MES 1
SECCION
Und
PU
4.50 x 4.20
m
m
m
m
m
548.57
492.52
477.86
337.31
90
150
240
Pza
m2
m2
m2
29.49
10.07
47.40
71.06
1522
410
608
863
3403
3.50 x 3.50
3.50 x 3.50
2.00 x 2.00
2.00 x 2.00
Cantidad
TOTAL GENERAL
Nota: los PU de las labores incluyen costo directo + Utilidad + Contingencias
Equipos Solicitados
2 Jumbos de 1 brazo
1 Scoops de 4 yd3
1 Scoop de 6yd3
1 Bolter
2 Shotcretteras
Val US$/mtrs
49,371.42
73,878.03
2,698.48
-
MES 2
Cantidad
Val US$/mtrs
105
166
25
8
57,599.99
81,758.35
11,946.39
2,698.48
-
123,249.45
271
44,883.85
4,129.46
28,821.77
61,323.49
1944
680
856
955
139,158.57
4435
MES 3
Cantidad
Val US$/mtrs
90
145
15
6
20
49,371.42
71,415.43
7,167.83
2,023.86
-
139,358.34
235
57,328.65
6,848.86
40,578.02
67,860.87
1727
821
720
805
172,616.41
4073
MES 4
Cantidad
Val US$/mtrs
MES 5
Cantidad
105
130
Val US$/mtrs
105
140
15
4
57,599.99
68,952.83
7,167.83
1,349.24
-
120,786.85
245
126,552.82
235
121,627.62
1331.00
50,929.31
8,268.99
34,131.05
57,202.09
1795
821
769
805
52,934.64
8,268.99
36,453.86
57,202.09
1692
763
738
748
49,897.16
7,684.82
34,984.33
53,151.76
8680.00
3495
3691
4176
150,531.45
4190
154,859.58
3941
145,718.07
57,599.99
64,027.63
1,349.24
-
TOTAL
Cantidad
90,638.93
4,000.00
94,638.93
90,638.93
4,000.00
94638.93
90,638.93
4,000.00
94638.93
90,638.93
4,000.00
94638.93
90,638.93
4,000.00
94638.93
357,046.95
406,613.68
365,957.22
376,051.32
361,984.61
495.00
731
55
30
20
20042.00
Val US$/mtrs
271,542.81
360,032.27
26,282.05
10,119.29
-
667,976.42
255,973.62
35,201.11
174,969.03
296,740.30
762,884.07
453,194.64
20,000.00
473,194.64
1,904,055.13
1,594,987.76
309,067.37
Promedio
99
146.2
11
6
4
266.2
1736
699
738.2
835.2
4008.4
DESCRIPCION
1'. AVANCE LINEAL TRACK LES
Rampa Negativa Con Jumbo, Con Scoop
SECCION
UNIDAD
CANT.
P.U. Directo
Contingencias
Utilidad
US$.
5%
10%
DIFERENCIA US$.
DIFERENCIA
%
4.50 x 4.20
US$./ m.
482.21
24.11
48.22
554.55
587.61
33.07
5.96%
4.50 x 4.20
US$./ m.
451.33
22.57
45.13
519.03
548.57
29.54
5.69%
3.50 x 3.50
US$./ m.
402.98
20.15
40.30
463.42
492.52
29.10
6.28%
3.50 x 3.50
US$./ m.
390.22
19.51
39.02
448.76
477.86
29.10
6.48%
3.00 x 3.00
US$./ m.
348.02
17.40
34.80
400.23
431.75
31.52
7.88%
3.00 x 3.00
US$./ m.
339.27
16.96
33.93
390.16
421.64
31.48
8.07%
2.00 x 2.00
US$./ m.
274.25
13.71
27.43
315.39
337.31
21.92
6.95%
US$./ Pza.
18.84
0.94
1.88
21.66
23.46
1.80
8.30%
US$./ Pza.
23.77
1.19
2.38
27.33
29.49
2.16
7.89%
US$./ Pza.
8.31
0.42
0.83
9.56
10.07
0.51
5.36%
US$ / m2
19.51
0.98
1.95
22.43
23.49
1.06
4.71%
US$ / m2
39.36
1.97
3.94
45.26
47.40
2.14
4.73%
US$ / m2
59.00
2.95
5.90
67.85
71.06
3.21
4.73%
mensual
77,493.57
77,493.57
90,638.93
mensual
4,000.00
4,000.00
4,000.00
0.00
81,493.57
94,638.93
13,145.35
US$
13,145.35
16.96%
0.00%
OBSERVACIONES DE PU CONTRATO
CATEGORIA
MAESTRO JUMBERO/CHOFER DUMPER
MAESTRO SOSTENIMIENTO
MAESTRO PERFORISTA
AYUDANTE OPERACIONES
ESCOOPERO/CAMION
UNIDAD
JORNAL S/. JORNAL U.S.$ L.SOCIALES
S/.XJORNAL
78.00
28.25
41.98
S/.XJORNAL
51.00
18.47
27.45
S/.XJORNAL
54.00
19.56
29.06
S/.XJORNAL
48.00
17.39
25.83
S/.XJORNAL
66.00
23.90
35.52
1.00
EQUIPOS
UNIDAD
U.S.$/HR
U.S.$/HR
U.S.$/HR
U.S.$/HR
U.S.$/Pie
GASTOS GENERALES
CONTINGENCIAS
UTILIDAD
%
%
%
COSTO
COSTO
COSTO
PROPIEDAD OPERACIN
TOTAL
U.S.$/HR
U.S.$/HR
U.S.$/HR
118.58
72.76
8.00
0.24
5%
10%
TOTAL
70.23
45.92
48.62
43.22
59.43
MATERIALES
ACEROS DE
PERFORACION
EXPLOSIVOS Y
ACCESORIOS
MADERA
DESCRIPCION
UNIDAD
U.S.$/Gln
U.S.$/Kg
U.S.$/Pza
U.S.$/Pza
U.S.$/Mt2
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
Unidad
U.S.$/Mt
Petroleo
S./Gln
Cemento
S./Bls
Acelerante
U.S.$/Kgs
Dramix
U.S.$/Kgs
Calibradores
U.S.$/Pza
Tuberia de polietileno de 2" AGUA
U.S.$/Pza
Tuberia de polietileno de 4" AIRE
U.S.$/Pza
Tubo PVC ( Recorte Voladura)
U.S.$/Pza
Manguera de Aire 1"
U.S.$/Mts
Manguera de Agua 1/2"
U.S.$/Mts
Soldadura Supercito 1 /8"
U.S.$/Kg
Sacos de polipropileno (50 Kgs/saco)
U.S.$/Unid
Fierro corrugado 3/4" x 8" (cancamo)
U.S.$/Pza
Varilla 1/2" x 9
U.S.$/Pza
Varilla 3/4" x9
U.S.$/Pza
Varilla 5/8" x9
U.S.$/Pza
Dramix
U.S.$/Kg
Calibradores
U.S.$/Pza
Barra de extension porta broca conica 2'
U.S.$/Pza
Barra de extension porta broca conica 4', 7876-6112-11
U.S.$/Pza
Barra de extension porta broca conica 6', 7876-6118-11
U.S.$/Pza
Barra de extension porta broca conica 8', 7876-1124-11
U.S.$/Pza
Broca de 40 mm
U.S.$/Pza
Broca de 38 mm
U.S.$/Pza
Barra MF T38 X H35 X R32 X 14", 7324-6543-20
U.S.$/Pza
Broca boton R32 X 1-3/4", 7733-5245-S45
U.S.$/Pza
Shank adapter HLX5 X T38, 7304-7585-01
U.S.$/Pza
Aco Top Cen R38 55,7994-3655 (COPLAS)
U.S.$/Pza
Broca escar. 4" GRADOS 12,7721-4802-S45 (RIMADORA) U.S.$/Pza
Adaptador PIL R32 40 12 GRADOS,7821-3440 (ADAPTADOR
U.S.$/Pza
RIMADORA)
Shank adapter hembra (BOLTER)
U.S.$/Pza
Barra de extension R32 H25 (BOLTER)
U.S.$/Pza
Broca boton R25 x 37 mm (BOLTER)
U.S.$/Pza
Afiladora de Brocas
U.S.$/Pza
Cordon detonante 5p (pentacord)(caja x 1500)
U.S.$/Mts
Igniter cord
U.S.$/Pza
Guia ensamblada 2.4 mts - carmex (300)
U.S.$/Pza
Emulex 45% 1 1/8" x 12" (128)
U.S.$/Cart
Emulex 45% 1 1/8" x 12" (128) (25 kGS)
U.S.$/Kgs
Exsadit 45% 7/8" x 7" (328)
U.S.$/Cart
Exsadit 45% 7/8" x 7" (328) (25 Kgs)
U.S.$/Kgs
Exsablock 7/8" x 7" (276)
U.S.$/Cart
Exsablock 7/8" x 7" (276) (20 Kgs)
U.S.$/Kgs
Exsanel 2.1 mts
U.S.$/Pza
Exsanel 2.4 mts
U.S.$/Pza
Exsanel 4.2 mts
U.S.$/Pza
Exsanel 3.0 mts N 288 (200)
U.S.$/Pza
Exsanel 4.8 mts N 180 (200)
U.S.$/Pza
Fanel blanco 1 al 10 (caja x 150)
U.S.$/Pza
Fulminante electrico de 4 m
U.S.$/Pza
Emulsion 65% (1"x 8")
U.S.$/Pza
Emulnor 1000 1" x 7" (264)
U.S.$/Kgs
Emulnor 3000 1 1/8" x 12" (114)
U.S.$/Kgs
S./Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
U.S.$/Pza
PRECIO 2011
S/.
PRECIO MAYO
2011 U.S.$
8.40
1.22
5.12
1.21
3.06
88.00
8.12
9.54
12.82
13.48
0.22
0.75
4.66
13.21
30.24
4.78
10.95
0.91
1.58
0.11
2.28
7.45
0.40
2.48
1.27
3.80
0.36
5.82
9.60
21.84
14.85
1.58
0.11
60.50
68.20
94.60
103.40
25.30
24.75
581.90
93.50
366.30
71.50
233.20
271.70
346.50
174.90
85.80
1100.00
0.21
0.41
0.63
0.49
2.51
0.23
2.23
0.16
2.21
1.14
1.32
1.58
3.54
1.79
1.96
7.97
127.45
19.1
2.89
15.91
7.14
46.16
6.92
11.32
0.67
23.13
3.18
4.52
2.63
3.30
3.53
0.61
17.53
8.33
8.33
17.00
5.20
2.28
4.21
51.70
8.97
6.77
6.38
4.79
5.90
9.24
11.18
T Anual :
365.00
D.NORMALES
273.00
DOMINGOS
Basico
31.33
1,500.00
Asig. Fam.
