.14

572.65

222.94

916.24

356.70

279

Asbestos Cement Pipes


Lead in
Kms.

Cost
per
Trip

50mm
Unit
100 mtrs.
L.F.6.58

20.00

80mm

Fuel
Compo.

Unit 100
mtrs.
L.F. 4.026

2075.33

315.40

25.00

2473.94

30.00

100mm

Fuel
Compo.

Unit
100 mtrs.
L.F.2.928

131.49

515.48

375.98

163.77

2872.55

436.56

35.00

3046.73

40.00

150mm

Fuel
Compo.

Unit
100 mtrs.
L.F.1.83

Fuel
Compo.

10

214.90

708.79

295.49

1134.06

472.79

614.49

267.67

844.93

368.04

1351.88

588.87

196.06

713.50

320.43

981.06

440.59

1569.70

704.95

463.03

227.25

756.76

371.40

1040.55

510.68

1664.88

817.09

3413.28

518.74

259.37

847.81

423.91

1165.74

582.88

1865.18

932.61

45.00

3779.83

574.44

291.50

938.85

476.42

1290.92

655.08

2065.48

1048.13

50.00

4146.37

630.15

323.63

1029.90

528.93

1416.11

727.28

2265.78

1163.65

60.00

4879.47

741.56

387.88

1211.99

633.95

1666.48

871.68

2666.38

1394.69

70.00

5612.56

852.97

452.14

1394.08

738.97

1916.86

1016.08

3066.97

1625.73

80.00

6345.65

964.38

516.40

1576.17

843.98

2167.23

1160.48

3467.57

1856.77

90.00

7078.75

1075.80

580.65

1758.26

949.00

2417.60

1304.88

3868.17

2087.81

100.00

7811.84

1187.21

644.91

1940.35

1054.02

2667.98

1449.28

4268.77

2318.84

125.00

8642.69

1313.48

800.65

2146.72

1308.56

2951.74

1799.27

4722.78

2878.83

150.00

10275.04

1561.56

960.31

2552.17

1569.50

3509.24

2158.07

5614.78

3452.91

175.00

11907.40

1809.64

1119.97

2957.63

1830.45

4066.73

2516.87

6506.78

4026.99

200.00

13539.75

2057.71

1279.63

3363.08

2091.39

4624.23

2875.66

7398.77

4601.06

280

Você também pode gostar