2.000
60.00
33.33
1560.00
INGRESO:
DESC.MEDICO
MENSUAL
Obreros
22.75
52.00
4.00
FERIADOS
10.00
VACAC.
26.00
ANUAL
Empleados
Obreros
Empleados
758.26
1,560.00
9,099.09
18,720.00
Obreros
Empleados
Conceptos
Obreros
CTS
98.56
0.00
1,182.72
0.00
13.00%
14/12/12*365/273
VACACIONES
83.33
0.00
999.96
0.00
10.99%
(30/273)
GRATIFICACIONES
166.65
0.00
1,999.80
0.00
21.98%
(60/273)
172.21
0.00
2,066.52
0.00
22.71%
(62/273)
DESCANSO MEDICO
11.11
0.00
133.32
0.00
1.47%
(4/273)
ESSALUD
68.24
0.00
818.92
0.00
9.00%
JUBILACION ANTICIPADA
15.17
0.00
181.98
0.00
2.00%
SCTR-SALUD
SCTR-PENSIONES(interior Mina)
VIDA LEY
7.36
0.00
88.26
0.00
0.97%
288.14
0.00
3,457.65
0.00
38.00%
3.26
0.00
39.13
0.00
0.43%
50.40%
ESSALUD
7.50
0.00
89.99
0.00
0.99%
1*A
IES
1.67
0.00
20.00
0.00
0.22%
1*B
SCTR-SALUD
SCTR-PENSIONES
VIDA LEY
0.81
0.00
9.70
0.00
0.11%
1*C
31.66
0.00
379.96
0.00
4.18%
1*D
0.36
0.00
4.30
0.00
0.05%
1*E
IMPUESTOS VACACIONES
5.54%
ESSALUD
IES
SCTR-SALUD
SCTR-PENSIONES
VIDA LEY
15.00
0.00
179.98
0.00
1.98%
2*A
3.33
0.00
40.00
0.00
0.44%
2*B
1.62
0.00
19.40
0.00
0.21%
2*C
63.33
0.00
759.92
0.00
8.35%
2*D
0.72
0.00
8.60
0.00
0.09%
2*E
IMPUESTO GRATIFICACIONES
11.08%
ESSALUD
IES
SCTR-SALUD
SCTR-PENSIONES
VIDA LEY
15.50
0.00
185.98
0.00
2.04%
3*A
3.44
0.00
41.33
0.00
0.45%
3*B
1.67
0.00
20.04
0.00
0.22%
3*C
65.44
0.00
785.25
0.00
8.63%
3*D
0.74
0.00
8.89
0.00
0.10%
3*E
11.45%
TOTAL:
1,885.08
1,560.00
22,620.69
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SEPTIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ACUMULADO
18,720.00
DES.MEDICO
VACACIONES
26
4
4
339
2.761
EQUIPOS
UNIDAD
COSTO PROPIEDAD
COSTO OPERACINCOSTO TOTAL
$/HR
86.87
23.13
110.00
$/HR
45.79
17.21
63.00
U.S.$/HR
U.S.$/HR
148.603%
U.S.$/HR
26
365
CONTINGENCIAS
GASTOS GENERALES
3%
0%
UTILIDAD
10%
100%
PRODUCCION TAJEOS
U.S.$/HR
MESES
UNIDAD
3.65
ENERO
TMS
CANTIDAD
27,417.00
6.31
FEBRERO
TMS
33,724.00
1.16
MARZO
TMS
32,548.00
0.92
ABRIL
TMS
31,181.00
SHOTCRETERA ALIVA
5.91
MAYO
TMS
28,884.00
U.S.$/Mes
1,400.00
JUNIO
TMS
26,491.00
U.S.$/Mes
2,200.00
JULIO
TMS
30,759.00
U.S.$/Mes
3,400.00
AGOSTO
TMS
27,152.00
LOCOMOTORA TROLLEY DE 10 TN
U.S.$/Mes
8,000.00
SEPTIEMBRE
TMS
27,055.00
90.82
OCTUBRE
TMS
27,835.00
47.03
NOVIEMBRE
TMS
32,217.00
180.00
PROMEDIO
TMS
29,569.36
COSTO UNIT
OBSERVACION
MEZCLADORA
U.S.$/Hr
4.44
Consumo
Unidad
$/Hr
50.00
3.00
Glns/Hr
$/Hr
40.00
2.00
Glns/Hr
$/Hr
63.00
3.50
Glns/Hr
$/Hr
90.00
1.50
Glns/Hr
$/Hr
50.00
4.00
Glns/Hr
$/Hr
0.10
Und
CONSUMO
P.UNIT
COSTO TOTAL
$/pie
MADERA
Pie2-Mina-mes
PERSONAL
Glb
530,984.18
0.00
0.00
0.00
1.00
19,175.25
19,175.25
GASTOS ADMINISTRATIVOS
0.04
MANTENIMIENTO CALESAS
Und
39.00
23.00
897.00
Glb
1.00
1,196.00
1,196.00
CAMION DYNA
Und
1.00
0.00
0.00
0.07
TOTAL
NOTA:
Factor de correccion longitud madera (pies a mts)
0.00
2,236.62
0.98
148.60%
SUELDO
BASICO
CANT
L.SOC. EMP.
103.53%
ZONA BAJA
T.CAMBIO
TOTAL
U.S.$
Ing. Residente
Ingeniero de Seguridad
Ing. Asistente Seguridad
Ingeniero Jefe de Guardia
Administrador
Operador de Costos/Sistemas
Asistenta Social
Jefe de Almacn
Auxiliar Almacen
0.50
0.50
0.50
1.50
0.50
0.50
0.50
0.50
1.00
7,000.00
6,000.00
4,500.00
5,000.00
3,000.00
4,500.00
2,000.00
2,000.00
1,470.00
7,246.99
6,211.71
4,658.78
5,176.42
3,105.85
4,658.78
2,070.57
2,070.57
1,521.87
14,246.99
12,211.71
9,158.78
10,176.42
6,105.85
9,158.78
4,070.57
4,070.57
2,991.87
5,160.08
4,422.93
3,317.20
3,685.77
2,211.46
3,317.20
1,474.31
1,474.31
1,083.62
Capataz
Bodeguero/Afilador /Lamparero
Inspector Seguridad
Mecanico Perforadoras
Soldador
Alquiler Lamparas
3.00
1.50
1.50
1.00
0.50
1.00
2,400.00
1,380.00
1,530.00
1,530.00
1,500.00
2,484.68
1,428.69
1,583.99
1,583.99
1,552.93
4,884.68
2,808.69
3,113.99
3,113.99
3,052.93
1,769.17
1,017.27
1,127.85
1,127.85
1,105.73
CANT
U.S.$
0.50
0.50
0.50
1.50
0.50
0.50
0.50
0.50
1.00
2,580.04
2,211.46
1,658.60
5,528.66
1,105.73
1,658.60
737.15
737.15
1,083.62
5,307.51
1,525.91
1,691.77
1,127.85
552.87
1,200.00
28,706.93
28,706.93
3.00
1.50
1.50
1.00
0.50
5,307.51
1,525.91
1,691.77
1,127.85
552.87
6,511.14
6,511.14
3,255.57
3,255.57
0.50
0.50
5,307.51
1,525.91
1,691.77
1,127.85
552.87
1.00
0.50
0.50
Alimentacion supervisores
Alimentacion obreros
Examen mdico
Pasajes Obreros (Parcoy - Trujillo Parcoy)
Pasajes Supervisores (Lima - Mina - Lima)
IMPLEMENTOS SEGURIDAD
Supervisores y otros
27,506.93
27,506.93
3,255.57
3,255.57
6
38
44
Precio/Dia
16.00
16.00
190.00
Dia Mes
30.00
30.00
6.00
Sistema
0.67
0.67
2.00
115.90
115.90
22.94
695.40
4,346.25
997.83
6
38
44
695.40
4,346.25
997.83
38
250.00
1.00
0.67
60.36
2,263.67
38
2,263.67
249.50
2.00
1.00
180.73
1,355.49
1,084.39
36.18
976.76
10.50
379.85
1.00
27.00
2.761
4,000.00
1,000.00
22,146.53
50,853.47
94,638.93
Dias trabajados
U.S.$/Mes
30.00 p' vehi
3,218.10
3,184.51
48.00
49.69
108.53 Petroleo
180
6,511.14
S/.
97.69
4.10
U.S.$
35.38
738.00
24.60
16,278.53
43,785.46
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
2.00
6.00
3.00
3.00
2.00
1.00
Factor Incidencia
GRADIENTE: 5/1000
12%
N de Taladros:
MANO DE OBRA
UNIDAD
OPERADOR DE JUMBO
AYUDANTE OPER.JUMBO
OPERADOR SCOOPTRAM
OPERADOR CAMION DE BAJO PERFIL
CARGADOR/DISPARADOR
BOMBERO
SERVICIOS AUXILIARES
SUB-TOTAL
CANTIDAD
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
1.00
1.00
1.00
0.00
3.00
1.00
1.00
51.00
FACTOR
INCIDENCIA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Avance/Disp.
FACT MO
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PU
3.00
MT
SUB TOTAL
70.23
43.22
59.43
59.43
48.62
43.22
43.22
U.S.$/MT
70.23
43.22
59.43
0.00
145.87
43.22
43.22
405.18
135.24
MATERIALES
DESCRIPCION
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voladura recorte)
TUBERIA DE POLIETILENO DE 2" AGUA
TUBERIA DE POLIETILENO DE 4" AIRE
HERRAMIENTAS
MANGA VENTILACION 30"
ALCAYATAS DE 3/4"
PETROLEO
SUB-TOTAL
UNIDAD
MTS/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
PZAS/DISP
PZAS/DISP
PZAS/DISP
GLB
MT/DISP
4.00 PZAS/DISP
200.47
189.34
200.47
189.34
0.00
11.14
11.14
10.00
0.00
0.00
VIDA UTIL
MTS
2,500
200
3,500
100,000
3,000
200
200
3.00
4.00
3.50
ESTANDAR
PZAS/DISP
0.08
0.95
0.06
0.00
0.00
0.06
0.06
1
3.50
PRECIO
U.S.$/PZA
581.90
93.50
366.30
1,100.00
71.50
233.20
271.70
0.40
2.28
7.45
1.01
4.66
5.12
4.78
U.S.$/MT
15.58
29.54
7.00
0.70
0.00
4.33
5.05
1.34
0.00
0.00
0.34
4.66
6.84
19.56
94.93
IMPLEMENTOS SEGURIDAD
DESCRIPCION
UNIDAD
IMPLEMENTOS SEGURIDAD
COSTO UNIT
U.S.$/Pers
2.57
MTS/DISP
Unidad
8.00
COSTO
U.S.$
20.54
U.S.$/MT
6.86
VOLADURA
DESCRIPCION
UNIDAD
CANTIDAD/
TALADRO
20.00
11.30
11.00
12.27
17.00
6.00
45.00
2.00
48.00
MTS/DISP
TALADROS
TALADROS
TALADROS
MTS
PZAS
PZAS
CANTIDAD
COSTO
UNIDAD KG
PZAS
U.S.$/Kg
226.00
44.14
2.51
135.00
26.37
2.51
102.00
7.77
2.23
0.21
0.63
1.58
U.S.$/MT
36.98
22.09
5.79
3.15
0.42
25.31
93.75
EQUIPOS
DESCRIPCION
UNIDAD
HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
2.50
3.50
0.00
0.00
9.00
0.00
5.00
12.00
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
110.00
63.00
1.65
0.70
2.35
1.06
3.00
4.06
0.24
COSTO
TOTAL
U.S.$
275.00
220.50
0.00
0.00
21.15
0.00
20.30
2.88
539.83
U.S.$/MT
180.19
510.97
CONTINGENCIA
UTILIDAD
SUB TOTAL COSTOS INDIRECTOS
5%
10%
25.55
51.10
76.64
587.61
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
EFICIENCIA DE AVANCES
DISTRIBUCION DE CARGA DE EXPLOSIVOS
CICLO
TIEMPO DE CICLO
LONG BARRA DE EXTEN
EFIC DE PERF
LONG PERFORACION
EFIC.AVANCE
LONG DE AVANCE EFECTIVA
DURACION GUARDIA
GUARDIAS/DIA
PRODUCCION/DIA
ESTAND
UNIDAD
AR
H/DISP
PIES
%
MT
%
MT
H
GDA/D
M/D
3.21
14.00
87%
3.71
81%
3.00
11
2
11.98
4.5
4.2
3.00
6%
60.13
2.65
159.36
UNIDAD
DESCRIPCION
Taladro Alivio
Arranque
1ra Ayuda Arranque
2da Ayuda Arranque
3ra Ayuda Arranque
Ayudas de Alzas
Ayudas de Arrastre
Contorno
Contorno de Recorte
Arrastres
TOTAL
TOTAL KGS
PESO
3.00
3.00
4.00
4.00
4.00
5.00
4.00
4.00
13.00
7.00
51.00
51.00
Kgs/Cartucho
EFICIENCIAS
DESCRIPCION
Densidad de Carga
Factor de Carga
UNIDAD
Kgs/mt
Kgs/Ton
EMULEX 45%
1 1/8"X12
Cebo
EXADIT
45%
7/8"X7"
Corona
EMULEX
45% 1
1/8"X12
Arrastre
39.00
44.00
44.00
44.00
55.00
0.00
0.00
0.00
0.00
226.00
44.14
102.00
7.77
0.00
0.00
0.00
0.00
0.00
44.00
0.00
0.00
91.00
135.00
26.37
0.20
0.08
0.20
VALOR
26.13
0.49
24.00
78.00
N de Taladros:
MANO DE OBRA
UNIDAD
OPERADOR DE JUMBO
AYUDANTE OPER.JUMBO
OPERADOR SCOOPTRAM
OPERADOR CAMION DE BAJO PERFIL
CARGADOR/DISPARADOR
BOMBERO
SERVICIOS AUXILIARES
SUB-TOTAL
CANTIDAD
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
1.00
1.00
1.00
0.00
3.00
0.00
1.00
48.00
FACTOR
INCIDENCIA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Avance/Disp.
FACT MO
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PU
3.00
MT
U.S.$/MT
SUB TOTAL
70.23
43.22
59.43
59.43
48.62
43.22
43.22
70.23
43.22
59.43
0.00
145.87
0.00
43.22
361.96
120.82
MATERIALES
DESCRIPCION
UNIDAD
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voladura recorte)
TUBERIA DE POLIETILENO DE 2" AGUA
TUBERIA DE POLIETILENO DE 4" AIRE
HERRAMIENTAS
MANGA VENTILACION 30"
ALCAYATAS DE 3/4"
PETROLEO
SUB-TOTAL
MTS/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
PZAS/DISP
PZAS/DISP
PZAS/DISP
GLB
MT/DISP
4.00 PZAS/DISP
185.62
178.20
185.62
178.20
0.00
7.42
7.42
10.00
0.00
0.00
VIDA UTIL
MTS
2,500
200
3,500
100,000
3,000
200
200
3.00
4.00
3.50
ESTANDAR
PZAS/DISP
0.07
0.89
0.05
0.00
0.00
0.04
0.04
1
3.50
PRECIO
U.S.$/PZA
581.90
93.50
366.30
1,100.00
71.50
233.20
271.70
0.40
2.28
7.45
1.01
4.66
5.12
4.78
U.S.$/MT
14.42
27.81
6.48
0.65
0.00
2.89
3.37
1.34
0.00
0.00
0.34
4.66
6.84
19.56
88.35
IMPLEMENTOS SEGURIDAD
DESCRIPCION
UNIDAD
IMPLEMENTOS SEGURIDAD
COSTO UNIT
U.S.$/Pers
2.57
MTS/DISP
Unidad
7.00
COSTO
U.S.$
17.97
U.S.$/MT
6.00
VOLADURA
DESCRIPCION
UNIDAD
CANTIDAD/
TALADRO
20.00
11.30
9.00
12.11
17.00
6.00
45.00
2.00
46.00
MTS/DISP
TALADROS
TALADROS
TALADROS
MTS
PZAS
PZAS
CANTIDAD
COSTO
UNIDAD KG
PZAS
U.S.$/Kg
226.00
44.14
2.51
109.00
21.29
2.51
102.00
7.77
2.23
0.21
0.63
1.58
U.S.$/MT
36.98
17.84
5.79
3.15
0.42
24.26
88.44
EQUIPOS
DESCRIPCION
UNIDAD
HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
2.50
3.50
0.00
0.00
9.00
0.00
0.00
12.00
1.65
COSTO
OPERACIN
U.S.$/HR
0.70
COSTO
TOTAL
U.S.$/HR
110.00
63.00
2.35
4.06
0.24
COSTO
TOTAL
U.S.$
275.00
220.50
0.00
0.00
21.15
0.00
0.00
2.88
519.53
U.S.$/MT
173.41
477.02
CONTINGENCIA
UTILIDAD
SUB TOTAL COSTOS INDIRECTOS
5%
10%
23.85
47.70
71.55
548.57
UNIDAD
ESTAND
AR
TIEMPO DE CICLO
LONG BARRA DE EXTEN
EFIC DE PERF
LONG PERFORACION
EFIC.AVANCE
LONG DE AVANCE EFECTIVA
DURACION GUARDIA
GUARDIAS/DIA
PRODUCCION/DIA
H/DISP
PIES
%
MT
%
MT
H
GDA/D
M/D
3.21
14.00
87%
3.71
81%
3.00
11
2
11.98
2.00
3.00
4.00
4.00
4.00
5.00
4.00
4.00
13.00
5.00
48.00
48.00
Kgs/Cartucho
EFICIENCIAS
DESCRIPCION
Densidad de Carga
Factor de Carga
UNIDAD
Kgs/mt
Kgs/Ton
EMULEX 45%
1 1/8"X12
Cebo
EXADIT
45%
7/8"X7"
Corona
EMULEX
45% 1
Malla Propuesta
1/8"X12
102.00
7.77
0.00
0.00
0.00
0.00
0.00
44.00
0.00
0.00
65.00
109.00
21.29
0.20
0.08
0.20
VALOR
24.43
0.46
24.00
78.00
N cartuchos
Arrastre
39.00
44.00
44.00
44.00
55.00
0.00
0.00
0.00
0.00
226.00
44.14
3
3
4
4
4
5
4
4
13
7
51
13
11
11
11
11
11
6
6
13
39
44
44
44
55
44
24
78
91
463
Emulnor 3000
Emulnor 3000
Emulnor 3000
Emulnor 3000
Emulnor 3000
Emulnor 3000
Emulnor 1x7
Emulnor 1x7
Emulnor 3000
5/1000
N de Taladros:
MANO DE OBRA
UNIDAD
OPERADOR DE JUMBO
AYUDANTE OP. JUMBO
OPERADOR SCOOPTRAM
OPERADOR CAMION DE BAJO PERFIL
CARGADOR/DISPARADOR
BOMBERO
SERVICIOS AUXILIARES
SUB-TOTAL
CANTIDAD
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
1.00
1.00
1.00
0.00
2.00
1.00
1.00
44.00
Avance/Disp.
FACTOR
FACT MO
INCIDENCIA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PU
3.00
MT
SUB TOTAL
70.23
43.22
59.43
59.43
48.62
43.22
43.22
U.S.$/MT
70.23
43.22
59.43
0.00
97.24
43.22
43.22
356.56
119.01
MATERIALES
DESCRIPCION
UNIDAD
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voaldura recorte)
TUBERIA DE POLIETILENO DE 2" AGUA
TUBERIA DE POLIETILENO DE 4" AIRE
HERRAMIENTAS
MANGA VENTILACION 30"
ALCAYATAS DE 3/4"
PETROLEO
SUB-TOTAL
MTS/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
PZAS/DISP
PZAS/DISP
PZAS/DISP
174.49
163.35
174.49
163.35
0.00
11.14
11.14
10.00
0.00
0.00
MT/DISP
4.00 PZAS/DISP
3.00
4.00
3.50
VIDA UTIL
MTS
2,500
200
3,500
100,000
3,000
200
200
ESTANDAR
PZAS/DISP
0.07
0.82
0.05
0.00
0.00
0.06
0.06
1
2.50
PRECIO
U.S.$/PZA
581.90
93.50
366.30
1,100.00
71.50
233.20
271.70
0.40
2.28
7.45
1.01
4.66
5.12
4.78
U.S.$/MT
13.56
25.49
6.10
0.60
0.00
4.33
5.05
1.34
0.00
0.00
0.34
4.66
6.84
13.97
82.27
IMPLEMENTOS SEGURIDAD
DESCRIPCION
UNIDAD
IMPLEMENTOS SEGURIDAD
COSTO UNIT
U.S.$/Pers
2.57
MTS/DISP
Unidad
7.00
COSTO U.S.$
17.97
U.S.$/MT
6.00
VOLADURA
DESCRIPCION
UNIDAD
MTS/DISP
TALADROS
TALADROS
TALADROS
MTS
PZAS
PZAS
18.00
9.00
14.00
41.00
2.00
41.00
CANTIDAD/
TALADRO
11.44
12.33
6.00
CANTIDAD
PZAS
206.00
111.00
84.00
COSTO
PROPIEDAD
U.S.$/HR
COSTO
OPERACIN
U.S.$/HR
UNIDAD KG
40.23
21.68
6.40
COSTO
U.S.$/Kg
2.51
2.51
2.23
0.21
0.63
1.58
U.S.$/MT
33.71
18.16
4.77
2.87
0.42
21.62
81.55
EQUIPOS
DESCRIPCION
UNIDAD
HRS/DISP
2.00
2.50
0.00
0.00
9.00
0.00
4.00
12.00
1.65
0.70
COSTO
COSTO TOTAL
TOTAL
U.S.$
U.S.$/HR
110.00
220.00
63.00
157.50
0.00
0.00
0.00
0.00
2.35
21.15
9.30
0.00
4.06
16.24
0.24
2.88
417.77
U.S.$/MT
139.44
428.28
CONTINGENCIA
UTILIDAD
SUB TOTAL COSTOS INDIRECTOS
5%
10%
21.41
42.83
64.24
492.52
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
EFICIENCIA DE AVANCES
CICLO
TIEMPO DE CICLO
LONG BARRA DE EXTEN
EFIC DE PERF
LONG PERFORACION
EFIC.AVANCE
LONG DE PERF EFECTIVA
DURACION GUARDIA
GUARDIAS/DIA
PRODUCCION/DIA
ESTAND
UNIDAD
AR
H/DISP
PIES
%
MT
%
MT
H
GDA/D
M/D
3.21
14.00
87%
3.71
81%
3.00
11
2
11.98
MT
ALTO LABOR
LONGITUD
SOBREROTURA
VOLUMEN TOTAL
DENSIDAD MATERIAL
TONELAJE
MT
MT
%
M3
TMS/M3
TMS/DISP
3.5
3.2
3.00
6%
35.64
2.65
94.43
DESCRIPCION
Taladro Alivio
Arranque
1ra Ayuda Arranque
2da Ayuda Arranque
3ra Ayuda Arranque
Ayudas de Alzas
Ayudas de Arrastre
Contorno
Contorno de Recorte
Arrastres
TOTAL
TOTAL KGS
PESO
Kgs/Cartucho
EFICIENCIAS
DESCRIPCION
Densidad de Carga
Factor de Carga
0.20
UNIDAD
Kgs/mt
Kgs/Ton
VALOR
22.80
0.72
0.08
0.20
5/1000
N de Taladros:
MANO DE OBRA
UNIDAD
OPERADOR DE JUMBO
AYUDANTE OP. JUMBO
OPERADOR SCOOPTRAM
OPERADOR CAMION DE BAJO PERFIL
CARGADOR/DISPARADOR
BOMBERO
SERVICIOS AUXILIARES
SUB-TOTAL
CANTIDAD
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
1.00
1.00
1.00
0.00
2.00
0.00
2.00
42.00
Avance/Disp.
FACTOR
FACT MO
INCIDENCIA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PU
3.00
MT
SUB TOTAL
70.23
43.22
59.43
59.43
48.62
43.22
43.22
U.S.$/MT
70.23
43.22
59.43
0.00
97.24
0.00
86.44
356.56
0.00
0.00
0.00
0.00
0.00
0.00
119.01
MATERIALES
DESCRIPCION
UNIDAD
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voaldura recorte)
TUBERIA DE POLIETILENO DE 2" AGUA
TUBERIA DE POLIETILENO DE 4" AIRE
HERRAMIENTAS
MANGA VENTILACION 30"
ALCAYATAS DE 3/4"
PETROLEO
SUB-TOTAL
MTS/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
PZAS/DISP
PZAS/DISP
PZAS/DISP
167.06
155.92
167.06
155.92
0.00
11.14
11.14
10.00
0.00
0.00
MT/DISP
4.00 PZAS/DISP
3.00
4.00
3.50
VIDA UTIL
MTS
2,500
200
3,500
100,000
3,000
200
200
ESTANDAR
PZAS/DISP
0.07
0.78
0.05
0.00
0.00
0.06
0.06
1
2.50
PRECIO
U.S.$/PZA
581.90
93.50
366.30
1,100.00
71.50
233.20
271.70
0.40
2.28
7.45
1.01
4.66
5.12
4.78
U.S.$/MT
12.98
24.33
5.84
0.57
0.00
4.33
5.05
1.34
0.00
0.00
0.34
4.66
6.84
13.97
80.24
IMPLEMENTOS SEGURIDAD
DESCRIPCION
UNIDAD
IMPLEMENTOS SEGURIDAD
COSTO UNIT
U.S.$/Pers
2.57
MTS/DISP
Unidad
7.00
COSTO U.S.$
17.97
U.S.$/MT
6.00
VOLADURA
DESCRIPCION
UNIDAD
CANTIDAD/
TALADRO
18.00
11.44
7.00
12.14
14.00
6.00
41.00
2.00
39.00
CANTIDAD
UNIDAD KG
PZAS
206.00
40.23
85.00
16.60
84.00
6.40
MTS/DISP
TALADROS
TALADROS
TALADROS
MTS
PZAS
PZAS
COSTO
U.S.$/Kg
2.51
2.51
2.23
0.21
0.63
1.58
U.S.$/MT
33.71
13.91
4.77
2.87
0.42
20.57
76.24
EQUIPOS
DESCRIPCION
UNIDAD
HRS/DISP
COSTO
PROPIEDAD
U.S.$/HR
2.00
2.50
0.00
0.00
9.00
0.00
0.00
12.00
1.65
COSTO
OPERACIN
U.S.$/HR
0.70
COSTO
COSTO TOTAL
TOTAL
U.S.$
U.S.$/HR
110.00
220.00
63.00
157.50
0.00
0.00
0.00
0.00
2.35
21.15
0.00
0.00
4.06
0.00
0.24
2.88
401.53
U.S.$/MT
134.02
415.53
CONTINGENCIA
UTILIDAD
SUB TOTAL COSTOS INDIRECTOS
5%
10%
20.78
41.55
62.33
477.86
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
EFICIENCIA DE AVANCES
CICLO
TIEMPO DE CICLO
LONG BARRA DE EXTEN
EFIC DE PERF
LONG PERFORACION
EFIC.AVANCE
LONG DE AVANCE EFECTIVA
DURACION GUARDIA
GUARDIAS/DIA
PRODUCCION/DIA
ESTAND
UNIDAD
AR
H/DISP
PIES
%
MT
%
MT
H
GDA/D
M/D
3.21
14.00
87%
3.71
81%
3.00
11
2
11.98
MT
ALTO LABOR
LONGITUD
SOBREROTURA
VOLUMEN TOTAL
DENSIDAD MATERIAL
TONELAJE
MT
MT
%
M3
TMS/M3
TMS/DISP
3.5
3.2
3.00
6%
35.64
2.65
94.43
DESCRIPCION
Taladro Alivio
Arranque
1ra Ayuda Arranque
2da Ayuda Arranque
3ra Ayuda Arranque
Ayudas de Alzas
Ayudas de Arrastre
Contorno
Contorno de Recorte
Arrastres
TOTAL
TOTAL KGS
PESO
Kgs/Cartucho
EFICIENCIAS
DESCRIPCION
Densidad de Carga
Factor de Carga
0.20
UNIDAD
Kgs/mt
Kgs/Ton
VALOR
21.11
0.67
0.08
0.20
UNIDAD
OPERADOR DE JUMBO
AYUDANTE OP. JUMBO
OPERADOR SCOOPTRAM
OPERADOR CAMION DE BAJO PERFIL
CARGADOR/DISPARADOR
BOMBERO
SERVICIOS AUXILIARES
SUB-TOTAL
1.00
1.00
1.00
0.00
1.00
0.00
0.00
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
CANTIDAD
38
FACTOR
1.00
1.00
1.00
1.00
2.00
1.00
1.00
Avance/Disp.
FACT MO
1.00
1.00
1.00
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PU
3.00
MT
SUB TOTAL
70.23
43.22
59.43
59.43
48.62
43.22
43.22
U.S.$/MT
70.23
43.22
59.43
29.71
97.24
43.22
43.22
386.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
128.93
MATERIALES
DESCRIPCION
UNIDAD
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voladura recorte)
TUBERIA DE POLIETILENO DE 2" AGUA
TUBERIA DE POLIETILENO DE 4" AIRE
HERRAMIENTAS
MANGA VENTILACION 30"
ALCAYATAS DE 3/4"
PETROLEO
SUB-TOTAL
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
PZAS/DISP
PZAS/DISP
PZAS/DISP
MT/DISP
4.00 PZAS/DISP
MTS/DISP
122.83
113.85
122.83
113.85
0.00
8.99
8.99
5.00
0.00
0.00
VIDA
ECONOMICA
MTS
2,500
200
3,500
100,000
3,000
200
200
3.00
4.00
3.50
ESTANDAR
PZAS/DISP
0.05
0.57
0.04
0.00
0.00
0.04
0.04
1
2.50
PRECIO
U.S.$/PZA
U.S.$/MT
581.90
93.50
366.30
1100.00
71.50
233.20
271.70
0.40
2.28
7.45
1.01
4.66
5.12
4.78
9.54
17.77
4.29
0.42
0.00
3.50
4.08
0.67
0.00
0.34
4.66
6.84
13.97
66.06
IMPLEMENTOS SEGURIDAD
DESCRIPCION
UNIDAD
Implementos Seguridad
COSTO UNIT
U.S.$/Pers
2.57
MTS/DISP
Unidad
7.50
UNIDAD
TALADROS
COSTO
U.S.$
19.26
U.S.$/MT
6.43
VOLADURA
DESCRIPCION
EMULEX 45% 1 1/8" X 12" (128)
EXADIT 45% 7/8" X 7" (328)
CORDON DETONANTE 5P
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300)
EXSANEL 4.80 MTL
SUB-TOTAL
TALADROS
TALADROS
MTS
PZAS
PZAS
CANTIDAD/T
ALADRO
24.00
7.25
11.00
5.00
CANTIDAD
UNIDAD KGS
PZA
174.00
33.98
55.00
4.19
35.00
2.00
35.00
COSTO
U.S.$/Kgs
2.51
2.23
0.21
0.63
1.58
U.S.$/MT
28.47
3.12
2.45
0.42
18.46
52.92
EQUIPOS
DESCRIPCION
UNIDAD
HRS/DISP
1.50
2.50
0.00
9.00
4.00
12.00
COSTO
PROPIEDAD
U.S.$/HR
1.65
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
110.00
63.00
0.70
2.35
4.06
0.24
COSTO
TOTAL
U.S.$
165.00
157.50
0.00
21.15
16.24
2.88
362.77
121.09
375.44
CONTINGENCIA
UTILIDAD
SUB TOTAL COSTOS INDIRECTOS
5%
10%
18.77
37.54
56.32
431.75
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
EFICIENCIA DE AVANCES
DISTRIBUCION DE CARGA DE EXPLOSIVOS
ESTAND
EMULEX
EXADIT 45
CICLO
UNIDAD
DESCRIPCION
# CART
# TAL
AR
11/8"X12"
7/8"X7"
TIEMPO DE CICLO
H/DISP
3.21
Alivio de arranque
3.00
LONG BARRA DE EXTEN
PIES
14.00
Arranque
10.00
4.00
40.00
EFIC DE PERF
%
87% AXERA
1ra Ayuda Arranque
9.00
2.00
18.00
LONG PERFORACION
MT
3.71
2da Ayuda Arranque
9.00
2.00
18.00
EFIC.AVANCE
%
81%
3ra Ayuda Arranque
6.00
2.00
12.00
LONG DE PERF EFECTIVA
MT
3.00
4ta Ayuda Arranque
6.00
2.00
12.00
DURACION GUARDIA
H
11.00
Ayudas de Cuadrador 4.00
2.00
8.00
GUARDIAS/DIA
GDA/D
2.00
Ayudas de Corona
4.00
3.00
12.00
PRODUCCION/DIA
M/D
11.98
Ayudas de Arrastre
6.00
3.00
18.00
Cuadradores
5.00
6.00
30.00
VOLUMEN POR DISPARO LABOR
Coronas
5.00
5.00
25.00
ANCHO LABOR
MT
3.00
Arrastres
9.00
4.00
36.00
ALTO LABOR
MT
3.00
TOTAL PERFORADOS
38.00
174.00
55.00
LONGITUD
MT
3.00
TOTAL CARGADOS
35.00
SOBREROTURA
%
6%
TOTAL KG
33.98
4.19
VOLUMEN TOTAL
M3
28.64
PESO
Kgs/Cartucho
0.195
0.076
DENSIDAD MATERIAL
TMS/M3
2.65
TONELAJE
U.S.$/MT
TMS/DISP
75.88
EFICIENCIAS
DESCRIPCION UNIDAD
Densidad de Carga
Kgs/mt
Factor de Carga
Kgs/Ton
VALOR
12.74
0.50
Kgs/Cart
Cart/Caja
KGS/CAJA
TOTAL PZAS
40.00
18.00
18.00
12.00
12.00
8.00
12.00
18.00
30.00
25.00
36.00
229.00
TOTAL KG
38.18
TOTAL
KGMS
7.81
3.52
3.52
2.34
2.34
1.56
2.34
3.52
2.29
1.91
7.03
38.18
EMULEX
EXADIT 45
11/8"X12"
7/8"X7"
0.195
0.076
128.00
328.00
25.00
25.00
UNIDAD
1.00
1.00
1.00
0.00
1.00
0.00
0.00
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
CANTIDAD
36
FACTOR
1.00
1.00
1.00
1.00
2.00
0.00
2.00
Avance/Disp.
FACT MO
1.00
1.00
1.00
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PU
3.00
MT
SUB TOTAL
70.23
43.22
59.43
59.43
48.62
43.22
43.22
U.S.$/MT
70.23
43.22
59.43
29.71
97.24
0.00
86.44
386.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
128.76
MATERIALES
DESCRIPCION
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voladura recorte)
TUBERIA DE POLIETILENO DE 2" AGUA
TUBERIA DE POLIETILENO DE 4" AIRE
HERRAMIENTAS
MANGA VENTILACION 30"
ALCAYATAS DE 3/4"
PETROLEO
SUB-TOTAL
UNIDAD
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
PZAS/DISP
PZAS/DISP
PZAS/DISP
MT/DISP
4.00 PZAS/DISP
MTS/DISP
132.04
125.09
132.04
125.09
0.00
6.95
6.95
5.00
0.00
0.00
VIDA
ECONOMICA
MTS
2,500
200
3,500
100,000
3,000
200
200
3.00
4.00
3.50
ESTANDAR
PZAS/DISP
0.05
0.63
0.04
0.00
0.00
0.03
0.03
1
2.50
PRECIO
U.S.$/PZA
U.S.$/MT
581.90
93.50
366.30
1100.00
71.50
233.20
271.70
0.40
2.28
7.45
1.01
4.66
5.12
4.78
10.24
19.49
4.61
0.46
0.00
2.70
3.15
0.67
0.00
0.00
0.34
4.66
6.83
13.95
67.10
IMPLEMENTOS SEGURIDAD
DESCRIPCION
UNIDAD
Implementos Seguridad
COSTO UNIT
U.S.$/Pers
2.57
MTS/DISP
Unidad
7.50
UNIDAD
TALADROS
COSTO U.S.$
19.26
U.S.$/MT
6.42
VOLADURA
DESCRIPCION
TALADROS
TALADROS
MTS
PZAS
PZAS
22.00
11.00
CANTIDAD/TA
LADRO
7.09
5.00
CANTIDAD
UNIDAD KGS
PZA
156.00
30.47
55.00
4.19
35.00
2.00
33.00
COSTO
U.S.$/Kgs
2.51
2.23
0.21
0.63
1.58
U.S.$/MT
25.49
3.12
2.45
0.42
17.38
48.86
EQUIPOS
DESCRIPCION
UNIDAD
HRS/DISP
1.50
2.50
0.00
9.00
0.00
12.00
COSTO
PROPIEDAD
U.S.$/HR
1.65
COSTO
OPERACIN
U.S.$/HR
0.70
COSTO
COSTO
TOTAL
TOTAL U.S.$
U.S.$/HR
110.00
165.00
63.00
157.50
0.00
2.35
21.15
4.06
0.00
0.24
2.88
346.53
115.51
366.64
CONTINGENCIA
UTILIDAD
SUB TOTAL COSTOS INDIRECTOS
18.33
36.66
55.00
5%
10%
421.64
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
DATOS
EFICIENCIA DE AVANCES
DISTRIBUCION DE CARGA DE EXPLOSIVOS
ESTAND
EMULEX
EXADIT 45
CICLO
UNIDAD
DESCRIPCION
# CART
# TAL
AR
11/8"X12"
7/8"X7"
Alivio de arranque
2.00
TIEMPO DE CICLO
H/DISP
3.21
Arranque
10.00
4.00
40.00
LONG BARRA DE EXTEN
PIES
12.00
1ra Ayuda Arranque
9.00
2.00
18.00
EFIC DE PERF
%
95% AXERA
2da Ayuda Arranque
9.00
2.00
18.00
LONG PERFORACION
MT
3.47
3ra Ayuda Arranque
6.00
2.00
12.00
EFIC.AVANCE
%
81%
4ta Ayuda Arranque
6.00
2.00
12.00
LONG DE PERF EFECTIVA
MT
2.80
Ayudas de Cuadrador 4.00
2.00
8.00
DURACION GUARDIA
H
11.00
Ayudas de Corona
4.00
3.00
12.00
GUARDIAS/DIA
GDA/D
2.00
Ayudas de Arrastre
6.00
3.00
18.00
PRODUCCION/DIA
M/D
11.22
Cuadradores
5.00
6.00
30.00
VOLUMEN POR DISPARO LABOR
Coronas
5.00
5.00
25.00
Arrastres
2.00
18.00
ANCHO LABOR
MT
3.00
9.00
TOTAL PERFORADOS
35.00
156.00
55.00
ALTO LABOR
MT
3.00
TOTAL CARGADOS
33.00
LONGITUD
MT
2.80
TOTAL KG
30.47
4.19
SOBREROTURA
%
6%
PESO
Kgs/Cartucho
0.195
0.076
VOLUMEN TOTAL
M3
26.80
DENSIDAD MATERIAL
TMS/M3
2.65
TONELAJE
U.S.$/MT
TMS/DISP
71.02
EFICIENCIAS
DESCRIPCION UNIDAD
Densidad de Carga
Kgs/mt
Factor de Carga
Kgs/Ton
VALOR
12.36
0.49
Kgs/Cart
Cart/Caja
KGS/CAJA
TOTAL
PZAS
40.00
18.00
18.00
12.00
12.00
8.00
12.00
18.00
30.00
25.00
18.00
211.00
TOTAL KG
34.66
TOTAL
KGMS
7.81
3.52
3.52
2.34
2.34
1.56
2.34
3.52
2.29
1.91
3.52
34.66
EMULEX
EXADIT 45
11/8"X12"
7/8"X7"
0.195
0.076
128.00
328.00
25.00
25.00
UNIDAD
1.00
1.00
1.00
0.00
1.00
0.00
0.00
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
Hom/Disp
CANTIDAD
1.00
1.00
1.00
1.00
2.00
0.00
2.00
28
FACTOR
0.67
0.67
0.67
0.50
0.67
0.67
0.67
MATERIALES
DESCRIPCION
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voladura recorte)
TUBERIA DE POLIETILENO DE 2" AGUA
TUBERIA DE POLIETILENO DE 4" AIRE
HERRAMIENTAS
MANGA VENTILACION 30"
ALCAYATAS DE 3/4"
PETROLEO
SUB-TOTAL
UNIDAD
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
MT/DISP
PZAS/DISP
PZAS/DISP
PZAS/DISP
MT/DISP
4.00 PZAS/DISP
MTS/DISP
92.87
83.89
92.87
83.89
0.00
8.99
8.99
5.00
0.00
0.00
3.00
4.00
3.50
VIDA
ECONOMICA
MTS
2,500
200
3,500
100,000
3,000
200
200
IMPLEMENTOS SEGURIDAD
DESCRIPCION
Implementos Seguridad
UNIDAD
Unidad
MTS/DISP
5.19
VOLADURA
DESCRIPCION
EMULEX 45% 1 1/8" X 12" (128)
EXADIT 45% 7/8" X 7" (328)
CORDON DETONANTE 5P
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300)
EXSANEL 4.80 MTL
SUB-TOTAL
EQUIPOS
UNIDAD
TALADROS
TALADROS
MTS
PZAS
PZAS
CANTIDAD/TA
LADRO
17.00
7.41
8.00
5.00
TALADROS
DESCRIPCION
UNIDAD
HRS/DISP
1.50
2.00
0.00
9.00
0.00
12.00
COSTO
PROPIEDAD
U.S.$/HR
1.65
CONTINGENCIA
UTILIDAD
SUB TOTAL COSTOS INDIRECTOS
5%
10%
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE
DATOS
EFICIENCIA DE AVANCES
DISTRIBUCION DE
ESTAND
CICLO
UNIDAD
DESCRIPCION
# CART
AR
TIEMPO DE CICLO
H/DISP
3.21
Alivio de arranque
LONG BARRA DE EXTEN
PIES
14.00
Arranque
10.00
EFIC DE PERF
%
87% AXERA
1ra Ayuda Arranque
9.00
LONG PERFORACION
MT
3.71
2da Ayuda Arranque
9.00
EFIC.AVANCE
%
81%
3ra Ayuda Arranque
6.00
LONG DE PERF EFECTIVA
MT
3.00
4ta Ayuda Arranque
6.00
DURACION GUARDIA
H
11.00
Ayudas de Cuadrador 4.00
GUARDIAS/DIA
GDA/D
2.00
Ayudas de Corona
4.00
PRODUCCION/DIA
M/D
11.98
Ayudas de Arrastre
6.00
Cuadradores
5.00
VOLUMEN POR DISPARO LABOR
Coronas
5.00
ANCHO LABOR
MT
3.00
9.00
Arrastres
ALTO LABOR
MT
3.00
TOTAL PERFORADOS
LONGITUD
MT
3.00
TOTAL CARGADOS
SOBREROTURA
%
6%
TOTAL KG
VOLUMEN TOTAL
M3
28.64
PESO
Kgs/Cartucho
DENSIDAD MATERIAL
TMS/M3
2.65
TONELAJE
TMS/DISP
75.88
EFICIENCIAS
DESCRIPCION UNIDAD
Kgs/mt
Densidad de Carga
Factor de Carga
Kgs/Ton
CON EQUIPO(REFUGIO)
Avance/Disp.
FACT MO
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PU
3.00
MT
SUB TOTAL
70.23
43.22
59.43
59.43
48.62
43.22
43.22
ESTANDAR
PZAS/DISP
0.04
0.42
0.03
0.00
0.00
0.04
0.04
2.00
U.S.$/MT
47.06
28.96
39.82
29.71
65.15
0.00
57.91
268.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
89.66
PRECIO
U.S.$/PZA
U.S.$/MT
581.90
93.50
366.30
1100.00
71.50
233.20
271.70
0.40
2.28
7.45
1.01
4.66
5.12
4.78
COSTO UNIT
U.S.$/Pers
2.57
CANTIDAD
UNIDAD KGS
PZA
126.00
24.61
40.00
3.05
35.00
2.00
25.00
7.22
13.09
3.24
0.31
0.00
3.50
4.08
0.67
0.00
0.34
4.66
6.84
11.18
55.11
COSTO
U.S.$
13.33
COSTO
U.S.$/Kgs
2.51
2.23
0.21
0.63
1.58
U.S.$/MT
4.45
U.S.$/MT
20.62
2.27
2.45
0.42
13.18
38.95
COSTO
OPERACIN
U.S.$/HR
COSTO
TOTAL
U.S.$/HR
110.00
63.00
0.70
2.35
4.06
0.24
COSTO
TOTAL
U.S.$
165.00
126.00
0.00
21.15
0.00
2.88
315.03
U.S.$/MT
105.15
293.31
14.67
29.33
44.00
337.31
VALOR
9.23
0.36
Kgs/Cart
Cart/Caja
KGS/CAJA
TOTAL
KGMS
5.86
3.52
3.52
2.34
1.17
0.78
1.56
2.34
1.52
1.52
3.52
27.66
EMULEX
EXADIT 45
11/8"X12"
7/8"X7"
0.195
0.076
128.00
328.00
25.00
25.00
Unid.
Cant.
FACTOR INCIDENCIA
1. MANO DE OBRA
Perforistas
Ayud. Perforista
Ayud.
1.00 Tarea
1.00 Tarea
1.00 Tarea
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua
3. MATERIALES Y HERRAMIENTAS
Barra conica 6'
Broca 40 mm
Aceite Perforacin
Perno Helicohidal de 6',tuerca,placa (1x18)=18
Resina (1x18)=18
Cembolt (6x18)=108
Adaptador para inst perno (1)
Herramientas de mina
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora
Manguera aire 1"
Manguera agua 1/2"
Tar.
Pza
Pza
Gln.
Pza.
Cart
Cart
Pza.
Global
P.P.
Mts.
Mts.
1.00
1.00
1.00
3.00
3.00
108
108
0.22
18
18
108
1
108.00
30.00
30.00
FACT
MO
1.00
1.00
1.00
Costo
Unit.$
Vida
Util
45.92
43.22
43.22
45.92
43.22
43.22
132.36
2.57
94.60
25.30
8.40
8.12
0.75
0.22
88.00
2.48
1.27
Costo x
Disp. $
Contingencia
Utilidad
COSTO TOTAL (US$/Pza. Con material)
5%
10%
7.35
7.70
1,820
350
200
0.24
150.00
150.00
7.70
0.43
5.61
7.81
1.85
146.16
13.50
23.76
0.44
1.34
200.47
11.14
25.92
0.50
0.25
26.67
COSTOS DIRECTOS
COSTOS FIJOS ( van en lista por separado )
Costo/Pza.
(US$/pza.)
1.48
20.40
20.40
1.02
2.04
23.46
Longitud Taladro :
Rendimiento
:
DESCRIPCIN
Unid.
Cant.
FACTOR INCIDENCIA
1. MANO DE OBRA
Perforistas
Ayud. Perforista
Ayudante
1.00 Tarea
1.00 Tarea
1.00 Tarea
1.00
1.00
1.00
3.00
FACT
MO
1.00
1.00
1.00
Costo
Unit.$
Vida
Util
45.92
43.22
43.22
Costo x
Disp. $
Costo/Pza.
(US$/pza.)
45.92
43.22
43.22
132.36
8.82
7.70
7.70
0.51
6.39
8.13
1.93
143.10
22.50
33.00
0.44
1.34
216.84
14.46
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua
3. MATERIALES Y HERRAMIENTAS
Barra conica 8'
Broca 40 mm
Aceite Perforacin
Perno Helicohidal de 8',tuerca,placa (1x15)=15
Resina (2x15)=30
Cembol (10x15)=150
Adaptador para inst perno (1)
Herramientas de mina
5. EQUIPO PERFORACIN-LIMPIEZA
perforadora
Manguera aire 1"
Manguera agua 1/2"
Tar.
P.P.
Pza
Gln.
Pza.
Cart
Cart
Pza.
Global
P.P.
Mts.
Mts.
3.00
112.50
112.50
0.23
15.00
30.00
150.00
1.00
112.50
30.00
30.00
2.57
103.40
25.30
8.40
9.54
0.75
0.22
88.00
2.48
1.27
1,820
350
200
0.24
150
150
27.00
0.50
0.25
27.75
COSTOS DIRECTOS
COSTOS FIJOS ( van en lista por separado )
Contingecia
Utilidad
COSTO TOTAL (US$/Pza. Con material)
5%
10%
1.85
25.64
25.64
1.28
2.56
29.49
42.50 M2
Unid.
Cant.
FACT
MO
Costo
Unit.$
1.00 Tarea
1.00 Tarea
1.00
1.00
1.00
1.00
45.92
43.22
FACTOR
INCIDENCIA
1. MANO DE OBRA
Maestro
Ayudante
Taladros:
50
Vida
Util
3. MATERIALES Y HERRAMIENTAS
Malla Electrosoldada 4'x4'
Cemento
Alambre No16
Grampa de Fe Coruugado 3/8"
Herramientas
5. EQUIPO PERFORACIN-LIMPIEZA
Perforadora
Barra de 4
Broca de 40 mm
Manguera aire 1"
Manguera agua 1/2"
Tar.
M2
Bolsa
Kgs
Pzas
Global
P.P.
P.P.
PP
Mts.
Mts.
2.00
50.00
1.00
3.00
75.00
50.00
50.00
50.00
30.00
30.00
89.14
2.57
3.06
10.95
1.22
1.21
0.24
68.20
25.30
2.48
1.27
COSTOS DIRECTOS
Contingencia
Utilidad
COSTO TOTAL (US$/M2. Sin material)
Costo/Pza.
(US$/pza.)
45.92
43.22
2.00
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad
Costo x
Disp. $
2.10
5.14
1.00
1.00
1.00
1.00
$/uni
$/uni
150.00
150.00
5.14
0.12
153.00
10.95
3.66
90.75
1.34
259.71
6.11
12.00
1.87
3.61
0.50
0.25
18.24
0.43
8.76
5%
10%
8.76
0.44
0.88
10.07
3.00
M3
UNIDAD
46.6
CANTID.
FACT MO
m2
COST./UNIT.
INCID
15.53 M2/M3
U.S.$
U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla
Tarea
1.00
45.92
Tarea
2.00
1.00
43.22
0.04
1.85
Maestro Shotcretero
Tarea
1.00
1.00
45.92
0.02
0.99
Tarea
1.00
43.22
Ayud1
Tarea
1.00
1.00
43.22
0.02
0.93
Operador Scoop
Tarea
0.38
1.00
59.43
0.01
0.48
4.38
IMPLEMENTOS SEGURIDAD
4.25
N Tars.
4.38
2.57
0.09
0.24
0.24
MATERIAL Y HERRAMIENTAS
Otras Herramientas
Global
1.00
1.34
$/M3
10.00
Cemento (10x3M3)=30
Bolsa
30.00
10.95
328.58
1.34
-
Kg
120.00
1.58
189.60
Acelerante (15x3M3)=45
lt
45.00
0.91
40.95
Calibradores (46.60M2x1)
Pza
46.60
0.11
5.13
Glns/Hr
3.50
Petroleo
2.00
4.78
33.49
EQUIPOS
599.09
Hrs.
2.00
63.00
Shotcretera y accesorios
Hrs.
3.00
5.91
17.73
143.73
12.86
126.00
3.08
20.43
5%
1.02
Utilidad
10%
2.04
3.06
23.49
DRAMIX
DRAMIX (0 KGS/M3)
17.78
30
18.95
60
20.12
90
21.29
120
22.46
3.00
M3
UNIDAD
23.03
CANTID.
FACT MO
COST./UNIT.
m2
INCID
7.68 M2/M3
U.S.$
U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla
Tarea
1.00
45.92
Tarea
2.00
1.00
43.22
0.09
3.75
Maestro Shotcretero
Tarea
1.00
1.00
45.92
0.04
1.99
Tarea
1.00
43.22
Ayud1
Tarea
1.00
1.00
43.22
0.04
1.88
Operador Scoop
Tarea
0.38
1.00
59.43
0.02
0.97
4.38
IMPLEMENTOS SEGURIDAD
8.59
N Tars.
4.38
2.57
0.19
-
0.49
0.49
MATERIAL Y HERRAMIENTAS
Otras Herramientas
Global
1.00
1.34
1.34
$/M3
Cemento (10x3M3)=30
Bolsa
30.00
10.95
328.58
10.00
Kg
120.00
1.58
189.60
Acelerante (15x3M3)=45
lt
45.00
0.91
40.95
Calibradores (23.30M2x1)
Pza
23.03
0.11
2.53
Glns/Hr
3.50
4.78
33.49
Petroleo
2.00
EQUIPOS
596.50
Hrs.
2.00
63.00
Shotcretera y accesorios
Hrs.
3.00
5.91
17.73
143.73
25.90
126.00
6.24
41.22
5%
2.06
Utilidad
10%
4.12
6.18
47.40
DRAMIX
DRAMIX (0 KGS/M3)
35.85
30
38.22
60
40.59
90
42.95
120
45.32
3.00
M3
UNIDAD
15.35
CANTID.
FACT MO
m2
COST./UNIT.
INCID
5.12 M2/M3
U.S.$
U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla
Tarea
1.00
45.92
Tarea
2.00
1.00
43.22
0.13
5.63
Maestro Shotcretero
Tarea
1.00
1.00
45.92
0.07
2.99
Tarea
1.00
43.22
Ayud1
Tarea
1.00
1.00
43.22
0.07
2.82
Operador Scoop
Tarea
0.38
1.00
59.43
0.02
1.45
4.38
IMPLEMENTOS SEGURIDAD
12.89
N Tars.
4.38
2.57
0.29
-
0.73
0.73
MATERIAL Y HERRAMIENTAS
Otras Herramientas
Global
1.00
1.34
1.34
$/M3
Cemento (10x3M3)=30
Bolsa
30.00
10.95
328.58
10.00
Kg
120.00
1.58
189.60
Acelerante (15x3M3)=45
lt
45.00
0.91
40.95
Calibradores (15.35M2x1)
Pza
15.35
0.11
1.69
Glns/Hr
3.50
4.78
33.49
Petroleo
2.00
EQUIPOS
595.65
Hrs.
2.00
63.00
Shotcretera y accesorios
Hrs.
3.00
5.91
17.73
143.73
38.80
126.00
9.36
61.79
5%
3.09
Utilidad
10%
6.18
9.27
71.06
DRAMIX
DRAMIX (0 KGS/M3)
53.58
30
57.13
60
60.68
90
64.24
120
67.79
Unid.
Tarea
SUB TOTAL
Par
Pza
Pza
Uni
Pza
Uni
Pza
Uni
Uni
Uni
Par
Uni
Par
Uni
Uni
Uni
Uni
Uni
Uni
Uni
Cant.
1.00
CANTIDAD
1.00
0.00
0.00
1.00
1.00
1.00
1.00
2.00
0.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
Costo
Unit.$
54.70
54.70
Costo x
Tarea
54.70
54.70
54.70
PRECIO
VIDA ECON. COSTO UNITARIO
US$/UNIDAD (Disparos)
POR DISPARO
15.91
183.00
0.09
46.16
1,095.00
0.00
6.92
183.00
0.00
7.14
90.00
0.08
11.32
1,095.00
0.01
0.67
90.00
0.01
23.13
365.00
0.06
3.18
7.00
0.91
4.52
365.00
0.00
2.63
365.00
0.01
3.30
7.00
0.47
3.53
365.00
0.01
0.61
45.00
0.01
17.53
183.00
0.10
8.33
90.00
0.09
8.33
90.00
0.09
17.00
30.00
0.57
5.20
120.00
0.04
2.28
183.00
0.00
4.21
365.00
0.01
SUB-TOTAL
2.57
HERRAMIENTAS
COSTOS DIRECTOS
Costo/Tarea.
(US$/Tarea)
SUB-TOTAL
1.18
58.44
SUB-TOTAL
3.75
5.84
9.59
10.00%
68.04
UNID. CANTIDAD
Par
Pza
Pza
Pza
Uni
Pza
Par
Par
Par
Par
Uni
Par
Uni
Uni
Uni
Uni
Uni
Uni
Uni
Uni
1.00
0.00
0.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PRECIO
VIDA ECON.
US$/UNIDAD (guardias)
15.91
90.00
46.16
300.00
6.92
180.00
11.32
360.00
0.67
90.00
23.13
365.00
3.18
25.00
4.52
25.00
2.63
150.00
3.30
15.00
3.53
365.00
0.61
45.00
17.53
183.00
8.33
75.00
8.33
75.00
17.00
30.00
5.20
120.00
2.28
150.00
4.21
365.00
30.57
365.00
SUB-TOTAL
C. UNIT.
POR TAREA
0.18
0.00
0.00
0.03
0.01
0.06
0.25
0.18
0.04
0.22
0.01
0.01
0.10
0.57
0.04
0.02
0.01
0.08
C.UNIT.
C/ropa agua
0.18
0.00
0.00
0.03
0.01
0.06
0.25
0.18
0.04
0.22
0.01
0.01
0.10
0.11
0.11
0.57
0.04
0.02
0.01
0.08
1.81
2.03
HERRAMIENTAS
DESCRIPCION
UNID.
Corvina
Lampa
Pico
Combo 6 Lbs
Llave Stilson de 8"
LLave Francesa 8"
Azuela
Chotana
Pzas
Pzas
Pzas
Pzas
Pzas
Pzas
Pzas
Pzas
DESCRIPCION
Herramientas Avances
Herramientas Sostenimiento
UNIDAD
VALOR
U.S.$/Disp
1.01
U.S.$/Disp
1.34
1.18
Mina
Balcon
Balcon
Balcon
Balcon
Balcon
Balcon
Balcon
Balcon
Nivel
2430
2430
2430
2430
2430
2430
2430
2360
Seccion
Gradiente
Ancho
Alto
3.5
3.5
0.5%
3.5
3.5
-15%
3.5
3.5
15%
3.5
3.5
0.5%
3.5
3.5
0.5%
2
2
0.5%
3.5
3.5
-15%
2
2
0.0%
SUB TOTAL
MES-1
MES-2
10
70
70
116
50
10
15
4
154
MES-3
195
MES-4
140
140
15
4
5
20
15
4
184
159
MES-5
120
4
10
134
TOTAL
10
586
120
10
45
20
15
20
826
Mina
Balcon
Balcon
Balcon
Nivel
2220
2430
2430
Seccion
Gradiente
Ancho
Alto
4.5
4.2
0.5%
4.5
4.2
0.5%
2
2
0.5%
MES-1
MES-2
90
4
94
MES-3
90
15
4
109
MES-4
90
MES-5
90
15
90
15
2
92
105
105
TOTAL
450
45
10
505
TOTAL
PERNO 8'
SHOT. A TODO COSTO 3"
MALLA 2"
PERNO 8'
SHOT. A TODO COSTO 3"
PERNO 8'
70
58
410
490
403
350
403
PERNO 8'
SHOTCRETE 2"
PERNO 8'
SHOTCRETE 2"
SHOTCRETE 2"
PERNO 8'
25
680
812
667
250
288
67
62
101
93
25
SHOTCRETE 2"
821
980
805
821
980
805
101
93
25
34
31
101
93
25
612
558
102
93
763
910
748
25
68
62
70
58
3,495
4,172
3,428
600
691
67
62
303
279
125
102
93
PERNO 8'
SHOTCRETE 2"
PERNO 8'
SHOTCRETE 2"
PERNO 8'
612
558
612
558
102
93
612
558
SHOTCRETE 2"
25
25
13
612
558
102
93
3,060
2,790
306
279
0
63
UNIDAD
Muestras:11
Minutos
CARGUIO
IDA CARGADO
0.75
DESCARGA
1.00
TIEMPO VARIABLE
Velocidad Cargado (Espacio/Tiempo) 100.00 Mts/Minuto
Velocidad Vacio (Espacio/Tiempo)
135.14 Mts/Minuto
0.40
VUELTA VACIO
0.74
6.00 Km/Hr
8.11 Km/Hr
TIEMPOS FIJOS
CARGUIO
Minutos
DESCARGA
Minutos
TIEMPOS MUERTOS
Minutos
SUB TOTAL
0.75
0.40
0.50
1.15
50.00
0.50
0.37
100.00
1.00
0.74
150.00
1.50
1.11
200.00
2.00
1.48
250.00
2.50
1.85
2.02
29.70
2.89
20.76
3.76
15.96
4.63
12.96
5.50
10.91
61.32
42.86
32.94
26.75
22.52
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
79.75
7.43
0.32
87.50
1.43
0.48
79.75
7.43
0.32
87.50
2.04
0.68
79.75
7.43
0.32
87.50
2.66
0.89
79.75
7.43
0.32
87.50
3.27
1.09
79.75
7.43
0.32
87.50
3.89
1.30
4.00
0.76
2.06
6.19
OS
CICLO
2.89
OBSERVACION
100.00 MTS
NO
300.00
3.00
2.22
350.00
3.50
2.59
400.00
4.00
2.96
450.00
4.50
3.33
500.00
5.00
3.70
550.00
5.50
4.07
600.00
6.00
4.44
6.37
9.42
7.24
8.29
8.11
7.40
8.98
6.68
9.85
6.09
10.72
5.60
11.59
5.18
19.44
17.11
15.27
13.79
12.57
11.55
10.69
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
79.75
7.43
0.32
87.50
4.50
1.50
79.75
7.43
0.32
87.50
5.11
1.70
79.75
7.43
0.32
87.50
5.73
1.91
79.75
7.43
0.32
87.50
6.34
2.11
79.75
7.43
0.32
87.50
6.96
2.32
79.75
7.43
0.32
87.50
7.57
2.52
79.75
7.43
0.32
87.50
8.19
2.73
A LABOR SUBTERRANEA
650.00
6.50
4.81
700.00
7.00
5.18
750.00
7.50
5.55
800.00
8.00
5.92
850.00
8.50
6.29
900.00
9.00
6.66
950.00
9.50
7.03
12.46
4.82
13.33
4.50
14.20
4.23
15.07
3.98
15.94
3.76
16.81
3.57
17.68
3.39
9.94
9.29
8.72
8.22
7.77
7.37
7.01
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
63.00
16.75
79.75
7.43
0.32
87.50
8.80
2.93
79.75
7.43
0.32
87.50
9.42
3.14
79.75
7.43
0.32
87.50
10.03
3.34
79.75
7.43
0.32
87.50
10.65
3.55
79.75
7.43
0.32
87.50
11.26
3.75
79.75
7.43
0.32
87.50
11.87
3.96
79.75
7.43
0.32
87.50
12.49
4.16
1,000.00
10.00
7.40
18.55
3.23
6.68
63.00
16.75
79.75
7.43
0.32
87.50
13.10
4.37
ITEM
AVANCES
DESCRIPCION
ACCESORIOS DE PERFORACION
BARRAS DE PERFORACION
BROCAS DE 45 MM
SHANK ADAPTER
AFILADOR BROCAS
COPLAS
RIMADORA DE 89 MM
ADAPTADOR DE RIMADORA
TUBO PVC (Voladura Recorte)
HERRAMIENTAS
IMPLEMENTOS SEGURIDAD
TUBERIA DE POLIETILENO DE 2'' AGUA
TUBERIA DE POLIETILENO DE 4'' AIRE
EXPLOSIVOS
EMULEX 45% 1 1/8'' x 12'' Cebos
EMULEX 45% 1 1/8'' x 12'' Arrastres
EXADIR 45% 7/8'' x 7'' Corona
CORDON DETONANTE 5P
GUIA ENSAMBLADORA 2.4 MTS (CARMEX)
EXANEL 4.8 MTS
SOSTENIMIENTO
BARRA CONICA 6', 8''
BROCA 40 MM
ACEITE PERFORACION
ADAPTADOR PARA INST. PERNO
HERRAMIENTAS DE MINA
PERNO HELICOIDAL TUERCA PLACA 6', 8'
RESINA
CEMBOLT
BARRA EXTENSION R32
BROCA BOTON R25 x 37 MM
SHANK ADAPTER HEMBRA
SOLDADURA SUPERCITO 1/8''
PERNO HYDRABOLT 6', TUERCA, PLACA
CEMENTO
MALLA ELECTROSOLDADA 4' x 4'
ALAMBRE No 16
GRAMPA DE FE CORRUGADO 3/8''
CANCAMOS
EL
CONTRATIST CONSORCIO
A
Y MARSA
CIMBRA METALICA
PLANCHA METALICA
LANZADO DE CONCRETO
VAR. DE FIERRO CORRUGADO 1'
VAR. DE FIERRO CORRUGADO 3/4'
VAR. DE FIERRO CORRUGADO 3/8'
ENTABLADO (8'' x 2'' x 4')
SACO POLIPROPILENO
LEYES SOCIALES
OBREROS EMPLEADOS
ESSALUD
9.00%
9.00%
JUBILACION ANTICIPADA
2.00%
2.00%
SCTR-SALUD
0.97%
0.97%
SCTR-PENSIONES(interior Mina)
4.05%
38.00%
0.00%
0.00%
VIDA LEY
0.36%
0.30%
16.38%
50.27%
TOTAL
CONCEPTOS
JORNAL
35.00
35.00
35.00
35.00
35.00
ENE.
FEB.
MAR.
ABR.
MAY.
dias
31
28
31
30
31
VAC
1,085.00
REMUNERACION
980.00
1,085.00
GRATIFICACIONES
Factor
ASIG.FAMILIAR
55
Descanso Medico
12
Hrs Extras
1.25
CTS
9.72%
SUB TOTAL
Gravado(Afecto al Impuesto)
APOR REM.PRINC
16.38%
APOR GRAT.
16.38%
APOR VAC.
16.38%
TOTAL:
BASICO
4.00
-
0.00
11.67
0.00
105.49
1,202.15
1,096.67
0.00
11.67
0.00
95.28
1,086.94
991.67
0.00
11.67
0.00
105.49
1,202.15
1,096.67
0.00
11.67
0.00
102.08
1,163.75
1,061.67
0.00
11.67
0.00
105.49
1,202.15
1,096.67
179.63
162.44
179.63
0.00
0.00
173.90
179.63
1,381.79
1,249.38
1,381.79
1,337.65
1,381.79
51.67
51.67
1,500.00
ASIG.FAM.
50.00
1,550.00
VAC
51.67
CONCEPTOS
51.67
51.67
ENE.
FEB.
MAR.
ABR.
MAY.
dias
30
30
30
10
30
REMUNERACION
DIAS LIBRES
APOR REM.
1,085.00
1,050.00
VACACIONES
18.11%
1,550.00
0.00
280.71
1,550.00
465.00
364.92
1,550.00
465.00
364.92
516.67
0.00
93.57
1,550.00
0.00
280.71
129.12
1,959.82
GRAT
APOR GRAT.
17.75%
129.12
167.85
167.85
0.00
0.00
43.04
1,959.82
2,547.77
2,547.77
653.27
VAC
APOR VAC.
CTS
18.11%
8.33%
TOTAL:
CONCEPTOS
JORNAL
1500.00
1500.00
1500.00
1500.00
1500.00
ENE.
FEB.
MAR.
ABR.
MAY.
dias
31
28
31
30
31
VAC
1,500.00
REMUNERACION
1,500.00
1,500.00
GRATIFICACIONES
Factor
ASIG.FAMILIAR
55
Descanso Medico
CTS
360
9.72%
SUB TOTAL
Gravado(Afecto al Impuesto)
APOR REM.PRINC
50.27%
APOR GRAT.
50.27%
APOR VAC.
50.27%
TOTAL:
1,500.00
1,500.00
VACACIONES
4.00
0.00
16.67
145.83
1,662.50
1,516.67
0.00
16.67
145.83
1,662.50
1,516.67
0.00
16.67
145.83
1,662.50
1,516.67
0.00
0.00
145.83
1,645.83
1,500.00
0.00
16.67
145.83
1,662.50
1,516.67
762.43
762.43
762.43
0.00
0.00
754.05
762.43
2,424.93
2,424.93
2,424.93
2,399.88
2,424.93
35.00
35.00
35.00
35.00
35.00
35.00
JUN.
JUL.
AGO.
SET.
OCT.
NOV.
DIC
TOTAL
30
31
31
30
31
30
31
365
GRAT
1,050.00
1,085.00
GRAT
1,085.00
1,050.00
1,085.00
1,050.00
1,085.00
11,725.00
1,050.00
0.00
11.67
0.00
102.08
1,163.75
1,061.67
1,050.00
0.00
11.67
0.00
105.49
2,252.15
2,146.67
0.00
11.67
0.00
105.49
1,202.15
1,096.67
0.00
11.67
0.00
102.08
1,163.75
1,061.67
0.00
11.67
0.00
105.49
1,202.15
1,096.67
0.00
11.67
0.00
102.08
1,163.75
1,061.67
1,050.00
0.00
11.67
0.00
105.49
2,252.15
2,146.67
173.90
351.62
179.63
173.90
179.63
173.90
351.62
2,100.00
0.00
140.00
0.00
1,242.01
16,257.01
15,015.00
2,285.56
0.00
173.90
1,337.65
2,603.78
1,381.79
1,337.65
1,381.79
1,337.65
2,603.78
18,716.47
59.63%
GRAT
51.67
GRAT
51.67
51.67
51.67
51.67
51.67
JUN.
JUL.
AGO.
SET.
OCT.
NOV.
30
30
30
30
1,550.00
465.00
364.92
1,550.00
465.00
364.92
1,550.00
275.13
1,550.00
465.00
364.92
0.00
465.00
84.21
1,550.00
0.00
280.71
51.67
51.67
DIC
TOTAL
30
365
10
1,550.00
465.00
364.92
361.66
516.67
159.07
1,550.00
275.13
14,828.33
3,771.67
3,368.46
3,100.00
550.25
0.00
0.00
167.85
167.85
167.85
38.73
129.12
167.85
73.16
1,549.38
2,547.77
4,372.89
2,547.77
587.95
1,959.82
2,547.77
2,935.69
27,168.09
1.83
1500.00
1500.00
1500.00
1500.00
1500.00
1500.00
1500.00
JUN.
JUL.
AGO.
SET.
OCT.
NOV.
DIC
TOTAL
30
31
31
30
31
30
31
365
GRAT
GRAT
1,500.00
1,500.00
1,500.00
1,500.00
0.00
16.67
145.83
1,662.50
1,516.67
1,500.00
0.00
16.67
145.83
3,162.50
3,016.67
0.00
16.67
145.83
1,662.50
1,516.67
0.00
16.67
145.83
1,662.50
1,516.67
762.43
1,516.48
762.43
762.43
1,500.00
1,500.00
1,500.00
0.00
16.67
145.83
1,662.50
1,516.67
0.00
16.67
145.83
1,662.50
1,516.67
1,500.00
0.00
16.67
145.83
3,162.50
3,016.67
762.43
762.43
1,516.48
16,500.00
1,500.00
3,000.00
0.00
183.33
1,750.00
22,933.33
21,183.33
9,894.81
0.00
754.05
2,424.93
4,678.98
2,424.93
2,424.93
2,424.93
2,424.93
4,678.98
33,582.20
103.53%
UNID.
U.S.$
U.S.$
U.S.$
HRS
HRS
UNID
10 M3
$36,430.00
$7,286.00
$29,144.00
15,000.00
250.00
5.00
MANTENIMIENTO
DESCRIPCION
Componentes
UNIDAD
%
CANTIDAD
50%
DEPRECIACION DE EQUIPOS
COSTO DE POSESION
DEPRECIACION
U.S.$/HR
1.94
C.INTERESES,SEGUROS E IMPUESTOS
U.S.$/HR
1.19
U.S.$/HR
3.13
MANTENIMIENTO RUTINARIO
U.S.$/HR
1.56
PERSONAL MANTNMTO
U.S.$/HR
1.22
SUB-TOTAL OPERACIONES
U.S.$/HR
2.78
TOTAL (OPERACIN+DEPRECIACION)
U.S.$/HR
5.91
COSTO DE OPERACIN